Loading...
R-2022-324 - 10/13/2022 RESOLUTION NO. R-2022-324 WHEREAS, the City of Round Rock has duly advertised for bids for the Water Distribution System Generator Project; and WHEREAS, McDonald Municipal and Industrial has submitted the lowest responsible bid; and WHEREAS, the City Council wishes to accept the bid of McDonald Municipal and Industrial, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with McDonald Municipal and Industrial for the Water Distribution System Generator Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of October, 2022. CRAIG MO GAN, yor City of Rouhd Rock, exas ATTEST: MEA AN SP S, City Clerk 011230222;4SW4262-0 2 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities& Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 16,2022 Round Rock,Texas 78665 BI D TABULATION PROJECT: Water Distribution System Generator 3400 Sunrise Rd M cDonald M unicipal& LOCATION: Round Rads,TX 78665 Company Name: Industrial Austin Engineering Co.,Inc. W-Industries HCSInc BID DATE: 9/15/2022-11 a.m. Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Addendum(s)Yes Addendum(s)?Yes Addendum(s)'Yes Addendum(s)iYes Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes APPROX UNIT ITEM 4 CITY. UNIT UNIT PRICE COST UNIT PRICE COST PRICE COST UNIT PRICE COST SOUTH 81 EST: 1 Erosion and Sedimentation Control. 100 LF $4.00 $400.00 $5.00 $500.00 $2.00 $200.00 $500.00 $50,000.00 SOUTHEAST EST: 2 Erosion and Sedimentation Control. 200 LF $4.00 $800.00 $5.00 $1,000.00 $2.00 $400.00 $1,000.00 $200,000.00 SOUTHEAST GST: 3 JErosion and Sedimentation Control. 100 LF $4.00 1 $400.00 $5.001 $500.00 $2.00 $200.001 $1,500.00 $150,000.00 AI I owatce for Mobilization,a maximum of 4 2.5%ofthe Contract Amount 1 LS $35,000.00 $35,000.00 $20,000.00 $20,000.00 $40,000.00 $40,000.00 $50,000.00 $50,000.00 Allowancefor DarabilizEtion,amaximum 5 of 2.5%of the Contract Amount 1 LS $5,000.00 $5,000.00 $5,000.00 $5,000.00 $40,000.00 $40,000.00 $50,000.00 $50,000.00 For providing Project Operations& Maintenance(O&M) Manualsforthe overall Project, no partial payment for thi s ite n until ail O&M s have been submitted and 6 approved, 1 LS $100.00 $100.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 SOUTH 81 EST: Furnish and install all rrtatsialsand labor for 7 rel)U ig underground waterl I nes 1 LS $165,000.00 $165,000.00 $125,000.00 $125,000.001 $125,000.00 $125,000.00 1 $125,000.00 $125,000.00 Page 1 of 4 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities& Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 16,2022 Round Rods,Texas 78665 BI D TABU LAT I O N PROJECT: Water Distribution Systern Generator SOUTH 81 EST: Furnish and install all materials and labor for all civil site grading and standby generator 8 aqui pment pad 1 LS $70,000.00 $70,000.00 $40,000.00 $40,000.00 $46,000.00 $46,000.00 $25,000.00 $25,000.00 SOUTH 81 EST: Furni sh and i nstal I al I mated al s and I abor for standby generator and automatic transfer 9 IsNitch 1 LS $88,000.00 $88,000.00 $235,000.00 $235,000.00 $146,000.00 $146,000.00 $250,000.00 $250,000.00 SOUTH 81 EST: Furni sh and i nstal I ai I mated aI s and I abor for both el ectri cal distribution and controls work and instrumentation and control swork i nd udi ng underground ductbanks,wi re, conduit,grounding, i nstal I ati on, 10 startup/commissioning,and training 1 LS $150,000.00 $150,000.00 $100,000.00 $100,000.00 $193,000.00 $193,000.00 $245,000.00 $245,000.00 SOUTHEAST EST: Furnish and install all materialsand labor for al I civi I site grading and standby generator 11 equipment pad 1 LS $65,000.00 $65,000.00 $150,000.00 $150,000.00 $42,000.00 $42,000.00 $50,000.00 $50,000.00 SOUTHEAST EST: Furnish and install all materials and labor for standby generator and automatic transfer 12 sNitch 1 LS $89,000.00 $89,000.00 $214,000.00 $214,000.00 $136,000.00 $136,000.00 $220,000.00 $220,000.00 SOUTHEAST EST: Furnish and install all materials and labor for both d ectri cal di stri bution and control s work and instrumentation and controlswork i nd udi ng underground ductbanks,wi re, conduit,grounding, i nstal I ati on, 13 startup/commissioning,and training 1 LS $175,000.00 $175,000.00 $100,000.00 $100,000.00 $163,000.00 $163,000.00 $240,000.00 $240,000.00 Page 2 of 4 Updated 6/17/19 CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities& Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 16,2022 Round Rods,Texas 78665 BI D T A BU L AT I O N PROJECT: Water Distribution System Generator SOUTHEAST GST: Furni sh and i nstal I at I msteri al s and I abor for 14 rerouting roadway 1 LS $30,000.00 $30,000.00 $20,000.00 $20,000.00 $22,000.00 $22,000.00 $76,000.00 $76,000.00 SOUTHEAST GST: Furni sh and i nstal I al I mated at s and I abor for all civil sitegrading, relocated Oncor padmount transformer equipment pad, and 15 standby generator equipment pad 1 LS $155,000.00 $155,000.00 $135,000.00 $135,000.00 $75,000.00 $75,000.00 $10,000.00 $10,000.00 SOUTHEAST GST: Furnish and install all mated 21sand labor payment to Oncor Electric Delivery for relocati ng overhead power I i ne and padmount 16 ltransformer 1 LS $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $38,000.00 $38,000.00 Furni sh aid i nstal I al I materi ai s and I abor for standby generator and automatic transfer 17 switch 1 LS $210,000.00 $210,000.00 $540,000.00 $540,000.00 $347,000.00 $347,000.00 $560,000.00 $560,000.00 SOUTHEAST GST: Furnish and install all mated 21s2nd labor for both electrical distribution and controlswork and instrumentation and controls work including underground dudbanks,wire, conduit, grounding, installation, 18 startup/commissioning,and training 1 LS $245,000.00 $245,000.00 ##########I $178,000.00 $198,569.00 $274,000.00 $274,000.00 TOTAL $1,508,700.00 $1,894,000.00 $1,604,369.00 $2,623,000.00 Indicates incorrect amount based on written number form Page 3 of 4 Updated 6/17/19 CITY OF ROUND ROCK BI DS EXTENDED AND CHECKED Utilities& Environmental Services BY: Amanda Taylor 3400 Sunrise Road DATE: September 16,2022 Round Rods,Texas 78665 BID TABULATION PROJECT: Water Distribution System Generator PROJECT: Water Distribution System Generator LOCATION: 3400 Sunrise RdRound Rods,TX 789 Company Name: BID DATE: 9/15/2022-11 a.m. Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Addendum(s)? Addendum(s)? Addendum(s)? Addendum(s)? Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes APPROX UNIT ITEM# QTY. UNIT UNIT PRICE COST UNIT PRICE COST PRICE COST UNIT PRICE COST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL $0.00 $0.00 $0.00 $0.00 Page 4 of 4 Updated 6/17/19