R-2022-369 - 11/17/2022 RESOLUTION NO. R-2022-369
WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with
PM Construction & Rehab, LLC for the Chandler Creek 36-inch Wastewater Line Replacement
Project, and
WHEREAS, the Council has determined that it is necessary to make adjustments/changes to
the quantity of work to be performed or materials, equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said
Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity
Adjustment/Change Order No. 1 to the Contract with PM Construction & Rehab, LLC for the
Chandler Creek 36-inch Wastewater Line Replacement Project, a copy of said quantity
adjustment/change order being attached hereto as Exhibit"A"and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 17th day of November, 2022.
CRAIG RGA , Mayor
City of Round Rock, Texas
ATTEST:
4 AGAN SP KS, CIty Clerk
0112.20222;4997-7364-3325
EXHIBIT
Contract Quantity Adjustment/Change Order
gpyryp gpp(rExnS
rep,Ol.16
Department: LIES
Project
Name: Chandler Creek 36-inch Wastewater Line Replacement Date: Nov-18-2022
City Project Change Order/Quantity
ID Number CCWWL Adjustment No. 1
Vendor PM Construction&Rehab, LLC 131 N. Richey Street Pasadena,TX 77506 346-268-0161
Company Name Address Phone No.
Justification
After contract award and more detailed site condition assessment was done replacement by pipe bursting was determined to be too risky.The
saturated soils along with a deep burial and the chance of getting "hung up"by the CIPP liner caused the replacement method to be changed
to compression fit. Since additional labor is involved in doing it by compression fit, an increase in the contract price was warranted along with
the other changes to the contract documents including the bid proposal,technical specifications and plans.
SUMMARY Amount "/o Change
Original Contract Price: $967,000.00
Previous Quantity Adjustment(s): $0.00
This Quantity Adjustment: $0.00
Total Quantity Adjustment(s): $0.00
Total Contract Price with Quantity Adjustment(s): $967,000.00
Previous Change Order(s): $0.00 0%
This Change Order: $97,892.00 10%
Total Change Order(s)To Date: $97,892.00 10%
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s)Plus Change Order(s)]: $1,064,892.00
Difference between Original and Adjusted Contract Prices: $97,892.00
Original Contract Time: 60
Time Adjustment by previous Quan.Adj./Change Order: 0
Time Adjustment by this Quan.Adj./Change Order: 0
New Contract Time: 60
S fof.Ali
Prepared By: David Freireich,Chief Utility Engineer 10/24/22
Signature Printed Name,Title,Company Date
ApprOVA
Contractor: Alam Quintero, Area Director, PM Construction 10/20/22
SignX��w
Printed Name,Title, Company Date
City Project
Manager: David Freireich,Chief Utility Engineer
Signature Printed Name,Title Date
Mayor/City
Manager
Signature Printed Name,Title Date
Page 1 of 1
Project Name: Chandler Creek 36-inch Wastewater Line Replacement
Quan. Adj./Change Order No.: 1
Change Order Data
Contract
Time
Adjustment
Item # Item Description Unit Qty. Unit Price Amount (Days)
Travel and Mobilization-TML Region 10
P9 (Highland Lakes-Austin) 1 EA $ 10,000.00 $ 10,000.00
Travel and Mobilization-Rehab of S01 FT
P26 to 1000 FT 1 EA $10,000.00 $ 10,000.00
21"-24"Point Repair(12'-16"deep)up to
H12 12 LF 2 EA $15,000.00 $30,000.00
Al 1 Additional diameter for bursting above 30" -732 LF $329.00 ($240,828.00)
36"HDPE DR 11 IPS
Additional diameter for compression bursting
D30-Alt above 30"(36"HDPE DR 17 IPS) 732 LF S 318.00 $232,776.00
H60 Access Pit(16'-20"deep) -1 EA $8,000.00 ($8,000.00)
H70 Trench Safety to 20'deep 147 LF $100.00 $14,700.00
J12-D Discount-Operate 8"pumping system per 1 LS $428.00 $428.00
pump sec
Dewatering Setup(well pointing)
Maximum 25'deep,includes 20 linear feet
H90 setup i EA $7,500.00 $7,500.00
H91-D Discount-Extra length over 230 linear feet -1 LS $ 144.00 ($144.00)
Operation Maintain Well Points by the
H92 Day 15 DAY $300.00 $4,500.00
01 Superintendent-Regular 120 HR $35.00 $4,200.00
02 Foreman-Regular 120 HR $30.00 $3,600.00
03 Laborer-Regular 720 HR $20.00 $14,400.00
04 Truck Driver-Regular 240 HR $24.00 $5,760.00
63S Clearing and Grubbing 2 AC $4,500.00 $9,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS: 97,892.00 0
Project Name: Chandler Creek 36-inch Wastewater Line Replacement
Quan. Adj./Change Order No.: 1
Quantity Adjustment Data
Contract
Time
Adjustment
Bid Item# Item Descri tion Unit Unit Price Amount
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS: $0.001 0
�p
s
S c
s '
A . -r• � � t N
es
to
� purple Hea
N I-35
C
Chisholm Trail Rd
ti-