CM-2022-304 - 12/2/2022 Taylor—Round Rock—Austin 138kV Line J0054)
E-14369
2021-2576KS
ENCROACHMENT ON EASEMENT
WHEREAS, Oncor Electric Delivery Company LLC ("Oncor"), is the owner of an easement in
Williamson County, Texas, which is recorded in Volume 233, Page 465, of the Deed Records of
Williamson County, Texas ("Easement"); and
WHEREAS, the City of Round Rock, ("User"), desires permission to construct, operate and maintain
an underground water drainage system consisting of approximately one thousand five hundred(1,500)
linear feet of sixteen inch(16")underground water drainage pipelines;approximately one thousand five
hundred (1,500) linear feet of forty-eight-inch (48") storm sewer reinforced concrete pipelines (RCPs);
approximately one hundred (100) linear feet of twenty-four-inch (24") storm sewer reinforced concrete
pipelines (RCPs); two storm sewer forty-eight inch (48') concrete riprap outfalls; two drop inlets not to
impeded ingress/egress; two junction boxes not to impede ingress/egress; and approved grading
changes as outlined in exhibits Al, A2, A3, A4 (collective "Encroaching Facility") within the area or
boundaries of the Easement("Easement Area").
NOW, THEREFORE, in consideration of the mutual covenants contained herein and other good and
valuable consideration,the receipt and sufficiency of which is hereby acknowledged,Oncor and User do
hereby agree as follows:
1. Location of Encroaching Facility. User may locate the Encroaching Facility in the Easement
Area, but only as described and shown on the attached drawing marked Exhibits Al-A4, incorporated
herein. User may not relocate the Encroaching Facility within the Easement Area without the consent
and approval of Oncor, which consent and approval shall be at Oncor's sole discretion. User
acknowledges and agrees that Oncor holds easement rights on the Easement Area; therefore, User
shall obtain whatever rights and permission, other than Oncor's, that are necessary.
2. Restrictions on Use of Easement Area. User shall use only so much of the Easement Area as
may be necessary to construct, maintain, operate and repair the Encroaching Facility. User shall,at its
own cost and expense, comply with all applicable laws, including but not limited to existing zoning
ordinances,governmental rules and regulations enacted or promulgated by any governmental authority
and shall promptly execute and fulfill all orders and requirements imposed by such governmental
authorities for the correction, prevention and abatement of nuisances in or upon or connected with said
Encroaching Facility. At the conclusion of any construction, User shall remove all debris and other
materials from the Easement Area and restore the Easement Area to the same condition it was in prior
to the commencement of User's construction thereon or in proximity thereto.
User shall not place trash dumpsters, toxic substances or flammable material in the Easement Area.
Further, if the Easement Area has transmission or distribution facilities located thereon, User shall not
place upon the Easement Area any improvements, including but not limited to, buildings, light standards,
fences(excluding barriers installed around transmission towers), shrubs,trees or signs unless approved
in advance in writing by Oncor. Additional general construction limitations on encroachments are
described and listed in Exhibit"B", attached hereto and by reference made a part hereof.
3. Maintenance of Encroaching Facility. User, at User's sole expense, shall maintain and
operate the Encroaching Facility. Oncor will not be responsible for any costs of construction,
reconstruction, operation, maintenance or removal of User's Encroaching Facility. User shall be liable
for any and all taxes and fees assessed by cities or other taxing authorities related to User's
Encroaching Facility or User's other allowed improvements being located on the Easement Area,
including, but not limited to, the assessment of any storm water fees.
Encroachment on Easement Page 1 of 11
2821-2576KS!E--14369
C/M--O GZr-�c�
4. Risk and Liability. User assumes all risks and liability resulting or arising from or relating to
User's use,the existing condition or location,or existing state of maintenance, repair or operation of the
Easement Area. It is further agreed that Oncor shall not be liable for any damage to the Encroaching
Facility as a result of Oncor's use or enjoyment of its Easement. Any Oncor property damaged or
destroyed by User or its agents, employees, invitees,contractors or subcontractors shall be repaired or
replaced by Oncor at User's expense and payment is due upon User's receipt of an invoice from Oncor.
5. Indemnification. User, to the extent allowable by law, agrees to defend, indemnify and hold
harmless Oncor, its officers, agents and employees, from and against any and all claims, demands,
causes of action, loss,damage,liabilities,costs and expenses(including attorney's fees and court costs)
of any and every kind or character, known or unknown,fixed or contingent,for personal injury(including
death), property damage or other harm for which recovery of damages is sought or suffered by any
person or persons that may arise out of,or be occasioned by,the negligence, misconduct or omission of
User, its officers, agents, associates, employees, contractors, subcontractors, subconsultants, or any
other person entering onto the Easement Area or may arise out of or be occasioned by the use of the
Encroaching Facility, except that the indemnity provided for in this paragraph shall not apply to any
liability resulting from the sole negligence of Oncor, its officers, agents, or employees or separate
contractors, and in the event of joint and concurrent negligence of both Oncor and User, responsibility
and indemnity, if any, shall be apportioned comparatively. Nothing contained herein shall ever be
construed so as to require User to assess, levy and collect any tax to fund its obligations under this
paragraph.Article XI Section 5 of the Texas Constitution provides that a city is prohibited from creating a
debt unless the city levies and collects a sufficient tax to pay the interest on the debt and provides a
sinking fund. The City of Round Rock has not and will not create a sinking fund or collect any tax to pay
any obligation created under this section.
6. High Voltage Restrictions. Use of draglines or other boom-type equipment in connection with
any work to be performed on the Easement Area by User,its employees,agents,invitees,contractors or
subcontractors must comply with Chapter 752, Texas Health and Safety Code, the National Electric
Safety Code and any other applicable safety or clearance requirements. Notwithstanding anything to the
contrary herein, in no event shall any equipment be within fifteen(15)feet of the Oncor 138,000 volt or less
power lines or within twenty (20) feet of the Oncor 345,000 volt power lines situated on the aforesaid
property. User must obtain Oncor's approval and notify the Temple Region Transmission Department
at 254-715-1167,48 hours prior to the use of any boom-type equipment on the Easement Area.
7. Relocation of Facilities. User shall not place its facility within 25 feet of any pole or tower leg
without written approval from Oncor. User agrees that in the event that Oncor determines that User's
Facility interferes with Oncor's facilities, User will relocate User's Facility at User's expense. User will be
entitled to relocate User's Facility on the encroachment area granted hereunder if reasonably possible
without further interference with Oncor's facilities. If User's Facility cannot be relocated on the
encroachment area, then, if reasonably possible, Oncor agrees to grant User an encroachment near
the encroachment granted hereunder so that User's facility can continue to operate as originally
intended.
8. Default and Termination. It is understood and agreed that, in case of default by User or its
agents in any of the terms and conditions herein stated and such default continues for a period of thirty
(30) days after Oncor notifies User of such default in writing, Oncor may at its election forthwith
terminate this agreement and upon such termination all of User's rights hereunder shall cease and come
to an end. This agreement shall also terminate upon the abandonment of the Encroaching Facility.
Encroachment on Easement Page 2 of 11
2021-2576KS!E-14369
This agreement shall extend to and be binding upon User and its successors and assigns, and is
not to be interpreted as a waiver of any rights held by Oncor under its Easement.
Executed this I
5 day of Dece4v, 66C 2022.
APPROVAL:
Oncor Electric Delivery Company LLC
By:-
Attorney-In-Fact
STATE OF TEXAS §
COUNTY OF TARRANT §
BEFgE ME, the undersigned authority, on this day personally appeared
(ZCh"\/ -, as Attorney-In-Fact of Oncor Electric Delivery Company
LLC, kn&vn to me to be the person whose name is subscribed to the foregoing instrument and
acknowledged to me that he executed the same for the purposes and consideration therein
expressed, in the capacity therein stated and he is authorized to do so.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of
A. D. 2022.
3"e
N D Y M, S Nl I H
Naiar, `ublic, Stale of TaNo blit in nd for lhd-gtate 6-ffe—xas
pires
61' Nct�-Stlj ID 12443
Encroachment on Easement Page 3 of 11
2021-2576KS I E-14369
ACCEPTANCE:
City of Round Rock
By:
Name: I J r--L,A Yt_ VL-5-
Title- Ass 1140-114 Cr
5
STATE OF TEXAS §
COUNTY OF WILLIAMSON §
BEFORE E, he undersigned author y, o thisday personally appeared
d
t ' ll A-J ,as the ' of the
City of R nd Rock, known to me to be the person whose name is silbscirib4d to the foregoing
instrument and acknowledged to me that he/she executed the same for the purposes and
consideration therein expressed, in the capacity therein stated and he/she isauthorizedto do so.
VEN UNDERMY HAND AND SEAL OF OFFICE this 2day of
A. D. 2022.
MONIQt1EADAMS �v
`•:
My NoWy ID#12057913 Notary Public in and o the State of Texas
E*res March 22,2026
After Recordina, Return To:
Oncor Electric Delivery Company LLC
Right of Way Services
Attn: Laura DeLaPaz
777 Main St, Suite 707
Ft. Worth,Texas 76102
Encroachment on Easement Page 4 of 11
2421-2576KS 1 E14369
Exhibit A 1
LEGEND
EXISTING P.O.W.
PROPOSED R.O.R.
P:OPOSCD CONSTRUCTION(ASCUENT
NO CHANNEL WORK E [SIT NODRAINAGE EASE-ENT
PROPOSED OITH GRADING TRANSMISSION 0 tX[STINC UTILITY
POLE 0 ExrSTINO PL&NIL'EIRIC$
+ CuRvE OAT&
POWER
POLE
—EXIST PC. ExIST Rol�
0
OHE — — — — ONE — — — — O�E
ti _j
<.
U I.
0 9 ps 1SEE HYDRAULIC DATA IN 1111 101
DRAINAGE AREA C LCULA'IONS.
f CH 0 ONE
POWER 0WER
POLE POWER POWER 01 ts, so,
PROPOSED JUNC Box POLE POLE SYSTEM CDS_A
PROP 24' RCP SCALE- I-SO'
' POWER PROPOSED D17Cm PROPOSED 16' WATER
POLE I DEPTH
1 1 OPE PROPOSED 48' RCP
775
UK. [was
S I.
PROPOSED JUNC BOX 1".=.—D IM 81—,
T70 0 TTO
O
PROPOSED DROPIn
INLET to
T65
LaJz
------------ LJA Engineering,Inc.11/4
GREENBELT CHANNEL
760 760 WATER LINE IMPROVEMENTS
PROPOSED 48' RCP SYSTEM CDS_A
PROP 24' RCP CHANNEL
- PLAN & PROFILE
11A 3c,'c TO iTA 35-DC
755
7-55 WALE P11 ZOIITAL! 1:.19'
ER TIC L I-Ell I OF I
11-1——.p. Lut HN
E!"
Ac 7 S -ILL] -S
Enegoachmm an Easement 30.00 31.00 32.00 33 34- 35-CO
2021.257OKS E-14369 Page5011
Exhibit A2
LEGEND
--•—
EX[STING R,O.R.
�..� PROPOSED R.O.R.
—..--- PROPOSED CONSTRUCTION EASEMENT
NO CHANNEL nOR% Ea 151 ING DRAINAGE EASEMENT
O O --— E- -UTILITY
O EEISIfNG PLANIMETRILS
I I I I t CURVE DATA
POWER
M '9'TRANSMISSIONI POLE I I I •l
POLE F GFEENKLTPOWER
,
Q / POLE
r H
EXIST ROTIEM IST RryN N
uj
LLJ
• POwER�
ONE �1F N '7 Ori j t-w — ONE — — tiO�HE, - ;,3 — ONE
J J
PROPOSED DROP INLET %• "� ^�� POLE _
T
U NOTES:
h e o 0 o F I. SEE NYDRAULIC DATA SNEETS FOR
DRAINAGE AREA CALCULATIONS.
-- J— — OHE — — r- — O.E —
PROPOSED DITCH SYSTEM COS-9 PROP05ED 16" WATER
n zs' sD
I' DEPTH PROP 24' RCP Y
10:1 SLOPES -POWER
PROPOSED 48' RLP
_---~--'.'__—_".._"" / ---- _--_ '—_'_'—��—`�_�:,._�•� POLE SCALE: r-50-
POLE u' POWER
POLE
770 770
nwasE o Ix+PQM qnp o4r
uRlr iK.0-0r d,
eFA[N 1.eba5
vmzl
.Pr,o o+tP Ya P,OO,K.
C
765 0
PROPOSED DROP INLET O 765
O
r
n LO O
M
Q 1
76o N 760
W LI
0.80% Z
c J J I..IA Engineering,Inc.
IIw.F:fY
= o.aox x
PROPOSED 48" RCP GREENBELT CHANNEL &
� U
755 755 WATER LINE IMPROVEMENTS
SYSTEM COS_B
PROP 24" RCP
CHANNEL
PLAN & PROFILE
< STA 35.00 gTO STA 40.00
750 750 SCALE�EpONcAt: i'•S4 SNEE1 2 OF 3
CE— Etp[N,4-to N c+ MIL+W.
O C P b N P N O R
�p " '• RG I T
tKb tun,wl Yt+:p, a0A xIMwA.
370' 36.00 37.00 38.00 39.00 40.00 pe
2021.257OKS-E-14369 Pages of 11
Exhibit A3
LEGEND
-'•'� Er IST1NG R.O.W.
�••� PROPOSED R.0.W.
NO CHANNEL WORK ---- PROPOSED CONSTRUCTION EASEMENT
Er ISI 1 NO DRAINAGE EASEMENT
—• EM[S1]Hf.UTILITY
EXIST
E•. NG
IST ING CULVEkT�%s CUR
vE16 TAL AHI(ETRICS
V POWER \
POLE TRANSL115510NPOWER 'K ', C r
Q POLE •-' POLE E 4}i[EHBOL7 -^ `J
F- ( '� J ._ ._ EXIST-ROW -, y
Y'ROW
W �-r^ A"" ry
'x ,..47.00 } - 9\14.00 _},_•]
'-jiHE
NOTES:
F11 1 p SEE HYDRAULIC DATA SHEETS FOR
Q - �.ti. oL yp DRAINAGE AREA CAL_4(ATIONS.
— H
s- --�
OH
POWER PROPOSED J11NC BOX 114 o as'
POLE POWER POWER
t CiW
PROPOSED 16" WATER POLE POI E 1 ' .cALEI - •Y
PROPOSED 48 RCP
l � � l
76S T65 l.T eoaA(Nr Is enFla(e IW1 Ix(
r]u�ir r.c we.Rnr"ie.aa;c•04+
p11(I t.(pal
f(.Ia n4lsfultar i(Ws
Wf(.M�liapat
rl[]•Pr lP![VLO Iq e1401nL.
ti
PROPOS E0 48" RSP
760 O T60
O
+a R PR "" Ef ..RADE O PROPOSED JUNC BOK
a V
Q RIWw.00A
_ H
755 Ln 755
�..�AyEsrt�Ie4��aaE Inc.
LIN-Fra
111/4
1.SZ%—
= GREENBELT CHANNEL &
iso 4 750 WATER LINE IMPROVEMENTS
a
CHANNEL
PLAN & PROFILE
STA 40.00 TO STA 45.00
745 745 SCALE HORIZON T.(Li'•�Q'
vERTICAL! 1'• SHEET 3 OF 3
n 2 O[1141 r[mu[•[0 nnY<1 rAt. WW[}•p.
N l R
CiN- M]w Slal[ (SSI,AA. Cawrl
CPO T xA W
mN A •00
41-00 42.00 43.00 44.04 45.04 Kc. co-rl.(L 91— •o( n-
DB
2021.2575K5:E•14369 Pape 7 0111
,v�v..�._—.\;I-��_-�-=—X-—Y_—_X—:_•K---- =X-� 1 _ Y�-X,.,• --- --_ .---X_.---�.-----...�—�:..L_5�---- _—_L.
Exhibit A4
----------- ----
-
OHE
Ii IER Z
iO
— I PR.;P,:.S_ I .R; P P.
N
Ln
V
�+ PPOPOSED DITCH
+— — 0HE --- — —
A PPOPOSED ° P
E'• i
--- l uaL.1K su1.0R11r�.
f r[Ki't T.lMai T.E lSa 1011.
wr[.v1l�xwt
a GREENBELT or rn K ulen ra 0M.lc.
14' IIi.5 45'
DITCH POLLR
A
i�r arlrn e[•
01
t 10' � 10'
E'•IST ING icj I I WA Engineering,Inc.111A
GROUPIO w i __ _ GREENBELT CHANNEL &
f0: �o-� WATER LINE IMPROVEMENTS
EL-'!ST CHANIILL 25' r
NO PROP :'"ORF"
i MISC. DRAINAGE DETAILS
TP51.15m155ION —� 1
POLE
SWEET I OF
as w rtx.µ•1t..ox-r.a. wtr w.
tie a
NN,
W-r 11A71 1I1r.
~� SECTION A-A "" ""S
Pitts c.r um . ,a -1W.
a3.. Enmachment an Easement 08
2021.25 BKS E 14
Pape Sol 11
LIMITATIONS ON
Oncor ELECTRIC DELIVERY COMPANY RIGHT OF WAY
EXHIBIT "B"
1. You are notified,and should advise your employees, representatives,agents, and contractors,
who enter the property that they will be working in the vicinity of high voltage electrical facilities
and should take proper precautions, included but not limited to the following stipulations and in
compliance, at all times, with Chapter 752, V.T.C.A., Health & Safety Code.
2. Blasting is not to be permitted on Oncor right-of-way or under Oncor lines.
3. Construction on electric transmission line easements acquired by Oncor after January 1, 2003
shall comply with the requirements of Public Utility Commission Substantive Rules§25.101, as
amended from time to time.
4. No crossing less than 45 degrees to the centerline of the right-of-way.
5. Grading will be done in order to leave the right-of-way as near as possible to present condition.
Spoil dirt will be removed from the right-of-way and no trash is to be left on right-of-way. Slopes
shall be graded so that trucks can go down the right-of-way when required and such that the
slopes can be mechanically maintained.
6. Equipment and materials will not be stored on the right-of-way during construction without
written approval of the Supervisor of Regional Transmission.
7. Street or road crossings are to be based on drawings submitted. Any change in alignment or
elevation will be resubmitted for approval.
8. No signs, lights or guard lights will be permitted on the right-of-way.
9. Power line safety equipment operations: hazard assessment and precautions inside the work
zone area must be performed and in compliance with OSHA Standard§1926.1408 at all times.
Equipment shall not be placed within fifteen (15) feet of the Oncor 138,000 volt or less power
lines or within twenty (20) feet of the Oncor 345,000 volt power lines.
Encroachment on Easement Page 9 of 11
2021-2576KS/E-14369
10. Any pre-approved fencing will not exceed eight(8)feet in height, and if metal in nature,will be
grounded, at ten(10)feet intervals,with an appropriate driven ground. Gates should be at least
sixteen (16) feet in width to allow Oncor access to the right-of-way.
11. No dumpsters will be allowed on Oncor right-of-way or fee owned property.
12. Draglines will not be used under the line or on Oncor right-of-way.
13. The existing grade shall not be disturbed,excavated or filled within 25 feet of the nearest edge
of any Oncor transmission structure (tower, pole, guy wire, etc...).
14. Right-of-way will be protected from washing and erosion by Oncor approved method before any
permits are granted. No discharging of water will be allowed within any portion of the right of
way. Drainage facilitation will not be allowed to discharge intolonto Oncor right-of-way.
15. No obstruction shall be installed on the right-of-way that would interfere with access to Oncor
structures or prevent mechanical maintenance.
16. Before any work is done under Oncor lines or by Oncor structures notify the Region
Transmission Department: Temple District, Josh Martin, 254-715-1167.
17. No hazardous materials will be stored on the right of way.
18. For purposes of this document, "Hazardous Materials"means and includes those substances,
including_ without limitation, asbestos-containing material containing more than one percent
(1%) asbestos by weight, or the group of organic compounds known as polychlorinated
biphenyls, flammable explosives, radioactive materials, chemicals known to cause cancer or
reproductive toxicity and includes any items included in the definition of hazardous or toxic
waste, materials or substances under any Hazardous Material Law. "Hazardous Material Laws"
collectively means and includes any present and future local: state and federal law relating to
the environment and environmental conditions including. without limitation, the Resource
Conservation and Recovery Act of 1976 ("RCRA"), 42 U.S.C. §6901 et sept., the
Comprehensive Environmental Response, Compensation and Liability Act of 1980,
Encroachment on Easement Page 10 or 11
2021-2576KS 1 E-14369
("CERCLA"), 42 U.S.C. §§9601-9657, as amended by the Superfund Amendments and
Reauthorization Act of 1986 ("SARA"), the Hazardous Material Transportation Act, 49 U.S.C.
§6901 et sec.,the Federal Water Pollution Control Act, 33 U.S.C. §1251, et sem.,the Clean Air
Act, 42 U.S.C. §741 et sea., the Clean Water Act, 33 U.S.C. §7401 et seg., the Toxic
Substances Control Act, 15 U.S.C. §§2601-2629, the Safe Drinking Water Act, 42 U.S.C.
§§300f-330j, and all the regulations, orders, and decrees now or hereafter promulgated
thereunder.
19. Brush and cut timber is not to be piled or stacked on Oncor right-of-way nor is it allowed to be
burned upon or in close proximity to the conductors or towers.
20. No structures or obstructions, such as buildings, garages, barns, sheds, swimming pools,
playground equipment, guard houses, etc., will be permitted on the right-of-way.
21. Landscaping on Oncor right-of-way is permitted when Oncor approves landscaping plans in
writing. No lighting or sprinkler systems are allowed on the right-of-way.
22. No park or park designation will be permitted on the right-of-way.
23. Gas Pipeline Protective Barrier; Grantee, at Grantee's sole expense, shall provide one of the
following protective barriers; 1) a concrete protective barrier between the surface and the pipe
that is a minimum of one (1) foot thick by one (1) foot wide, if pipe is wider than one (1) foot,
then width of pipe, with the top of the concrete barrier to be at least one (1) foot below the
surface or final grade, 2)construct the gas pipeline inside of a proper protective steel casing, 3)
where electric facilities are located above ground, install the pipeline a minimum of ten(10)feet
below the ground surface, or 4) where electric facilities are located below ground, install the
pipeline at a depth that provides for a minimum of a ten(10)foot clearance between the pipeline
and the underground electric facilities.
24. No fire hydrants or manholes will be permitted within the right-of-way.
25. Any drainage feature that allows water to pond, causes erosion, directs stormwater toward the
right-of-way or limits access to or around Oncor's facilities is prohibited. Drainage facilitation
will not be allowed to discharge into/onto Oncor right-of-way.
26, No boring pits or other type of pits will be permitted within the right-of-way.
Encroachment on Easement Page 11 of 11
2021-2576KS/E 14369