Loading...
CM-2023-034 - 2/24/2023STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: LJA ENGINEERING, INC. ("Engineer") ADDRESS: 7500 Rialto Boulevard, Austin, TX 78735 PROJECT: Round Rock West Area 5 — Water, Wastewater and Storm Drain Improvements This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and LJA Engineering, Inc., hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 24th day of February, 2022 for the Round Rock West Area 5 Water, Wastewater and Storm Drain Improvements Project in the amount of $365,901.25; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $31,159.59 to a total of $397,060.84; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4, Compensation and Exhibit D Fee Schedule shall be amended by increasing by $31,159.59 the maximum amount payable under the Contract for a total of $397,060.84, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] 6M-2-M3-o,3 Supplemental Contract 0199.202208, 4865 4138 9902 Rev. 06' 16 84275 LJA ENGINEERING, INC. By: &t--d '� 1-&-L Kenneth G. Sthrock 2/7/2023 Date Supplemental Contract Rev.06?16 0199 202208, 4865 4138 9902 84275 CITY ]' ROUND ROCK AP VED AS T FORM: j J , r.ityy Manager .'tepha ie L. Sandre, City Attorney Date Supplemental Contract Rev.06?16 0199 202208.4865 4138 9902 84275 City of Round Rock Contract for Engineering Services RRW Area 5 Water, Wastewater, and Storm Drain Improvements ADDENDUM TO EXHIBIT B Engineering Services Round Rock West Area 5 Water, Wastewater, and Storm Drain Improvements General Work Description: The purpose of the Area 5 supplemental is for additional services to prepare alternative storm drain layouts/exhibits, additional TCP coordination and design implementation, developing pavement repair detail and coordination, and developing conflict matrix for project. Also included, is additional effort to survey Aqualine easement, prepare meets and bounds documents for proposed easement, and additional survey collected near the Creekview outfall. TASK 1. PROJECT MANAGEMENT Project schedule has been extended from original contract resulting in additional project management effort. Tasks include the following: A. Prepare monthly invoices for submission to the City for all requests for payment. B. Produce Project Scheduling C. Team meetings (4) D. Utility Coordination Meetings (2) E. QA/QC Models, Exhibits, Calculations, Assumptions TASK 2. TOPOGRAPHICAL SURVEY Proposed storm drain, water and wastewater improvements require additional area of survey collection along the Aqualine easement and near Creekview outfall. Preparation for meets and bounds documents for the Aqualine easement are also included. w City of Round Rock Contract for Engineering Services TASK 3. SUBSURFACE UTILITY ENGINEERING No additional effort requested. RRW Area 5 Water, Wastewater, and Storm Drain Improvements TASK 4. GEOTECHNICAL ENGINEERING — BEYOND (SUB) No additional effort requested. TASK 5. ENVIRONMENTAL STUDIES No additional effort requested. TASK 6. PS&E STORM DRAIN 6.1 GENERAL, TRAFFIC, & EROSION CONTROL Coordinate with the City transportation group to address pavement and traffic control comments. Develop pavement repair detail provided in steps in line with traffic control phasing. Update traffic control to accommodate the pavement repair intent. 6.2 HYDROLOGY & HYDRAULICS Develop storm drain layout alternatives and exhibits including pipe types (arch vs circular), explore alignment options at different outfall locations including (pavement vs sidewalk). Develop exhibits for Aqualine easement. TASK 7. PS&E WATER & WASTEWATER In conjunction with storm drain alternatives, develop water and wastewater alternatives and exhibits. Develop exhibits for new alignments. TASK 8. BID PHASE No additional effort requested. TASK 9. CONSTRUCTION PHASE No additional effort requested. City of Round Rock RRW Area 5 Water, Wastewater, Contract for Engineering Services and Storm Drain Improvements ADDENDUM TO EXHIBIT C Work Schedule Task Begin End Notice To Proceed 3/07/2022 3/07/2022 Topographical Survey 3/14/2022 4/15/2022 Environmental Studies 4/18/2022 5/13/2022 PS&E 4/18/2022 11/04/2022 30% Submittal 4/18/2022 6/10/2022 30% City Review 6/13/2022 6/24/2022 60% Submittal 6/27/2022 8/19/2022 60% City Review 8/22/2022 9/02/2022 90% Submittal 1/03/2023 2/03/2023 90% City Review 2/06/2023 2/17/2023 100% Submittal 2/20/2023 3/10/2023 Bid Phase 3/13/2023 4/14/2023 Construction Phase 4/17/2023 4/19/2024 City of Round Rock RRW Area 5 Water, Wastewater, Contract for Engineering Services and Storm Drain Improvements ADDENDUM TO EXHIBIT D Fee Schedule Total Total iOther Task Labor Hours Loaded Labor Cost Direct Costs Subconsultants TOTALS Task 1: Project Management 32 $5,710.00 $117.00 $0 00 $5,827.00 Task 2: Survey 58 $7,220.00 $0.00 $0.00 $7,220.00 Task 3: Subsurface Utility Engineering (SUE 0 $0.00 $0.00 $0.00 $0.00 Task 4: Geotechnical Engineering 0 $0.00 $0.00 $0.00 $0.00 Task 5: Environmental 0 $0.00 $0.00 $0 00 $0.00 Task 6: PS&E Storm Drain 130 $11,549.59 $0.00 $0.00 $11,549,59 Task 7: PS&E Water & Wastewater 80 $6.563.00 $0.00 $0.00 $6,563.00 Task 8: Bid Phase 0 $0.00 $0 00 $0.00 $0.00 Task 9: Construction Phase 0 $0.00 $0 00 $0.00 $0.00 Task 10 Contingency- 15% 0 1 $0.00 1 $0 00 $0.00 $0.00 SUPPLEMENTAL NO.1 TOTAL: 300 $31,042.59 $117 00 $0.00 $31,159.59 ORIGINAL CONTRACT TOTAL: 2220 $357,521.25 $2,800.00 1 $5.580.00 $365,901.25 REVISED CONTRACT TOTAL: 2520 $388,563.84 $2,917 00 $5,580.00 $397,060.84 ROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with UA Engineering, Inc. for the Round Rock West Area 5 - Water, Wastewater, and Storm Drain Improvements. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/24/2023 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $31,159.59 Indexes: Self -Financed Stormwater Construction Attachments: SC#1 with UA-RRW Area 5_7FEB2023_partial, MAP Department: Utilities & Environmental Services Text of Legislative File CM-2023-034 On February 24, 2022, the City entered an Engineering Services Contract with UA Engineering, Inc. to design water, wastewater, and storm water improvements in the Round Rock West neighborhood. The improvements are needed to help alleviate existing drainage issues and to replace an aging infrastructure. The scope of services included in the contract are surveying, engineering analyses, design, permitting, and preparation of construction drawings. During the design process, unexpected conflicts arose between the proposed storm water system and existing dry utility facilities. To avoid these conflicts, it requires additional effort on the storm water design and drainage easement coordination. Supplemental No. 1 would provide funding to redesign the proposed storm water system so it would meet the minimum clearance distance from existing facilities. The current contracted amount is $365,901.25. Supplemental No. 1 adds $31,159.59 to the original contract and would increase the total contracted amount for UA Engineering to $397,060,84. Cost: $31,159.59 Source of Funds: Self -Financed Storm water Construction City of Round Rock Page 1 o}r-