CM-2022-325 - 12/22/2022Page I of 3 Contract Quantity Adjustment/Change Order MON111[INOO[ Fl1M; -, 01116 Department: Transportation Project Name: Oakmont Drive Extension City Project ID Number Vendor Chasco Constructors _ Company Name Justification Date: Change Order/Quantity Adjustment No. PO Box 1057, Round Rock 7868.0 _ Address - 11/7/22 5 (512) 244-0600 Phone No. 1) Final Balancing Change Order SUMMARY Amount % Change Original Contract Price: 449 $2, ,994.00 Previous Quantity Adjustment(s): -$145,873.20 This Quantity Adjustment: $9,029.00 Total Quantity Adjustment(s): -$136,844.20 Total Contract Price with Quantity Adjustment(s): $2,313,149.80 Previous Change Order(s): $502,687.75 22% This Change Order: $0.00 0% Total Change Order(s) To Date: $502,687.75 22% Adjusted Contract Price [Original Contract Price Plus Quantity r Adjustment(s) Plus Change Order(s)]: $2,815,837.55 Difference between Original and Adjusted Contract Prices: $365,843.55 Original Contract Time: 270 Time Adjustment try previous Quan. Adj./Change Order: 142 Time Adjustment by this Quan. Adj./Change Order: 0 New Contract Time: 412 Submitted for Approval! Prepared By: Bill Stablein, Project Manager, City of Round Rock TX _ 11/7/22 Signature Printed Name, Title, Company Date Approvals Contractor: Bill Bambrick Vice President, Chasco Constructors 11/7/22 Signature Printed Name, Title, Company Date City Project Manager: : Al S' ature Printed Name, Title Date Mayor/City Manager �JU,4L64 j-• i " 4 LAA- Signature Printed Name, Title Date Contract Quantity Adjustment/Change Order Project Name: Oakmont Drive Extension Quan. Adj./Change Order No. Chance Order Data Contract Time Adjustment Item ► .. Page ] of][ Contract Quantity Adjustment/Change Order 4duNO MO[K'i xh rev, Ol: ld Protect Name: Oakmont Drive Extension Quan. Adj./Change Order No. Quantity Adjustment Data n Bid Item # Item Description p Unit Qty. Unit Price Amount Contract Time Adjustment Item #1 Barricades signs & traffic handling MO 6 2,600.00 $15,600.00 Item #20 Driveways CONC SY 43 73.00 $3,139.00 Item #51 Rock filter dams (Instail)(TY 3) LF 16 $40.00 $640.00 Item #59 Steel Casing (12 In)(Open) LF -90 $115.00 -$10,350.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 T TAL5: 02 . 0 City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 5 with Chasco Constructors, LTD., LLP. for the Oakmont Drive Extension Project, Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/22/2022 Dept Director: Gary Hudder, Transportation Director Cost: $9,029.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA-CO#5_partexec Department: Transportation Text of Legislative File CM-2022-325 The City issued a NTP to Chasco Contractors on August 2, 2021 for the Oakmont Extension Project. Change Order #1 was for the addition of a valley gutter at Sunrise and Oakmont Drive to aid in the drainage of the street, adjusting a manhole to grade, and to construct a doghouse protective cover to bridge over the existing waste water line that the roadway is spaning. It also included the removal of curb and gutter and HMAC. The net of the change order and quantity adjustment was $30,933.00 and brought the total contract price to $2,480,927.00. Change Order #2 was for the relocation adjustment and lowering of the waterline and to relocate and adjust the existing waste water line and install a new manhole. The Quantity Adjustment is in the amount of $35,614.00 and the Change Order portion is $113,588.75. The total is $154,202.75. Change Order #3 was for the contractor to supply all materials for the illumination system on Oakmont Drive. Including poles heads, foundations, conduits, wire, and pull boxes and bases complete and installed. The Quantity Adjustment is ($55,900.00) a credit and the Change Order is $220,425.00. The total is $164, 525.00. Change Order #4 is for additional waterline, added drainage swales, added concrete valley gutters at Sunrise and Cypress, price increases for asphalt and the Storm Troopers due to delays, additional electrical runs per Oncor for the Street lights. The deducts are for the lime treatment that was not used on the east City of Round Rock Page 1 of 2 Agenda Item Summary Condnued CM-2022-325 end of the project. The add ons are for $128,511.00 and the deducts total to ($121,357.20). The net change order is $7,153.90. Bringing the total contract price to $2,806,808.55. Change Order #5 is is to even up all the used and none use items in the contract. This is all quantity adjustments including additional barricades due to the length of the project, adjustments to a driveway and the removal of some steel casing that was not used. The total for this change order is $9,029.00. The new total for the project is $2,815,837.55. Cost: $9,029.00 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Page 2 of 2