Loading...
CM-2023-016 - 1/27/2023Page I of 3 Contract Quantlty Adjustrnent/Change Order �Mw�061tty/14 rm,ou16 Department: Utilities and Evironrrterttal Services Project Name: Dorrnbown DumPster Endosures Ph 2 Date: 1VSp3 city Project Change Order/Quantity ID Number DTT5H Adjustment No. 2 Vendor Aday and Associates 1810 CR 122 North, Round Rode. TX 786fi5 512-748-3310 Company Name Address Phone No. ]ustifkatllon On western sfbe (Prof 1) addition of dumpster pad depth. SUMMARY Original Contract Price. Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order; Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustments) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prioes: 0% 0% $0.00 0% $231,510.00 $3,735.00 Original Contract Time: 75 days Time Adjustment by previous Quan. Adj./Change Order: 82 days . Time Adjustment by this Quan. Adj./Change Order: 68 days New Contract Time: 225 days Contractor: re City Project Manager: Mayor/ UI�/ Manac:r I A �'I-2023-014r Printed Name, Title, Company ple Adaw, President/C.E.O., Adav & ) Printed Name, Title, Company Printed Name, to rt S nted Name, Title Date 01-25-2023 Date Page 2 of 3 Contract Quantity Adjustment/ Change Order ryawewa� Twn Project Name: Downtown Dumpster Enclosures, Ph 2 Quan. Adj./Change Order No.: Chance Order Data Item # Item Description Unit Wy. Unit Price Amount Contract Time Adjustment (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.0a $0.00 $0.00 $0.00, $0.001 $0.00 $0.00 $a.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 It — Contract Quantity Adjustment/ Change Order -- 'e+. 07, L6 Project Name: Downtown Dumpster Enclosures, Ph 2 Quan. Adj./Change Order No.: uantit Ad ustment Data Bid Item # Item Description Unit Qtv. Unit Price Amount Contract Time Adjustment 5 QA2-Furnish All Materials, Equipment, Tools & Labor Necessary to install concrete dumpster pad and concrete apron for Project 1 as shown on Plans SY -1.3 $520.00 -$676.00 0 18 QA2-Furnish All Materials, Equipment, Tools & Labor Necessary to install 30" swing gates, relocated center 6°x6" gate posts, adjustalbe gate hinges, lock, and handle for Project 1 as shown on Revision 2 of plans sealed 12/13/22 and updated 1/11/23. EA 1 $5,000.00 $5,000.00 66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 4 324.00 68 % 11 % i F;#S %�S•r lS.� M Tr�+�rRS f �` iM��iMM~�rSy�s+ : 5TY d 4 City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Aday & Associates, LLC for the Downtown Dumpster Enclosures - Phase 2 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 1/27/2023 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $4,324.00 Indexes: General Self -Financed Construction Attachments: MAP, OA.CO No. 2-DTDE-Partially executed Department: Utilities & Environmental Services Text of Legislative File CM-2023-016 This project provides dumpster enclosures in two alleyways just south of Main Street in downtown Round Rock. This is Phase 2 of the Downtown Dumpster Enclosure program and includes one site on the west of 5. Mays Street (Project 1) behind Long Branch Saloon, and one site on the east side of S. Mays Street (Project 2) behind Liberty BBQ. The project is meant to minimize illegal dumping and to provide for a cleaner alleyway in the downtown area. On Project 1, the contractor poured the foundation four inches off assignment making the alleyway four inches narrower than designed. The contractor will cut the front posts and move them back at no additional cost to the City. Staff recognized that the front posts could move back as much as 22 inches. This adjustment would be a benefit for the City in alley width gained and would help Central Texas Refuse (CTR) more easily drive their disposal trucks through the alley. This also helps with access for the northern neighbor whose warehouse bay door is located across the alley from the dumpster enclosure. The trade off is that an additional middle door for business access to the dumpsters will need to be added. Change Order / Quantity Adjustment (CO/CIA) No. 2 will add a third door to the middle of the dumpster enclosure (change order of $5,000). The additional 22 inches will provide the disposal trucks additional clearance in the alleyway. This CO/QA also deletes the QA No. 1 concrete extension, which is 1.3 square yards of concrete that will not be installed to extend the enclosure foundation (credit of $676) for a net CO/CIA No. 2 of $4,324. Oty of Round Rock ." --. "..-.-._.Page 102 Agenda Item Summary Conflnued CM-2023.018 Cost: $4,324 Source of Funds: General Self -Financed Construction C4 of Round Rock Page 2 of 2 Monique Adams From: Elizabeth Granberry Sent: Wednesday, April 5, 2023 11:27 AM To: Monique Adams Cc: Becca Thibodaux Subject: Aday Change Order, CM-2023-016 Attachments: CM-2023-016 - 1 27_2023.pdf, REVISED CM-2023-016.pdf Good Morning Monique, The attached signed change order has an error. This was discovered during the Legistar review process but it looks like the corrected version never made its way to you. Is there anyway we can get the City Manager to signed the attached revised version? Thank you! Sincerely, Liz Granberry Accountant Senior Phone: (512) 218-5437 :K TEXAS Page I of 3 T Ol 16 Department: Project Name: City Project SD Number Vendor Justification Contract Quantity Adjusdnent/Change Order Utilities and Evironmental ServKes Downtown Dumpster Enclosures, Ph 2 Date: 1/12/23 Change Order/Quantity DTTSH Adjustment No. 2 Aday and Associates 1810 CR 122 North Round Rock, TX 78665 512 748-3310 Company Name Address Phone No. )n western site (Prof 1) addition of dumpster pad depth. SUMMARY Original Contract Price' Previous Quantity Adjustment(s): This Quantity Ad)ustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Ad)ustment(s): Previous Change Order(s): This Change Order Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices Original Contract Time: Time Adjustment by previous Quan Ad)./Change Order Time Adjustment by this Quan Ad) /Change Order: New Contract Time: Prepared B ature MM) Contractor. Sig tire City Project I 1 iayor/ury Wall, lart. �y1 41 ��023� old 0% $0.00 0% $0.00 0% $232,099.00 $4,324.00 75 days 82 days 68 days 225 days W-LME•.I%V-! C6rfipany Date aiy�- P Nam , Title, Company Hate �,.. i. Printed Name, Tit Date Printed Name, Title Date Page 2 of 3 it—w, Contract Quantity Adjustment/Change Order rey. o;; I e Project Name: Downtown Dumpster Enclosures, Ph 2 Quan. Adj./Change Order No.: Chanee Order Data Item # Item Description Unit Unit Price Amount Contract Time Adjustment Da s $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order rm, CL;Ih Project Name: Downtown Dumpster Enclosures, Ph 2 Quan. Adj./Change Order No.: uanii Aa uszmeni uata Bid Item # Item Description Unit Unit Price Amount Contract Time Adjustment 5 QA2-Furnish All Materials, Equipment, Tools & Labor Necessary to install concrete dumpster pad and concrete apron for Project 1 as shown on Plans SY #, $520.00 -$676.00 18 QA2-Fumish All Materials, Equipment, Tools & Labor Necessary to install 30" swing gates, relocated center 6"x6" gate posts, adjustalbe gate hinges, lock, and handle for Project 1 as shown on Revision 2 of plans sealed 12/13/22 and updated 1/11/23. EA 1 $5,000.00 $5,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS! 1 324.00 0