CM-2022-323 - 12/22/2022STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: RPS INFRASTRUCTURE INC. ("Engineer") ADDRESS: 4801 Southwest Parkway, Pkwv 2, Suite 150, Austin, TX 78735 PROJECT: CR 112 Improvements from A.W. Grimes Boulevard to CR 117 This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and RPS Infrastructure, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 5th day of December, 2019 for the CR 112 Improvements from A.W. Grimes Boulevard to CR 117 Project in the amount of $347,442.39; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on July 22, 2021 to amend the scope of services and to increase the compensation by $663,281.84 to a total of $1,010,724.23; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $38,850.00 to a total of $1,049,574.23; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $38,850.00 the lump sum amount payable under the Contract for a total of $1,049,574.23, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.06. 16 0199 1958, 4894-8811-2451 8427{ RPS INFRASTRUCTURE, INC. By: Kevin J. Hoffma ire r o -Transport Business 1412022 Date Supplemental Contract Re%.06f l6 0199 1958. 4894-8811-24: 1 84275 CPI'Y OF ROUND ROCK By: Laurie Hadley, City hanag /Z Z 1-7-2— Date Supplemental Contract 0199 1958.4894-8811-2451 APPROVED AS TO FORM: Step anie L. Sandre, City Attorney Re%..0& 16 84275 ADDENDUM TO EXHIBIT B Engineering Services for Roadway Improvements on CR 112 from A.W. Grimes Blvd to CR 117 From: To: Length: County: City: PROJECT STATEMENT Round Rock, Texas A.W. Grimes Blvd Approximately 400' east of CR I l7 1.18 miles Williamson Round Rock The roadway improvements for CR 112 from A.W. Grimes Blvd to approximately 400' east of CR 117 are to widen this 1.18-mile section from a two-lane roadway to six -lane divided roadway and add pedestrian facilities. The City's Transportation Master Plan indicates this section of CR 112 should be enhanced to six -lanes. This supplemental is for additional design and analysis to accommodate modifications for an adjacent development and two future roadways that will intersect with CR 112. The additional work required is described below according to each task to be performed. RIGHT-OF-WAY DATA (FC 130) A. Utility Accommodation: The ENGINEER will include up to four (4) utility sleeves to accommodate utilities. The location and elevation of the sleeves will be provided by the developer's engineer. PROJECT MANAGEMENT (FC 145) A. Managing Contracted Services (Project Management) a. Coordination with CITY: The ENGINEER will coordinate with the CITY to accommodate changes in the design plans and analysis for the future cross streets to complete the project. ROADWAY DESIGN FC 160 CR 112 - Round Rock, TX Page] of 3 Exhibit B A. Cross Streets: The ENGINEER shall provide an intersection layout detailing the pavement design and drainage design at the intersection of each cross street. The layout shall include the horizontal and vertical alignments, curb returns, grading, transition length, stationing, pavement, drainage details, and American with Disabilities Act Accessibility Guidelines (ADAAG) compliance items. The ENGINEER shall design for full pavement width to the ROW and provide a transition to the existing roadway. B. Cut and Fill Quantities: The ENGINEER shall update the roadway model and develop an earthwork analysis to determine cut and fill quantities and provide final design cross sections at 100 feet intervals. Cross sections shall be delivered in standard GEOPAK format on 11"x17" sheets or roll plots and electronic files. The ENGINEER shall update cut and fill calculations and quantities related to the impact of the development roadways and turn bays. DRAINAGE (FC 1611 A. Drainage Area Maps (External & Internal): The ENGINEER will update the drainage area map to include the right turn bays and potential impact from development. B. Storm Sewer Hydraulic Tables: The ENGINEER will update hydraulic data using Geopak Drainage software for the proposed storm sewer system. The storm system will be designed for the 25-year event per the approved design criteria. SIGNING AND PAVEMENT MARKING (FC 162) A. Signing: The ENGINEER shall include signs for the right turn bays, update the signing layouts, and revise the sign summary sheet accordingly. B. Pavement Marking: The ENGINEER shall update the striping plan and layouts to accommodate the roadways tie-ins and right turn bays. MISCELLANEOUS (FC 163) A. Traffic Control Plan, Detours, Sequence of Construction: The ENGINEER shall update the Traffic Control Plans (TCP) for the project to provide continuous access to the new roadways to the development. B. Illumination: The ENGINEER will update the illumination design impacted by the right turn lanes including updating illumination layouts and lighting detail sheets C. Stormwater Pollution Prevention Plans (SW3P): The ENGINEER shall update the SW3P sheets to accommodate the new cross streets and turn lanes. CR 112 Round Rock, TX Page 2 of 3 Exhibit B D. Compute and Tabulate Quantities: The ENGINEER shall update the summaries and quantities within all formal submittals. E. Estimate: The ENGINEER shall update and report quantities necessary in standard State bid format for the remaining milestones and Final PS&E submittals. F. Construction Schedule: The Engineer shall update the construction time determination schedule to include the additional cross streets and turn lane construction. G. Utility Investigation/Coordination: The ENGINEER will reevaluate the impact of the development roadways to existing utilities and the proposed roadway improvements including the identification of new utility conflicts, coordination, compliance with the UAR, and resolution of identified utility conflicts. CR 112 Round Rock, TX Page 3 of 3 Exhibit B ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page !_ 2 !! !! ` , #! !! !! �! 1 i $§ !! � • !: \ :1 \ \ ' � 7 � � � � _ � { { § 2 \ � ■ k } � � | E k ! k k k ! ! a�� � � � � � � � # ■ # ■ r � « � � � � � ■ se ! _ E L I ! s ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page N N O fV P! CV y F7 i III � I�I II II IIIII o f iiii n n �i �I �ii i 111 II III IY INIl9 II I � I III 111191� eye e vi eye i�e�e i ii N 2 Lr. IIIIIIIIIIIII��� 011111111111111111 ROUND RACK City of Round Rock TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with RPS Infrastructure, Inc. for the CR 112 Improvements from A.W. Grimes Boulevard to CR 117 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/22/2022 Dept Director: Gary Hudder, Transportation Director Cost: $38,850.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: CR 112 Supp. 2_RPS Department: Transportation Text of Legislative File CM-2022-323 This engineering agreement with RPS Infrastructure, Inc. is for the proposed roadway improvements for CR 112 from A.W. Grimes Blvd to approximately 400' east of CR 117 and to widen this 1.18-mile section from a two-lane roadway to six -lane divided roadway and add pedestrian facilities. The proposed roadway improvements include widening the existing limits to a six -lane divided urban roadway. The design is for a six -lane divided roadway. Curb and gutter and a drainage pipe system are anticipated to accommodate drainage needs. A 10-foot shared use path is proposed on one side of the roadway and a 6-foot sidewalk on the other. ROW will be required and is to come predominately from the north side of the roadway. This agreement includes the development of the schematic and 30% PS&E. The cost of this work is $347,442.39. Supplemental #1 was for additional engineering services to design and full set of PS&E plans. This supplemental was for $663.281.89. Total contract price is $ 1,010,724.23. Supplemental Agreement #2 is for additional engineering services to design and analysis to accommodate modifications for an adjacent development and two future roadways that will intersect with CR 112. This supplemental is in the amount of $38,850.00. The total contract price is now $1,049,574.23. City of Round Rock Page 1 of 2 Agenda Item Summary Condnued (CM-2022-323) Cost: $38,850.00 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Page 2 of 2