Loading...
CM-2023-061 - 3/24/2023STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: FREESE AND NICHOLS, INC. _ ("Engineer") ADDRESS: 10431 Morado Circle Suite 300 Austin TX 78759 PROJECT: Chisholm Trail South — Waterline Replacement This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Freese and Nichols, Inc., hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 27th day of October, 2022 for the Chisholm Trail South — Waterline Replacement Project in the amount of $155,378.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $11,329.00 to a total of $166,707.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2 Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. II. Article 4 Compensation and Exhibit D. Fee. Schedule shall be amended by increasing by $11,329.00 the maximum amount payable under the Contract for a total of $166,707.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] 1 —G(,O( Supplemental Contract 0199.202241;4854-3914-8886 Rev 06A 6 842,'S FREESE AND NICHOLS, INC. By:. w o -j I o L Date ��— Supplemental Contract Rev.06: 16 0199.202241.4854-3914-8886 84275 CITY OF ROUND ROC By: y� City Manager Date Supplemental Contract 0199,202241; 4854-3914 8886 APPROVED AS TO FORM: Stephanie L. Sandre, City Attorney Rev.06/16 84275 10431 Morado Circle, Suite 300 - Aus6n, Texas 78759 • 512-617-3100 - fax 512-617-3101 www.freese.com ADDENDUM TO EXHIBIT B Engineering Services The City of Round Rock (City) requests that the water line from Brushy Creek to RM 620 be relocated outside the pavement into City Parks property. Additional survey is required to design the trenchless crossing of Brushy Creek to avoid new trail infrastructure and to route the water line outside pavement. Basic Services: Preliminary Design Phase 1. Provide additional topographic survey west of Chisholm Trail for design of the trenchless crossing of Brushy Creek and to develop a route outside pavement for the water line between Brushy Creek and RM 620. F'--� INE_AND GEODfTICS I o n d 5 u t v e y o r s "-�v February 9, 2023 Revised: February 27, 2023 Michael Lafferty, PE Treatment, Transmission, and Utilities Freese and Nichols, Inc. 10431 Morado Circle Building 5, Suite 300 Austin, Texas 78759 S12-643-0821 direct 512-689-0658 cell Michael.Lafferty@freese.com RE: Additional Services Engineering Design Surveying Project: Chisholm Trail Water Line #RRK22876 Mr. Lafferty: Inland Geodetics is please to present our proposal to perform Professional Surveying Services for the above referenced project. The specific scope of work is developed from email instructions dated February 9, 2023. Inland understands that the City of Round Rock will secure ROE for surveying activities prior to NTP and provide Inland copies with any special instructions. SCOPE OF SERVICES Project Site Address of Subject Property: Legal Description Subject Property: Appraisal District ID number: 500 Chisholm Trail Rd, Round Rock Chisholm Trail Crossing Park, R426128, R436400, Williamson County Topographic Survey 1. Inland will utilize survey control monuments as established from previous work on this project. 1504 Chisholm Trail Road, Suite 103 Round Rock, TX 78681 512-238-1200 TBPELS Firm Reg. No. 10059100 February 27, 2023 Page 2 of 2 2. The coordinate values will be reconciled to NAD 83 Texas State Plane Coordinates, Central Zone 4203, US Survey feet and NAVD 88 for vertical control datums. These values will be derived from GPS SmartNet VRS observations at each point that include geographic positions of northing, easting and orthometric heights. 3. Inland will coordinate with a Subsurface Utility Engineer (SUE) of the Clients choosing and locate Level B markings from said SUE company withing the Project Limits. 4. Inland will collect spot elevations within the project site including edges of back of curbs, driveways, visible utilities, drainage structures, centerline of roads, trees 8" and up (per City of Round Rock Tree Ordinance), any other hard surfaced improvements within the defined area, grade breaks, flowlines of watercourses, and other significant features relevant to the project. Inland will extend the project site to the edge of pavement/back of curb along public roadways. The collected data will include spot elevations and breaklines sufficient to generate and/or merge to a 1 foot contour interval DTM for the project. 5. Inland will collect building/structure corners within the project site or route 6. Deliverables will include an Autocad 3D file with break -lines and associated XML file. A DTM file processed to 1.0 foot contours will be provided and the associated spot point data in ASCII format. A list of benchmarks and project control coordinates will be included. Inland estimates the fees (billed hourly basis) for the above services to be: Topographic Survey: $10,000.00 (non taxable) TOTAL: $10,000.00 Inland will begin work within three (3) weeks of Notice to Proceed. The estimated fee proposed above are based on personnel time required to perform the described Scope of Services. Additional time requirements resulting from project scope changes, site/route changes, plan revisions, field recovery of or discrepancies of control provided will be considered reasonable cause for us to seek additional compensation for services not included in these amounts. AUSTIN SURVEY COMPANY LLC DBA INLAND GEODETICS Miguel A. Escobar, LSLS, RPLS Chief Surveyor 1504 Chisholm Trail Road, Suite 103 Round Rock, Texas 78681 512-238-1200 P-%Proposals\Freese and Nichols (FNIC)\Chisholm Trail Add Service (FNIC-002) 2023,02\lnland Proposal • Chisholm Trail Add Service 2.docr Inland Geodetics TBPELS Firm No. 10059100 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page 0 N N N F+ N G %D 00 V 0% p, �+ ll, r A W ♦+ n+ N ,+ p pp V u A w N n n [c v 2 m N' n c o 3 n o g o '�° n c o g v r- o c a v m n o 3 3 rov `c c c IT 3 m v ? o `- m 3 nm m L^. N 3 A 3 d G m 3. ° C 1 n N O O » n K X t0 3 v { 6, an 3 U S W 5. W ,', 3 .ro^. ".` 2 T y 3 ro v r3e 3 - o 3 p A '^ qo ro• O .O '^ v, oo m ro a w A w a 3 n v 3- x p n' f `eE n p �Oi. :E n C, e Q n O v H O n 3 o A 0 O n 3 o 0 �. p n_ 3 O D (D I^ C LAfi n L D N 3 ro CL 3 rn N •{ 00 X `C 9C _ `C N m 3 O N ON D 'w O O ' ro S m D n m o~i q m y n 1 wN 3 uo n ivp, 00 Op 3 O 3 L CC' 3 O 7 nn L c 3 p 3 c y _ j O w 3 o 3 o 3 C 3 V, S1 O 7 j 7 C oi 7 e3n A A in' p N Z w N w In .c d M O w O a W O s r Ln a N F N a d w N N x N A a a N N ,� N O w N N ,r A a n N r N CL j N O CL o, N N N A O n N O Q C W a a N N O a N ►+ N O C o, N p c m 7 N N C ' T c A N A T c N = N S C r = N T c \ N r \ wC T C \ V \ N ro CL N � \ \ S L N W �LL,,, S C LD N \ S L 1p 4-. \ m a \ �--' W w 7 L w W F-� \ 3 L V 01 \ N S C V D1 �y T C Q� N N \ ro a \ N �--� f0 a Oi \ V w n a \ r N N w a r \ A \ W T Q w \ OO \ W l \ N p \ N a 4+ A � W ro s r \ A \ W y^ �I . J C C C Cw CC CC C Cw > m C > ro 3 N W x y m d C ro G \ r W C ro Q W \ N N O_ N F+ \ C ro G O \ C ro Q N O C ro 4 Qt \ w w C ro CL 01 \ N w ro a N N \ W C ro a V \ N w ro Q W \ N w ro m W \ N W C m d O \ N W N a p N a C ro O_ \ N W C N O_ r hi W C c T N C c dt N W C r N ro A N c N N W ro Q N ro G \ N T � O T � 00 O O � 1D ka S O N 3 A �C C d N � 3 N N y n ro . m � - ul » I w N = O r � ro N w S� *4 w w w a `i o c ro r w, •4 r N \ OI 7 F+ L d V X 2 r-4. r� ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page vro � v A oay Dmaypp yaq px_ _ _ o��ro9 s$ ro 3y �ypR °�Tirie9 0 p s m rt R ti3.5. Q a �- j. 3 ar M [[C N J N a A S N N y W N N N � M M R i N ��QQ1Y i a 3 M N � 9 c N pNp 0 N NilN a N N U g N N = S a N N N N N N N N N N N N N N N N N N N N M N N N N N N N N N N N H Q �C g m x L�J vv � na� py�n a of a a1�v @,v o �3a $Q11 O� 63E Ole r 3 1 al$g 3.33 ey$ 3 't m� KI OW Z 3aG Na f. mac.. 3 5i C� Ep w N � N p m; N N • 0 2 M m W N w m N m �r N T N N N N N M N N N N N N N N N M N N M N N N M N N N N N 1 O c m- o M • Q. py y its,m n Mix S$ x� Y, Qqf IX_ O F _ !Qy� Q 9 x q NN b» 3e 3 3pi nQ 9-111 F 8 & a, Epp �F_ aF n5.3 g�.3R�.�� 3y mO3 9�R, 4 e c+3S'G g g p �'1. p.3y3 4g3 qg Oy'g X$ �1 g x z dye g xx pp 3. R gm 5. 5�. A Cnf 3 N N Qp 3F N M yy�� 44 bS 2 2 C m pZ 3 m N N N N N M N N M N M N N N N N N M N N N N N N N N N N N N M M M N N y O O N N N N N N N N N N N N N N N M N N M N N N N N M N N M N N N N qy Tmmi y N ITROUND ROCK AS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Freese and Nichols, Inc. for the Chisholm Trail South - Waterline Replacement Project: Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/24/2023 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $11,329.00 Indexes: Self -Financed Water Construction Attachments: Signed Supplemental_No1_FreeseNichols, LAF - SC#1 with Freese and Nichols - Chisholm Trail South, 22_09_ChisholmTrailSouth_WL Map Department: Utilities & Environmental Services Text of Legislative File CM-2023-061 The City's Transportation Department is widening Chisholm Trail Road from Sam Bass Road to Ranch Road 620. Along this segment of roadway, the City currently has a 10-inch asbestos cement waterline on the east side of the roadway that was installed in 1972. Due to the age and material of the existing waterline, it has reached the end of its design life. The City has contracted with Freese and Nichols to provide design, bid and 'construction phase services for replacement of the existing waterline. This project will replace approximately 2,400 linear feet of existing waterline with a new 12-inch waterline. The project also includes a waterline crossing under Brushy Creek, which is to be installed by trenchiess methods. The waterline replacement design will be included in the contract documents for the Transportation Department's Chisholm Trail South Improvements project. Supplemental Agreement No. 1 is for additional survey work associated with the waterline alignment. During the design phase, it was determined that due to existing conditions, the proposed waterline alignment will need to be located outside of the area surveyed for the Transportation Department project. This supplemental agreement will capture that additional area. The total cost of Supplemental Agreement No. 1 is $11,329, City of Round Rock Page 1 of 2 Agenda Item Summary Continued (CM-2023-001) Cost: $11,329.00 Source of Funds: Self -financed Water Funds City of Round Rock Page 2 of 2