CM-2022-174 - 7/22/2022Page l of 3 Contract Quantity Adjustment/Change Order ■l7lMW FO[% trw5 my, O3/t6 Department: Project Name: S Mays Gateway Enhancements Date: 7/11/22 City Project Change Order/Quantity ID Number Adjustment No. 2 Vendor G Hyatt Construction, Inc. 2006 Bagdad Road, # 170, Leander, TX 78641 5126505637 Company Name Address Phone No. Justification banges to dumpster pad locations & changes to corten bridges SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: St nttted for Approval Justin HyA President G Hyai e 7 Printed Name, Title, Company Amount % Change 0% $0.00 0% $0.00 0% $2,554 135.10 $30,758.00 0 Inc. 7{11J Date Contractor: Inc. 7{11J Date Contractor: � `- Justin Hyatt, President G Hyatt Construction Inc. 7 11 22 S;ovre Printed Name, Title, Company Date City Project Manager: ll ZOZ.2 Mayor/Cit gnature _ , / Printed Name, Title j �Date Manager lutes] � / r A" [) 1ii{ I L' �/- 7 as as Sign re _• inted Name, Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order -?IR011N0 Ron[ 7ENA$ rev, OWL6 Project Name: S Mays Gateway Enhancements Quan. Adj./Change Order No.: Chanoe Order Data i�;��?r�!}�`a'i'�s'� ,ia'�1����`����c=��xt��_ . _I� .... .7.. � ,r�� • - . _�..:_:,.. � .�� � .._ i Contract Time Item DescEIRt-101L. nit PriceU Adjustment ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Page 3 of 3 Contract Quantity Adjustment/Change Order rev, OV16 Project Name: S Mays Gateway Enhancements Quan. Adj./Change Order No.: Amianth- AdinaFemmnF nnFzb k P Bid Item # 1.05 Item Descri tion Cut new locations for dum stern Unit LS Qtv. 1 Unit Price 2 155.00 Amount Contract Time Adjustment 2 155.00 1.17 Remove steel in ads or new locations EA 4 656.25 2 625.00 1,17 Patch yin with 6" concrete SF 324 15.00 __ $4 80p.00 1.11 Curie & Gutter @ ads to be atrhed Cold patch asphalt @ ad to be atched LF 26 $25.00 650.40 1.17 Sr= 36 8.00 $288.00 1.09 Chan footings for torten bridges EA 4 2 250.00 4 000.0 ' 1.09 Steel su ort laces and an les EA EA 2 $z 270.004 540.00 $2 pp0.00 - 1.09 Saw cut concrete for changes 4 - _ 500.00 --0.00 $0.00 0.00 0.00 _ �m 0.00 10.00 _ _ _ 0.pO 0.00 0.00 D.00 _. �. $0,00 0.00 - - -- $0.00 - - T _ -- 0.00 $0.00 - t -- _- 0.00 _..._ 0.00 0.00 . -- -- - $0.00 o.Do 0.00 rAL : n JROU NDROCK XAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with G. Hyatt Construction, Inc. for the S. Mays Gateway Enhancements Project, Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/22/2022 Dept Director: Gary Hudder, Transportation Director Cost: $26,058.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA#2_partexec Department: Transportation Text of Legislative File CM-2022-274 The city has undertaken a commercial revitalization project along South Mays from Nash Street to Hester's Crossing to provide for Gateway Enhancements at the southern end of downtown Round Rock. Quantity Adjustment No 2 makes revisions to the dumpster pad locations to better accommodate the property owners and adds additional support for the torten bridges over the existing drainage structures for continuous accessibility along the sidewalks. This work adds $26,058.00 to the project. The original contract amount was $2,523,377.10. This and QA No. 1 plus QA No. 2 bring the total contract price to $2,554,135,10. Cost: $26,058.00 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Page 1 of 1