Lake Georgetown Chemical Feed System Date: 6/3/22
Change Order/Quantity
ZEBRA Adjustment No. 3
Associated Construction Partners, Ltd 215 W Bandera Rd, Suite 114-461, Boerne, Texas 78006 210-698-8714
Company Name Address Phone No.
This change order accounts for the addition of a fence around the chemical rill station and the time associated with having the installed flow
meters serviced and cleaned.
SUMMARY
Amount
% Change
]riginal Contract Price:
$1,064,900.00
previous Quantity Adjustment(s):
$23,713.55
This Quantity Adjustment:
$0.00
rotal Quantity Adjustment(s):
$23,713.55
rotal Contract Price with Quantity Adjustment(s):
$1,088,613.55
previous Change Order
$43,375.95
0s}; °
This Change Order:
$5,341.49
0%
Total Change Order(s) To Date;
$48,717.44
4%
adjusted Contract Price [Original Contract Price Plus
quantity Adjustments) Plus Change Order(s)]:
$1,137,330.99
)Ifrerence between Original and Adjusted Contract Prices:
$72,430.99
original Contract Time:
210
rime Adjustment by previous Quan. Adj./Change Order:
266
rime Adjustment by this Quan. Adj./Change Order;
150
Vew Contract Time:
626
Submitted for Approval
°repared By: y
Christopher Perkins, PM, CORR
6/3 22
Si_gnatur
Printed Name, Title, Company
Date
Approvals
i
:ontractor: Shane Sim son Executive Vice President Associated Construction Partners, Ltd.,
6/14/22_
Signature
Printed Name, Title, Company
Date
-ity Project
+tanager:
Signatu
Printed Name, Title
Date
Hayor/City94�Aanager
Signature
Printed Name, Title
Date
Page 2 of 2
Contract Quantity Adjustment/Change Order
g0UN6 k08[ IilAS
w, 0l�1
Project Name: Lake Georgetown Chemical Feed System
Quan. Adj./Change Order No.:
Chanee Order Data
Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
us
Adjustment
Adjus(Das
3.1
Fence around Chemical Fill Station
LS
1
$5,431.49
$5,431.49
30
3.2
Flow Meter Cleaning and Servicing
-
-
-
120
TOTALS:I
$5,431.49
150
fwl
ixVXI 4
I
r qr
41
At
On
4m
I'M
ROUND ROCK
TEXAS
City of Round Rock
Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 3 with Associated
Construction Partners, Ltd. for the Lake Georgetown Chemical Feed System
Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 7/1/2022
Dept Director: Michael Thane, Utilities & Environmental Services Director
Cost: $5,341.49
Indexes: Self -Financed Water Construction
Attachments: Map, CO -CIA No.3 - RI
Department: Utilities & Environmental Services
Text of Legislative File CM-2022-158
The City owns a raw water pump station on Lake Georgetown, which supplies water to Round Rock's Water
Treatment Plant. In the past several years, invasive zebra mussels have been detected in Lake Georgetown
and on the intake structure of the raw water pump station. Zebra mussels have a long history of attaching
in massive quantities to raw water intakes and pipelines, damaging the infrastructure and restricting flow
to the facility.
This project aims to construct a sodium permanganate chemical feed system at Round Rock's Lake
Georgetown raw water pump station. The system assists with taste and odor issues, provides manganese
control, and assists zebra mussel prevention in raw water pipelines. The project consists of a chemical fill
station, a bulk chemical storage tank, a chemical building, and three chemical feed lines down to the raw
water intake.
As part of the construction, a chemical fill station was added outside the Lake Georgetown pump station
fence. After construction, it was determined that a small fence should be constructed to protect the fill
station. The Department is requesting thirty days for the fence construction and 120 days for servicing the
flow meters before the station is placed in operation. This additional work outlined in Quantity
Adjustment/Change Order(QA/CO) No. 3 will cost $5,341.49. The City awarded Associated Construction
Partners, LTD the contract in June 2020 for $1,064,900. With the addition of QA/CO No.'s 1, 2, and 3, the
new contract total is $1,137,330.96.
City of Round Rock Page 1 of 2
Agenda Item Summary Condnued CM-2022-168
Cost: $5,341.49
Source of Funds: Self -Financed Water Construction
City of Round Rock Page 2 of 2