R-2022-277 - 8/25/2022 RESOLUTION NO. R-2022-277
WHEREAS, the City of Round Rock ("City") desires to complete the Chandler Creek Pipe
Bursting Replacement Project ("Project"); and
WHEREAS, the City is a member of the Texas Government Statewide Purchasing
Cooperative ("Buy Board"); and
WHEREAS, PM Construction& Rehab, LLC is an approved vendor of the Buy Board; and
WHEREAS, the City Council now wishes to enter into a "Standard Form of Agreement
Between Owner and Contractor" with PM Construction& Rehab, LLC for the Project,Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City a "Standard
Form of Agreement between Owner and Contractor" with PM Construction & Rehab, LLC for the
Project.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 25th day of August, 2022.
CRAIG M! A if ayor
City of Ro d Ro. , Texas
ATTEST:
UM,
66(--a
MEAGAN S KS, Ci Clerk
0112 20222,4804-0509-5982
®rmlovaPM Construction& Rehab, LLC
131 N Richey St
An IPP, Company Pasadena,TX 77506
July 19, 2022
City of Round Rock
Attn: David Freireich
Bid Proposal: Chandler Creek Sewer Rehab HGAC#TP07-18
Round Rock,Texas
Pipe Bursting Replacement
Dear Bidder,
PM Construction & Rehab, LLC is pleased to offer the following proposal pricing to provide pipe
bursting(PB)replacement services of the 36-Inch sanitary sewer lines for the above referenced
project. Our proposal is based on the documents provided by City of Round Rock. This pricing
includes providing all labor, material, supervision, and equipment necessary to complete the scope
of work as listed below.
Scope of work performed by PM Construction & Rehab, LLC:
Provide pre-work submittals.
Erosion and sediment controls
➢ PM Construction & Rehab, LLC will perform pre-rehab CCN& cleaning(normal only). Two-
wheel drive vehicle access to manholes is required for this work.
PB replacement to utilize DR 11 HDPE for replacement pipe, utilizing pneumatic bursting
methods only. All excavations will be backfilled with previously excavated material.
➢ Pricing is based on completing diameters &associated quantities as listed in this proposal's
schedule of values. Any change in overall or segmental length, host pipe diameters, host
pipe material, replacement material or thickness could result in pricing changes.
➢ Demobilize all construction equipment and clean-up of all identifiable debris generated by
PM Construction & Rehab, LLC crew(s).
➢ Proposal includes costs for one mobilization; additional mobilization will be invoiced
accordingly.
PM Construction & Rehab, LLC proposes to complete the above scope of services for the
prices listed below:
Restoring Communities with Safe, Smart, and Lasting Infrastructure .-jvjw.t&amipr.com.
Item No. Description Qty Unit Unit Price Total
Travel and Mobilization-TML Region 10
P9 (Highland Lakes-Austin) 1 _ EA $ 10,000.00 $ 10,000.00
Travel and Mobilization-Rehab of 501 FT
P26 to 1000 FT 1 EA $ 10,000.00 5 10,000.00
Burst Existing 27"or 30"to 30"IPS SDR 19
D30 (12'-16'Deep) 732 LF $ 275.00 $ 201,300.00
Additional diameter for bursting above
Al 1 30"(36" HDPE DR 11 IPS) 732 LF _$ 329.00 $ 240,828.00
H60 Access Pit(16'-20"deep) 3 EA $ 8,000.00 $ 24,000.00
H69 Trench Safety(16'-20"deep) 3 EA $ 100.00 $ 300.00
Set up 8"pump ande piping including up
J3 to 1000 feet of bypass discharge line 3 EA $ 11,000.00 $ 33,000.00
112 Operate 8"pumping system per pump 75 DAY $ 5,640.00 $ 423,000.00
Discount-Operate 8" pumping system per
J12-D pump 1 LS $ (428.00) $ (428.00)
Dewatering Setup(well pointing)
Maximum 25'deep, includes 20 linear
H90 feet setup 1 EA $ 7,500.00 $ 7,500.00
Extra length dewatering over 20 linear
H91 feet 712 LF $ 100.00 $ 71,200.00
H91D Discount-Extra length over 230 linear feet 1 LS $ (53,700.00) $ (53,700.00),
$ 967,000.00 j
This pricing does not include the cost for the following:
• Prevailing wages.
D. Pre or Post TV-To be completed by the City
D Service Reconnections
D Heavy pipe cleaning, including but not limited to grease, roots,tuberculation removal,
mechanical cleaning, debris disposal, dump site, etc.
• Grouting,vibration monitoring, point repairs(internal or open cut), new installation, etc. to
be handled by Others if required.
• Traffic control outside of temporary signs & cones.
• Testing of any kind
D Any permits or fees, including fees for water source. Source and any associated fees to be
provided by Others.
D Changes in pipe diameter, quantities, host pipe material, replacement pipe material, or
lengths(overall or segmental), curing or bursting methods will result in pricing changes.
Static bursting is NOT included in this proposal.
• Bursting cast iron (Cl)or ductile iron(Dl) mains is NOT included in this proposal.
• Locating of buried manholes or Owner right of way by Others(if required).
5> Haul off unsuitable excavated materials or suitable replacement materials hauled in.
D Rock excavation or blasting.
Restoring communities with safe, smart & lasting infrastructure www.teamipr.com
Any work not specifically detailed in this proposal.
> Pricing firm for 30 days from date of this proposal.
Thank you for the opportunity to offer you this proposal. Should you have any questions or require
additional information, please do not hesitate to contact me.
Sincerely,
PM Construction&Rehab, LLC
'/ , •
Justin Mouton
Business Development
Jo
- - - • oa -s. C�.7N
o 0
� `-, 11 9 0 8 C31u11'A;C'k3R1 -
s ,
o
II
3406 t €?
Rp -
E
- - �
0
Date:8762022
N 36 INCH
A CHANDLER CREEK INTERCEPTOR
LINE REPLACEMENT RdUNOROCK XAS
TE
ts.Hee�vir<oti�t>tnasuv S