R-2022-344 - 10/27/2022 RESOLUTION NO. R-2022-344 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Hensel Phelps Construction Co. for the Library Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 4,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 4 to the Contract with Hensel Phelps Construction Co. for the Library Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of October, 2022. CRAlq MO AN, Mayor City oF Rourif Rock, Texas AT EST: � MEAGAN nNKS, Ci Clerk 0112.20222;487345]1-8841 EXHIBIT „A„ fPage I or Contract Quantity Adjustment/Change Order Department: General Services Project Name: Round Rodc Public Library Date: 9/14/22 City Project Change Order/Quantity ID Number Adjustment No. 4 7usdfication As the project progresses,minor changes Incur some costs. Many of these changes were missing on the plan or changes that needed to be made in the field.This Change Order represents the largest cost changes not covered by the Owner's Betterment Allowance within the construction contract.This change order Includes the follow Offs:043-045-049-053-056-060-075-087-099- 100-101-104- 105- 106-107-108.109-110. SUMMARY Amount %Change Original Contract Price: ::$:149,446.020 Previous Quantity Adjustmends):This Quantity Adjustment:Total Quantity Adjustment(s):Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): 0100 This Change Order: $555,997.00 0.02 Total Change Order(s)To Date: $555,997.00 0.02 Adjusted Contract Price [Original Contact Price Plus Quantity Adjustments)Plus Change Order(s)): $30,502,249.00 Difference between Original and Adjusted Contract Prices: $705,443.00 Original Contract Time: 578/578 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 578/578 SubnnIkW fQr Applik4l Prepared By: 6C Richard Will Construction Manager,CORR h Zo Signature Printed Name,Title,Company to Contractor: { MWA40r, [ �� na anted Name,Title,Company _ Date City Project �/J �S M Chad McDowell General Services Director CORR Ll�slgnatuW Printed Name,Title Date Mayor/City Manager Craig Morgan, Mayor signature Printed Name,Title Date J?N0MOQ(TI%A5 Contract Quatiry Adjustment/Change Order Project Name: Round Rock Public Library Quan.Adj./Change Order No.: 4 Change Order Data Contract Time Item# Item Description Unit Qty. Unit Price Amount Adjustment (Days) I OB 021 -COR 014-Oncor Overhead LS 1 $31,336.00 $ 31,336.00 0 Power Relocation 2 OB 038-COR 036- Lib-Site LS 1 $23,484.00 $ 23,484.00 0 Communication Tie-In 3 OB 043-COR 070- Lib RAHU Power LS 1 $40,469.00 $ 40,469.00 0 Requirement Confirmation OB 045-COR 074-Terrazzo Flooring 4 Thickness Specifications versus Contract LS 1 $52,748.00 $ 52,748.00 0 Drawings 5 OB 051 -COR 085-Sloping at Rooftop LS 1 $16,083.00 $ 16,083.00 0 Garden Ded(Additional Information 6 08 053 -COR 052-RFI 192-Lib- Display LS 1 $7,935.00 $ 7,935.00 0 Devices Recessed in Natural Stone Panels 7 OB 056-COR 087-Terra Cotta Jamb LS 1 $12,404.00 $ 12,404.00 0 Flashing 8 OB 060-COR 068- NEDT Coordination LS 1 $70,905.00 $ 70,905.00 0 Impacts 9 OB 075-COR 088-Oncor Pad Intallabon LS 1 $ 3,624.00 $ 3,624.00 0 (Piers Only) 10 OB 087-COR 113- Lib Fastening Method LS 1 $ 11,548.00 $ 11,548.00 0 for SW-1 and AP-1 at Elevator 11 OB 099-COR 144-Gar Curb to Divert LS 1 $ 20,768.00 $ 20,768.00 0 Water from IT Room and Elec. Room 12 OB 100-COR 136- NEDT-Grade Re- LS 1 $ 72,411.00 $ 72,411.00 0 Establishment OB 101 -COR 137- NEDT Paving 13 Assist/Paving Related Impacts-6.28.22- LS 1 5 19,796.00 $ 19,796.00 0 7.9.22 14 OB 104-COR 155- Flow Fill at at North LS 1 $ 7,790.00 $ 7,790.00 0 Sidewalk for Atmos Gas Line OB 105-COR 157-Site Walkway Canopy 15 Steel for Skylights LS 1 $ 2,063.00 $ 2,063.00 0 16 OB 106-COR 142-Bus Lane Scope of LS 1 $ 50,300.00 $ 50,300.00 0 Work 17 OB 107-COR 156-Gar South Eyebrow LS 1 $ 2,509.00 $ 2,509.00 0 Canopy In-Fill Framing 08 108-COR 162-Additional Parking, 18 Curb and Gutter,and Flatwork at Austin LS 1 $ 69,010.00 $ 69,010.00 0 Ave 19 OB 109-COR 163-Lockable Cabinets for LS 1 $ 2,225.00 $ 2,225.00 0 Elevator Disconnects 20 08 110-COR 164 -Paint NEDT Curb and LS 1 $ 5,250.00 $ 5,250.00 0 Gutter Subtotal $ 522,658 Insurancel 0.759°% $ 3,967 Subtotal $ 526,625 Bondi 0.55% $ 2,896 Subtotal $ 529,521 Fee 5% $ 26,476 TOTALS 1 $ 555,997 CFFY OF ROUND ROCK ROUND ROCK PUBLIC LIBRARY-CHANGE ORDER LOG tl1B DRIB OESCIIMIN)N wBCparMCfOR COST I1Kf1eNAT%N1(narpn Jwl(lamplaBt W50MlM 01R110f $oW6 0MNGE UTEB0111 OBDiI-<M Ol!-oMY PImeH nsprepo[rluass«iatN wan tlw nkU[bnotme prtrnea0 OKKOR had to nbn[aaa 1.law,tmth pdaa Msmad I d/MR021 pawerRMoabn Nmsolplralp+ S 31.33600 powtta[wMmetwamttttcllh pMlece also Ner EdrarY XP Dnknown aaanbM 05031-COR 036-ub•Stye NEDT Prefect sh wl In Mar drawn,the AT&T handiness,to N 3 13/19/2021 Nanselphl% S 23.48140 I.Infenmeronlnuttomardthe We had to sit me ErRts to our tommvnimlbnW NP unknawnmaahinra CbnmuWalbn TllYr Np6A bv[mu Tllm was now MMM NlheY sang, ih medn'is Ma to aopnsaMaditiwldrama OB043 C0R070-W RIdNpawer rtyiiMto sone,RSllVa as overoad per as no This Games MHU Main,remains fear Nl additional power 3 ll/Ia/202 RNrrYarrwnt�lYlnalOn NMYIpM% $ 0.469 TO aWNN1Als seadeaianstar tall RANuand me[warm mail HP NE wnHNmr the met Of supplynB an additional sMipn party that was ounimi amnia and(1) 104th RAl aplM real 0504S.CORO.-Tem[ap Bawtry T14s afwiBeonfptlatMwnnln[nasal ml Maknesa Wlh ThbthanRM1asaprLtM with lnueaslri{th mlhnns a 1/$/2022 1nklrww SpaaNbabM aanm ConarM mamelphl% S 52148.00 tem®(rem La'm]/Y mkt Oue to5pea16OtkMVMm dthe«naaiofroml/a'ta1/TI1hi6dualo XP NE ornNslcn Onaamea Cameron Dmmrys GJtarttaes. SpnOkaabna warms Coni Dnwil dMMnrn. TM Mande Hamtland with the Mded...news on Me S MM22 0605114nwl shot% S 16A 'w mofpMm per M 269-Sampling at Ransil Garden Daak Drawings mBed Am net deck as me ro0mp lam..But HP "Initiation !semen DeY AM1.4 [ mlear anal Additional issee M1rrsel Inlamaibn. OBOS3 CORM M 192-W.okp4T Tire prkld br NH ahanp bdrdei Ih ma atad[4tM w&h 6 2A/M2 pmlam Raonudl Wlurd Sao% all pnalps $ 793SM added Mial armrM me ENp4Y dans at the valval none Sttmns ttemkkartMnth walVaawe. Hp Own.mama. Palls paaela. lit Menalm, eeda wllanabcoa DBM-MROB7 Teen Ca0a3aMb the marls M1 l aevads to ane added Rashal lthe Teta ^weaIMBFBhamaat was b[4ndllbM where IT 2/!/1012 Ftatldry Mansel Phelps 5 lZ,aq.pp Coal jambs per"12A-Ten Caa lamb staining. RaMavalith tuaal waa ormhar Nddry antl ihh HP GCNEomisuon ltaanlng wasal owdemIMude Inhe t [orltanOlon do[uminntbn. no prOp%al Mnrsbts of HIM.1 PMpsadaptlnd as tram management own and%atter baso adjustments and nwln me new ash manaeemm plan has two wna:a mabir a4n dan outngpr plc f sm ani craw;rtMal d a 10K mishmat er fal when tower,new Is rtmwed.Tru proposal area.the atom[Nun mionialM planned.TMs prep%aI induMs the added all d the o0dOmr platform to dad,1OK allpdate,armed darimp and added cast needed OB060-CORON-MEDTCOardlnatln "Ism Nor luh0h hal bel brine IMte4lundtartohlh & L23/M22 Ynpatts HtlrtelPMlPs $ 70,90$.00 malhe opentm man avo[WM with OMMAIRS m! in en[RRPLpnjeR[na1M b/NBOT HP Owner Error [elearrd4r bhkh. dNWa, This propoml all IMpOesms6 vented W the NfOT pmJeO on:XamtN pnathleourprown%mm..amace.nil pmp[dsl outims",the prpj.pollinator kn¢m%rldaurn to nae,a mapMN fan cur peameler mass va darn toll,our h7Me l[ompllvo,ankh petMliillNu rt len[e rt%i ma. Tn4drayw b for prione'nvaned In me ala:menl draw 0.pads(Pita OaN).Th ONCOR pads an shown an the 9 � � OB 015.COR M-Omar Nd hm;Nden Nenwl Phal% $ 3,63e.0p Arahhnvral DnwiM,hwremr no Plam aeshown on theMo l4n aremwnon lee 5nvnunlnuthkMvnl HP GCNEOmisuon IpwnOnNl ShmunlmAr[Nte'ctuaDrawlnm,ONCORpmidM me (imminent deals In ah ataa[1ad ditto wniN Wert rtOvked for moll pi W. The Wking for this change includes the cost sssocated with M order to avoid the concrete imperfections,we 10 6/6/2022 OB 087-COR 113-Lib Fastening Hensel PhelpsS 11,548.00 furnishing and Installing the the plywood and face nsgbg the decided to install plywood under the SWI in the Hp Unknown conditions Method forSW-1 and AP-1 at Elevator SW-1 Panels to the AP-1 panels.This priChg Also Includes a Monumental Stairs i credlt for the ottinally deswied AM and SW-1 sttachmeM. The pricing associated with this change is far removkg bollards We have to add a concrete curb to prevent water from 11 8/2/2022 OB 099-COR 1"-Gar Curb to Divert Herne!Phelps S 20,768.00 on kvtl L adding a cw4We curb to divert water from the keel ftwing Into the electrical rooms from the Staff Garden HP AR omission Water from IT Room and Elec.Room 117 and Electrical roams,and Increasing the drain size In the I.staff garden ramp to a trench drain per RF138S. ramp. The pricing for this change is associated with the cost of Hensel 11 Phelps to provide protection at the Oght polo anchor bops, OB 100-COR 136-NEDT-Grade Re- I ete reset ulMy valve sleeves,make ooncrrepals at the ADA NEDT project h-a#ady was going to get this work done 12 8/3/2022 Establishment Hensel Phelps S 72,421.00 ramp incl curb,curb cut and grind at the drives as determined but In order to avoid delays In the Library,we decide to HP Owner scope change I by Nelson,and overall take care of this. grade re-establahmentaround the project.Please we,this addition!work Is to be tracked via T&M. The pricing for this change includes the cost associated with 101-COR 137•NEDT Pivkg assisting the paving activbtlew4mixacts from the NEDT project 08 13 BN/2022 Assist/Paving101-COR Rented impacts-6.28.22• Hensel Phelps $ 19,796.00;per CORR direction.Spec uRy,this pticing Includes the cost for NEDT project was paving roads and we had to move the HP Owner scope change 7.9.22 the jobsae fence relocation required per the NEDT project.This construction fence multiple times. Included Hensel Phelps tabor.Metalink labor.additional labor from eon Concepts,and feria stand material. 08104-COR 155-Flow Fill at at North The tag for this change Includes the cost associated with Atmos arta don't Install the gas One so we had to do a 14 8/16/2022 Sidewalk for Atmos Gas I hne Hensel Phttps S 7.790.00 histaging flow fi0 an the North side of the Library to temporary fill. HP Unknown conations accommodate the Atmos gas line. OB 105,COR 1S7-Site Wa4way canO1111 Tia ps icn'g for this change Includes the cost associated with the There Is a discrepancy between the construcftm is 8/20/2022 Steel for Sic Hensel Phelps S 2.063.OD added fwming mquled t0 make up the dimension discrepancy drawings and the construction site. HP A/E omission for the skylight training at the waMwav canopy per RFI 409. The pricing for this change Includes the cost associated with 36 8/23/2022 OB 106-COR 142-Bus Lane Scope of Hensel Phelps S $0 300vo nhToavWg and re-instaMng the bus Lane at the Ubrary per CORR NEDT project had this scope on their contract but we HP Owner scope change Work direction and decide to take care of this to avoid possible delays. design. The pricing for this change includes the cost associated with furnishing and installing the infill framing to accommodate the 17 8/29/2022 OB 107,COR 1S6-Gar South Eyebrow Hensel Phelps S LS09.00 steel discrepancy between the Architectural and Structural There Is a discrepancy between the constructions H P A/E omission Canopy to-Flll Framing drawings.Per RFI 370,the high canopy requited 6'metal drawings and the construction site framing with supports so that the South side eyebrow canopies match in site at V. i The pricing for this change includes the cost associated with Alpha Paving completing the additional paving,parking spaces, curb and gutter,and flatwork on the North side of Austin Ave. 00108-COR 162,XMT-Parking and Please now.the pricing is based off the single drawing 18 9/7/2022 Nat Work at Austin Ave Hansel Phelps S 69.010.00 avallable.The drawing did not This is an additional scope for the NEDT project. HP Owner scope change include scale,and some eldsting slle conditions vvy from the drawing.AddMfonally,the timeline of this work was discussed to occur in October wW Menu)Phelps Is stM scheduled to be onsite. The pricing for this change includes the cost associated with 08109-COR 163•lockable Cabinets for furnishing and metalling the lockable cabinets for the elevator According to the state inspector,each elovstor must 19 9/9/2022 Elevator Disconnects Hensel Phelps S L225.00 daconnects.This incUes a lockable cabinet in the Ubrary have a disconnect cabinet no mare than 20'away. HP A/E omission Penthouse,a lockable access panel In the Group Study Room and level 4 of the Garage 1M prciry lu t6k[Nnle m<lutles ine wt auoWleO WIR 06110 CORIb PaInv NEDTUrbanC CaIMb6 rk[[u2 aMrytlerarourd Me Ubary HW was 20 W13/2022 Goner HlM PhMR 5.]50.00 eV aly WR of M NOT smM IM wa prke0a13N6 rpu6st lNk Uin Mkklenaluope Mt6R NEO!erojan MP Owner e[ooe[nan6e 01N9 CORR _ wvp $ 52!,658 _ InwMn[e _ Q]59% 5 3,W _ SUMOW 5 526.625 OpOG OSS% S 2,296 S Wml S 529,521 Fee _ 5% S 26,,06 TOTAL $ 555,99 6, ) RrlktO RGCK TEXAS oaRK" Round Rock Library Change Order # 004 Summary Date:09/14/2022 Change Order q 4 to contract with Hensel Phelps Construction Co. Cost:$555,997.00 Overview: As the project progresses,minor changes incur some costs.This Change Order represents the largest cost changes not covered by the Owner's Betterment Allowance within the construction contract. 1. OB 021-COR 014:Oncor Overhead Power Relocation 2. OB 038—COR 036:Site Communication Tie-in 3. OB 043-COR 070:Lib RAHU Power Requirement Confirmation 4. OB 045-COR 074:Terrazzo Flooring Thickness Specifications versus Contract Drawings S. 08 051-COR 085:Sloping at Rooftop Garden Deck Additional Information 6. 08 OS3-COR OS2:RFI 192-Lib-Display Devices Recessed in Natural Stone Panels 7. OB 056-COR 087:Terra Cotta Jamb Flashing 8. OB 060-COR 068:NEDT Coordination Impacts 9. OB 075-COR 088:Oncor Pad Installation(Piers Only) 10. OB 087-COR 113:Lib fastening Method for SW-1 and AP-1 at Elevator 11. OB 099-COR 194:Gar Curb to Divert Water from IT Room and Elec.Room 12. OB 100-COR 136: NEDT-Grade Re-Establishment 13. OB 101-COR 137: NEDT Paving Assist/Paving Related Impacts-6.28.22-7.9.22 14. OB 104-COR 155:Flow Fill at North Sidewalk for Atmos Gas Line 15. OB 105-COR 157:Site Walkway Canopy Steel for Skylights 16. OB 106-COR 142:Bus Lane Scope of Work 17. OB 107-COR 156:Gar South Eyebrow Canopy In-Fill Framing 18. OB 108-COR 162:Additional Parking,Curb and Gutter,and Flatwork at Austin Ave 19. OB 109-COR 163:Lockable Cabinets for Elevator Disconnects 20. OB 110-COR 164:Paint NEDT Curb and Gutter Betterment(encumbered in contract) Original Remaining to Date $750,000.00 $0 Change Order 001-002-003 Total Remaining to Date $149,446.00 $92,189.94