R-2022-340 - 10/27/2022 RESOLUTION NO. R-2022-340 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Chasco Constructors for the Oakmont Drive Extension Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 4,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 4 to the Contract with Chasco Constructors for the Oakmont Drive Extension Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A"and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of October, 2022. CRAIGOR N, Mayor City of toundlRock, Texas ATTEST: LA MEAGAN S INKS, Ci Clerk 0112.20224 4873-55134259 EXHIBIT "A» Page i of 3 Contract Quantity Adjustment/Change Order • RCUImROCN .r•, n:v,03/36 Department: Transportation Project Name: Oakmont Drive Extension Date: 10/11/22 City Project Change Order/Quantity ID Number Adjustment No. 4 Vendor Chasco Constructors PO Box 1057,Round Rock 78680 (512)244.0600 Company Name Address Phone No. Justificatfon Chasco CP 07 Extend waterline 20 LF Chasco CP 08 Add drainage swales at RR AMP Chasco CP 09 Add concrete valley gutters at Cypress&Sunrise Chasco CP 11 Revise street light electrical services at Sunrise&N.Mays Old Item#13 Delete Ilme treated subgrade between Cypress&Sunrise Bid Item#33 Price Increase for storm troopers Bid Item#16 Price Increase for asphalt paving New Item#1 Add subgrage prep between Cypresss&Sunrise New Item#2 Remove debris&tires from creek New Item#3 Price increase for concrete SUMMARY Amount %Change Original Contract Price: $2,449,994.001 Previous Quantity Adjustment(s): -$24,516.00 This Quantity Adjustment -$121,357.20 Total Quantity Adjustment(s): -$145,873.20 Total Contract Price with Quantity Adjustment(s): $2,304,120.80 Previous Change Order(s): $374,176.75 16% This Change Order: $128,511.00 6% Total Change Order(s)To Date: $502,687.75 22% Adjusted Contract Price [Original Contract Price Pius Quantity Adjustment(s)Plus Change Order(s)]: $2,806,808.55 Werence between Original and Adjusted Contract Prices: $356,814.55 Original Contract Time: 270 Time Adjustment by previous Quan.Adj./Change Order: 113 Time Adjustment by this Quan.Adj./Change Order: 110 New Contract Time: 493 - Submitted for Approval Prepared By. BI[I Stabielnc Project Manager,City of Round Rock TX 10/11/22 Signature Printed Name,Title,Company Date Approvals Contractor: BIII Bambrick Vice President Chasco Constructors 10111/22 Ignature Printed Name,Title,Company Date City Project -Q ` Q` P 10-Q^j! '2 Manager: - �`J Signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page 2 of 3 Contract Quantity Adjusbnent/Change Order Project Name: Oakmont Drive Bdenslon Quan.Adj./Change Order No.: 4 Chan a Order Data Contract Time Adjustment Item# Item Descrlptlon Unit Qty. Unit Price Amount 1 12"PVC waterline LF 20 $124.00 $2,480.00 2 Test&chlorine waterune LF 20 f2.75, $75.00 3 Trench protection LF 20 $5.00 $100.00 Chasco CP 08 Add draIna0e swales 1 Drainage Swale with rock rt ra EA 2 $2,,550.00 $5,100.00 2 Chasco CP 09 Add concrete val!ey gutters i Concrete!ft putters SY 270 $100.00 $27,000.00 Chasm CP ii unr se Electirtol service anges n u t I way 5O- $19.00 $950. n u way 275 J55.00 2S.00 Conduit ore Driveway LF $1 0. 6,500.00 1 ELC SRV TY D PS(U)-120/240 EAi 1 1#040.00 Power wire 3-conductor $8.00 Furnish place topsoil , . eveg to on $9,700 2 Pothole existing utIlItIes LS 1 $2,500.00 $2,500.09 Additional ng&traffic control ,875. 0 2 New I s P-5-g:-r-a—& gra ae tem rep $37,764.00 vrm ,Item e e t res from c Item#t3 [Price Increase or concrete CY 1 514 1 $8.00 $4,112.00 10j i i Page 3 of 3 Contract Quantity Adjustment/Change Order NOLMd RMR i I. rev,CijE6 Project Name: Oakmont Drive Extension Quan.Adj./Change Order No.: 4 QuantlitV Mustment Data Contract Time Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment me Treat su ra e -9,r426 0 , 14 meTr—eat ant mix 4 - 66 C 1 , , 33 Price Increase Storm Troopers SW A04 10 EA 2 4,265.00 8,530.00 22 16 Price Increase D-GR HMA(SQ)TY-C SAC-B TN 3647 $ 5.22 $ 19,035.00 PG70-22 49 0.0 .001 0.001 0. .00 .0 . 0 0.001 .001 0.001 0.001 .00 . 0 ON .0a