Contract Quantity Adjustment/Change Order
Utilities and Environmental Services
Communications and Water Treatment Plant Control System Improvements Date: 6/6/22
Change Order/Quantity
SCADA Adjustment No. 4
Control Panels USA Inc. 16310 Bratton Lane, Suite 100, Austin, TX 78728 512-863-3224
Company Name Address Phone No.
)ue to the unavailability of Allen-Bradley relays, the Contractor has had to eliminate the installation of the relays at the Southeast pump
tation, and use alternate power relays at the High Service Pump Station. Additionally, a change in the antenna at the Lake Georgetown raw
Aster pump station to increase signal reliability.
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Pius
Quantity Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contractlime:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
Submitted for Approval
Amount % Change
$2,495,359.00
$0.00
$2,495,359.00�
$161,670.00 6%
$11,285.00 0%
$172,955.00 7%
$2,668,314.O01
$172,955.00
380
145
90
615
Prepared By:
Christopher Perkins, CoRR
�z z k Zz
Signatur
Printed Name, Title, Company
l5ate
Contractor
�11� 1A,pprovals p
S 41 iLr Pq r re ceo
6 - 6 -;-.1
S' ature
! Printed Name, Title, Company �4fiiroX a4t S VS
c, Date
City Project
(/�---^-�
&
Manager:
/s Christopher Perkins, PE
C
F Z Z
Mayor/C
ignatur
Printed Name, Title
Date
IMonager
.. �3rq e
f
��^
eM_2
Sign ture
12'
Printed Name, Title
_1''5%
Date
Page 2 of 3
Contract Quantity Adjustment/Change Order
Po-__
OCK TEXAS
rev, D1116
Project Name: Communications and Water Treatment Plant Control System Improvements
Quan. Adj./Change Order No.
Chanoe Order Data
Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
(Daysl
1
Deduct for Southeast EST Allen-Bradley
relays
LS
-1
$2,087.00
-$2,087.00
0
2
Lake Creek Pump Station - Equipment
Turn Over
LS
1
$0.00
$0.00
0
3
WTP HSP 1-6 - Dent Power Monitors Sub. i
LS
1
$8,222.00
$8,222.00
60
4
Lae Georgetown RWPS Antenna
Modification
LS
1
$5,150.00
$5,150.00
30
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Page 3 of 3
Contract Quantity Adjustment/Change Order
Pv-
—k roes
rev, 01116
Project Name: Communications and Water Treatment Plant Control System Improvements
Quan. Adj./Change Order No.
Quantity Adjustment Data
Bid Item #
Item Description
Unit
(M.
Unit Price
Amount
Contract
Time
Adjustment
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$a.00
$0.00
$0.00,
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS:[
$0,001
0
City of Round Rock
ROUND ROCK
TEXAS Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 4 with Control Panels
USA Inc. for the Communications and Water Treatment Plant Control System
Improvements Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 6/24/2022
Dept Director: Michael Thane, Utilities and Environmental Services Director
Cost: $11,285.00
Indexes: Self -Financed Water Construction
Attachments: QA.CO no. 4-Control Panels
Department: Utilities & Environmental Services
Text of Legislative File CM-2022-151
The City of Round Rock's Communications and Water Plant Control System Improvements project involves
updating communication infrastructure in Round Rock's Water Treatment Plant (WTP), reuse water
distribution system, water distribution system, and wastewater collection system.
Due to the rapid advancement of technology, the electronic control system infrastructure associated with
Round Rock's WTP has either become outdated, reached its design life, or is no longer supported by the
manufacturer. This project is reorganizing, consolidate controls, upgrade the hardware, and network
components to current industry standards. Updating the WTP's hardware also provides the opportunity to
switch the WTP's operating platform to match the operating platform currently being installed at the
Brushy Creek East Regional Wastewater Treatment Plant. Updating the hardware and using the same
operating platform and programming architecture across the entire water and wastewater system provides
for operational efficiency and a more maintainable system.
The City is currently updating the field communication network to a modern cellular network. Doing this
will increase reliability in the system, the ability to transmit more information, and increased ease in
adding additional monitoring to the system.
City of Round Rock Page 1 of 2
Agenda ftem Summary Coadnued (CW2022--151)
Quantity Adjustment/Change Order (QA/CO) No. 4 includes various changes and deducts that were
uncovered and determined necessary during construction. Due to equipment shortages, several power
relays had to be deducted from the contract and other power relays had to be switched to a different
manufacturer. Additionally, modifications to the Lake Georgetown raw water pump station
communications antenna were proposed by a signal path study conducted to increase the reliability of the
communication network from this remote site.
On October 8, 2020, the City of Round Rock entered an agreement with Control Panels USA Inc. for
$2,495,359. Currently, three QA/CO's have been approved for a total of $161,670. With the addition of
QA/CO No. 4 for $11,285, the new contract total will be $2,668,314.
Cost: $11,285