Loading...
Contract - Plummer Associates - 1/26/2023 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PLUMMER ASSOCIATES, INC. ("Engineer") ADDRESS: 6300 La Calma Drive, Suite 400,Austin, TX 78752 PROJECT: BCRWWS East WWTP TPDES Permit Renewal This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Plummer Associates, Inc., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 4th day of March, 2022 for the BCRWWS East WWTP TPDES Permit Renewal Project in the amount of$23,000.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on April 22, 2022 to amend the scope of services and to increase the compensation by $3,150.00 to a total of $26,150.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $24,960.00 to a total of$51,110.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1. City Services and Exhibit A. City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2. Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. III. Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $24,960.00 the maximum amount payable under the Contract for a total of$51,110.00, as shown by the attached Addendum to Exhibit D. Supplemental Contract Rev.06/16 0199.202212.4885-2644.0515 84275 1 R-2023-022 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. PLUMMER ASSOCIATES, INC. By; wCi iafaaq Date Supplemental Contract Rev.06/16 0199.202212;4885-2644.0515 84275 2 CITY OF ROUND ROCK APPROVED AS TO FORM: By: �\ A f- Craig rga ayor tep anie L. Sandre, City Attorney G 2 Dat Supplemental Contract Rev.06/16 0199.202212;4885-2644.0515 84275 3 ADDENDUM TO EXHIBIT A City Services Per the scope of work documented in Exhibit B — Engineering Service, the City of Round Rock (OWNER) responsibilities will include the following for the BASIC SERVICES: • Review water quality data tables provide comments as requested. • As available, OWNER will provide the ENGINEER any water quality data collected by the OWNER. ADDENDUM TO EXHIBIT B Engineering Services The City of Round Rock(OWNER) has requested Plummer Associates, Inc., (ENGINEER)to assist in securing Texas Pollutant Discharge Elimination System (TPDES) permit renewal for the Brushy Creek Regional East Wastewater Treatment Facility (WWTF) Permit No. WQ0010264002. A contract for Engineering Services to assist the City was signed by the City Manager, Laurie Hadley, on March 4, 2021. The Brushy Creek Regional East WWTF permit renewal application was submitted to the Texas Commission on Environmental Quality (TCEQ) on November 14, 2022. The permit renewal application is currently under administrative review. The OWNER expects comments or protests to the permit application by the public. This expectation is based on the previous permit application process and the current public interest in the facility's operation. Additionally, the OWNER has requested a review of publicly available water quality data collected in Brushy Creek Segment No. 1244, the segment to which the Brushy Creek Regional East WWTF discharges. These requests are considered Additional Services to the TPDES permit renewal Engineering Services contract. ADDITIONAL SERVICE SCOPE ENGINEER will provide technical or procedural support if the draft permit is protested by the public. This includes attending meetings with TCEQ, responding to TCEQ's requests for information, and supporting the OWNER during the permitting process. Should the TCEQ determine that a contested case hearing is appropriate for the project, ENGINEER will assist in initial strategy discussions with the OWNER to identify technical and regulatory issues with presenting the case. Contested case assistance beyond initial strategy is not anticipated to be able to be accommodated in the proposed Additional Services budget. ENGINEER assumes approximately 92 hours for this task. Additionally, ENGINEER will prepare a review of available flow and water quality data of Brushy Creek Segment No. 1244, the segment to which the Brushy Creek Regional East WWTF discharges. This data review includes accessing data from the United States Geological Survey (USGS) stream gages, Surface Water Quality Monitoring (SWAM) stations along Brushy Creek, EPA ECHO data for other WWTF discharges quality to Brushy Creek, and available Receiving Water Assessments completed by TCEQ. If the OWNER has collected water quality data, ENGINEER will compile and collate the data into the database. ENGINEER will prepare data tables that include the information from the available flow and water quality data review. Data will be summarized in the tables using descriptive statistics. ENGINEER will conduct a visual survey of the upstream and downstream portions of Brushy Creek Segment No. 1244. The visual survey will provide recommendations for Brushy Creek environmental improvements, such as bank stabilization, aquatic habitat, or riparian areas. ENGINEER will submit field notes and a list of areas where stream improvements could be warranted. ENGINEER assumes approximately 56 hours for this task. B-1 ADDITIONAL SERVICES BUDGET The Not-to-Exceed budget without prior approval for the Additional Services is $24,960. ENGINEER will complete the above Additional Service on a time-and-materials basis. B-2 ADDENDUM TO EXHIBIT C Work Schedule ENGINEER will initiate work on ADDITIONAL SERVICES upon verbal authorization to proceed from the OWNER. There will be no change to the existing schedule for the TPDES Permit Renewal application and the draft permitting process. This timeline for this work is dependent on the TCEQs schedule. The following deliverables and schedule are anticipated for the water quality data review: • Prepare a review of publicly available flow and water quality data of Brushy Creek Segment No. 1244, the segment to which the Brushy Creek Regional East WWTF discharges. This data review includes accessing data from the United States Geological Survey (USGS) stream gages, Surface Water Quality Monitoring (SWAM) stations along Brushy Creek, EPA ECHO data for other WWTF discharges quality to Brushy Creek, and available Receiving Water Assessments completed by TCEQ. ENGINEER will prepare data tables that include the information from the available flow and water quality data review. ENGINEER will provide water quality data tables to OWNER. This work will be initiated within four weeks of OWNER approval. ADDENDUM TO EXHIBIT D Fee Schedule Brushy Creek Regional Wastewater System TPDES Permit Renewal Application Project Name: Additional Services Total Total Other Task Labor Hours Loaded Labor Cost Direct Costs Subconsultants TOTALS Task I: Draft Permit Assistance 92 $ 15,480.00 $ - $ - $ 15,480.00 Task I I: Water Quality Review of Brushy Creek 56 $ 9,480.00 $ - $ - $ 9,480.00 GRAND TOTAL: 148 1 $ 24,960.00 1 $ - $ - $ 24,960.00