Loading...
CM-2022-180 - 8/5/2022Page I of 3 Contract Quantity Adjustment/Change Order m.01/l6 Department: PARD Project Name: Yonders Point - Phase II Improvement Project 2022 Date: 7/12/22 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor PannasRemneeuq. �amwaew, ,, 3219 Harpers Ferry Lane, Austin, TX 78745 512.825.3950 Company Name Address Phone No. Justification In order to meet the grade of the new plaza area, a portion of the existing trail must be demolished and raised to allow positive drainage of the site. Additionally, on the other side of the plaza, a small section of trail needs to demolished to meet ADA guidelines where the plaza will tie into it. Due to the grade changes and new concrete, several irrigation lines needed to be raised and SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 90 days 0 5 95 days 0% $42,000.00 16% $42,000.00 16% $302,880.00 $42,000.00 Prepared By: JWK& (/( V\, KATl% ►i5iil�,_MIRK DV. Mh*- OWJiL -7 2 J 2� Signature Printed Name, Tide, Company Date Contractor. ' -� jc--- I i.� �/LfLa-3 I i2 1 Z2 Sig Printed Name, Title, Company Date City Project Manager. yiV. M(rl,?— 7//Z/22. Signature Printed Name, Title ate Mayor/City -- ¢� ._ _ _ _._ i r A CA4- / L2-1 Fo Page 2 of 3 Contract Quantity Adjustment/Change Order OVA Project Name: Yonders Point - Phase 11 Improvement Project 2022 Quan. Adj./Change Order No.: Change Order Data Item tt 1 Unit LS Qty. 1 1 Unit Price $11,000.00 Amount $11,000.00 Contract Time Adjusbnent 0 Item Description Demo sidewalk, raise grade, and reinstall Isidewalk to ensure positve drainage 2 Demo sidewalk, raise grade, and reinstall sidewalk to meet ADA guidelines LS 1 $5,800.00 $5,800.00 0 3 Irrigation adjustments due to grade changes/ new concrete LS 1 $17,000.00 $17,000.00 0 4 Sod installation around stage LS 1 $8,200.00 $8,200.00 5 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.00 $0.00 $0.00 $o.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order m, a] l6 Project Name: Yonders Point - Phase II Improvement Project 2022 Quan. Adj./Change Order No.: 1 Quantity Adjustment Data itcontract rime Adjustment 1TEROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Partners Remodeling, Restoration & Waterproofing for the Yonders Point- Phase II Improvement Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 8/5/2022 Dept Director: Rick Atkins, Director Parks and Recreation Cost: $42,000.00 Indexes: General Self -Financed Construction Attachments: LAF- Quantity Adjustment -Change Order #1with Partners Remodeling, Restoration and Waterproofing, Contract Partners Remodeling Department: Parks & Recreation Text of Legislative File CM-2022-180 This item addresses field changes that were required during the Yonders Point Phase II project. During construction, a portion of sidewalk associated with the new plaza created a drainage problem that was unforeseen. To remedy the problem and assure appropriate drainage, a section of trail needed to be demolished and raised up. Additionally, on the other side of the plaza, a small section of existing trail needed to be demolished and repoured to achieve the appropriate slope to meet ADA guidelines where the tie in for the new trail took place. When these area were raised, it required irrigation lines to also be raised and modified to make sure they operate in an efficient manner. Finally, because of the heavy use of the plaza with events, a portion of the revegetation was upgraded from seeding to sod installation. This project will expand the amenities at Yonders Point and provide even more space for passive recreation in Old Settlers Park. It will also create a space for new high -profile events, such as Memorial Day and Veterans Day. In addition to the items included in this contract, the Yonders Point Phase II project will include additional trees and irrigation, the installation of custom artwork, and electrical service that will support larger events, such as Light Up the Lake. That work will be completed outside this contract by separate vendors. Cost: $42,000 Source of Funds: General Self -Finance Construction City of Round Rock Page 1