R-2022-251 - 7/28/2022 RESOLUTION NO. R-2022-251 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with J.D. Abrams, LP for the Kenney Fort Boulevard Segments 2 & 3 Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with J.D. Abrams, LP for the Kenney Fort Boulevard Segments 2 & 3 Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A"and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of July, 2022. CRAI4Rind tRGAN, i+or - City oRoc ex ATTEST: kClerk� lm � MEAGAN SP KS, C 0112 20222.4866-2303-7225 EXHIBIT «A» Pager 1 oF3 Contract Quantity Adjustment/Change order .aKoun Department: artrnentofTran yofttlon Project Name: Kenney Fart Sed.2&3 Date: 7/5/22 City Project Change Order/Quantity - ID Number STP 2021(74s2 MM Adjustment No. 3 Vendor J.D.Abrams LP 5811 Trade Center Or.Bldg 1 Austin TX 78744 512-322-4000 Company Name Address Phone No. ]usuficatlerl Quantity Adjustment:The datification from M 13 Increased the area of the HeadwalVWingwall at Culvert 11.Added additional month of barricades due to pervious change orders, 12"Striping Elimination overran during Phase 18 traffic switch. Change Order-Material for Sprinkler System Repairs that were In aortflld with the Installation of the foundations for the sound wag. SUMMARY Amount %Mange Original Co*xl Prioe' 23 409120.97, Previous QuvaV Adjustment(s): $82,404.24 This Quantuy AdjustmnN: $88,390.00 Total Quantity Adjustment(s): $170,794.24 Total Condract Rice with Quantlty Adjustment(s): !P3,579 915.21 Previous Gunge Order($): $1,662,838.44 7% This Change Order: $514.39 0% Total Change Order(s)To Date: $1,663,352.83 7% AdJusted Conlract Rice [Original Contract Pike Plus Quar ty Adjustmengs)Plus Change Urder(s)): $25,243,268,041 8% Difference be wem Original and Adjusted Contract Rices: $1,834,147.07 Orginal Contract Time: 450 'rW*AdAmment by previous Quan,Ad),/O""Order 53 Time Adjustment by this Quern.Adj./Change Order: 5 New Contract Thu: 508 Prepared 8y: Ear*• elf— Edgar Reyes PmlectManaW,J.D._Abrams,LP 7/5/22 s natwe Printed Name,Title,Company Date 01)(0acto Stcvcn Zbranck,VP ol'Operauons J D Abrams I P ?,622 �g erre -7 Printed Name,Title,Company Date City Project / Manager: Stgratwe Prints Marne,Title - f mayor/city marmer Signature Printed Name,Title Date Pate 2 of 1 Contract Quantlty Adjustment/Change Order Project Name:Kenney Fort Sect.2&3 Quan.Adj./Change Order No.; 3 Change Order Date _.,,N ..,. r., '�_-. r,.,.. ,,.,�. .a ...,,.. ,�,:.�,- far . a,. n, t •: ,a,.,, ,�.t° __.._, "*4r .. Contract Time Adjustment Item 0 Item D n (fait QW. unit Price Amount .A»i &.�rl t Ufibaf CO3-1 Spgilnkkr Sygern Re irs-P' Inlereference With Tmgallation of Sound Wall LS 1S51439— .391 .001 1.001 9.00 $0.00 $0.00 $0.00 $0.00 so.001 $0.001 to. so.00 so.00 00 o.00 ,00 —NEW v Pale 3 a3 Contract QuantFtV Adjustment/Change Order �iwnuw M,Cana Pro"Name: Kemey Fart Sett.2&3 Quan.Ad)XMnge Order No.: 3 _ter uant Ity Adjmtmot Data Contract Time Bid Item g Item DescriptJon Unit Unit Price Amount Adjustment WINOWALLPw-t 11W-d , 4 wINOWALL Pw-1 Hw-8F-r _ EA 2. 1 OQ 118,02 . 5 2 6MI BARRICADES.SIGNS TRAFFIC HANDLING 1 1G,000.00 , EUM EXT PAV MRK&MAKS 12- LF #l1. 5 2, 401 AN .001 PADI 30.001 .001 so UM *01,39 $m .J �oJL3 CONSTRUCTION SERVICES, LLC Phoney 512-921-3865 Bid Date: June 2,2022 Proposal 11: Calvert 11 Will-"&mme order ai Pro ed; KennW Port BLVD —Cert[fled COA/TIiDOT DBE MBB&NUB+'• 11.3 Construction Services.LLC proposes to provide all the materials,labor,equipment and supervision necessary to perform the following work at the above referenced project per plans and specilkations. 117!1110 DeSCnIMON UNIT QUANTITIES 1110FRICS exr.Muce 1300-456 6783 Wingwall PW 1 8'-Or Incl Dknensions EA -1.00 1 534 500.00 - 345aa.00 1300-466 6783 WIMwall PW 1 8'-New d)menslons EA 1.00 $90.882.00 9200 Total Change $65,382.00 Order Notes: All permlLs,lane closures and traffic control are excluded. All layout is excluded. Fleld Testing Is excluded Handrail Not Included General Contractor to provide access and staging area for 3L3 materials d equipment. AM maintenance is excluded. AN shoring and mass excavation are excluded. All dewatering Is excluded. Sales tax Is Included In above pricing. If exempt,please send an exemption certlNcate prior to comiencement of work. If bond Is requlred,add 2.5%of contract amount and place In motNlllatlon. Pricing is good for thirty(30)days. •eye°AN bid prices are negotiatrle.eee•s Tis;FG REQUEST FOR INFORMATION � C e 'tea n►..,a.��«�'' Chic 7e�r,GNc CioMrA►�v RFl Number:2105-002 Subject: Culvert 11 Wingwall Callouts To: JC Montelongo,E.I.T Date of Request: 5/1/22 Engineer Associate/Project Manager City Of Round Rock Date Needed: ASAP Project: City Of Round Rock ( }Interpretation of contract requirements Kenney Fort Blvd.-Seg 2&3 { }Information not shown In the contract documents Control:0914-05-195 ( }Conflict In contract requirements ( Coordination Issue From: ( }Contract drawing reference J.D.Abrams,L.P. ( }Shop drawing reference 5811 Trade Center Drive Bldg.i ( }Specification reference Austin,Texas 78744 ( Confirmation (X}Other Description:Plan sheet 180(Culvert 11 Plan&Profile)has a callout for a proposed Headwall(8% but doesn't include a callout with stations and offsets. Please provide station and offsets for the headwall/wingwalls on culvert 11. Signature: Edgar Reyes tate: 06/01/2022 Reply: Callouts for proposed Headwall (8-ft) have been added providing the stationing and offsets for the headwall. Please see attached exhibit (sheet 3). Answered By: Alexis Woffenden Date: 06/01/2022 D I.J.CONSTRUCTION,INC Osly Production Reporl Job No. 2135 Super: Cody BwWme Prayed: Kenwy Fat BMd Sag 2 A 3 Date: 0-21.22 Loce0w: Round Rock Index. Pd": J.D.Abrams Road: 45 WBS ITEM DESCRIPTION LROT QUANTITY 1 46 WK ZN PAV MRK NON-REMOV W 4 BRK LF 1 2 49 WK ZN PAV MRK NON-REMOV W 4 SLD LF 50 WK ZN PAV MRK NON•RFMOV Y 4 BRK LF 4 51 WK ZN PAV MRK REMOV TY II-A-A LF 4 S 52 WK ZN PAV MRK REMOV TY II-C-R EA 5 a 53 WK ZN PAV MRK REMOV W 4 BRK LF 6 7 54 WK ZN PAV MRK REMOV W 4 SLD LF 2.005 7 6 55 WK ZN PAV MRK REMOV Y 4 SLD LF 2,310 s 0 58 REFL PAV MRK TY I W 8 DOT 91IML LF 9 101 57REFL PAV MRK TY I W 8 SLO 90WL LF 10 11 56 REFL PAV MRK TY I W 12 SLID O ML LF 11 12 69 REFL PAV MRK TY I W 24 SLD 90MIL LF 12 13 50 REFL PAV MRK TY 1 W ARROW 9DML EA 13 14 61 REFL PAV MRK TY I W DBL ARW DOM L EA 14 15 62 REFL PAV MRKTY I W WORD OOMIL EA 15 18 63 REFL PAV MRK TY i Y 8 SLO OOMIL LF 16 17 041 REFL PAV MRK TY I Y 12 SLO 90MIL LF 17 16 65 REFL PAV MRK TY i Y ISLAND 9DML LF 16 19 88 REFL PAV MRK TY II W 4 BRK LF 19 20 67 REFL PAV MRK TY tl W 4 DOT LF 20 21 a6 REFL PAV MRK TY Il W 4 SLD LF 21 22 69 REFL PAV MRK TY 11 Y 4 SLO LF 22 23 70 REFL PAV MRKR TY I C EA Z3 24 71 REFL PAV MRKR TY it A•A EA 24 2.51 721 REFL PAV MRKR TV II C R EA 25 26 73 FLIM EXT PAV MRK 8 MRKS 4• LF 1,451 26 27 74 ELVR EXT PAV MRK 3 MAKS 6' LF 436 27 26 n SLIM EXT PAV MRK A MRKS 12' if TSM PS 29 70 ELIM EXT PAV MRK d MRKS ARROW EA 29 301 771 FLIM EXT PAV MRK 6 MRKS WORD EA 30 31 76 ELIM EXT PAV MRK 6 MRKS UTURN EA 31 32 221 MOBILIZATION LS 1 32 3 33 3 34 34 35 35 36 36 Is Index Complete? Yes of NO ® O Remarks, Itpaclor's Name Inspector's NO or Fax Number J.D.ABRAMS,L.P. OSO 5811 Trade Center Drive Bldg, 1 Austin,Texas 78744 Phone: 512-322-4000 July 5,2022 J.C. Montelongo 11,E.I.T Engineer Associate/Project Manager City of Round Rock 3400 Sunrise Dr. Round Rock,Texas 78665 Reference: Sprinkler System Repairs—Sound Wall Installation Kenney Fort Blvd. Project: STP 2021(745)MM Control: 0914-05-195 Dear Mr. Montelongo: Please find attached a change proposal cost summary in the amount of$514.63. The cost summary is for the material required to repair the property owners sprinkler systems since they were in conflict with the installation of the foundations for the sound wall. Please call if you have any questions or need any additional information. Sincerely, J.D. Abrams,L.P. '[1 Edgar Reyes Project Manager Attachments: Cost Summary cc: 2105.2.3.1.020 2105.1.5.011 Steven Zbranek 0 a a 4 J.Q.ABRAMS L.P. AUSTIN - DALLAS - EL PASO- HOUSTON Change Proposal Cost Summary City Of Round Rock Project: Kenney Fort Seg.2&3 Control; 0814-05.186 Job No.2105 Estimator: Edgar Reyes Change File;011 Date: "ut-22 Brief Scope of Work: Sprinkler System Re airs-Sound Wall Installation Does this Change affect the Contract Time NO If so,num er o da a +1-: 0 WORK DESCRIPTION LABOR MATERI TOTALS LABOR: Direct Labor 0.00 0.00 MATERIAL: Total-Material Costs 000 0.00 EQUIPMENT Total-Equipment Costs 0.00 0.00 SUBCONTRACTORS: Total-Subcontractor Costs 485.27 485.27 SUBTOTALS: 0.00 0.00 0.00 4 .27486.27 Compensation on Direct Labor-2 Burden Compensation on Direct Labor-55% 0.00 0.00 Compensation on Material-25% 0.00 0.00 Compensation on Equipment-15% 0.00 0.00 Compensation on Subcontracts-5% 4.28 24.26 SUBTOTALS: 0.00 0.00 0.00 509.53 609.63 UNIT PRICES: Unit Unit Price Description Quantity Measure Price 1. 0.00 2. 0.00 1 0.00 4. 0.00 Estimate Subtotal 509.53 Unit Price Subtotal 0.00 Bond 1.0% 6.10 TOTAL CHANGE PROPOSAL OST: $514.63 m I'Mi", 2165 Direclive s WA Sprinkler 5-JW-22 System Repairs•Sound Well Installation Estimator ER UunitC Fie Ott Descoption Quantity Unk Price L-M-E-S tJUOF RW#r l Equipment Sue0oMmt Total SUBCONTRACT SpdnkW System Repass(Matemi) SoundWall lnslallabort 109 LS "S Mo 5 C X 1�aq 0 w 4452T ISS j -- uMG40 0.00 ._ .. —..._, ..... ..- BUIt6EN __..._11l.tJ_.� 44111 0.00 0. COMPENSATH)M 0.00 0.00 4,30 T+.i7i 24.211. _ .0 41) _ 5dve1 Tra,i "•+ r il • J " v � �� n • � 11 C y ,. ,r � S �•'mac`- aI .L ate., ". � '�' . � o',. •ri" �, �•, a , • . _ �•, s 0 ll 11 'T . 1 •w • .dam' ,r� '�5pran��'• i '� � � � � c`a., a fig\ Y' e`.el + , j Y +A ��4�``� ,0° �± �'� -+�r^�'x-•• � ,_�..,._• ,�oeatlot•;+-Dr � t � Tj• ♦ It x' °� ,oG �„�,,,m � , ,f:r [7Czaj ♦<oo� a � µ q�, ySo _ r-� Co11mc}o, jr ` r r ♦ p, 1 _ lrJe51:'{C Oj ra v tisk-Rd-� � , ♦' r ' ■ ?i 'w ��Oh1Q1Sd+'� +� ry � • - ive G -E �l' """'"off � . ; � .,���` � � �•,..o • ,� ,� w �Cz*OSSiflf�'1�.r_ ., [ %)w' _..1 •r ' �°�••y.�, \ QT`S P4 1 - , a USO _ � • �$ � -I - �.' ' .• � . • • ,� a n ?" Fes► � G�zntDro � tryrYfr��1 � �� � �,S,Oh' I�{ �• f � ry3 h }♦ •f r i ..$� .�•r .10 ,VO it :+' � i y�.-r •� � �� ' ,¢ U00d5 �j0 �� ,,k•.--Fori�Thomas•P1� `� �' C3°t, V 1� � .�. 46 r cn �� lenbn' ,•+ IL ;os"�r�61 U7•r.,