Contract - PM Construction & Rehab, LLC - 11/17/2022 Page 1 of 3 Contract Quantity Adjustment/Change Order ROUNO ROO(IFXA`i rev,01/16 Department: UES Project Name: Chandler Creek 36-inch Wastewater Line Replacement Date: Nov-18-2022 City Project Change Order/Quantity ID Number CCWWL Adjustment No. 1 Vendor PM Construction&Rehab, LLC 131 N. Richey Street Pasadena,TX 77506 346-268-0161 Company Name Address Phone No. Justification After contract award and more detailed site condition assessment was done replacement by pipe bursting was determined to be too risky.The saturated soils along with a deep burial and the chance of getting "hung up" by the CIPP liner caused the replacement method to be changed to compression fit. Since additional labor is involved in doing it by compression fit, an increase in the contract price was warranted along with the other changes to the contract documents including the bid proposal,technical specifications and plans. SUMMARY Amount %Change Original Contract Price: $967,000.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $967,000.00 Previous Change Order(s): $0.00 0% This Change Order: $97,892.00 10% Total Change Order(s)To Date: $97,892.00 10% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $1,064,892 00 Difference between Original and Adjusted Contract Prices: $97,892.00 Original Contract Time: 60 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 60 Prepared By: David Freireich,Chief Utility Engineer 10/24/22 Signature Printed Name,Title,Company Date Contractor: Sig at Printed Name,Title,Company Date City Project Manager: tI �1 i David Freireich,Chief Utility Engineer 0 ture Printed Name,Title Date Mayor/City4Manager M &e� SigqbturePrinted Name,Title Dafte Page 2 of 3 Project Name: Chandler Creek 36-inch Wastewater Line Replacement Quan. Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) P9 Travel and Mobilization-TML Region 10 1 EA $ 10,000.00 $ 10,000.00 (Highland Lakes-Austin) Travel and Mobilization-Rehab of 501 FT P26 1 EA $ 10,000.00 $ 10,000.00 to 1000 FT 21"-24" Point Repair(12'-16"deep)up to H12 2 EA $ 15,000.00 $30,000.00 12 LF Additional diameter for bursting above 30" Al 1 -732 LF $329.00 ($240,828.00) (36" HDPE DR 11 IPS) Additional diameter for compression bursting D30 Alt above 30"(36'' HDPE DR 17 IPS) 732 LF $318.00 $232,776.00 H60 Access Pit(16-20"deep) -1 EA $8,000.00 ($8,000.00) H70 Trench Safety to 20'deep 147 LF $ 100.00 $ 14,700.00 J12-D Discount-Operate 8" pumping system per 1 LS $428.00 $428.00 pump spec Dewatering Setup(well pointing) Maximum 25'deep,includes 20 linear feet H90 setup 1 EA $7,500.00 $7,500.00 H91-D Discount-Extra length over 230 linear feet -1 LS $ 144.00 ($ 144.00) Operation Maintain Well Points by the H92 15 DAY $300.00 $4,500.00 Day O1 Superintendent-Regular 120 HR $35.00 $4,200.00 02 Foreman-Regular 120 HR $30.00 $3,600.00 03 Laborer-Regular 720 HR $20.00 $ 14,400.00 04 Truck Driver-Regular 240 HR $24.00 $5,760.00 B35 Clearing and Grubbing 2 AC $4,500.00 $9,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Project Name: Chandler Creek 36-inch Wastewater Line Replacement Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0