Loading...
R-2023-011 - 1/12/2023 RESOLUTION NO. R-2023-011 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Austin Engineering Co., Inc. for the McNeil Road Extension Railroad Culverts Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Austin Engineering Co., Inc. for the McNeil Road Extension Railroad Culverts Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. RESOLVED this 12th day of January, 2023. ih , CRAIG ORG , Mayor City of Round IrIck,Texas ATTEST: MEAGAN SPOiKS, City Iflerk 0 112.20222;4864-9297-7479 EXHIBIT rrn„ Page I of3 Contract Quantity Adjustment/Change Order reouHo■00(ir,u•, rev,0 1/16 Department: Transportation Dept Project Name: Mcneil Rd.extension Railroad Culverts Date: 11/8/22 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Austin Engineering Co., Inc PO Box 342349 Austin, TX 78734 512-327-1464 Company Name Address Phone No. Justification The plans called for both the 42"casing and 48"casing to have a wall thickness of 0.375"which from what I understand came from an agreement with UPRR. Railpros,the railroad flagging company, noticed the discrepancy in my submitted work plans and notified us of the minimum wall thickness for the 42"culvert is 0.625"and the 48"culvert is 0.688".This change order is required in order to produce the spefided material. Please see attached supporting documents SUMMARY Amount %Change Original Contract Price: $869,428.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0,00, Total Contract Price with Quantity Adjustment(s): $869,428.00 Previous Change Order(s): 0% This Change Order: $113,231,56 13% Total Change Order(s)To Date: $113,231.56 13% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: 982,659.56 Difference between Original and Adjusted Contract Prices: $113,231.56 Original Contract Time: 45 Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: 15 New Contract Time: 60 Submitted for Approval Prepared By: / _ Austin Keller, V.P.Austin Engineering Co,, Inc 11/8/22 Signature Printed Name,Title,Company Date Approvals Contractor: Austin Keller,V.P. Austin Engineering Co., Inc 11/8/22 Signature Printed Name,Title,Company Date City Project Manager. 2, C1�l•yh��8t.. Signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Vagc 2 o F 3 PND�acxil= Contract Quantity Adjustment/Change Order rcv,01/]6 Project Name: McneJ Rd. extension Railroad Culverts Quan. Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Prlce Amount (Days) 17 Jack and Bore Tun Pipe 42"adder LF 102 $562.00 $57,324.00 7 18 Jack and Bore Tun Pipe 48"adder LF 170 695.00 $118,150.00 7 17 Jack and Bore Tun Pipe 42"deletion LF 102 -$210.12 -$21,432.24 18 lack and Bore Tun Pipe 48"deletion LF 170 -$240.06 -$40,810.20 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 . 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 T $11 , Page 3 of 3 RDUNO IIOCIf 11 M.\i Contract Quantity Adjustment/Change Order rer,OU16 Project Name: Mcneil Rd.extension Railroad Culverts Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Bid Item # Item Description Unit QtV._ Unit Price Amount Adjustment - _ ustm $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ---- $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - - --- - $0.00 -- $0.00 $0.00 $0.00 $0.00 -- - - -- $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - - $0.00 $0.00 $0.00 -- - - $0.00 - 0.00 0 Z q 1. EU m s N N Rc mty Pie are 5 > EErbe`� Spencer Pierce EM Architecture B Interiors EMarest � ve erty P SGons Bar EOvo N m st Cancer 0WOSt y ce Center T E '^ N O' A i Ll EMore St !j � parKEe Sheets&Cross6eld QBliss Salon&Med Spa Pa'r"Le Law N E ga9ded Pye ml PerK� N /_ Deer(oot Dr