Loading...
R-2022-212 - 6/23/2022 RESOLUTION NO. R-2022-212 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cruz Tec, Inc. for the South Interceptor Manhole Rehabilitation Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Cruz Tec, Inc. for the South Interceptor Manhole Rehabilitation Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of June, 2022. CRAIG GA , Mayor City of Round R ck, Texas ATTEST: L4N M AGAN SP KS, C y Clerk--" 0112.20222;4891-1750-8132 Nage I of 4 Contract Quantity Adjustment/Change Order EXHIBIT ■aM+o�ooc rixn. /I/�11 rev,01/16 /100 Department: Utilities and Environmental Services Project Name: South Interceptor Wastewater Manhole Rehabilitation Date: 10/6/21 City Project Change Order/Quantity ID Number REGSI Adjustment No. 1 Vendor Cruz Tec,Inc. 12210 Ann Lane, Houston,Texas 77064 281-469-2888 Company Name Address Phone No. Justification A change order was necessary due to epoxy procurement issues and production delays,thus,an alternative material coating product was chosen. SUMMARY Amount %Change Original Contract Price: $784,527.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: -$133,050.00 Total Quantity Adjustment(s): -$133,050.00 Total Contract Price with Quantity Adjustment(s): $651,477.00 Previous Change Order(s): $0.00 0% This Change Order: $113,400.00 17% Total Change Order(s)To Date: $113,400.00 17% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $764,877.00 Difference between Original and Adjusted Contract Prices: -$19,650.00 Original Contract Time: 160 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 160 Prepared By: Kaitlyn Saucedo 10/6/21 /zTWalurel 0 Printed Name,Title,Company Date Contractor Jennifer Soliz Corporate Secretary Cruz Tec, Inc. 10/8/2021 lure Printed Name,Title,Company Date City Project � 10 Z` Manager: O 1 S Printed Na e,Title Date Mayor/City Manager Signature Printed Name,Title Date Page 2 of 4 Contract Quantity Adjustment/Change Order aouNnRoacrcx�s !E',CI SIO Project Name: South Interceptor Wastewater Manhole Rehabilitation Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) CO-1 Change Coating Material in Bid Item 10& VF 305 $260.00 $79,300.00 0 12 for 48-inch Manholes to GeoCast CO-1 Change Coating Material in Bid Item 11 & VF 110 $310.00 $34,100.00 0 13 for 60-inch Manholes to GeoCast $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 113,400.00 0 Page 3 of 4 Contract Quantity Adjustment/Change Order ROUNO NOIX r_ra-, rev,01/16 Project Name: South Interceptor Wastewater Manhole Rehabilitation Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount Furnish All Materials, Equipment,Tools& 10 Labor Necessary for Corrosion Resistant VF 305 $135.00 -$41,175.00 0 Lining for Concrete Manholes(48-inch Diameter) per Technical Specifications Furnish All Materials, Equipment,Tools& 1.1 Labor Necessary for Corrosion Resistant VF 110 $175.00 $19,250.00 0 Lining for Concrete Manholes(60-inch Diameter)per Technical Specifications Furnish All Materials, Equipment,Tools& 12 Labor Necessary for Cementitious VF 305 $175.00 -$53,375.00 0 Manhole Coating (48-inch Diameter)per Technical Specifications Furnish All Materials, Equipment,Tools& 13 Labor Necessary for Cementitious VF 110 $175.00 -$19,250.00 0 Manhole Coating (60-inch Diameter)per Technical Specifications $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 4 of 4 Contract Quantity Adjustment/Change Order �oin+a wac TF_%AS rev,01/16 T TA -$133,050.0010 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !!! ! ! !!! !! ! ! ! ! !!! ! ! ! ! ! !! ! ! ! ! ! ! ¬«172 ÏÏ1325 ³±45 §¨¦35 Document Path: O:\Workspaces_GIS\+Utilities_workspace\MAPS\2019\Council\SouthInterceptor\SouthInterceptor.mxdDate: 7/22/2019 ± SOUTH INTER CEPTORMANHOLE REH ABILITATION SO UTH INTERC EPTO R