Loading...
R-2022-323 - 10/13/2022 RESOLUTION NO. R-2022-323 WHEREAS, the City of Round Rock has duly advertised for bids for the Lake Creek Wastewater Line Replacement Project; and WHEREAS, Austin Underground, Inc. has submitted the lowest responsible bid; and WHEREAS, the City Council wishes to accept the bid of Austin Underground, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Austin Underground,Inc. for the Lake Creek Wastewater Line Replacement Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of October, 2022. 4 M , CRAIG ORG ,Mayor City of Round ck, Texas ATTEST: MEAGAN SJyKS, Ci Clerk 011230222;489 W89-0398 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities&Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement 3400 Sunrise Rd JKB Construction Company LOCATION: Round Rock,TX 78665 Company Name: Austin Underground,Inc. Patin Construction LLC Royal Vista Inc. LLC BID DATE: 9/13/2022,2 p.m. Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Addendum(s)Yes Addendum(s)Yes Addendum(s)Yes Addendum(s)Yes Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes APPROX UNIT UNIT UNIT ITEM 4 QTY. UNIT UNIT PRICE COST PRICE COST PRICE COST PRICE COST Mobilization,Bonds and Insurance,not-to-exceed 1 5%of the Base Bid Amount. I LS $170,000.00 $170,000.00 $50,000.00 $50,000.00 $198,000.00 $198,000.00 $229,000.00 $229,000.00 Provide a DVD containing Video of Project Sites 2 Before the Start of Construction on the Project l LS $1,500.00 $1,500.00 $750.00 $750.00 $2,000.00 $2,000.00 $8,600.00 $8,600.00 Implement a Traffic Safety Plan(Vehicular and Pedestrian)Signed by a P.E.for Work Located in or 3 Near the Roadway 1 LS $3,200.00 $3,200.00 $7,500.00 $7,500.00 $5,000.00 $5,000.00 $33,000.00 $33,000.00 Prepare,Submit,and Implement a Trench Safety Plan for Signed by P.E., in Conformance with State Law&OSHA,Including All Materials Required to 4 Implement 1 LS $1,500.00 $1,500.00 $1,500.00 $1,500.00 $10,000.00 $10,000.00 $4,000.00 $4,000.00 Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality 5 (TCEQ) 1 LS $1,500.00 $1,500.00 $3,000.00 $3,000.00 $8,500.00 $8,500.00 $5,600.00 $5,600.00 6 Preparation of Right-of-Way 58 STA $220.00 $12,760.00 $5,600.00 $324,800.00 $700.00 $40,600.00 $1,750.00 $101,500.00 7 Trench Safety Implementation(Trench) 5185 LF $4.00 $20,740.00 $5.00 $25,925.00 $10.00 $51,850.00 $2.75 $14,258.75 8 Trench Safety Implementation(Manholes/Bore Pits) 46500 SF $0.30 $13,950.00 $0.50 $23,250.00 $4.25 $197,625.00 $0.75 $34,875.00 9 Furnish,Install,Maintain and Remove Silt Fence 5200 LF $3.00 $15,600.00 $4.00 $20,800.00 $5.25 $27,300.00 $6.50 1 $33,800.00 Page 1 of 10 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities&Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement Furnish,Install,Maintain and Remove Tree 10 Protection 24 EA $250.00 $6,000.00 $1,000.00 $24,000.00 $800.00 $19,200.00 $1,300.00 $31,200.00 11 Demolish and Remove Existing Manholes 19 EA $2,000.00 $38,000.00 $2,500.00 $47,500.00 $2,500.00 $47,500.00 $5,100.00 $96,900.00 Abandon Existing 15"Wastewater Line In Place utilizing Flowable Fill or Slurry Mix per City of 12 Round Rock Specifications 4300 LF $15.00 $64,500.00 $20.00 $86,000.00 $40.00 $172,000.00 $32.00 $137,600.00 Abandon Existing 15"Wastewater Line in Rail Road ROW utilzing Flowable Fill or Slurry Mix per City 13 of Round Rock Specifications 600 LF $25.00 $15,000.00 $40.00 $24,000.00 $60.00 $36,000.00 $72.00 $43,200.00 14 Remove Exisitng 30"Wastewater Line 30 LF $63.00 $1,890.00 $40.00 $1,200.00 $25.00 $750.00 $230.00 $6,900.00 15 Abandon Existing 8"Wastewater Line In Place 50 LF $25.00 $1,250.00 $20.00 $1,000.00 $50.00 $2,500.00 $164.00 $8,200.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 6"SDR 35(PS46)PVC 16 Wastewater Line 70 LF $50.00 $3,500.00 $75.00 $5,250.00 $22.50 $1,575.00 $110.00 $7,700.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 8"SDR 35(PS46)PVC 17 Wastewater Line 50 LF $73.00 $3,650.00 $85.00 $4,250.00 $20.00 $1,000.00 $117.00 $5,850.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 10"SDR 35(PS46)PVC 18 Wastewater Line 50 LF $89.00 $4,450.00 $ 100.00 $5,000.00 $ 30.00 $1,500.00 $ 135.00 $6,750.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 15"SDR 26(PSI l 5)PVC 19 Wastewater Line 55 LF $150.00 $8,250.00 $125.00 $6,875.00 $85.00 $4,675.00 $190.00 $10,450.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 24"SDR 26(PSI 15)PVC 20 Wastewater Line 5000 LF $250.00 $1,250,000.00 $250.00 $1,250,000.00 $225.00 $1,125,000.00 $414.00 $2,070,000.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 30"SDR 26(PSI 15) 21 Wastewater Line 30 LF $420.00 $12,600.00 $400.00 $12,000.00 $395.00 $11,850.00 $531.00 $15,930.00 Page 2 of 10 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities& Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement Furnish all Materials,Equipment,Tools&Labor Necessary for Temporary Bypass or Bypass Pumping 22 in order to Install the new Wastwater Line 1 LS $46,000.00 $46,000.00 $1,500.00 $1,500.00 $375,000.00 $375.000.00 $72,000.00 $72,000.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install a Temporary 18" Wastewater Line Connection Near Station 26+21,Including Temporary 18"Wastewater Line,Temporary Manholes,and Temporary Connections to Existing and/or New Line and Removal of all Temporary 23 litems I I LS $24,000.00 $24,000.00 $60,000.00 $60,000.00 $20,700.00 $20,700.00 $64,000.00 $64,000.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install a Temporary 15"Wastewater Line Connection New Station 29+47,Including Temporary 18"Wastewater Line,Temporary Manhole,and Temporary Connections to Existing and/or New Line and Removal of all Temporary 24 Items I LS $10,000.00 $10,000.00 $30,000.00 $30,000.00 $11,500.00 $11,500.00 $48,000.00 $48,000.00 Furnish all Materials,Equipment,Tools&Labor 25 Necessary Install Concrete Encasement 75 LF $170.00 $12,750.00 $100.00 $7,500.00 $115.00 $8,625.00 $506.00 $37,950.00 Furnish all Materials,Equipment,Tools&Labor 26 Necessary Install Concrete Cap 525 LF $70.00 $36,750.00 $50.00 $26,250.00 $40.00 $21,000.00 $230.00 $120,750.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 42"Steel Encasement by Bore 27 under Rail Road ROW 430 LF $1,900.00 $817,000.00 $1,500.00 $645,000.00 $1,275.00 $548,250.00 $1,400.00 $602,000.00 Allowance for Coordinating and Reimbursing the Cost for RailPros for Rail Line Inspection duming installtion of the Steel Encasement Pipe under Rail Road ROW. Reimbursement to paid RailPro Invoice 28 1plus 15%. 1 1 LS 1$125,000.00 $125,000.00 $125,000.00 $125,000.00 $125,000.00 $125,000.00 1$125,000.00 1 $125,000.00 Page 3 of 10 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities&Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement Allowance for Coordinating and Reimbursing the Cost for UPRR Certified Rail Survey to provide surveying of Centerline of Track durning installtion of the Steel Encasement Pipe under Rail Road ROW. 29 Reimbursement to paid Invoice plus 15%. 1 LS $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install New 5'Diameter Fiberglass 30 Wastewater Manholes,Inlcuding Inverts 130 VF $1,300.00 $169,000.00 $1,500.00 $195,000.00 $1,800.00 $234,000.00 $1,500.00 $195,000.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install New 5'Diameter Fiberglass 31 Water Tight Wastewater Manholes,Inlcuding Inverts 195 VF $1,900.00 $370,500.00 $2,050.00 $399,750.00 $2,450.00 $477,750.00 $1,900.00 $370,500.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install New 5'Diameter Fiberglass Water Tight Wastewater Manhole with Vent, 32 Inlcuding Inverts 1 EA $27,000.00 $27,000.00 $32,000.00 $32,000.00 $33,560.00 $33,560.00 $27,500.00 $27,500.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install New 4'Diameter Wastewater 33 Water Tight Manholes,Inlcuding Inverts 65 VF $1,300.00 $84,500.00 $2,000.00 $130,000.00 $4,770.00 $310,050.00 $1,400.00 $91,000.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect to Existing Concrete Manholes,Including Coring,Connection, 34 Rebuilding Inverts,and Fiberglass Manhole Insert 2 EA $4,600.00 $9,200.00 $5,000.00 $10,000.00 $8,850.00 $17,700.00 $10,200.00 $20,400.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect to Existing Fiberglass 35 Manhole(30"Opening)with new 30"PVC Pipe i EA $4,200.00 $4,200.00 $6,500.00 $6,500.00 $9,800.00 $9,800.00 $17,500.00 $17,500.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Existing 6"W WL to Proposed 36 Manholes 2 EA $4,000.00 $8,000.00 $ 5,000.00 $10,000.00 $ 1,000.00 $2,000.00 $ 4,800.00 $9,600.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Existing 8"WWL to Proposed 37 Manholes 7 EA $4,000.00 $28,000.00 $6,500.00 $45,500.00 $1,500.00 $10,500.00 $4,800.00 $33,600.00 Page 4 of 10 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities&Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Existing 10"W WL to 38 Proposed Manholes 1 EA $4,000.00 $4,000.00 $7,500.00 $7,500.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Existing 12"W WL to 39 Proposed Manholes 1 EA $4,000.00 $4,000.00 $7,500.00 $7,500.00 $2,500.00 $2.500.00 $5,300.00 $5,300.00 Furnish all Materials,Equipment.Tools&Labor Necessary to Connect Existing 15" W WL to 40 Proposed Manholes 2 EA $4,000.00 $8,000.00 $7,500.00 $15,000.00 $2,800.00 $5,600.00 $7,200.00 $14,400.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Existing 18" W WL to 41 Proposed Manholes 2 EA $4,000.00 $8,000.00 $7,500.00 $15,000.00 $3,000.00 $6,000.00 $6,800.00 $13,600.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Proposed 30"W WL to 42 Existing Manhole 1 EA $4,000.00 $4,000.00 $10,000.00 $10,000.00 $4,000.00 $4,000.00 $18,100.00 $18,100.00 Furnish all Materials,Equipment,Tools&Labor Necessary for Installation and Establishment of Hydromulch with Flexible Growth Medium in 43 Accordance with Technical Specification 16500 SY $4.50 $74,250.00 $3.00 $49,500.00 $7.00 $115,500.00 1 $4.00 $66,000.00 Furnish all Materials,Equipment,Tools&Labor Necessary for Defelction Testing of the Wastewater 44 Line in Accordance with Technical Specification 1 LS $13,000.00 $13,000.00 $15,000.00 $15,000.00 $10,000.00 $10.000.00 $13,700.00 $13,700.00 Furnish all Materials,Equipment,Tools&Labor Necessary for Air Testing of the Wastewater Line in 45 Accordance with Technical Specification 1 LS $6,500.00 $6,500.00 $15,000.00 $15,000.00 $8,000.00 $8,000.00 $13,700.00 $13,700.00 Furnish all Materials,Equipment,Tools&Labor Necessary for Vacuum Testing of Manholes in 46 lAccordance with Technical Specification 36 EA $630.00 $22,680.00 $250.00 $9,000.00 $1,000.00 $36,000.00 $682.00 $24,552.00 TOTAL $3,591,170.00 $3,817,100.00 $4,384,460.00 54,939,465.75 n tca es incorrect amount ase on written num er arm Page 5 of 10 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities& Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement PROJECT: Lake Creek Wastewater Line Replacement LOCATION: 3400 Sunrise Rd Round Rock,TX 78665 Com m Name: Austin En ineerin Co.,Inc. BID DATE: 9/13/2022,2 p.m. Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Addendum(s)Yes Addendum(s)? Addendum(s)? Addendum(s)? Bid Bond? Yes Bid Bond? Yes I Bid Bond? Yes Bid Bond? Yes APPROX UNIT UNIT UNIT I FEM1 h QTY. UNIT UNITPRICE COST PRICE COST PRICE COST PRICE COST Mobilization,Bonds and Insurance,not-to-exceed 1 5%of the Base Bid Amount. I LS $250,000.00 $250,000.00 $0.00 $0.00 $0.00 Provide a DVD containing Video of Project Sites 2 Before the Start of Construction on the Project 1 LS $650.00 $650.00 $0.00 $0.00 $0.00 Implement a Traffic Safety Plan(Vehicular and Pedestrian)Signed by a P.E.for Work Located in or 3 Near the Roadway 1 LS $25,000.00 $25,000.00 1 $0.00 1 $0.00 $0.00 Prepare,Submit,and Implement a Trench Safety Plan for Signed by P.E., in Conformance with State Law&OSHA,Including All Materials Required to 4 Implement I LS $1,000.00 $1,000.00 $0.00 $0.00 $0.00 Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality 5 (TCEQ) I LS $18,000.00 $18,000.00 1 $0.00 1 1 $0.001 1 $0.00 6 Preparation of Right-of-Way 58 STA $3,075.00 $178,350.00 $0.00 1 $0.00 $0.00 7 Trench Safety Implementation(Trench) 5185 LF $1.00 $5,185.00 $0.00 $0.00 $0.00 8 Trench Safety Implementation(Manholes/Bore Pits) 46500 SF $0.50 $23,250.00 $0.00 $O.UO $0.00 9 IFumish.Install.Maintain and Remove Silt Fence 5200 LF $5.55 $28,860.00 $0.00 1 $0.00 $0.00 Page 6 of 10 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities&Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement Furnish,Install,Maintain and Remove Tree 10 Protection 24 EA $170.00 $4,080.00 $0.00 $0.00 $0.00 11 Demolish and Remove Existing Manholes 19 EA $850.00 $16,150.00 $0.00 $0.00 $0.00 Abandon Existing 15"Wastewater Line In Place utilizing Flowable Fill or Slurry Mix per City of 12 Round Rock Specifications 4300 LF $30.00 $129,000.00 $0.00 $0.00 $0.00 Abandon Existing 15"Wastewater Line in Rail Road ROW utilzing Flowable Fill or Slurry Mix per City 13 of Round Rock Specifications 600 LF $30.00 $18,000.00 $0.00 $0.00 $0.00 14 Remove Exisitng 30"Wastewater Line 30 LF $115.00 $3,450.00 $0.00 $0.00 $0.00 15 Abandon Existing 8"Wastewater Line In Place 50 LF $3.00 $150.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 6"SDR 35(PS46)PVC 16 Wastewater Line 70 LF $233.00 $16,310.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 8"SDR 35(PS46)PVC 17 Wastewater Line 50 LF $239.00 $11,950.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 10"SDR 35(PS46)PVC 18 Wastewater Line 50 LF $250.00 $12,500.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 15"SDR 26(PSI 15)PVC 19 Wastewater Line 55 LF $270.00 $14,850.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 24"SDR 26(PSI 15)PVC 20 Wastewater Line 5000 LF $463.00 $2,315,000.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 30"SDR 26(PSI 15) 21 Wastewater Line 30 LF $500.00 $15,000.00 $0.00 $0.00 $0.00 Page 7 of 10 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities&Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement Fumish all Materials,Equipment,Tools&Labor Necessary for Temporary Bypass or Bypass Pumping 22 in order to Install the new Wastwater Line 1 LS $316,000.00 $316,000.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install a Temporary 18"Wastewater Line Connection Near Station 26+21,Including Temporary18"Wastewater Line,Temporary Manholes,and Temporary Connections to Existing and/or New Line and Removal of all Temporary 23 Items I LS $80,500.00 $80,500.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install a Temporary 15"Wastewater Line Connection Near Station 29+47,Including Temporary 18"Wastewater Line,Temporary Manhole,and Temporary Connections to Existing and/or New Line and Removal of all Temporary 24 11tems 1 LS $52,000.00 $52,000.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor 25 Necessary Install Concrete Encasement 75 LF $140.00 $10,500.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor 26 Necessary Install Concrete Cap 525 LF $70.00 $36,750.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install 42"Steel Encasement by Bore 27 under Rail Road ROW 430 LF $1,150.00 $494,500.00 $0.00 $0.00 $0.00 Allowance for Coordinating and Reimbursing the Cost for RailPros for Rail Line Inspection durning installtion of the Steel Encasement Pipe under Rail Road ROW. Reimbursement to paid RailPro Invoice 28 plus 15%. 1 LS $125,000.00 $125,000.00 $0.00 $0.00 $0.00 Page 8 of 10 Updated 6117119 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities& Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement Allowance for Coordinating and Reimbursing the Cost for UPRR Certified Rail Survey to provide surveying of Centerline of Track durning installtion of the Steel Encasement Pipe under Rail Road ROW. 29 Reimbursement to paid Invoice plus 15%. 1 LS $25,000.00 $25,000.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install New 5'Diameter Fiberglass 30 Wastewater Manholes,Inlcuding Inverts 130 VF $1,415.00 $183,950.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install New 5'Diameter Fiberglass 31 Water Tight Wastewater Manholes,Inlcuding Inverts 195 VF $1,995.00 $389,025.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install New 5'Diameter Fiberglass Water Tight Wastewater Manhole with Vent, 32 Inlcuding Inverts 1 EA $30,000.00 $30,000.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Install New 4'Diameter Wastewater 33 Water Tight Manholes,Inlcuding Inverts 65 VF $1,500.00 $97,500.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect to Existing Concrete Manholes,Including Coring,Connection, 34 lRebuilding Inverts,and Fiberglass Manhole Insert 2 EA $21,500.00 $43,000.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect to Existing Fiberglass 35 Manhole(30"Opening)with new 30"PVC Pipe 1 EA $2,700.00 $2,700.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Existing 6"W WL to Proposed 36 Manholes 2 EA $6,800.00 $13,600.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Existing 8"W WL to Proposed 37 Manholes 7 EA $7,000.00 $49,000.00 $0.00 $0.00 $0.00 Page 9 of 10 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities& Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 14,2022 Round Rock,Texas 78665 BID TABULATION PROJECT: Lake Creek Wastewater Line Replacement Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Existing 10"W WL to 38 Proposed Manholes 1 EA $4,200.00 $4,200.00 $0.00 $0.00 $0.00 Famish all Materials,Equipment,Tools&labor Necessary to Connect Existing 12"W WL to 39 Proposed Manholes I EA $8,500.00 $8,500.00 $0.00 $0.00 $0.00 Furnish all Materials.Equipment.Tools&Labor Necessary to Connect Existing 15"W WL to 40 Proposed Manholes 2 EA $8,800.00 $17,600.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary to Connect Existing 18"W WL to 41 Proposed Manholes 2 EA $9,000.00 $18,000.00 $0.00 $0.00 $0.00 Furnish all Materials.Equipment.Tools&Labor Necessary to Connect Proposed 30"W WL to 42 Existing Manhole 1 EA $21,000.00 $21,000.00 $0.00 $0.00 $0.00 Necessary for Installation and Establishment of Hydromulch with Flexible Growth Medium in 43 Accordance with Technical Specification 16500 SY $1.00 $16,500.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary for Defelction Testing of the Wastewater 44 Line in Accordance with Technical Specification I LS $13,000.00 $13,000.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary for Air Testing of the Wastewater Line in 45 Accordance with Technical Specification l LS $21,000.00 $21,000.00 $0.00 $0.00 $0.00 Furnish all Materials,Equipment,Tools&Labor Necessary For Vacuum Testing of Manholes in 46 Accordance with Technical Specification 1 36 EA $525.00 $18,900.00 _�`����GF\111,1 $0.00 $0.00 TOTAL $5,174,460.00 �+� •••��� •'•e�Y'+�� so.00 e $0.00 Indicates incorrect amount based on written number formS*7r' •'•y*�;/f i ALVIN R. SUTTON, III i 9653U /;/���`•. �C� aSE�• 9-15-2022 Page 10 of 10 �jjF" ";\ ` Updated 6/17/19