CM-2022-265 - 10/28/2022Page I or Contract Quantity Adjustment/ Change Order rev, 01 IB Department: Utilities & Environmental Services Project Name: Lake Georgetown Raw Water Intake Screen Replacement Date: 10/18/22 City Project Change Order/Quantity ID Number ZEBRA Adjustment No. 1 Vendor Excel Construction Services, LLC 1202 Leander Dr, Leander, TX 78641 Company Name Address Phone No. Justification :hange in the material type for the 30-inch screen risers to 316 stainless steel for two screens. There is a credit for not reconnecting the air )urst lines to the new screens. A non cost time extension was included to cover the material delays and the contractor having to move their crev or the emergency BCRUA repair. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Submitted for Approval P.E. Amount % Change 0% $11,985.00 1% $11,985.00 1% $1,845,985.00 , $11,985.00 210 0 585 795 '11-dIzz. SignaturV Printed Name, Title, Company Date _Apor''ovals.' . Contractor: J&t+�IJ0,-, Kevin Wenske, President, Excel Construction Services 10/18/22 City Project Signature Printed Name, Title, Company ��A Date � , Manager: !(�S { /t S 1 171?— gnature Printed Name, Title Date I Mar W �,L Ac +q !' d'{ 4� ! a-V `3 Manager li,"444/L �t Ilr!1A�Lt_ s� �j�t� yru' Si natil+re PrinW Name, Title ` v Date e''kl- 2D Z 1 Z& Page 2 of'3 Contract Quantity Adjustment/Change Order gglNp g9d[re xts Project Name: Lake Georgetown Raw Water Intake Screen Replacement Quan. Adj./Change Order No. Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 30" Inlet Riser Material Change EA 2 $9,775.00 $19,550.00 0 2 Airline Connection Credit LS 1 -$7,565.00 -$7,565.00 0 3 Material Time Delay $0.00 585 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/ Change Order Rd 0 NOOK i i + •., re: 0J:J6 Project Name: Lake Georgetown Raw Water Intake Screen Replacement Quan. Adj./Change Order No. Quantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0 IEROUND ROCK xas City of Round Rock Agenda item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Excel Construction Services, LLC for the Lake Georgetown Raw Water Intake Screen Replacements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/28/2022 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $11,985.00 Indexes: Self -Financed Water Construction Attachments: CO-QA No. 1 - 10.18.22 Department: Utilities & Environmental Services Text of Legislative File CM-2022-265 The City of Round Rock owns a raw water pump station on Lake Georgetown, which supplies water to the City's water treatment plant. Invasive zebra mussels have been detected in Lake Georgetown and on the intake structure of the raw water pump station. Zebra mussels have a long history of attaching in massive quantities to raw water intakes, thereby damaging the infrastructure and restricting flow to the facility. The purpose of this project is to replace our raw water intake screens with copper alloy screens, which are zebra muscle resistant. The new screens require minimal maintenance and are less susceptible to clogging due to zebra mussels. The Brushy Creek Municipal Utility District (MUD) owns and operates a raw water intake directly adjacent to the City of Round Rock's raw water intake. Brushy Creek MUD is replacing its raw water intake screens with copper alloy screens similar to the City of Round Rock. The Utilities & Environmental Services Department opened bids for the project on June 9, 2020. There were three total bids with Excel Construction coming in as the low bidder. The total contract amount was $1,834,000.Of that amount, the City of Round Rock's share is $1,208,000. The City is being reimbursed by Brushy Creek MUD for their share of the project costs based on the terms set forth in the ILA. Change Order No. 1 is for a change in material type of two 30-inch risers to 316 stainless steel. The change in material type will allow the risers to be more resistant to corrosion. A credit was provided for not requiring the contractor to reconnect the existing airlines to the new screens. Additionally, a time City of Round Rock Page 1 of 2 Agenda Item Summety Continued C*2022-205 extension of 585 days was provided to allow for material delays and the delay caused by the Brushy Creek Regional Utility Authority emergency repair. The total value for Change Order No. 1 is $11,985. Cost: $11,985 Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 of 2