Loading...
CM-2023-035 - 2/24/2023STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: LJA Engineering, Inc. ("Engineer") ADDRESS: 7500 Rialto Boulevard, Austin, TX 78735 PROJECT: Round Rock West — Greenbelt Channel and Waterline Improvements This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and LJA Engineering, Inc., hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 22nd day of October, 2020 for the Round Rock West — Greenbelt Channel and Waterline Improvements Project in the amount of $124,636.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $30,347.85 to a total of $154,983.85; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $30,347.85 the maximum amount payable under the Contract for a total of $154,983.85, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. `signature pages follow] M-2-D2-3-em57 Supplemental Contract 0199 202035; 4874-96314958 Rev.Q6'A 6 84275 LJA ENGINEERING, INC. By: Kenneth G. (chrock 2/7/2023 Date Supplemental Contract Rev.06116 0199.202035,4874-96314958 84275 CITY OF ROUND ROCK By:) r ,(City Manager &fw I - �• v'�-a4-- Date Supplemental Contract 0199.202035, 4874-96314958 VEDAS O FORM: Steph LSandre, City Attorney Rev.06r16 84275 City of Round Rock GRRW Greenbelt Channel Grading Contract for Engineering Services and Water Line Improvements ADDENDUM TO EXHIBIT B Engineering Services Greater Round Rock West Greenbelt Channel Grading and Water Line Replacement General Work Description: The purpose of the Greenbelt supplemental is for additional services to update greenbelt channel design. This includes adding storm drain design, collecting additional survey for new alignments, updating water alignment and design, and updating environmental documents to account for current requirements. Also included, is additional effort preparing exhibits and coordinating with City for Oncor permit. TASK 1. PROJECT MANAGEMENT Project schedule has been extended from original contract resulting in additional project management effort. Task includes the following: A. Prepare monthly invoices for submission to the City for all requests for payment. B. Produce Project Scheduling C. Team meetings (4) D. QA/QC Models, Exhibits, Calculations, Assumptions TASK 2. TOPOGRAPHICAL SURVEY Proposed storm drain and new water line alignments require an additional area of survey collection along the greenbelt and more detailed survey through Windy Cove and Knollwood Cove cul-de-sac easements. City of Round Rock Contract for Engineering Services TASK 3. ENVIRONMENTAL STUDIES GRRW Greenbelt Channel Grading and Water Line Improvements 3.1 GENERAL WETLAND DETERMINATION Update to reflect current Section 404 Clean Water Act rules (Rapanos). 3.2 CULTURAL RESOURCES Update letter and coordinate with Texas Historical Commission to obtain concurrence. TASK 4. PS&E CHANNEL GRADING 4.1 HYDROLOGY Update drainage areas for Channel and develop storm sewer drainage areas for new alignment, calculate times of concentration, determine land use runoff values, and calculate peak flow rates. All results will be compared to the 2D model created in previous work authorization for verification purposes. 4.2 HYDRAULICS The Engineer will update HEC-RAS of the greenbelt channel resulting from the proposed storm drain trunkline. Inlets and pipes will be placed using Geopak Drainage to determine inflow and capacity characteristics. No additional deliverables anticipated. Plan sheets will be updated for proposed improvements. 4.3 WATER QUALITY The engineer will update the Water Pollution Abatement Plan Exception request and submit to TCEQ. TASK 5. PS&E WATER LINE Water line design will be updated to proposed alignment designation between Lime Rock and Creekview. No additional deliverables anticipated. Plan sheets will be updated for proposed improvements. 6. BID PHASE No additional effort requested. City of Round Rock Contract for Engineering Services GRRW Greenbelt Channel Grading and Water Line Improvements ADDENDUM TO EXHIBIT C Work Schedule Task Begin End Notice To Proceed 10/28/2020 10/28/2020 Topographical Survey 11/2/2020 12/4/2020 Environmental Studies 11/9/2020 12/18/2020 PS&E 12/4/2020 4/16/2021 50% Submittal 12/4/2020 1/22/2021 50% City Review 1/22/2021 2/5/2021 90% Submittal 1/03/2023 2/10/2023 90% City Review 2/13/2023 2/24/2023 100% Submittal 2/27/2023 3/03/2023 Bid Phase 3/06/2023 4/07/2023 City of Round Rock Contract for Engineering Services GRRW Greenbelt Channel Grading and Water Line Improvements ADDENDUM TO EXHIBIT D Fee Schedule Total Total Other Task labor Hours Loaded Labor Cost Direct Costs Subconsultants TOTALS Task 1: Project Management 24 $4,000,75 $216.00 $0.00 $4,216 75 Task 2: Survey 56 $7,080,00 $0.00 $0.00 $7,080 00 Task 3: Environmental 4 $500.00 $0.00 $0.00 $500.00 Task 4: PS&E Channel Grading 120 $14,800.50 $0.00 $0.00 $14,800 50 Task 5: PS$E Water Line 30 $3,750.60 $0.00 $0.00 $3,750.60 Task 6: Bid Phase 0 $0.00 $0.00 $0.00 $0 00 SUPPLEMENTAL NO.1 TOTAL: 234 $30,131.85 $216.00 $0.00 $30,347.85 ORIGINAL CONTRACT TOTAL: 824 $124,420.00 $216.00 $0.00 $124,636.00 REVISED CONTRACT TOTAL: 1058 $154,551.85 $432.00 $0.00 $154,983.86 PT:ROUNO ROCK AS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with UA Engineering, Inc. for the Round Rock West - Greenbelt Channel and Waterline Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/24/2023 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $30,347.85 Indexes: Self -Financed Stormwater Construction Attachments: SC#1 with UA -RRW Greenbelt Grading_partial, Location Map tit Department: Utilities & Environmental Services Text of Legislative File CM-2023-035 The City previously entered an Engineering Services Contract with UA Engineering to provide construction plans and bidding documents for channel and waterline improvements in the Round Rock West Greenbelt area. A drainage assessment, previously completed for the Round Rock West neighborhood, identified multiple habitable structures along the Greenbelt area to be in danger of being flooded. The flood risk came from the channel adjacent to the properties. The contract scope included a channel design to increase capacity to alleviate some of the flooding issues. However, the channel is located near multiple large electrical facilities that require a large clearance area. To meet these requirements, the design needed to be changed from a channel to a buried storm water line. This supplemental will add a storm drain design component to the scope. The original contract amount was $124,636. Supplemental No. 1 will increase the contract amount by $30,347.85 to a new total contract of $154,983.85 for UA Engineering. Cost: $30,347.85 Source of Funds: Self -Financed Stormwater Construction City of Round Rock Page 1 of 2