Loading...
CM-2022-158 - 7/1/2022Page 1 of 2 r•Odc � xa ev, 01116 Department: Project Name: City Project ID Number Vendor Justification Contract Quantity Adjustment/Change Order Utilites & Environmental Services Lake Georgetown Chemical Feed System Date: 6/3/22 Change Order/Quantity ZEBRA Adjustment No. 3 Associated Construction Partners, Ltd 215 W Bandera Rd, Suite 114-461, Boerne, Texas 78006 210-698-8714 Company Name Address Phone No. This change order accounts for the addition of a fence around the chemical rill station and the time associated with having the installed flow meters serviced and cleaned. SUMMARY Amount % Change ]riginal Contract Price: $1,064,900.00 previous Quantity Adjustment(s): $23,713.55 This Quantity Adjustment: $0.00 rotal Quantity Adjustment(s): $23,713.55 rotal Contract Price with Quantity Adjustment(s): $1,088,613.55 previous Change Order $43,375.95 0s}; ° This Change Order: $5,341.49 0% Total Change Order(s) To Date; $48,717.44 4% adjusted Contract Price [Original Contract Price Plus quantity Adjustments) Plus Change Order(s)]: $1,137,330.99 )Ifrerence between Original and Adjusted Contract Prices: $72,430.99 original Contract Time: 210 rime Adjustment by previous Quan. Adj./Change Order: 266 rime Adjustment by this Quan. Adj./Change Order; 150 Vew Contract Time: 626 Submitted for Approval °repared By: y Christopher Perkins, PM, CORR 6/3 22 Si_gnatur Printed Name, Title, Company Date Approvals i :ontractor: Shane Sim son Executive Vice President Associated Construction Partners, Ltd., 6/14/22_ Signature Printed Name, Title, Company Date -ity Project +tanager: Signatu Printed Name, Title Date Hayor/City94�Aanager Signature Printed Name, Title Date Page 2 of 2 Contract Quantity Adjustment/Change Order g0UN6 k08[ IilAS w, 0l�1 Project Name: Lake Georgetown Chemical Feed System Quan. Adj./Change Order No.: Chanee Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time us Adjustment Adjus(Das 3.1 Fence around Chemical Fill Station LS 1 $5,431.49 $5,431.49 30 3.2 Flow Meter Cleaning and Servicing - - - 120 TOTALS:I $5,431.49 150 fwl ixVXI 4 I r qr 41 At On 4m I'M ROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 3 with Associated Construction Partners, Ltd. for the Lake Georgetown Chemical Feed System Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/1/2022 Dept Director: Michael Thane, Utilities & Environmental Services Director Cost: $5,341.49 Indexes: Self -Financed Water Construction Attachments: Map, CO -CIA No.3 - RI Department: Utilities & Environmental Services Text of Legislative File CM-2022-158 The City owns a raw water pump station on Lake Georgetown, which supplies water to Round Rock's Water Treatment Plant. In the past several years, invasive zebra mussels have been detected in Lake Georgetown and on the intake structure of the raw water pump station. Zebra mussels have a long history of attaching in massive quantities to raw water intakes and pipelines, damaging the infrastructure and restricting flow to the facility. This project aims to construct a sodium permanganate chemical feed system at Round Rock's Lake Georgetown raw water pump station. The system assists with taste and odor issues, provides manganese control, and assists zebra mussel prevention in raw water pipelines. The project consists of a chemical fill station, a bulk chemical storage tank, a chemical building, and three chemical feed lines down to the raw water intake. As part of the construction, a chemical fill station was added outside the Lake Georgetown pump station fence. After construction, it was determined that a small fence should be constructed to protect the fill station. The Department is requesting thirty days for the fence construction and 120 days for servicing the flow meters before the station is placed in operation. This additional work outlined in Quantity Adjustment/Change Order(QA/CO) No. 3 will cost $5,341.49. The City awarded Associated Construction Partners, LTD the contract in June 2020 for $1,064,900. With the addition of QA/CO No.'s 1, 2, and 3, the new contract total is $1,137,330.96. City of Round Rock Page 1 of 2 Agenda Item Summary Condnued CM-2022-168 Cost: $5,341.49 Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 of 2