R-2022-323 - 10/13/2022 RESOLUTION NO. R-2022-323
WHEREAS, the City of Round Rock has duly advertised for bids for the Lake Creek
Wastewater Line Replacement Project; and
WHEREAS, Austin Underground, Inc. has submitted the lowest responsible bid; and
WHEREAS, the City Council wishes to accept the bid of Austin Underground, Inc., Now
Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City a contract
with Austin Underground,Inc. for the Lake Creek Wastewater Line Replacement Project.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 13th day of October, 2022.
4 M ,
CRAIG ORG ,Mayor
City of Round ck, Texas
ATTEST:
MEAGAN SJyKS, Ci Clerk
011230222;489 W89-0398
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities&Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
3400 Sunrise Rd JKB Construction Company
LOCATION: Round Rock,TX 78665 Company Name: Austin Underground,Inc. Patin Construction LLC Royal Vista Inc. LLC
BID DATE: 9/13/2022,2 p.m. Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes
Addendum(s)Yes Addendum(s)Yes Addendum(s)Yes Addendum(s)Yes
Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes
APPROX UNIT UNIT UNIT
ITEM 4 QTY. UNIT UNIT PRICE COST PRICE COST PRICE COST PRICE COST
Mobilization,Bonds and Insurance,not-to-exceed
1 5%of the Base Bid Amount. I LS $170,000.00 $170,000.00 $50,000.00 $50,000.00 $198,000.00 $198,000.00 $229,000.00 $229,000.00
Provide a DVD containing Video of Project Sites
2 Before the Start of Construction on the Project l LS $1,500.00 $1,500.00 $750.00 $750.00 $2,000.00 $2,000.00 $8,600.00 $8,600.00
Implement a Traffic Safety Plan(Vehicular and
Pedestrian)Signed by a P.E.for Work Located in or
3 Near the Roadway 1 LS $3,200.00 $3,200.00 $7,500.00 $7,500.00 $5,000.00 $5,000.00 $33,000.00 $33,000.00
Prepare,Submit,and Implement a Trench Safety
Plan for Signed by P.E., in Conformance with State
Law&OSHA,Including All Materials Required to
4 Implement 1 LS $1,500.00 $1,500.00 $1,500.00 $1,500.00 $10,000.00 $10,000.00 $4,000.00 $4,000.00
Prepare Stormwater Pollution Prevention Plan,
Including Submission to and Receiving Permits from
Texas Commission on Environmental Quality
5 (TCEQ) 1 LS $1,500.00 $1,500.00 $3,000.00 $3,000.00 $8,500.00 $8,500.00 $5,600.00 $5,600.00
6 Preparation of Right-of-Way 58 STA $220.00 $12,760.00 $5,600.00 $324,800.00 $700.00 $40,600.00 $1,750.00 $101,500.00
7 Trench Safety Implementation(Trench) 5185 LF $4.00 $20,740.00 $5.00 $25,925.00 $10.00 $51,850.00 $2.75 $14,258.75
8 Trench Safety Implementation(Manholes/Bore Pits) 46500 SF $0.30 $13,950.00 $0.50 $23,250.00 $4.25 $197,625.00 $0.75 $34,875.00
9 Furnish,Install,Maintain and Remove Silt Fence 5200 LF $3.00 $15,600.00 $4.00 $20,800.00 $5.25 $27,300.00 $6.50 1 $33,800.00
Page 1 of 10 Updated 6/17/19
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities&Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
Furnish,Install,Maintain and Remove Tree
10 Protection 24 EA $250.00 $6,000.00 $1,000.00 $24,000.00 $800.00 $19,200.00 $1,300.00 $31,200.00
11 Demolish and Remove Existing Manholes 19 EA $2,000.00 $38,000.00 $2,500.00 $47,500.00 $2,500.00 $47,500.00 $5,100.00 $96,900.00
Abandon Existing 15"Wastewater Line In Place
utilizing Flowable Fill or Slurry Mix per City of
12 Round Rock Specifications 4300 LF $15.00 $64,500.00 $20.00 $86,000.00 $40.00 $172,000.00 $32.00 $137,600.00
Abandon Existing 15"Wastewater Line in Rail Road
ROW utilzing Flowable Fill or Slurry Mix per City
13 of Round Rock Specifications 600 LF $25.00 $15,000.00 $40.00 $24,000.00 $60.00 $36,000.00 $72.00 $43,200.00
14 Remove Exisitng 30"Wastewater Line 30 LF $63.00 $1,890.00 $40.00 $1,200.00 $25.00 $750.00 $230.00 $6,900.00
15 Abandon Existing 8"Wastewater Line In Place 50 LF $25.00 $1,250.00 $20.00 $1,000.00 $50.00 $2,500.00 $164.00 $8,200.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 6"SDR 35(PS46)PVC
16 Wastewater Line 70 LF $50.00 $3,500.00 $75.00 $5,250.00 $22.50 $1,575.00 $110.00 $7,700.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 8"SDR 35(PS46)PVC
17 Wastewater Line 50 LF $73.00 $3,650.00 $85.00 $4,250.00 $20.00 $1,000.00 $117.00 $5,850.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 10"SDR 35(PS46)PVC
18 Wastewater Line 50 LF $89.00 $4,450.00 $ 100.00 $5,000.00 $ 30.00 $1,500.00 $ 135.00 $6,750.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 15"SDR 26(PSI l 5)PVC
19 Wastewater Line 55 LF $150.00 $8,250.00 $125.00 $6,875.00 $85.00 $4,675.00 $190.00 $10,450.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 24"SDR 26(PSI 15)PVC
20 Wastewater Line 5000 LF $250.00 $1,250,000.00 $250.00 $1,250,000.00 $225.00 $1,125,000.00 $414.00 $2,070,000.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 30"SDR 26(PSI 15)
21 Wastewater Line 30 LF $420.00 $12,600.00 $400.00 $12,000.00 $395.00 $11,850.00 $531.00 $15,930.00
Page 2 of 10 Updated 6/17/19
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities& Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
Furnish all Materials,Equipment,Tools&Labor
Necessary for Temporary Bypass or Bypass Pumping
22 in order to Install the new Wastwater Line 1 LS $46,000.00 $46,000.00 $1,500.00 $1,500.00 $375,000.00 $375.000.00 $72,000.00 $72,000.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install a Temporary 18" Wastewater
Line Connection Near Station 26+21,Including
Temporary 18"Wastewater Line,Temporary
Manholes,and Temporary Connections to Existing
and/or New Line and Removal of all Temporary
23 litems I I LS $24,000.00 $24,000.00 $60,000.00 $60,000.00 $20,700.00 $20,700.00 $64,000.00 $64,000.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install a Temporary 15"Wastewater
Line Connection New Station 29+47,Including
Temporary 18"Wastewater Line,Temporary
Manhole,and Temporary Connections to Existing
and/or New Line and Removal of all Temporary
24 Items I LS $10,000.00 $10,000.00 $30,000.00 $30,000.00 $11,500.00 $11,500.00 $48,000.00 $48,000.00
Furnish all Materials,Equipment,Tools&Labor
25 Necessary Install Concrete Encasement 75 LF $170.00 $12,750.00 $100.00 $7,500.00 $115.00 $8,625.00 $506.00 $37,950.00
Furnish all Materials,Equipment,Tools&Labor
26 Necessary Install Concrete Cap 525 LF $70.00 $36,750.00 $50.00 $26,250.00 $40.00 $21,000.00 $230.00 $120,750.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 42"Steel Encasement by Bore
27 under Rail Road ROW 430 LF $1,900.00 $817,000.00 $1,500.00 $645,000.00 $1,275.00 $548,250.00 $1,400.00 $602,000.00
Allowance for Coordinating and Reimbursing the
Cost for RailPros for Rail Line Inspection duming
installtion of the Steel Encasement Pipe under Rail
Road ROW. Reimbursement to paid RailPro Invoice
28 1plus 15%. 1 1 LS 1$125,000.00 $125,000.00 $125,000.00 $125,000.00 $125,000.00 $125,000.00 1$125,000.00 1 $125,000.00
Page 3 of 10 Updated 6/17/19
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities&Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
Allowance for Coordinating and Reimbursing the
Cost for UPRR Certified Rail Survey to provide
surveying of Centerline of Track durning installtion
of the Steel Encasement Pipe under Rail Road ROW.
29 Reimbursement to paid Invoice plus 15%. 1 LS $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install New 5'Diameter Fiberglass
30 Wastewater Manholes,Inlcuding Inverts 130 VF $1,300.00 $169,000.00 $1,500.00 $195,000.00 $1,800.00 $234,000.00 $1,500.00 $195,000.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install New 5'Diameter Fiberglass
31 Water Tight Wastewater Manholes,Inlcuding Inverts 195 VF $1,900.00 $370,500.00 $2,050.00 $399,750.00 $2,450.00 $477,750.00 $1,900.00
$370,500.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install New 5'Diameter Fiberglass
Water Tight Wastewater Manhole with Vent,
32 Inlcuding Inverts 1 EA $27,000.00 $27,000.00 $32,000.00 $32,000.00 $33,560.00 $33,560.00 $27,500.00 $27,500.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install New 4'Diameter Wastewater
33 Water Tight Manholes,Inlcuding Inverts 65 VF $1,300.00 $84,500.00 $2,000.00 $130,000.00 $4,770.00 $310,050.00 $1,400.00 $91,000.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect to Existing Concrete
Manholes,Including Coring,Connection,
34 Rebuilding Inverts,and Fiberglass Manhole Insert 2 EA $4,600.00 $9,200.00 $5,000.00 $10,000.00 $8,850.00 $17,700.00 $10,200.00 $20,400.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect to Existing Fiberglass
35 Manhole(30"Opening)with new 30"PVC Pipe i EA $4,200.00 $4,200.00 $6,500.00 $6,500.00 $9,800.00 $9,800.00 $17,500.00 $17,500.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Existing 6"W WL to Proposed
36 Manholes 2 EA $4,000.00 $8,000.00 $ 5,000.00 $10,000.00 $ 1,000.00 $2,000.00 $ 4,800.00 $9,600.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Existing 8"WWL to Proposed
37 Manholes 7 EA $4,000.00 $28,000.00 $6,500.00 $45,500.00 $1,500.00 $10,500.00 $4,800.00 $33,600.00
Page 4 of 10 Updated 6/17/19
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities&Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Existing 10"W WL to
38 Proposed Manholes 1 EA $4,000.00 $4,000.00 $7,500.00 $7,500.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Existing 12"W WL to
39 Proposed Manholes 1 EA $4,000.00 $4,000.00 $7,500.00 $7,500.00 $2,500.00 $2.500.00 $5,300.00 $5,300.00
Furnish all Materials,Equipment.Tools&Labor
Necessary to Connect Existing 15" W WL to
40 Proposed Manholes 2 EA $4,000.00 $8,000.00 $7,500.00 $15,000.00 $2,800.00 $5,600.00 $7,200.00 $14,400.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Existing 18" W WL to
41 Proposed Manholes 2 EA $4,000.00 $8,000.00 $7,500.00 $15,000.00 $3,000.00 $6,000.00 $6,800.00 $13,600.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Proposed 30"W WL to
42 Existing Manhole 1 EA $4,000.00 $4,000.00 $10,000.00 $10,000.00 $4,000.00 $4,000.00 $18,100.00 $18,100.00
Furnish all Materials,Equipment,Tools&Labor
Necessary for Installation and Establishment of
Hydromulch with Flexible Growth Medium in
43 Accordance with Technical Specification 16500 SY $4.50 $74,250.00 $3.00 $49,500.00 $7.00 $115,500.00 1 $4.00 $66,000.00
Furnish all Materials,Equipment,Tools&Labor
Necessary for Defelction Testing of the Wastewater
44 Line in Accordance with Technical Specification 1 LS $13,000.00 $13,000.00 $15,000.00 $15,000.00 $10,000.00 $10.000.00 $13,700.00 $13,700.00
Furnish all Materials,Equipment,Tools&Labor
Necessary for Air Testing of the Wastewater Line in
45 Accordance with Technical Specification 1 LS $6,500.00 $6,500.00 $15,000.00 $15,000.00 $8,000.00 $8,000.00 $13,700.00 $13,700.00
Furnish all Materials,Equipment,Tools&Labor
Necessary for Vacuum Testing of Manholes in
46 lAccordance with Technical Specification 36 EA $630.00 $22,680.00 $250.00 $9,000.00 $1,000.00 $36,000.00 $682.00 $24,552.00
TOTAL $3,591,170.00 $3,817,100.00 $4,384,460.00 54,939,465.75
n tca es incorrect amount ase on written num er arm
Page 5 of 10 Updated 6/17/19
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities& Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
PROJECT: Lake Creek Wastewater Line Replacement
LOCATION: 3400 Sunrise Rd Round Rock,TX 78665 Com m Name: Austin En ineerin Co.,Inc.
BID DATE: 9/13/2022,2 p.m. Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes
Addendum(s)Yes Addendum(s)? Addendum(s)? Addendum(s)?
Bid Bond? Yes Bid Bond? Yes I Bid Bond? Yes Bid Bond? Yes
APPROX UNIT UNIT UNIT
I FEM1 h QTY. UNIT UNITPRICE COST PRICE COST PRICE COST PRICE COST
Mobilization,Bonds and Insurance,not-to-exceed
1 5%of the Base Bid Amount. I LS $250,000.00 $250,000.00 $0.00 $0.00 $0.00
Provide a DVD containing Video of Project Sites
2 Before the Start of Construction on the Project 1 LS $650.00 $650.00 $0.00 $0.00 $0.00
Implement a Traffic Safety Plan(Vehicular and
Pedestrian)Signed by a P.E.for Work Located in or
3 Near the Roadway 1 LS $25,000.00 $25,000.00 1 $0.00 1 $0.00 $0.00
Prepare,Submit,and Implement a Trench Safety
Plan for Signed by P.E., in Conformance with State
Law&OSHA,Including All Materials Required to
4 Implement I LS $1,000.00 $1,000.00 $0.00 $0.00 $0.00
Prepare Stormwater Pollution Prevention Plan,
Including Submission to and Receiving Permits from
Texas Commission on Environmental Quality
5 (TCEQ) I LS $18,000.00 $18,000.00 1 $0.00 1 1 $0.001 1 $0.00
6 Preparation of Right-of-Way 58 STA $3,075.00 $178,350.00 $0.00 1 $0.00 $0.00
7 Trench Safety Implementation(Trench) 5185 LF $1.00 $5,185.00 $0.00 $0.00 $0.00
8 Trench Safety Implementation(Manholes/Bore Pits) 46500 SF $0.50 $23,250.00 $0.00 $O.UO $0.00
9 IFumish.Install.Maintain and Remove Silt Fence 5200 LF $5.55 $28,860.00 $0.00 1 $0.00 $0.00
Page 6 of 10 Updated 6/17/19
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities&Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
Furnish,Install,Maintain and Remove Tree
10 Protection 24 EA $170.00 $4,080.00 $0.00 $0.00 $0.00
11 Demolish and Remove Existing Manholes 19 EA $850.00 $16,150.00 $0.00 $0.00 $0.00
Abandon Existing 15"Wastewater Line In Place
utilizing Flowable Fill or Slurry Mix per City of
12 Round Rock Specifications 4300 LF $30.00 $129,000.00 $0.00 $0.00 $0.00
Abandon Existing 15"Wastewater Line in Rail Road
ROW utilzing Flowable Fill or Slurry Mix per City
13 of Round Rock Specifications 600 LF $30.00 $18,000.00 $0.00 $0.00 $0.00
14 Remove Exisitng 30"Wastewater Line 30 LF $115.00 $3,450.00 $0.00 $0.00 $0.00
15 Abandon Existing 8"Wastewater Line In Place 50 LF $3.00 $150.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 6"SDR 35(PS46)PVC
16 Wastewater Line 70 LF $233.00 $16,310.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 8"SDR 35(PS46)PVC
17 Wastewater Line 50 LF $239.00 $11,950.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 10"SDR 35(PS46)PVC
18 Wastewater Line 50 LF $250.00 $12,500.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 15"SDR 26(PSI 15)PVC
19 Wastewater Line 55 LF $270.00 $14,850.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 24"SDR 26(PSI 15)PVC
20 Wastewater Line 5000 LF $463.00 $2,315,000.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 30"SDR 26(PSI 15)
21 Wastewater Line 30 LF $500.00 $15,000.00 $0.00 $0.00 $0.00
Page 7 of 10 Updated 6/17/19
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities&Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
Fumish all Materials,Equipment,Tools&Labor
Necessary for Temporary Bypass or Bypass Pumping
22 in order to Install the new Wastwater Line 1 LS $316,000.00 $316,000.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install a Temporary 18"Wastewater
Line Connection Near Station 26+21,Including
Temporary18"Wastewater Line,Temporary
Manholes,and Temporary Connections to Existing
and/or New Line and Removal of all Temporary
23 Items I LS $80,500.00 $80,500.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install a Temporary 15"Wastewater
Line Connection Near Station 29+47,Including
Temporary 18"Wastewater Line,Temporary
Manhole,and Temporary Connections to Existing
and/or New Line and Removal of all Temporary
24 11tems 1 LS $52,000.00 $52,000.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
25 Necessary Install Concrete Encasement 75 LF $140.00 $10,500.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
26 Necessary Install Concrete Cap 525 LF $70.00 $36,750.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install 42"Steel Encasement by Bore
27 under Rail Road ROW 430 LF $1,150.00 $494,500.00 $0.00 $0.00 $0.00
Allowance for Coordinating and Reimbursing the
Cost for RailPros for Rail Line Inspection durning
installtion of the Steel Encasement Pipe under Rail
Road ROW. Reimbursement to paid RailPro Invoice
28 plus 15%. 1 LS $125,000.00 $125,000.00 $0.00 $0.00 $0.00
Page 8 of 10 Updated 6117119
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities& Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
Allowance for Coordinating and Reimbursing the
Cost for UPRR Certified Rail Survey to provide
surveying of Centerline of Track durning installtion
of the Steel Encasement Pipe under Rail Road ROW.
29 Reimbursement to paid Invoice plus 15%. 1 LS $25,000.00 $25,000.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install New 5'Diameter Fiberglass
30 Wastewater Manholes,Inlcuding Inverts 130 VF $1,415.00 $183,950.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install New 5'Diameter Fiberglass
31 Water Tight Wastewater Manholes,Inlcuding Inverts 195 VF $1,995.00 $389,025.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install New 5'Diameter Fiberglass
Water Tight Wastewater Manhole with Vent,
32 Inlcuding Inverts 1 EA $30,000.00 $30,000.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Install New 4'Diameter Wastewater
33 Water Tight Manholes,Inlcuding Inverts 65 VF $1,500.00 $97,500.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect to Existing Concrete
Manholes,Including Coring,Connection,
34 lRebuilding Inverts,and Fiberglass Manhole Insert 2 EA $21,500.00 $43,000.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect to Existing Fiberglass
35 Manhole(30"Opening)with new 30"PVC Pipe 1 EA $2,700.00 $2,700.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Existing 6"W WL to Proposed
36 Manholes 2 EA $6,800.00 $13,600.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Existing 8"W WL to Proposed
37 Manholes 7 EA $7,000.00 $49,000.00 $0.00 $0.00 $0.00
Page 9 of 10 Updated 6/17/19
CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED
Utilities& Environmental Services BY: Amanda Taylor
3400 Sunrise Road DATE: September 14,2022
Round Rock,Texas 78665 BID TABULATION
PROJECT: Lake Creek Wastewater Line Replacement
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Existing 10"W WL to
38 Proposed Manholes 1 EA $4,200.00 $4,200.00 $0.00 $0.00 $0.00
Famish all Materials,Equipment,Tools&labor
Necessary to Connect Existing 12"W WL to
39 Proposed Manholes I EA $8,500.00 $8,500.00 $0.00 $0.00 $0.00
Furnish all Materials.Equipment.Tools&Labor
Necessary to Connect Existing 15"W WL to
40 Proposed Manholes 2 EA $8,800.00 $17,600.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary to Connect Existing 18"W WL to
41 Proposed Manholes 2 EA $9,000.00 $18,000.00 $0.00 $0.00 $0.00
Furnish all Materials.Equipment.Tools&Labor
Necessary to Connect Proposed 30"W WL to
42 Existing Manhole 1 EA $21,000.00 $21,000.00 $0.00 $0.00 $0.00
Necessary for Installation and Establishment of
Hydromulch with Flexible Growth Medium in
43 Accordance with Technical Specification 16500 SY $1.00 $16,500.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary for Defelction Testing of the Wastewater
44 Line in Accordance with Technical Specification I LS $13,000.00 $13,000.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary for Air Testing of the Wastewater Line in
45 Accordance with Technical Specification l LS $21,000.00 $21,000.00 $0.00 $0.00 $0.00
Furnish all Materials,Equipment,Tools&Labor
Necessary For Vacuum Testing of Manholes in
46 Accordance with Technical Specification 1 36 EA $525.00 $18,900.00 _�`����GF\111,1 $0.00 $0.00
TOTAL $5,174,460.00 �+� •••��� •'•e�Y'+�� so.00 e $0.00