CM-2022-207 - 9/2/2022Page 1 of mr, 0015 Department: Project Name: City Project ID Number ]ustifleation Contract Quantity Adjustment/Change Order General Services Round Rods Public Library Date: 7/28/22 Change Order/Quantity Adjustment No. 3 ks the project progresses, minor changes incur some costs. Many of these changes were missing on the plan or changes that needed to be nade in the field. This Change Order represents the largest cost changes not covered by the Owner's Betterment Allowance within the xonstruction contract. This change order includes the follow OB's: 094 - 093 - 092 - 091 - 088 . SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: Amount Change 0.00 $49,921.00 0.00 $49,921.00 0.00 $29,946,252.00 $149,446.00 578/578 0 0 New Contract Time: 578/578 Prepared By: ., 6-elt Richard Will, Construction Manager, CORR Signature Printed Name, Title, Company Date ki A. PrqipJm P Contractor: - g re Printed Name, Tide, Com any Date City Project � Manager: Chad McDowell General Services Director CORK Mayor/City Mananar nature i Printed Name, Tide 1 R/n n47q All/ lti �G tr. Date ClI2 I2 2- C,/v)- z b Z -2- - Zb �- ROIINO ROb[ i i �.t Project Name: Quan. Adj. / Change Order No.: Contract Quatity Adjustment/ Change Order Change Order Data Round Rock Public Library Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 OB 094 - COR 145 - Lib Monumental Stair Diffuser Grille Size LS 1 $753.00 $ 753.00 0 2 OB 093 - COR 141 - Parking Guidance Di ital Si na a with Aluminum Angle L5 1 $8,353.OD $ 8,353.00 0 3 OB 092 - COR 134 - Staff Service Elevator Architectural vs Structural Dimensions LS 1 $12,719.00 $ 12,719.00 0 4 OB 091 - COR 133 - Library and Site Communications Site Tie-in and Quazite Box Confirmation and T&M Work LS 1 $14,276.00 $ 14,276.00 0 5 OB 088 - COR 122 - Lib Duct Insulation Tvoe at Exposed Ceilings LS 1 $10,827.00 $ 10,827.00 0 6 $ - $ 7 $ $ 8 $ $ 9 $ $ 10 $ $ 11 $ $ 12 $ $ 13 $ $ 14 $ $ 15 $ $ Subtotal $ 46,928 Insurancel 0.759% $ 356 Subtotal $ 47,284 Bond 0.55% $ 260 Subtotal $ 47,544 Fee 5% $ 2,377 TOTALS S 49,921 ROUtNO ROdC TEXAS Gera.. am Round Rock Library Change Order # 003 Summary Date: 07/28/2022 Change Order # 3 to contract with Hensel Phelps Construction Co. Cost: $49,921.00 Overview: As the project progresses, minor changes incur some costs. This Change Order represents the largest cost changes not covered by the Owner's Betterment Allowance within the construction contract. 1. OB 094 - COR 145: Lib Monumental Stair Diffuser Grille Size 2, OB 093 - COR 142: Parking Guidance Digital Signage with Aluminum Angle 3. OB 092 - COR 134: Staff Service Elevator Architectural vs Structural Dimensions 4. OB 091- COR 133: Library and Site Communications Site Tie-in and Quazite Box Confirmation and T&M Work 5. OB 088 - COR 122: Lib Duct Insulation Type at Exposed Ceilings Betterment (encumbered in contract) Original $750,000.00 Remaining to Date $0 Change Order 001-002 Total Remaining to Date $ 99,525.00 $ 52,693.94 hd u cc C Z O Cd aL O s � � 3 G W � dy u u o W ? Z S G u "i A i v g w u 0 •I V C A q 6p m E c Y '_ ' e v o q C �Ey; ^aSgH v c b M O Y yl m S FL- C .pp s y� _ �� 3 a'vmiv6 00� Y •' n� w� c N n? m E O b m� g m� M m Y c a• 6 a� 4 6 �usi Y� c m g qCq C F N E L N r q M L Y C R e 8 8 h !/1 W 4 Y N tYJ Y C C E a 3 � L' C m Y o pp� m Oil Z� x M_ Sm 7 05 N N N N G b N Y. n rl N k � A E o - o j J u i S S � q [ a y a c G 8g€ � Pa 08 Or N N ryH m M y N ROUND Roca TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 3 with Hensel Phelps Construction Co. for the Library Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/2/2022 Dept Director: Chad McDowell, General Services Director Cost: $49,921.00 Indexes: 2014 General Obligation Bonds Attachments: Change Order No. 3 Department: General Services Text of Legislative File CM-2022-207 As the project progresses, minor changes incur some costs. Many of these changes were missing on the plan or changes that needed to be made in the field. This Change Order represents the largest cost changes not covered by the Owner's Betterment Allowance within the construction contract. Cost: $49,921.00 Source of Funds: 2014 General Obligation Bonds City of Round Rock Page 1 of 1