Loading...
R-2022-398 - 12/1/2022 RESOLUTION NO. R-2022-398 A RESOLUTION AMENDING "APPENDIX A: FEES,RATES AND CHARGES" TO THE CODE OF ORDINANCES,CITY OF ROUND ROCK,TEXAS, RELATED TO SUBDIVISION FEES,BUILDING PERMIT FEES AND ZONING FEES WHEREAS, the City desires to amend certain fees related to subdivision fees, building permit fees, and zoning fees from"Appendix A: Fees, Rates and Charges";Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, I. That the following fees set forth in "Appendix A: Fees, Rates and Charges" to the Code of Ordinances, City of Round Rock, Texas, related to Subdivision Design and Construction are hereby amended as follows: PART Ill —ZONING AND DEVELOPMENT CODE CHAPTER 4:SUBDIVISION DESIGN AND CONSTRUCTION Article I. In General: 4-14 Subdivision fees: Concept plans $500.00 Revised preliminary plats (requiring approval of 50% of original preliminary plat the Planning & Zoning Commission) application fee Notification fees (when required): Per notified property owner $2.00 Per published notice $275.00 Inspection fees: Inspection fees for public improvements and/or private streets shall be 0112.20222;4880.8146-6432 equal to 3%of the actual total construction costs of installing and constructing the public improvements and/or private streets being inspected.The amount of the inspection fees for public improvements and/or private streets shall be sealed by the developer's engineer and approved by the City Engineer. II. That the following fees shall be added to "Appendix A: Fees, Rates and Charges" to the Code of Ordinances, City of Round Rock, Texas, related to Zoning and Development Standards: CHAPTER 8—ZONING AND DEVELOPMENT STANDARDS Article X. Buildings and Building Regulations: Division 1. Building Codes: 8-106 Residential Construction: t _.._._,...,,.._ _For all new residential construction a permit fee for each building shall be paid at the time of filing the permit application, in accordance with the following schedule: For single-family/townhome residential $485.00 construction For duplex residential construction $970.00 For multi-family construction $60.00 plus $0.12 per square foot of floor space For all new multifamily construction and all new condominium construction, a fee in the amount shown shall be paid at the time of filing the permit $0.08 per square foot of floor space application, said fee to be for review of building plans for compliance with Fire Code Requirements 2 and for initial in-field inspection of each building Commercial and office construction: For all new commercial and office construction,a permit fee in the amount shown shall be paid for $0.12 per square foot of office each building at the time of filing the permit space application For all new commercial and office construction, a fee in the amount shown shall be paid at the time of filing the permit application, said fee to be for $0.08 per square foot of floor space ; review of building plans for compliance with Fire Code requirements and for initial in-field inspection of each building Industrial Construction: For all new industrial construction, a -���-.-_- permit fee in j $60.00 plus$0.12 per square foot of !the amount shown shall be paid for each building at floor space the time of filing the permit application .............. _ For all new industrial construction, a fee in the amount shown shall be paid at the time of filing the permit application,said fee to be for review of building plans for compliance with Fire Code $0.08 per square foot of floor space requirements and for initial in-field inspection of E each building r— Other types of Construction: For all other types of new construction, a permit fee in the amount shown shall be paid for each $60.00 plus$0.12 per square foot of floor space building at the time of filing the permit application For all other types of new construction, a fee—in the amount shown shall be paid at the time of filing ' the permit application,said fee to be for review of $0.08 per square foot of floor space building plans for compliance with Fire Code requirements and for initial in-field inspection of 3 each building I Other permits: Installation regulated by Code of Ordinances: Any owner, authorized agent, or contractor who desires to enlarge, alter, remodel, repair, or change the occupancy of a building or structure,or to install irrigation systems, or alter fire extinguishing apparatus, elevators, engines or to install a steam boiler,furnace, heater, incinerator, or other heat- producing apparatus, or other appurtenances, or otherwise provide for a fixed improvement,the installation of which is regulated by this Code, shall pay a fee for each building permit as required at the time of filing application in accordance with the following: ... __. Commercial Construction: .___ ...__ The applicant for the permit shall include an amount for the Total Valuation, which shall be the !. total of all construction work for which the permit is sought, including but not limited to all materials, labor, painting, roofing, electrical, plumbing, heating, air conditioning, and any other permanent equipment incorporated in the construction work. If the building official does not agree with the amount of the Total Valuation as submitted by the applicant,the Building Official shall determine the total cost using certified construction estimates or nationally recognized publications to determine the total Valuation. If an applicant disputes the Total Valuation as determined by the Building Official, E the applicant may appeal to the City Manager, 3 whose decision regarding the Total Valuation shall E be final Total Valuation: 4 $2,000.00 and less t $50.00 E $50.00 for the first$2,000.00 plus $2,000.01 to$15,000.00 $10.00 each additional thousand or fraction thereof,to and including F $15,000.00 i `$180.00 for the first $15,000.00 plus $15,001.00 to$50,000.00 $7.00 for each additional thousand or fraction thereof,to and including $50,000.00 $425.00 for the first$50,000.00 plus $50,001.00 to$100,000.00 $5.00 each additional thousand or a 'fraction thereof,to and $100,000.00 $675.00 for the first $100,000.00 i plus $3.00 each additional thousand $100,001.00 to$500,000.00 or fraction thereof,to and including I $500,000.00 i € $1875.00 for the first$500,000.00 $500,000.00 and up plus $2.00 for each additional thousand i Residential Construction: Tier#1: r -� -- For on-the-spot permit. For example, s ;electrical, plumbing, mechanical, irrigation,and $50.00 ;storage sheds. Tier#2: Pergolas without roof,wood decks and patios without electrical or plumbing work $125.00 Tier#3: 5 Solar Panels $150.00 Tier#4: _.� _.-_ __ p W-------- .� Covered patios with concrete; no electric or plumbing. $200.00 l Tier#5: Elevated decks, concrete slab electrical, plumbing, $300.00 outdoor kitchens __.__..._..__._......... _._... Tier#6: Swimming pools $350.00 Tier#7: Home remodels and additions. $500.00 Installation regulated by the Fire Code:Any owner, authorized agent, or contractor who desires to enlarge, alter, remodel, repair, or change the occupancy of a building or structure, or to install irrigation systems,or alter fire extinguishing i apparatus, elevators, engines or to install a steam boiler,furnace, heater, incinerator, or other heat- producing apparatus,or other appurtenances, or i otherwise provide for a fixed improvement,the installation of which is regulated by the City Fire Code, shall pay a fee for compliance with Fire Code requirements and for the initial in-field inspection of the building at the time of filing application in accordance with the following: Total Valuation: $2,000 and less $15.00 $2,001 to$15,000 $25.00 for the first$2,000 plus $1.50 for each additional thousand 6 or fraction thereof,to and including $15,000 $50.00 for the first$15,000 plus I i $1.25 each additional thousand or $15,001 to$50,000 fraction thereof;to and including $50,000 $100.00 for the first$50,000 plus $50,0001 to$100,000 $1.00 each additional thousand or fraction thereof,to and including $100,000 $150.00 for the first$100,000 plus $100,001 to$500,000 $0.65 each additional thousand or fraction thereof,to and including $500,000 i $500.00 for the first$500,000 plus $500,000 and up $0.35 each additional thousand or fraction thereof Moving of building or structures $50.00 Demolition of a building or structures $50.00 Failure to obtain permit: Where work for which a permit is required by the Code is started or proceeded with prior to obtaining said permit,the fees herein specified } shall be doubled, but the payment of such double Double Fee E fee shall not relieve any person from fully complying with the requirements of the Code in execution of that work, nor from any other penalties prescribed by the Code. Reinspection fee: Upon notification by the permit holder or his agent, ` $75.00 the Building Official or the Fire Department shall 7 make the necessary inspection and shall either 1 approve that portion of the construction as completed or shall notify the permit holder or his agent of any violation of the Code. If upon re- inspections a portion of the construction is not « approved,a fee in the amount shown shall be paid for any subsequent re-inspections of the construction not approved. I Structural steel inspection fee: Theater of$100.00 or�$0.07 per square foot of the total floor space For any type of construction where structural steel contained within the steel frame, components will be included,the applicant for a plus the total area covered by, but building permit shall pay a fee in the amount shown not contained within,the steel frame r.........._ ._ _ _ _ ... Where the steel frame components are a minimal part of the construction being permitted and require no more than two inspections as determined by the Building Official,the structural $100.00 steel assessment fee shall be as shown. The applicant shall be entitled to a refund of such fee in the event no structural steel inspection is actually made. '7Fire sprinkler system inspection fees: Fire sprinkler system plan review and inspection: For any type of construction which includes a fire sprinkler system,a fee for the review of sprinkler $60.0 for each riser plus$2.00 for plans,visual inspection, and hydraulic leak each sprinkler head in excess of 25 inspection of the system in the amount shown shall be paid at the time of filing the permit application E I � Re-inspections: Upon notification by the permit holder or his agent,the Fire Department shall make !. the necessary inspection and shall either approve $75.00 the fire sprinkler system plan as installed or notify the permit holder or his agent of any violations of 8 the Fire Code. if upon inspection a portion of the fire sprinkler system inspected is not approved, a fee in the amount shown shall be paid for any subsequent re-inspections of the fire sprinkler system Partial visual inspection fee: For requests to visually inspect only a portion of a fire sprinkler system, rather than the entire system at once, an additional fee in the amount shown shall be paid for each $25.00 partial inspection requested in addition to the initial sprinkler system plan review fee Fire systems inspection fee: r- For any type of construction which includes a fire system other than a sprinkler system, including kitchen hood suppression systems and paint hood $50.00 per system suppression systems, an inspection fee in the amount shown shall be paid at the time of filing the permit application Alarm plans review and inspection fee: For any type of construction which includes a fire alarm system, a fee for plan review, including visual $60.00 for each panel plus$1.00 for and audible in-field inspection, in the amount each device shown shall be paid at the time of filing the permit € application j Upon notification by the permit holder or his agent, the Fire Department shall make the necessary inspection and shall either approve the fire alarm [ system plan as installed or notify the permit holder of his agent of any violations of the Fire Code. If $50.00 upon inspection a portion of the fire alarm system inspected is not approved, a fee in the amount [ shown shall be paid for any subsequent re inspections of the fire alarm system 9 Institutional facility inspection fees: The Fire Department shall provide fire prevention inspections of the institutional facilities as I requested $1.00 per bed for hospitals and Institutional facility inspection fees shall be paid to ` nursing homes the Fire Department at the time of request, in the 's $50.00 for institutional facilities amounts shown which require a day care or foster care license from the state No refunds: Except as provided herein under structural steel inspection fee, after an application for a building , permit has been made and the permit fee paid, there will be no refunds made by the City to applicant Expired permits: Once a building permit has expired,the applicant must reapply for a new permit and pay all applicable fees Copies of inspection reports: "Additional copies of any inspection or fire report 3 prepared by the Fire Department shall be available $3.00 for an additional charge as shown Environmental research fee: Requests to the Fire Department for environmental site research shall be subject to a fee in the amount " $100.00 plus$35.00 per hour or shown to cover the costs of research and i fraction thereof after the first hour production 10 $300,000 for injuries in any one Public liability insurance policy: Minimum amount accident$100,000 for injuries to any 8-107 of liability insurance coverage required prior to one person $50,000 for property obtaining a permit damage Worker's compensation insurance policy: Minimum Amount not less than the minimum amount of workers' compensation insurance coverage required by state statutes coverage required prior to obtaining permit 8-113(f)(1) Certificates of occupancy: ---�—� --� Where no building permit is required but a certificate of occupancy is necessary, an application fee in the amount shown shall be paid at the time i $75.00 of filing an application for certificate of occupancy, which fee shall include one inspection For a temporary certificate of occupancy, an application fee in the amount shown shall be paid !! 8-113(f)(2) at the time of filing an application for a temporary $250.00 certificate of occupancy,which fee shall include j one inspection For an extension of a temporary certificate of occupancy, an application fee in the amount shown shall be paid at the time of filing an application for $100.00 an extension of a temporary certificate of occupancy III. That the following fees set forth in "Appendix A: Fees, Rates and Charges" to the Code of Ordinances, City of Round Rock, Texas, related to Zoning and Development Standards are hereby amended as follows: 11 CHAPTER 10:ZONING AND DEVELOPMENT REVIEW BODIES AND PROCEDURES Article I. In General: 10-1 Zoning: Notification fees per property owner $2.00 Published notice $275.00 Standard site plan $2,000.00 plus $200.00 per acre, calculated as appears under"Notes" Notes: $1,000.00 plus $200.00 times the number of acres or fraction thereof in excess of 1 acre, calculated on a pro rata basis. Example: a 2.75 acre tract would generate a fee of $2,350.00 calculated as follows: $2,000.00+($200.00 x 1.75=$350.00) _ $2,350.00 IV. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. 12 RESOLVED this Ist day of December, 2022. CRAIG M0,k6'jANj0ayor City of Round Ro , Texas ATTEST: MEAGAN SP S, C y Clerk 13 Back- up Materials Not part of official Resolution RESOLUTION NO. R-202 r A RESOLUTION AMENDING "APPENDIX A: FEES, RATES AND CHARGES" TO THE CODE OF ORDINANCES, CITY OF ROUND ROCK, TEXAS, RELATED TO SUBDIVISION FEES, BUILDING PERMIT FEES AND ZONING FEES WHEREAS, the City desires to amend certain fees related to subdivision fees, building permit fees, and zoning fees from "Appendix A: Fees, Rates and Charges"; Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, I. That the following fees set forth in "Appendix A: Fees, Rates and Charges" to the Code of Ordinances, City of Round Rock, Texas, related to Subdivision Design and Construction are hereby amended as follows: PART III—ZONING AND DEVELOPMENT CODE CHAPTER 4:SUBDIVISION DESIGN AND CONSTRUCTION Article I. In General: 4-14 Subdivision fees: Concept plans $500.00 ors 2c�eF 104 Revised preliminary plats(requiring approval of 50%of original preliminary plat the Planning&Zoning Commission) application fee Notification fees (when required): Per notified property owner $ 8A2.00 Per published notice $159.99275.00 Inspection fees: Inspection fees for public 0112.20222:4880-8146-6432 improvements and/or private streets shall be equal to 4-.53%of the actual total construction costs of installing and constructing the public improvements and/or private streets being inspected.The amount of the inspection fees for public improvements and/or private streets shall be sealed by the developer's engineer and approved by the City Engineer. II. That the following fees shall be added to "Appendix A: Fees, Rates and Charges" to the Code of Ordinances, City of Round Rock, Texas, related to Zoning and Development Standards: CHAPTER 8—ZONING AND DEVELOPMENT STANDARDS Article X. Buildings and Building Regulations: Division 1. Building Codes: 8-106 Residential Construction: For all new residential construction, a permit fee for each building shall be paid at the time of filing the permit application, in accordance with the following schedule: For single-family/townhome residential construction 485.00 For duplex residential construction $970.00 For multi-family construction $60.00 plus$0.12 per square foot of floor space For all new multifamily construction and all new condominium construction, a fee in the amount shown shall be paid at the time of filing the permit 0.08 per square foot of floor space application, said fee to be for review of building plans for compliance with Fire Code Requirements 2 and for initial in-field inspection of each building Commercial and office construction: For all new commercial and office construction, a permit fee in the amount shown shall be paid for $0.12 per square foot of office each building at the time of filing the permit space application For all new commercial and office construction, a fee in the amount shown shall be paid at the time of filing the permit application, said fee to be for $0.08 per square foot of floor space review of building plans for compliance with Fire Code requirements and for initial in-field inspection of each building Industrial Construction: For all new industrial construction, a permit fee in $60.00 plus$0.12 per square foot of the amount shown shall be paid for each building at floor space the time of filing the permit application For all new industrial construction, a fee in the amount shown shall be paid at the time of filing the permit application, said fee to be for review of 0.08 per square foot of floor space building plans for compliance with Fire Code requirements and for initial in-field inspection of each building Other types of Construction: For all other types of new construction, a permit $60.00 plus $0.12 per square foot of fee in the amount shown shall be paid for each floor space building at the time of filing the permit application For all other types of new construction, a fee in the amount shown shall be paid at the time of filing the permit application, said fee to be for review of 0.08 per square foot of floor space building plans for compliance with Fire Code requirements and for initial in-field inspection of 3 each building Other permits: Installation regulated by Code of Ordinances: Any owner, authorized agent, or contractor who desires to enlarge, alter, remodel, repair, or change the occupancy of a building or structure, or to install irrigation systems, or alter fire extinguishing apparatus, elevators, engines or to install a steam boiler, furnace, heater, incinerator, or other heat- producing apparatus, or other appurtenances, or otherwise provide for a fixed improvement, the installation of which is regulated by this Code, shall pay a fee for each building permit as required at the time of filing application in accordance with the following: Commercial Construction: The applicant for the permit shall include an amount for the Total Valuation, which shall be the total of all construction work for which the permit is sought, including but not limited to all materials, labor, painting, roofing, electrical, plumbing, heating, air conditioning, and any other permanent equipment incorporated in the construction work. If the building official does not agree with the amount of the Total Valuation as submitted by the applicant, the Building Official shall determine the total cost using certified construction estimates or nationally recognized publications to determine the total Valuation. If an applicant disputes the Total Valuation as determined by the Building Official, the applicant may appeal to the City Manager, whose decision regarding the Total Valuation shall be final Total Valuation: 4 $2,000.00 and less $50.00 $50.00 for the first$2,000.00 plus $2,000.01 to $15,000.00 $10.00 each additional thousand or fraction thereof, to and including $15,000.00 $180.00 for the first$15,000.00 plus $15,001.00 to $50,000.00 $7.00 for each additional thousand or fraction thereof, to and including 50 000.00 $425.00 for the first$50,000.00 plus $50,001.00 to $100,000.00 $5.00 each additional thousand or fraction thereof, to and $100,000.00 $675.00 for the first $100,000.00 $100,001.00 to $500,000.00 plus$3.00 each additional thousand or fraction thereof,to and including $500,000.00 $1875.00 for the first$500,000.00 $500,000.00 and up plus $2.00 for each additional thousand Residential Construction: Tier#1: For on-the-spot permit. For example, electrical, plumbing, mechanical, irrigation, and $50.00 storage sheds. Tier#2: Pergolas without roof, wood decks and patios 125.00 without electrical or plumbing work Tier#3: 5 Solar Panels $150.00 Tier#4: Covered patios with concrete; no electric or 200.00 plumbing. Tier#5: Elevated decks, concrete slab electrical, plumbing, outdoor kitchens 300.00 Tier#6: Swimming pools $350.00 Tier#7: Home remodels and additions. $500.00 Installation regulated by the Fire Code: Any owner, authorized agent, or contractor who desires to enlarge, alter, remodel, repair, or change the occupancy of a building or structure, or to install irrigation systems, or alter fire extinguishing apparatus, elevators, engines or to install a steam boiler, furnace, heater, incinerator, or other heat- producing apparatus, or other appurtenances, or otherwise provide for a fixed improvement, the installation of which is regulated by the City Fire Code, shall pay a fee for compliance with Fire Code requirements and for the initial in-field inspection of the building at the time of filing application in accordance with the following: Total Valuation: $2,000 and less $15.00 $2,001 to $15,000 $25.00 for the first $2,000 plus $1.50 for each additional thousand 6 or fraction thereof,to and including 15 000 $50.00 for the first$15,000 plus $15,001 to$50,000 $1.25 each additional thousand or fraction thereof; to and including $50,000 $100.00 for the first$50,000 plus $50,0001 to$100,000 $1.00 each additional thousand or fraction thereof,to and including $100,000 $150.00 for the first$100,000 plus $100,001 to$500,000 $0.65 each additional thousand or fraction thereof,to and including $500,000 $500.00 for the firs$500,000 plus $500,000 and up $0.35 each additional thousand or fraction thereof Moving of building or structures $50.00 Demolition of a building or structures $50.00 Failure to obtain permit: Where work for which a permit is required by the Code is started or proceeded with prior to obtaining said permit,the fees herein specified shall be doubled, but the payment of such double Double Fee fee shall not relieve any person from fully complying with the requirements of the Code in execution of that work, nor from any other penalties prescribed by the Code. Reinspection fee: Upon notification by the permit holder or his agent, $75.00 the Building Official or the Fire Department shall 7 make the necessary inspection and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent of any violation of the Code. If upon re- inspections a portion of the construction is not approved, a fee in the amount shown shall be paid for any subsequent re-inspections of the construction not approved. Structural steel inspection fee: The greater of$100.00 or$0.07 per For any type of construction where structural steel square foot of the total floor space components will be included, the applicant for a contained within the steel frame, building permit shall pay a fee in the amount shown plus the total area covered by, but not contained within, the steel frame Where the steel frame components are a minimal part of the construction being permitted and require no more than two inspections as determined by the Building Official, the structural 100.00 steel assessment fee shall be as shown. The applicant shall be entitled to a refund of such fee in the event no structural steel inspection is actually made. Fire sprinkler system inspection fees: Fire sprinkler system plan review and inspection: For any type of construction which includes a fire sprinkler system, a fee for the review of sprinkler $60.0 for each riser plus$2.00 for plans, visual inspection, and hydraulic leak each sprinkler head in excess of 25 inspection of the system in the amount shown shall be paid at the time of filing the permit application Re-inspections: Upon notification by the permit holder or his agent, the Fire Department shall make the necessary inspection and shall either approve 75.00 the fire sprinkler system plan as installed or notify the permit holder or his agent of any violations of 8 the Fire Code. If upon inspection a portion of the fire sprinkler system inspected is not approved, a fee in the amount shown shall be paid for any subsequent re-inspections of the fire sprinkler system Partial visual inspection fee: For requests to visually inspect only a portion of a fire sprinkler system, rather than the entire system at once, an additional 25.00 fee in the amount shown shall be paid for each partial inspection requested in addition to the initial sprinkler system plan review fee Fire systems inspection fee: For any type of construction which includes a fire system other than a sprinkler system, including kitchen hood suppression systems and paint hood $50.00 per system suppression systems, an inspection fee in the amount shown shall be paid at the time of filing the permit application Alarm plans review and inspection fee: For any type of construction which includes a fire alarm system, a fee for plan review, including visual $60.00 for each panel plus$1.00 for and audible in-field inspection, in the amount each device shown shall be paid at the time of filing the permit application Upon notification by the permit holder or his agent, the Fire Department shall make the necessary inspection and shall either approve the fire alarm system plan as installed or notify the permit holder of his agent of any violations of the Fire Code. If $50.00 upon inspection a portion of the fire alarm system inspected is not approved, a fee in the amount shown shall be paid for any subsequent re- inspections of the fire alarm system 9 Institutional facility inspection fees: The Fire Department shall provide fire prevention inspections of the institutional facilities as requested $1.00 per bed for hospitals and Institutional facility inspection fees shall be paid to nursing homes the Fire Department at the time of request, in the $50.00 for institutional facilities amounts shown which require a day care or foster care license from the state No refunds: Except as provided herein under structural steel inspection fee, after an application for a building permit has been made and the permit fee paid, there will be no refunds made by the City to applicant Expired permits: Once a building permit has expired, the applicant must reapply for a new permit and pay all applicable fees Copies of inspection reports: Additional copies of any inspection or fire report prepared by the Fire Department shall be available $3.00 for an additional charge as shown Environmental research fee: Requests to the Fire Department for environmental site research shall be subiect to a fee in the amount $100.00 plus$35.00 per hour or shown to cover the costs of research and fraction thereof after the first hour production 10 Public liability insurance policy: Minimum amount $300,000 for injuries in any one 8-107 of liability insurance coverage required prior to accident$100,000 for injuries to any obtaining a permit one person$50,000 for property damage Worker's compensation insurance policy: Minimum Amount not less than the minimum amount of workers' compensation insurance coverage required by state statutes coverage required prior to obtaining permit 8-113 f 1 Certificates of occupancy: Where no building permit is required but a certificate of occupancy is necessary, an application fee in the amount shown shall be paid at the time $75.00 of filing an application for certificate of occupancy, which fee shall include one inspection For a temporary certificate of occupancy,an application fee in the amount shown shall be paid 8-113 f 2 at the time of filing an application for a temporary $250.00 certificate of occupancy, which fee shall include one inspection For an extension of a temporary certificate of occupancy, an application fee in the amount shown shall be paid at the time of filing an application for $100.00 an extension of a temporary certificate of occupancy M. That the following fees set forth in "Appendix A: Fees, Rates and Charges" to the Code of Ordinances, City of Round Rock, Texas, related to Zoning and Development Standards are hereby amended as follows: 11 CHAPTER 10: ZONING AND DEVELOPMENT REVIEW BODIES AND PROCEDURES Article I. In General: 10-1 Zoning: Notification fees per property owner $42.00 Published notice $IW275.00 Standard site plan $-12 000.00 plus$200.00 per acre, calculated as appears under"Notes" Notes: $1,000.00 plus$200.00 times the number of acres or fraction thereof in excess of 1 acre, calculated on a pro rata basis. Example: a 2.75 acre tract would generate a fee of $-12 350.00 calculated as follows: $-12 000.00+ ($200.00 x 1.75 = $350.00) _ $-12 350.00 Regardless of the eFege;RR the total fee fre wite plan with three staff reviews shall nl.t ewe-eed- $r nnn nn IV. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. 12 RESOLVED this 1st day of December, 2022. Z// CRAIG MO AN, Mayor City of R d Rock, Texas ATTEST: MEAGAN SPIN , City Clerk 13 Old and New Project Fees Old SDP fee—$1,000+$100/acre after the first acre, $5,000 max New SDP fee—$2,000+$100/acre after the first acre, no max Old Building permit fee—$0.08 per square foot; New building permit fee—$0.12 per square foot Old Fire review fee—$0.05 per square foot; New fire review fee-$0.08 per square foot Discount Tire—8,192 square foot building on a 1.59-acre lot Old SDP+ Building+ Fire fees combined:$1,117.60+$655.36+$409.60=$2,182.56 New fees combined: $2,117.60+$983.04+$655.36=$3,756.00 Out of a total fee amount due (including impact and other fees) of$83,684.46 Retail Strip—21,004 square foot building on a 3.02-acre lot Old fees:$1,405+$1,680.32 +$1,050.2 =$4,135.52 New fees: $2,405+$2,520.48+$1,680.32 =$6,605.80 Out of a total of$61,726.67 (no roadway impact fees were due, but would have added $96,143 more) Round Rock 19 Light Industrial Warehouse—176,534 square foot building on a 20.46-acre lot Old fees:$4,892.76+$14,122.72+$8,826.70=$27,842.18 New fees: $5,892.76+$21,184.08+$14,122.72=$41,199.56 Out of a total of$123,361.39(no roadway impact fees were due, but would have added $333,971 more) Single-family Subdivision—65 lots+ 2,214 linear feet of new streets and all public utilities and drainage costing$1,172,377.65 Old SIP fees:$17,585.66=$270.55 per home New SIP fees: $35,171.32 =$541.10 per home Old building permit fee: $285 per home New building permit fee: $485 per home Total increase per home: $470.55 Out of a total of$12,375.89 per home ($4,814 of which is the roadway impact fee) City SDP Fee(old—m new) SDP Fee Structure SIP Fee(old-->new) SIP Fee Structure Pad=$1,117.60-->$2,117.60 Old: 0+$100/acre beyond 1st acre;max$ Basic-$379.92-->$759.84 Old:Review-$0.Inspection-1.5%of cost of public infrastructure Round Rock Retail=$1,405.00-->$2,405.00 New:w:$2 52000+$100/acre beyond 1st acre;no max max Moderate=$2,550.45-->$5,100.90 (due at acceptance).New:Review-$0.Inspection-3%of cast of LI=$4,892.76-->$5,892.76 Phase of SF subdivision=$17,585.66-->$35,171.32 public infrastructure(due at acceptance) Pad=$2,051.12 Sliding scale based on impervious cover plus other base Basic=$1,396.48 Review-$500.00 plus$10.00 per acre or lot(whichever is greater). Cedar Park Retail=$3,541.16 fees;no max Moderate=56,507.05 Inspection-varies from 1.75%of cost of construction(for higher cost LI=$5,890.33 Phase of SF subdivision=$21,666.61 projects)to 3.5%(for lower cost projects) Pad=$3,4389.90 $0.05 per sf impervious cover plus other base fees;no Basic=$1,133,33 Review-$250.Inspection-3.5%of the construction cost,due up Leander Retail=$6,352.90 Moderate=$6,201.05 front.$1,000 resubmittal fee after 1st resubmittal under standard max LI=$26,133.15 Phase of SF subdivision=$41,283.22 review procedure. Pad=$5,153.25 550,Basic=$4 $5,000+$175 per acre beyond 1st acre+$50 tech fee;no $4,500+$100 per acre/lot over 1 acre/lot/easement area(whichever Georgetown Retail=$5,403.50 max Moderate=$5,110 is greater)+$50 tech fee LI=$8,455.50 Phase of SF subdivision=$10,950 Pad=$4,555.58 $0.06 per sf impervious cover(or$0.12 for expedited Basic=$1,386.48 Pflugerville Retail=$10,966.38 review)+$0.05 per sf imp coy for fire review+$15 tech Moderate=$6,451.05 $500 app fee up front+3.5%of construction cost upon approval LI=$54,482.93 fee.No max Phase of SF subdivision=$41,533.22 Pad=$2,838.30 Basic=$759.94 Hutto Retail=$5,106.90 $1,000+$100/acre+ + sf imp cover(not incl. Moderate=$5,100.90 3%of opinion of probable cost,due up front bldg footprint). N No max LI=$19,001.10 Phase of SF subdivision=$35,171.33 Pad=$159 Basic=$633.20 Prelim site plan-$50/acre or portion thereof;Full site 2.5%of cost of all public paving and all public and private water, Frisco Retail=$302 Moderate=$4,250.75 plan-$100/acre or portion thereof. sewer,and storm up to within 5'of the building,due at pre-con LI=$2,046 Phase of SF subdivision=$29,309.44 Pad=$250 Basic=$886,48 3.5%of the valuation of the public infrastructure,due prior to permit McKinney Retail=$250 $250 base fee plus$50/acre if>5 acres;max$2,500 Moderate=$5,951.05 issuance LI=$1,023 Phase of SF subdivision=$41,033.22 Pad=$763.50 Submittal fee of$656.25+land disturbance permit fee of Basic=$504.76 2%of the total cost to construct the public infrastructure(paid upon Sugar Land Retail=$763.50 Moderate=$3,400.60 LI=$763.50 $107.25 for sites above 1 acre Phase of SF subdivision=$23,447.55 request of acceptance) SDP Examples Used SIP Examples Used Pad Site=Discount Tire(8,192 GFA,1.59 acre lot,41,278 impervious cover) Basic=East Anderson Subdivision(153 it wastewater extension costing$25,328) Retail Strip=Gattis Retail Village(21,004 GFA,3.02 acre lot,99,558 imp cover) Moderate=Embassy Suites(686 ft water and 720 it wastewater costing$170,030) Light Industrial=Round Rock 19(176,534 GFA,20.46 acre lot,495,263 imp cover) Phase of SF subdivision=Vizcaya Ph 7A(65 lots+2214 feet of new streets costing$1,172,377.65) Summary of Proposed Fee Changes — Planning Activities Application Current Fee Proposed Fee Justification tPlan Conce _- , . ,$�,.� ,.�.,� p 00 base fee $500 base fee Lots are no longer shown on Concept +$25 per lot(varies) +$100 legal fee Plans since the adoption of the +$100 legal fee +Notification fees(varies) Development Code in 2018. +Notification fees(varies) Revised Preliminary Plat None 50%of original Preliminary Plat New fee covers review for revised (Requiring P&Z approval) application fee application requiring P&Z approval. Legal Notice Published on $150 per published notice $275 per published notice Publication costs have increased since Newspaper the last revision of this fee(2009). Proposed fee covers the average cost of publication. Mailed Notification Fee $1 per property owner $2 per property owner Proposed fee covers current postage (To property owners and supplies costs per mailed notice. within 300 ft of subject property) Site Development Permit $1000 base fee+$200/acre $2000 base fee+$200/acre beyond Staff time(hourly rate)required to beyond first acre(pro-rated). first acre(pro-rated).No cap. review SDP applications is frequently Capped at$5,000 double or triple the fee collected. Subdivision Improvement 1.5%of the cost of the public 3%of the cost of the public Average of local cities,but without Permit(inspection fee) improvements improvements additional review fee charged by some.Will help recapture staff time required to review small-medium projects.Still collected at acceptance, whereas other cities collect upon submittal or approval.