Loading...
CM-2023-036 - 2/24/2023STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. I TO CONTRACT FOR ENGINEERING SERVICES FIRM: BGE, INC. ("Engineer") ADDRESS: 101 West Louis Henna Boulevard, Suite 400, Austin, TX 78728 PROJECT: I Million Gallon Reuse Ground Storage Tank This Supplemental Contract No. I to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and BGE, Inc., hereinafter called the "Engineer," WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 12th day of August, 2021 for the I Million Gallon Reuse Ground Storage Tank Project in the amount of $215,306.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $48,918.00 to a total of $264,224.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2, Engineering_ Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $48,918.00 the maximum amount payable under the Contract for a total of $264,224.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract 0199 202116,4864-9210-6830 Rev.06/16 84275 BCE, INC. By: LZ Date Supplemental Contract Rev,06/16 0199 202116,4864.9210-6830 84275 CITY ROUND ROCK B y: i" , . , &,"", fps, y, ity Manager Date Supplemental Contract 0199 202116.4864-9210-6830 APP ED AS TO ORM: M Stephani L. Sandre, City Attorney Rev.06116 84275 EXHIBIT B PROFESSIONAL SERVICES FOR CITY OF ROUND ROCK l MILLION GALLON (MODIFYING TO 2 MG) REUSE GROUND STORAGE TANK ENGINEERING SERVICES ADDENDUM TO EXHIBIT B Engineering Services 1 MILLION GALLON (MODIFYING TO 2 MG) REUSE GROUND STORAGE TANK The scope set forth herein defines the work to be performed by BGE, Inc. (ENGINEER) in revising the design of the 1 MG Reuse Ground Storage Tank (currently at 90% design) with a 2 MG Reuse Ground Storage Tank (PROJECT). Both the CORR and ENGINEER have attempted to clearly define the work to be performed and address the needs of the PROJECT. This scope of work includes the replacement of approximately 25 sheets from the original project scope of work. BASIC SERVICES Task 1. Project Management and Meetings Task 2. Construction Documents Project Description The PROJECT will increase the amount of reuse water storage available at the reuse facility at the East Wastewater Treatment Plant. More storage is needed because of the higher peak demands on the system since its inception in 2012. This amendment includes revision of the current design of a l MG tank with a 2 MG tank. Task 1. PROJECT MANAGEMENT AND MEETINGS BGE will perform the functions to manage the project in a manner to fulfill the contractual requirements. Task 2. CONSTRUCTION DOCUMENTS ENGINEER will perform design services required to revise the existing 90% plans for the 1 MG tank and resubmit 90% and 100% design package that includes the replacement of approximately 25 sheets for the larger 2 MG tank for review by CORR. Assumptions 1 Exclusions: I) No additional geotechnical investigations or analyses are required, per the geotechnical engineer (Raba Kistner). 2) No pump or electrical design modifications will be required. If required, additional services will be requested. 3) Assumes the overflow drain will be piped to the existing overflow pipe or manhole from Clearwell Tank l or the existing wastewater manhole located northeast of Clearwell Tank I in the corner of the site. 4) City will modify the permit as necessary for the 2 MG reuse revision_ EXHIBIT 8 PROFESSIONAL SERVICES FOR CITY OF ROl VD ROCS, I MILLION GALLON REUSE GROLND STORAGE TANK FEESCHEDULE BASIC SERVICES LUMP SUM Task I. Project Management and Meetings $ 8,276 Task 2. Construction Documents $ 41,274 TOTAL $ 49,550 Attachment A Page 2 of 2 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page Li rxk Tnk Name Mede # RTV [muted Agreement 2 W% 0esign PaGkaff Construction D«uments 6 SPenhcatwn tist a QA'Q[ 5 QA/QC Recovery G Subrmnal to CORR • CORR Review # 60%Warkshop 9 100% Design Pxkye 16 Canstiuctmn Dauments 1 % P101at Mon" 12 f QAIQC ]3 • QA1QC Recovery u f Submittal to CORR IS f CORR Review 16 6?{ {id Phase i 7 ad Phase la# E ]N181TC wORK SLNEOUIE � P1gec1CORR Reuse Waler Tani Oaie iut 1,,7,23 6iaruo.r Sv.•�iry O.ra— 51as Fvs]h Prtd-1.1 l day Wed 2c1123 Wed 2? 1123 60 days Thu 2i 2/23 Wed e126123 1 30 days Thu 20123 Wed 3115223 1 3 days Thu 1116/23 Mon 1; 202'21 3 S days Tuta1i1123 M"a+17,73 a 1 day in 4116/23 Fri 4114123 5 7days Mon1,127i23 Two 4125123 6 1 day Wed 4126123 Wed 4/26i23 7 3{ days Thu 4/27123 Man 6/19123 { 16 days Thu N27/23 Thu 5118i23 { 10 days Fri 5129123 Thu 6/1123 10 I day Fr1617123 fr16/1123 11 3 days Men 615/23 Wed 617/23 12 I day Thu 63123 Thu 61W 23 13 7 days Fo 619/23 Mon 6119123 le f{ daya Tue 6120/23 Man 9/11123 as days Tue 6/10/23 Mon 9111?23 LS RHWrt N>mtf 1in'2] Feb tl Yir'21 •p 23 Mar 2) --13 M,zj a,f 11 Sr0 11 QI 25 I a iSli la S f2, 1926 S 12_O Z61 9 162]lA.? li it la.] 1I_132$ 1 9 t{_a310.6 152 21 110,1r]4.I 1 1 ® Rgen Sxwwsry • ray.ul Tars Ain-a•ar I IMn+e raN auntwn-od,. 1— iw.JroN. • IMrtwe iaarnana Wrvalwme.ry RaVp� EnnM11ar6i �� WrWeiwmary S ilanuil5.mnury �� ENNMI MAwm• 0 D.46e f hayeri Nord hov., �+ ADDENDUM T4 EXHIBIT D Fee Schedule Attached Behind This Page FEE ESTIMATE FOR City of Round Rock 1 Million Gallon Reuse Ground Storage Tank Project EXHIBIT D - FEE SCHEDULE ■+� s F71ivlrTJ, Sa��is°�i'����■■■■■■[J■■■�■>•. 'E m ■ r� a � S>• �s t� YiY� �Y � � �[EIR � � � rsi �� �� ■■■■■■[ >• ■■■■■■1 ■■■■� ■■■■■rl■■■■■1 ■■■■f ! ■■■■■rl■■■■■1 ■■■■■r.� Fl■■■■■■■R rxr City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with BGE, Inc. for the 1 Million Gallon Reuse Ground Storage Tank Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/24/2023 Dept Director, Michael Thane, Utilities and Environmental Services Director Cost: $48,918.00 Indexes: Self -Financed Water Construction Attachments: SC 1-Partially Executed-BGE, 21.07.CM.1MGReuseGST Department: Utilities & Environmental Services Text of Legislative File CM-2023-036 The City of Round Rock operates a reuse water treatment facility at the East Brushy Creek Regional Wastewater Treatment Plant. In 2011, the City of Round Rock constructed the first one million gallon reuse water ground storage tank as part of the construction of the overall reuse water treatment facility. The City has seen a large growth in demand for reuse water over the past few years. This demand currently strains the existing reuse water system at peak flow rates. In order to meet the needs of the reuse water system, Round Rock is proposing to increase the treated storage capacity of the reuse water system with an additional two million gallon ground storage tank. This project will increase the amount of reuse water storage to a total of three million gallons of storage at the facility. Additional storage in the reuse water system allows the system to handle higher peak flow rates, and to operate the system at a more steady-state. The current contract with 8GE for this project is $215,306 and it included engineering design and bid phases services for a one million gallon tank. During the design phase, the City decided to increase the second tank size to accommodate future growth and delay any future storage needs. This Supplemental No. 1 will increase the contract by $48,918 for a revised total contract with BGE of $264,224. City of Round Rock Page 1 of 2 Agenda Item Summary Continued CM•202J•0J6 Cost: $48,918 Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 of 2