CM-2023-037 - 2/24/2023STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: GUPTA & ASSOCIATES, INC. ("Engineer") ADDRESS: 13717 Neutron Road Dallas TX 75244 PROJECT: Water Distribution System Generator Addition This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Gupta & Associates, Inc., hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 14th day of October, 2021 for the Water Distribution System Generator Addition Project in the amount of $210,186.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $40,175.00 to a total of $250,361.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2 Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. III Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $40,175.00 the maximum amount payable under the Contract for a total of $250,361.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] 141--2,Q3-v3-4, Supplemental Contract 0199.202121. 4886-0346-5809 Rev.06116 94275 GUPTA & ASSOCIATES, INC. By:,,, ,4 1 ) Date Supplemental Contract Rev.06116 0199.202121;4886-0346-5809 84275 CITY OF ROUND ROCK ity M ger Date Supplemental Contract 0199.202121; 4886-0346-5809 APP ED AS TIRM: Stephanil L. Sandre, City Attorney Rev.06/16 84275 ADDENDUM TO EXHIBIT B Engineering Services 1. An existing, unused 50 kW generator will be relocated to the Phase V area and connected through an automatic transfer switch (ATS) to the electrical distribution and controls infrastructure; 2. The generator pad, ATS, and wire/conduit will be oversized to accommodate a larger generator that may replace this 50 kW unit in the future; 3. This work will be issued as a change order to the general contractor now constructing the generator project. 4. Site civil and structural engineering to be done by JQ Infrastructure (JQi). Additional Details: 1. The available generator is not large enough to run the entire Phase V loads. However, it is believed to be large enough to power the SCADA Servers Rack is in the electrical room. This was the initial aim for installing a generator. 2. The generator equipment pad, ATS, and wire/conduit will be sized for a generator that could power the entire Phase V loads should The City decide to upgrade it at some point in the future. 3. The base contract still has special services funds for survey and Geotech. a. The special services for survey were already authorized from the original design, and we have approximately $5,000 that is available to perform a survey at this generator location. b. For the Geotech, we request a copy of the Geotech report from the Phase V Treatment Expansion Project. If this is not available, we will request authorization to use a portion of the Geotech special services to perform a boring and get a site -specific report. ADDENDUM T4 EXHIBIT C Work Schedule Milestone Duration Completion Date Notice to Proceed 20 February 2023 Topographic Survey (field work) 2 weeks 06 March Topographic Survey (CAD work) 2 weeks 20 March Civil / Structural / Electrical Draft Design 3 weeks 10 April City Review of Draft Design 2 weeks 24 April Final Design 2 weeks 08 May Construction Notice to Proceed 1 week 15 May Construction 8 weeks 10 July Startup and Commissioning 1 week 17 July Final Acceptance 2 weeks 31 July ADDENDUM TO EXHIBIT D Fee Schedule Fee Breakdown Description GAI Subconsultants GAI Markup Total Design Phase $17,078 $16,030 $1,603 $34,71 L Construction Phase $2,213 $2,955 $296 $5,464 Total $19,291 $18,985 $1,899 $40,175 IE.. Z 0 ROUNE'3ROCK XASS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Gupta & Associates, Inc. for the Water Distribution System Generator Addition Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/24/2023 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $40,175.00 Indexes: Self -Financed Water Construction Attachments: SC#1 with Gupta -partially executed, MAP Department: Utilities & Environmental Services Text of Legislative File CM-2023-037 With the onset of inclement weather in February of 2021, Governor Abbott passed and signed the Texas Senate Bill 3 (SB3) requiring an emergency plan for all Texas utilities. During the evaluation of the water distribution system by the City of Round Rock, it was determined that standby generators were needed at the three identified distribution sites. Standby generators will help provide greater resiliency and flexibility in the distribution system during a prolonged power outage. As the project unfolded, it was determined that the addition of a generator for the water distribution system communication control cabinet at the Water Treatment Plant was needed. The original contract was for the design, bid, and construction phase services associated with the addition of three standby generators on three separate water distribution pump stations: Southeast Elevated Pump Station, South 81 Pump Station, and Southeast Ground Pump Station. This agenda item serves as Supplemental Agreement No. 1 for the engineering services associated with the design and construction phase for the additional generator at the Water Treatment Plant. The Utilities & Environmental Services Department previously selected Gupta & Associates to complete the project engineering. The original contract amount for the project was $210,186. The cost of Supplemental Agreement No. 1 is $40,175, which increases the contract amount to $250,361. Cost: $40,175 City of Round Rock Page I of 2 Agenda Item Summary Conflnued (CM•2023-037J Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 of 2