CM-2022-174 - 7/22/2022Page l of 3
Contract Quantity Adjustment/Change Order
■l7lMW FO[% trw5
my, O3/t6
Department:
Project
Name: S Mays Gateway Enhancements Date: 7/11/22
City Project Change Order/Quantity
ID Number Adjustment No. 2
Vendor G Hyatt Construction, Inc. 2006 Bagdad Road, # 170, Leander, TX 78641 5126505637
Company Name Address Phone No.
Justification
banges to dumpster pad locations & changes to corten bridges
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus Quantity
Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
St nttted for Approval
Justin HyA President G Hyai
e 7 Printed Name, Title, Company
Amount % Change
0%
$0.00 0%
$0.00 0%
$2,554 135.10
$30,758.00
0
Inc. 7{11J
Date
Contractor:
Inc. 7{11J
Date
Contractor:
� `-
Justin Hyatt, President G Hyatt Construction Inc.
7 11 22
S;ovre
Printed Name, Title, Company
Date
City Project
Manager:
ll ZOZ.2
Mayor/Cit
gnature
_
, /
Printed Name, Title
j
�Date
Manager
lutes]
� /
r A" [) 1ii{ I L' �/-
7 as as
Sign re
_•
inted Name, Title
Date
Page 2 of 3
Contract Quantity Adjustment/Change Order
-?IR011N0 Ron[ 7ENA$
rev, OWL6
Project Name: S Mays Gateway Enhancements
Quan. Adj./Change Order No.:
Chanoe Order Data
i�;��?r�!}�`a'i'�s'� ,ia'�1����`����c=��xt��_ . _I� .... .7.. � ,r�� • - . _�..:_:,.. � .�� � .._ i
Contract
Time
Item DescEIRt-101L. nit PriceU Adjustment
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Page 3 of 3
Contract Quantity Adjustment/Change Order
rev, OV16
Project Name: S Mays Gateway Enhancements
Quan. Adj./Change Order No.:
Amianth- AdinaFemmnF nnFzb
k
P
Bid Item #
1.05
Item Descri tion
Cut new locations for dum stern
Unit
LS
Qtv.
1
Unit Price
2 155.00
Amount
Contract
Time
Adjustment
2 155.00
1.17
Remove steel in ads or new locations
EA
4
656.25
2 625.00
1,17
Patch yin with 6" concrete
SF
324
15.00
__
$4 80p.00
1.11
Curie & Gutter @ ads to be atrhed
Cold patch asphalt @ ad to be atched
LF
26
$25.00
650.40
1.17
Sr=
36
8.00
$288.00
1.09
Chan footings for torten bridges
EA
4
2 250.00
4 000.0 '
1.09
Steel su ort laces and an les
EA
EA
2
$z 270.004
540.00
$2 pp0.00
-
1.09
Saw cut concrete for changes
4
-
_
500.00
--0.00
$0.00
0.00
0.00
_
�m
0.00
10.00
_
_
_
0.pO
0.00
0.00
D.00
_.
�.
$0,00
0.00
- -
--
$0.00
- -
T _
-- 0.00
$0.00
-
t --
_-
0.00
_..._
0.00
0.00
.
--
-- -
$0.00
o.Do
0.00
rAL :
n
JROU
NDROCK
XAS
City of Round Rock
Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 2 with G. Hyatt
Construction, Inc. for the S. Mays Gateway Enhancements Project,
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 7/22/2022
Dept Director: Gary Hudder, Transportation Director
Cost: $26,058.00
Indexes: RR Transportation and Economic Development Corporation (Type B)
Attachments: QA#2_partexec
Department: Transportation
Text of Legislative File CM-2022-274
The city has undertaken a commercial revitalization project along South Mays from Nash Street to Hester's
Crossing to provide for Gateway Enhancements at the southern end of downtown Round Rock.
Quantity Adjustment No 2 makes revisions to the dumpster pad locations to better accommodate the
property owners and adds additional support for the torten bridges over the existing drainage structures
for continuous accessibility along the sidewalks. This work adds $26,058.00 to the project.
The original contract amount was $2,523,377.10. This and QA No. 1 plus QA No. 2 bring the total contract
price to $2,554,135,10.
Cost: $26,058.00
Source of Funds: RR Transportation and Economic Development Corporation
City of Round Rock Page 1 of 1