Contract - Thalle Constructioin Company - 3/23/2023 CITY OF ROUND ROCK AGREEMENT FOR BRUSHY CREEK REGIONAL WASTEWATER SYSTEM 24-INCH WASTEWATER MAIN REPAIR PROJECT WITH THALLE CONSTRUCTION COMPANY THE STATE OF TEXAS § CITY OF ROUND ROCK § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § COUNTY OF TRAVIS § THAT THIS AGREEMENT for construction services (24-inch wastewater main located at the southeast corner of the intersection of Greenlawn Boulevard and Gattis School Road A ("Project") (referred to herein as the "Agreement"), is made and entered into on this the 23 day of the month of , 2023 by and between the CITY OF ROUND ROCK, a Texas home-rule municipality, whose offices are located at 221 East Main Street, Round Rock, Texas 78664-5299 (referred to herein as"Owner"or"City"), and THALLE CONSTRUCTION COMPANY, whose mailing address is 10110 East FM 917, Alvarado 76009 (referred to herein as"Contractor"). That for and in consideration of the mutual promises contained herein and other good and valuable consideration, the sufficiency and receipt of which are hereby acknowledged, it is mutually agreed between the parties as follows: ARTICLE 1: EXEMPTION TO COMPETITIVE BIDDING REQUIREMENTS Section 252.022(a)(2) and Section 252.022(3) of the Texas Local Government Code allows exemptions to competitive bidding requirements for 1): procurements that are necessary to preserve the health and safety of residents of the City; and 2) procurements necessary because of unforeseen damage to public machinery, equipment, or other property. The procurement set forth herein is the result of unforeseen damage to an existing wastewater main located at the southeast corner of the intersection of Greenlawn Boulevard and Gattis School Road. The City has an obligation to protect the health safety and welfare of the residents by promptly completing the Project. ARTICLE 2: THE CONTRACT DOCUMENTS The Contract Documents consist of the Agreement, Scope of Work (referred to herein as "Work" and "Cost of Work" and attached as Exhibit "A") and the City's General Conditions (referred to herein as "General Conditions" and attached as Exhibit `B" and any Modifications issued after the execution of this Agreement. Said Exhibits "A" and Exhibit `B" shall be incorporated herein by reference for all purposes. The Agreement and Exhibits shall form the Contract, and said Exhibits are as fully a part of the Contract as if repeated herein. The Contract _R-2023-CIS represents the entire and integrated agreement between the parties hereto and supersedes any prior negotiations, representations, or agreements, either written or oral. ARTICLE 3: THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 4: DATE OF COMMENCEMENT; COMPLETION. 4.1 Commencement. The date of the commencement of the Work shall be the effective date of this Agreement. Effective date of the Agreement is defined as the date upon which the binding signatures of both parties to this Agreement are affixed. 4.2 Completion. The Agreement shall terminate upon successful completion of the Work. ARTICLE 5: CONTRACT SUM Owner shall pay Contractor for the Work set forth herein in an amount not-to-exceed One Hundred Fifteen Thousand Two Hundred Eighty-Seven and 51/100 Dollars ($115,287.51)to be paid as set forth in Exhibit"A." Changes in the Work shall made pursuant to Article 10 of the attached Exhibit "B," General Conditions. ARTICLE 6: PAYMENTS 6.1 Applications for Payment. Based upon Applications for payment submitted to Owner by Contractor, Owner shall make progress payments on account of the Contract Sum to Contractor as provided below. 6.1.1 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 6.1.2 Provided that an Application for Payment is received and accepted by Owner not later than the tenth (10th) day of a month, Owner shall make payment to the Contractor not later than the tenth (10th) day of the next month. If an Application for payment is received by received by Owner after the application date fixed above, payment shall be made by Owner not later than one month after the Owner receives and accepts the Application for Payment. 6.1.3 Each Application for Payment shall be based on the most recent schedule of values submitted by Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of 2 the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as Owner may require. This Schedule, unless objected to by the Owner, shall be used as a basis for reviewing Contractor's Applications for Payment. 6.1.4 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 6.1.5 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 6.2 Final Payment. 6.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when Contractor has fully performed the Contract except for Contractor's responsibility to correct Work, and to satisfy other requirements, if any,which extend beyond final payment. 6.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the Work is fully performed to the acceptance of the Owner. In no event shall final payment be required to be made prior to thirty (30) days after all Work on the Contract has been fully performed. Defects in the Work discovered prior to final payment shall be treated as non-conforming Work and shall be corrected by Contractor prior to final payment, and shall not be treated as warranty items. ARTICLE 7: INSURANCE 7.1. Insurance Companies. 7.1.1 All insurance required by the Contract Documents shall be obtained from solvent surety or insurance companies that are duly licensed by the State of Texas and authorized to issue insurance policies for the limits and coverages required by the Contract Documents. 7.2 Workers' Compensation Insurance Coverage. 7.2.1 Definitions: .1 Certificate of coverage ("Certificate") - A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on the Project, for the duration of the Project. 3 .2 Duration of the Project - includes the time from the beginning of the Work on the Project until the Contractor's/ person's Work on the Project has been completed and accepted by the Owner. .3 Persons providing services on the Project ("subcontractor" herein) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the Project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, by way of illustration and not of limitation, independent contractors, Subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the Project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 7.2.2 Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of Contractor providing services on the Project, for the duration of the Project. 7.2.3 Owner will not execute the Contract prior to Contractor providing all required certificates of coverage. 7.2.4 If the coverage period shown on Contractor's current certificate of coverage ends during the duration of the Project, Contractor must, prior to the end of the coverage period, file a new certificate of coverage with Owner showing that coverage has been extended. 7.2.5 Owner shall obtain from each person providing services on the Project, and provide to Owner: .1 A certificate of coverage, prior to that person beginning Work on the Project, so Owner will have on file certificates of coverage showing coverage for all persons providing services on the Project; and .2 No later than seven (7) days after receipt by Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. 7.2.6 Contractor shall retain all required certificates of coverage for the duration of the Project and for one (1)year thereafter. 4 7.2.7 Contractor shall notify Owner in writing by certified mail or personal delivery within ten (10) days after Contractor knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project. 7.2.8 Contractor shall post at its office or on each Project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 7.2.9 Contractor shall contractually require each person with whom it contracts to provide services on a Project to: .1 Provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the Project, for the duration of the Project. .2 Provide to Contractor, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project, for the duration of the Project. .3 Provide Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. .4 Obtain from each other person with whom it contracts, and provide to Contractor: a) a certificate of coverage, prior to the other person beginning Work on the Project; and b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. .5 Retain all required certificates of coverage on file for the duration of the Project and for one(1)year thereafter. .6 Notify Owner in writing by certified mail or personal delivery within ten (10) days after the person knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project. 5 .7 Contractually require each person with whom it contracts, to perform as required by paragraphs 5.2.9.1 - 5.2.9.7, with the certificates of coverage to be provided to the person for whom they are providing services. 7.2.10 By signing this Contract or providing or causing to be provided a certificate of coverage, Contractor is representing to Owner that all employees of Contractor who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. 7.2.11 Contractor's failure to comply with any of these provisions is a breach of Contract by Contractor which entitles Owner to declare the Contract void if Contractor does not remedy the breach within ten (10)days after receipt of notice of breach from Owner. 7.3 Contractor Insurance Requirements. 7.3.1 General Requirements: .1 Contractor shall carry insurance in the types and amounts indicated below for the duration of the Contract, which shall include items owned by Owner in the care, custody and control of Contractor prior to and during construction and warranty period. .2 Contractor must complete and forward the required Certificates of Insurance to Owner before the Contract is executed as verification of coverage required below. Contractor shall not commence Work until the required insurance is obtained and until such insurance has been reviewed by Owner. Approval of insurance by Owner shall not relieve or decrease the liability of Contractor hereunder and shall not be construed to be a limitation of liability on the part of Contractor. Contractor must also complete and forward the required Certificates of Insurance to Owner whenever a previously identified policy period has expired as verification of continuing coverage. .3 Contractor's insurance coverage is to be written by companies licensed to do business in the State of Texas at the time the policies are issued and shall be written by companies with A.M. Best ratings of B+VII or better, except for hazardous material insurance which shall be written by companies with A.M. Best ratings of A-or better. 6 .4 All endorsements naming Owner as additional insured,waivers,and notices of cancellation endorsements as well as the Certificate of Insurance shall indicate: City of Round Rock, 221 E. Main St., Round Rock,Texas 78664. .5 The "other" insurance clause shall not apply to Owner where Owner is an additional insured shown on any policy. It is intended that policies required in the Contract, covering both Owner and Contractor, shall be considered primary coverage as applicable. .6 If insurance policies are not written for amounts specified below, Contractor shall carry Umbrella or Excess Liability Insurance for any differences in amounts specified. If Excess Liability Insurance is provided, it shall follow the form of the primary coverage. .7 Owner shall be entitled, upon request and without expense, to receive certified copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modification of policy terms, conditions, limitations, or exclusions except where policy provisions are established by law or regulations binding upon either of the parties hereto or the underwriter on any such policies. .8 Owner reserves the right to review the insurance requirements set forth during the effective period of this Contract and to make reasonable adjustments to insurance coverage, limits, and exclusions when deemed necessary and prudent by Owner based upon changes in statutory law, court decisions, the claims history of the industry or financial condition of the insurance company as well as Contractor. .9 Contractor shall not cause any insurance to be canceled nor permit any insurance to lapse during the term of the Contract or as required in the Contract. .10 Contractor shall be responsible for premiums, deductibles and self-insured retentions, if any, stated in policies. All deductibles or self-insured retentions shall be disclosed on the Certificate of Insurance. .11 Contractor shall provide Owner thirty (30) days written notice of erosion of the aggregate limits below occurrence limits for all applicable coverages indicted within the Contract. .12 If Owner-owned property is being transported or stored off-site by Contractor, then the appropriate property policy will be endorsed for transit and storage in an amount sufficient to protect Owner's property. 7 .13 The insurance coverages required under this contract are required minimums and are not intended to limit the responsibility or liability of Contractor. 7.3.2 Business Automobile Liability Insurance. .1 Contractor shall provide coverage for all owned, non-owned and hired vehicles. The policy shall contain the following endorsements in favor of Owner: a) Waiver of Subrogation endorsement TE 2046A; b) 30-day Notice of Cancellation endorsement TE 0202A; and c) Additional Insured endorsement TE 9901 B. .2 Contractor shall provide coverage in the following types and amounts: A minimum combined single limit of$500,000 per occurrence for bodily injury and property damage. Alternate acceptable limits are $250,000 bodily injury per person, $500,000 bodily injury per occurrence and at least $100,000 property damage liability each accident. 7.3.3 Workers' Compensation and Employers' Liability Insurance. .1 Contractor's coverage shall be consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Section 401). Contractor shall assure compliance with this Statute by submitting two (2) copies of a standard certificate of coverage (e.g. ACCORD form) to Owner's Representative for every person providing services on the Project as acceptable proof of coverage. The required Certificate of Insurance must be presented as evidence of coverage for Contractor. Workers' Compensation Insurance coverage written by the Texas Workers Compensation Fund is acceptable to Owner. Contractor's policy shall apply to the State of Texas and include these endorsements in favor of Owner: a) Waiver of Subrogation, form WC 420304; and b) 30-day Notice of Cancellation, form WC 420601. .2 The minimum policy limits for Employers' Liability Insurance coverage shall be as follows: $100,000 bodily injury per accident, $500,000 bodily injury by disease policy limit and$100,000 bodily injury by disease each employee. 7.3.4 Commercial General Liability Insurance. .1 Contractor's policy shall contain the following provisions: 8 a) Blanket contractual liability coverage for liability assumed under the Contract and all contracts relative to this Project. b) Completed Operations/Products Liability for the duration of the warranty period. c) Explosion, Collapse and Underground (X, C &U)coverage. d) Independent Contractors coverage. e) Aggregate limits of insurance per project, endorsement CG 2503. f) Owner listed as an additional insured, endorsement CG 2010. g) Thirty (30)day notice of cancellation in favor of OWNER, endorsement CG 0205. h) Waiver of Transfer of Recovery Against Others in favor of OWNER, endorsement CG 2404. .2 Contractor's Policy shall provide coverages a) and b) with minimum limits as follows: A combined bodily injury and property damage limit of$500,000 per occurrence. ARTICLE 8: TERMINATION AND SUSPENSION 8.1 Owner has the right to terminate this Agreement, in whole or in part, for convenience and without cause, at any time upon thirty (30)days' written notice to Contractor. 8.2 In the event of any default Contractor, Owner has the right to terminate this Agreement for cause, upon ten(10) days' written notice to Contractor. 8.3 Contractor has the right to terminate this Agreement only for cause, that being in the event of a material and substantial breach by Owner, or by mutual agreement to terminate evidenced in writing by and between the parties. 8.4 In the event Owner terminates pursuant to 8.1 or 8.2 above, the following shall apply: Upon Owner's delivery of the referenced notice to Contractor, Contractor shall discontinue all Work in connection with the performance of this Agreement and shall proceed to cancel promptly all Work insofar as such Work is chargeable to this Agreement. Within thirty (30) days after such notice of termination, Contractor shall submit a statement showing in detail the Work satisfactorily performed under this Agreement to the date of termination. Owner shall then pay Contractor that portion of the charges, if undisputed. The parties agree that Contractor is not 9 entitled to compensation for Work it would have performed under the remaining term of the Agreement except as provided herein. ARTICLE 9: MISCELLANEOUS PROVISIONS 9.1 Where reference is made in this Agreement to a provision of any document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 9.2 Owner's representative is: Michael Thane Director of Utilities and Environmental Services 3400 Sunrise Road Round Rock, Texas 76665 (512)218-3236 mthanea,,roundrocktexas. og_v Contractor's representative: Robert Farrow Thalle Construction Company 10110 East FM 917 Alvarado,Texas 76009 9.3 Neither Owner's representative nor Contractor's representative shall be changed without ten (10)days' written notice to the other party. 9.4 Waiver of any breach of this Agreement shall not constitute waive of any subsequent breach. 9.5 Although this Agreement, is drawn by Owner, both parties hereto expressly agree and assert that, in the event of any dispute over its meaning or application, this Agreement shall be interpreted reasonably and fairly, and neither more strongly for not against either party. 9.6 This Agreement shall be enforceable in Round Rock, Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms and conditions herein, exclusive venue for same shall lie in Coryell County, Texas. This Agreement shall be governed by and in accordance with the laws and court decisions of the State of Texas. 9.7 Both parties hereby expressly agree that no claims or disputes between parties arising out of or relating to this Agreement or a breach thereof shall be deducted by an arbitration proceeding, including without limitation, any proceeding under the Federal Arbitration Act (9 USC Section 1-14) or any applicable state arbitration statute. 9.8 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. 10 ARTICLE 10: NON-APPROPRIATION AND FISCAL FUNDING This Agreement is a commitment of Owner's current revenues only. It is understood and agreed that Owner shall have the right to terminate this Agreement at the end of any City fiscal year if the governing body of City does not appropriate funds sufficient to purchase the services as determined by Owner's budget for the fiscal year in question. Owner may affect such termination by giving Contractor a written notice of termination at the end of its then current fiscal year. ARTICLE 11: TAXES Owner is exempt from Federal Excise and State Sales Tax; therefore, tax shall not be included in Owner's charge. ARTICLE 12: RIGHT TO ASSURANCE Whenever either party to this Agreement, in good faith, has reason to question the other party's intent to perform hereunder, then demand may be made to the other party for written assurance of the intent to perform. In the event that no written assurance is given within the reasonable time specified when demand is made,then and in that event the demanding party may treat such failure as an anticipatory repudiation of this Agreement. ARTICLE 13: INDEMNIFICATION Contractor shall defend (at the option of Owner), indemnify, and hold Owner, its successors, assigns, officers, employees and elected officials harmless from and against all suits, actions, legal proceedings, claims, demands, damages, costs, expenses, attorney's fees, and any and all other costs or fees arising out of, or incident to, concerning or resulting from the fault of the Contractor, or Contractor's agents, employees or subcontractors, in the performance of Contractor's obligations under this Agreement, no matter how, or to whom, such loss may occur. Nothing herein shall be deemed to limit the rights of Owner or Contractor (including, but not limited to the right to seek contribution) against any third party who may be liable for an indemnified claim. ARTICLE 14: COMPLIANCE WITH LAWS,CHARTER AND ORDINANCES A. Contractor, its agents, employees and subcontractors shall use best efforts to comply with all applicable federal and state laws, the Charter and Ordinances of the City of Round Rock, as amended, and with all applicable rules and regulations promulgated by local, state and national boards, bureaus and agencies. B. In accordance with Chapter 2271, Texas Government Code, a governmental entity may not enter into a contract with a company for goods or services unless the contract contains written verification from the company that it: (1)does not boycott Israel; and(2)will not boycott 11 Israel during the term of this contract. The signatory executing this Agreement on behalf of Contractor verifies Contractor does not boycott Israel and will not boycott Israel during the term of this Agreement. C. In accordance with 2274, Texas Government Code, a governmental entity may not enter into a contract with a company with at least ten (10) full-time employees for a value of at least One Hundred Thousand and No/100 Dollars ($100,000.00) unless the contract has provision in the contract verifying that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The signatory executing this Agreement on behalf of Contractor verifies Contractor does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association, and it will not discriminate during the term of this Agreement against a firearm entity or firearm trade association. D. In accordance with 2274, Texas Government Code, a governmental entity may not enter a contract with a company with at least ten (10) full-time employees for a value of at least One Hundred Thousand and No/100 Dollars ($100,000.00) unless the contract has provision in the contract verifying that it: (1)does not boycott energy companies; and (2)will not boycott energy companies during the term of this Agreement. The signatory executing this Agreement on behalf of Contractor verifies Contractor does not boycott energy companies, and it will not boycott energy companies during the term of this Agreement. ARTICLE 15: ASSIGNMENT AND DELEGATION The parties each hereby bind themselves, their successors, assigns and legal representatives to each other with respect to the terms of this Agreement. Neither party shall assign, sublet or transfer any interest in this Agreement without prior written authorization of the other party. ARTICLE 16: NOTICES All notices and other communications in connection with this Agreement shall be in writing and shall be considered given as follows: 1. When delivered personally to the recipient's address as stated in this Agreement; or 2. Three (3) days after being deposited in the United States mail, with postage prepaid to the recipient's address as stated in this Agreement. 12 Notice to Contractor: Thalle Construction Company 10110 East FM 917 Alvarado, Texas 76009 Notice to Owner: Laurie Hadley, City Manager Stephanie L. Sandre,City Attorney 221 East Main Street AND TO: 309 East Main Street Round Rock,TX 78664 Round Rock,TX 78664 Nothing contained herein shall be construed to restrict the transmission of routine communications between representatives of Owner and Contractor. ARTICLE 17: APPLICABLE LAW; ENFORCEMENT AND VENUE This Agreement shall be enforceable in Round Rock, Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. ARTICLE 18: DISPUTE RESOLUTION Owner and Contractor hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by any arbitration proceeding, including without limitation, any proceeding under the Federal Arbitration Act(9 USC Section 1-14)or any applicable state arbitration statute. ARTICLE 19: SEVERABILITY The invalidity, illegality, or unenforceability of any provision of this Agreement or the occurrence of any event rendering any portion or provision of this Agreement void shall in no way affect the validity or enforceability of any other portion or provision of this Agreement. Any void provision shall be deemed severed from this Agreement, and the balance of this Agreement shall be construed and enforced as if this Agreement did not contain the particular portion or provision held to be void. The parties further agree to amend this Agreement to replace any stricken provision with a valid provision that comes as close as possible to the intent of the stricken provision. The provisions of this section shall not prevent this entire Agreement from being void should a provision which is of the essence of this Agreement be determined void. ARTICLE 20: MISCELLANEOUS PROVISIONS 20.1 Standard of Care. Contractor represents that it employs trained, experienced and competent persons to perform all of the services, responsibilities and duties specified herein and 13 that such services, responsibilities and duties shall be performed in a manner according to generally accepted industry practices. 20.2 Time is of the Essence. Contractor understands and agrees that time is of the essence and that any failure of Contractor to fulfill obligations for each portion of this Agreement within the agreed timeframes will constitute a material breach of this Agreement. Contractor shall be fully responsible for its delays or for failures to use best efforts in accordance with the terms of this Agreement. Where damage is caused to Owner due to Contractor's failure to perform in these circumstances, Owner may pursue any remedy available without waiver of any of Owner's additional legal rights or remedies. 20.3 Force Majeure. Neither Owner nor Contractor shall be deemed in violation of this Agreement if it is prevented from performing any of its obligations hereunder by reasons for which they are not responsible or circumstances beyond their control. However, notice of such impediment or delay in performance must be timely given, and all reasonable efforts undertaken to mitigate its effects. 20.4 Multiple Counterparts. This Agreement may be executed in multiple counterparts, any one of which shall be considered an original of this document; and all of which, when taken together, shall constitute one and the same instrument. 20.5 Execution. This Agreement is entered into as of the day and year first written above and is executed in at least two (2) original copies, of which one is to be delivered to the Contractor and the remainder to the Owner. IN WITNESS WHEREOF, Owner and Contractor have executed this Agreement on the dates indicated. City of Round Roc ,Texas Thalle Construction Co.,Inc. By: AMBy: C-Z Printed Name: rPrinted Name: Stephen E. Kohler Title. Title: President& COO Date Signed: Date Signed: 03.02.2023 Attest: By: Meagan Spinl s, ity Clerk For City,Approved as to Form: By. Stephanie L. San re, City Attorney Exhibit "A" ISSUING OFFICE TH/1 LLE CU•^ISIFUCTICIN -OMPANY ATTN Brian Beach Robert Farrow Plummer&Associates 10110 E. FM 917 Brushy Creek WWTP Alvarado,Texas 76009 0982 003 03 Project No. Thalle 20 349 Reference. Off Site Unflitration Investigation Date May 17, 2022 Description: Expose suspected inflittration location,investigation and dewatering CONTRACTOR'S PROPOSAL DESCRIPTION AMOUNT LABOR $59,444.59 MATERIALS $2.387.15 SUBCONTRACTOR OTHER $5.500.00 SUBTOTAL $67.331.74 MARGIN 25.00% $16.832.9 SUBTOTAL W/MARGIN $84,164.68 EQUIPMENT $30.457.86 $30,457.86 SUBTOTAL EQUIPMENT COSTS $30,457.86 0.00% $00 BONDS 0.68% $664.97 SUBTOTAL BONDS $664.97 UNIT PRICE WORK UNIT UNIT PRICE QUANTITY $0.0 SUBTOTAL UNIT PRICE WORK $0.00 Total Cost of Change $115,287.51 Calendar Days Time Extension Required Contractor's Certification: certify this estimate is made in good faith, and the supporting documentation is accurate and complete to the best of my knowledge and belief 5 . 21 . 22 Obert Farrow Date Project Manager Thalle 20 349 Off Site Unflitration Investigation 100A Expose suspected inflittration location,investigation and dewatering Crew Labor Costs Activity: Expose suspected inflittration location,investigation and dewatering Resource ID Resource Description QTY. UoM Unit Cost Burden(55%) Taxable Tax Rate(8.25%) Extended Cost FMNUTILITY Utility Foreman 64.00 MH $ 59.00 1.55 NO 0.00% $ 5,852.80 LAB1 Pipe Layer 269.50 MH $ 29.00 1.55 NO 0.00% $ 12,114.03 LAB3 Laborer(Skilled) 173.00 MH $ 27.00 1.55 NO 0.00% $ 7,240.05 LA84 Vac Truck Operator 4.00 MH $ 28.00 1.55 NO 0.00% $ 173.60 OE2 Operator-Class 2 Ldr/Dozer 86.50 MH $ 32.00 1.55 NO 0.00% $ 4,290.40 OE3 Operator-Class 3 Exc/FG Do 178.00 MH $ 32.00 1.55 NO 0.00% $ 8,828.80 Per Diam Expense 59 MD $ 80.00 1.00 NO 0.00% $ 4,720.00 Smalls Tools Modifier 0.25 $ 38,499.68 1 NO 0.00% $ 9,624.92 PM Project Manager 60.00 MH $ 110.00 1.55% NO 0.00% $ 6,600.00 Activity 0 Subtotal: $ 59,444.59 Thalle 20 349 Off Site Unflitration Investigation 200A Off Site Unflitration Investigation EQUIPMENT COSTS Activity: 200A Resource ID Resource Description QTY. UoM Unit Cost Burden(50%) Taxable Tax Rate(8.25% Extended Cost 3-TSRENTAL Trench Box Rental 8.00 day $ 545.00 N/A YES 0.00% $ 4,719.70 8GEN5KW Light Tower 4.00 day $ 165.00 N/A YES 0.00% $ 660.00 8EX06S 323 Cat Excavator 86.00 HR $ 176.00 N/A YES 0.00% $ 15,136.00 8LDR05 Cat Loader 86.00 HR $ 89.00 N/A YES 0.00% $ 7,654.00 8PU01 Foreman Truck 86.00 HR $ 7.00 N/A YES 8.25% $ 602.00 8TRUCKW2 Vaccumm Truck 4.00 HR $ 145.00 N/A YES 8.25% $ 580.00 8PUMP03E 3"Electric Pump 224.00 HR $ 2.84 N/A YES 8.25% $ 636.16 United Rentals Hammer 1.00 WEEK $ 235.00 N/A YES 8.25% $ 235.00 United Rentals Hammer 1.00 WEEK $ 235.00 N/A YES 8.25% $ 235.00 Activity 200A Subtotal: $ 30,457.86 8 0 contro Thalle 20 349 Off Site Unflitration Investigation Expose suspected inflittration location,investigation and dewatering Materials Activity: Mechanical Fitment(Materials) 2008 Resource ID Resource Description QTY. UoM Unit Cost Taxable Tax Rate(8.25%) Extended Cost NO 0.00% $ - CTSA Utility Stone 48.00 Ton $ 26.50 NO 0.00% $ 1,272.00 Viking Fence 1-3/8"Saddle Clamp 20.00 EA $ 2.11 YES 8.25% $ 42.20 Viking Fence Sand bags for Temp Fence 20.00 EA $ 8.00 YES 8.25% $ 160.00 Viking Fence 6'Talle Temp Fence Panel 120.00 LF $ 1.20 YES 8.25% $ 144.00 Viking Fence Fuel Surcharge 1.00 EA $ 50.00 YES 8.25% $ 50.00 Viking Fence Environmental Fee 1.00 EA $ 2.11 YES 8.25% $ 2.11 Viking Fence 42"x 6'Water Barricade(white) 3.00 EA $ 25.00 YES 8.25% $ 75.00 Viking Fence 42"x 6'Water Barricade(orange) 3.00 EA $ 25.00 YES 8.25% $ 75.00 CMC Marking Paint 1.00 EA $ 9.63 YES 8.25% $ 9.63 CMC Round Point Shovel 4.00 EA $ 24.61 YES 8.25% $ 98.44 CMC 16"Drain Spade 3.00 EA $ 41.95 YES 8.25% $ 125.85 Barnsco 2"Tie Down Ratchets 4.00 EA $ 24.75 YES 8.25% $ 99.00 Barnsco Contractor Bags 1.00 EA $ 13.23 YES 8.25% $ 14.32 Barnsco Marking Paint 1.00 EA $ 4.54 YES 8.25% $ 4.91 Barnsco Utility Knife 1.00 EA $ 4.90 YES 8.25% $ 4.90 Longhorn Portables Portapotty 1.00 EA $ 125.00 YES 8.25% $ 135.31 Longhorn Portables Fuel Surcharge 1.00 EA $ 12.14 YES 8.25% $ 12.14 Ramtool Fiberglass Probe Rod 1.00 EA $ 62.34 YES 8.25% $ 62.34 NO 0.00% $ - NO 0.00% $ - Activity 2008 Subtotal: $ 2,387.15 0 contro Thalle 20 349 Off Site Unflitration Investigation Expose suspected inflittration location, investigation and dewatering Activity: Subcontractor Other Expenses 300A Resource ID Resource Description QTY. UoM Unit Cost Burden (50%) Extended Cost JTC Trucking 323 In Out 2.00 EA $ 750.00 N/A $ 1,500.00 Loader In Out 2.00 EA $ 750.00 N/A $ 1,500.00 Trench Boxes In Out 2.00 EA $ 750.00 N/A $ 1,500.00 Compactor in out 2.00 EA $ 500.00 N/A $ 1,000.00 0.00 LS $ - N/A $ - 0.00 LS $ - N/A $ 0.00 LS $ - N/A $ 0.00 LS $ - N/A $ 0.00 ea $ - N/A $ 0.00 ea $ - N/A $ 0.00 ea $ - N/A $ 0.00 LS $ - N/A $ 0.00 LS $ - NA $ $ - N/A $ SUBTOTAL SUBCONTRACTOR OTHER 300A SUBTOTAL $ 5,500.00 8 0 contro F o O o o c o 0 0 o a o ��., O m O m O - � > > > 0 0 o s OO o m D a a o v a a a o o 0 0 0 0 0 o 0 0 0 mw o x c N H `o E E A u u w E w o `o ° `o u° a o o N o m 0 0 x m x m x m m o ,n m ry e m o ry o 15 c � o \ o 0 o 0 0 0 o c a o 0 0 0 0 0 0 0 0 ... a a o o itio 0 0 0 0 ry m \ a v \ � N � N N O \0 0 0 0 0 0 lo 0 0 F N a < \ v N v c o 3 o m ry o ry 3 \ �: oN. \0 0 0 0 0 0 0 0 0 0 a a ry ry ry a a ry ` ry o ry o 0 0 0 .n o o .n o �n 0 0 0 0 0 0 0 0 0 \ o 0 0 0 0 0 0 0 0 m \ a e � _ ry\ o 0 0 0 0 0 0 0 e a \ z z z E E E - a v z > g z > r > > g z > > w w w a - 'm m m a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a gw fOu w Ou >g u q w gu zm Ou g O0wOO 0mOO Q Q O a f w f 2 2 2 f � O wfp a l O � 2u 0z aO f o oO0 1 < o O 2 u a o 0 ., o w 'u o w w E wo ¢0 6 g0 O O m m O0m 0mam 0m m m m �., e 11 5 0 `oa 5 a o o S 5 a o m J S J 5 a o wo G a d o g o Qd ou Q Q z Z oz u u mp a z zo o ma s opo zzo LL Q o z o , e Ea z a u o a w m g Q i U F o p O O p ni O ❑ O i.j 0 ❑ O H O z 7 �Q wp Y p w w Z Q wp w ❑ w Z Q wp ❑ w z a m z o p J z a u w z ❑ < < ❑ 0 z a m w z o N p p a w a z w > 5 a z 'n a 3 S2 Sm " a z > g 3 w o f g a a o 5 a a o c m ❑ V. g d 0 o a O ti p l7 w D o Ow V' D ❑ s o a = J a o a o x J d o E ^ o . . .. . . .. m oa za0000gSoo � � � ooSS00000 � 000000S $ o � E E E • 3 r � C' iking Rentals Austin Location: DFW Location: Houston Location: Toll Free(800)-252-8117 ID:QT2022-06394 MBE Certificates: Date: 4/20/2022 9602 Gray Blvd 11308 S.Pipeline Road 10814 E.Hardy Rd MBE#AU01362(SMSDC-Atx/SA) Expiration Date:5/20/2022 Austin,TX 78758 Euless,TX 76040 Houston,Tx 77093 MBE#HMMB37676NO919 www.rentviking.com www.rentviking.com www.rentviking.com (NCTRCA-Dallas/Ft Worth) (Office) 512-837-6411 (office)469-221-0670 (Office) 281-990-3608 State HUB#1742043230800 i I nalle Construction - CUSTOMER WILL PICK UP AND RETURN TO 10110 E FM 917 OUR YARD Billing Address I Alvarado,TX 76009 Shipping/Location I Intersection Greenlawn Blvd&Gattis School Rd Alvarado,TX 76009 Round rock,TX 78664 Oscar Moreno Jesus Lumbreras Point of Contact Phone:(214)477-0092 Sales Person (512)633-2678 Email:omoreno@thalle.com jesus@vikingfence.com I Description TEMPORARY FENCE ProductsQty LF Months Unit Price Term Rental 1 3/8 ps saddle clamp(Install Date TBD) 20 1 2.11 42.20 18.0%/7.60 2 PER PANEL Sand Bags for Temp Fence(Install Date TBD) 20 8.00 160.00 18.0%/0.00 2 PER BASE 6'Tall Temporary Fence Panel(Install Date TBD) 10 120 1 1.20 144.00 18.0%/25.92 •Base For Temp Fence(Install Date TBD) 11 1 0.00 0.00 18.0%/0.00 Fuel Surcharge 1 50.00 50.00 18.0%/0.00 Environmental Fee 1 2.11 2.11 18.0%/0.00 SUBTOTAL Note: Additional mobilizations/partial-pulls @,$325.00. Remove and relocate fence(may vary by circumstance)add$1.0011inear ft. Add$175.00 per hour for waiting time or required safety classes/onentations. If job site install requires hand-carry,please add$0.65 per linear ft. Minimum project installation charge @$500.00. All Quotes are only valid for 7 days due to commodity price fluctuations out of our control. Prices are also subject to available inventory. TRAFFIC CONTROL Products Qty LF Unit Price One-rime Water Barricades-42"Tall x 6'Length(Monthly 3 18 25 75.00 recurring Fee)-Orange Water Barricades-42"Tall x 6'Length(Monthly 3 18 25 75.00 recurring Fee)-White Install mobilization-per mobilization(One time fee) 0 0 0.00 CUSTOMER WILL PICK UP AND RETURN TO OUR YARD Page 1 eking Rentals ONETIME RECURRING , ,, SUBTOTAL , ,, Summary Subtotal 548.31 Tax 45.24 Bond Total 593.55 Signature Print Name&Date Date Page 2 VIKING FENCE CO., LTD RENTAL TERMS AND CONDITIONS 1. DEFINITIONS "Commencement Date"means the date of delivery of any material,equipment or devices by VIKING FENCE CO.,LTD to the JOB SITE. "Job Site"means the particular Job Site or Job Sites where the Customer has advised VIKING FENCE CO.,LTD the Rental Fence System is to be delivered and installed. "Rental Fence System"means any components supplied to the Customer by VIKING FENCE CO.,LTD including but not limited to chain link fabric,fence posts,fence panels,bases, sandbags,gates,windscreen,fitting,gate hinges or any other material or equipment that VIKING FENCE Co.,LTD may rent to the Customer. "Portable Sanitation Device"means any sanitation component supplied to the Customer by VIKING FENCE CO.LTD including but not limited to portable toilets,specialty toilets,ADA- compliant restrooms,VIP Solar Restrooms,Comfort Stations,Hand Washing stations,sinks,holding tanks,sanitation accessories or any other material or equipment that VIKING FENCE Co.LTD may rent to the Customer. "Traffic Control Device"means any crowd or traffic control component supplied to the Customer by VIKING FENCE CO.LTD including but not limited to jersey barriers,water barricades, crowd control barricades,traffic control signage,surveillance equipment/surveillance trailers,ROSS(Rapid Deployment Surveillance Systems),channelizing devices or any other material or equipment that VIKING FENCE CO.LTD may rent to the Customer. "Rental Product"means,but is not limited to,any Rental Fence System component Portable Sanitation Device or any Traffic Control Device supplied to the Customer by VIKING FENCE CO.LTD. "Customer"means any person,company,partnership or corporation that rents a Rental Fence System,Portable Sanitation Device or Traffic Control Device from VIKING FENCE CO.,LTD and included,where appropriate,any person who is actually or apparently authorized by the Customer to act on its behalf. "Agreement"means an agreement between VIKING FENCE CO.,LTD and a CUSTOMER for the rental of any device or equipment for the Job Site as a result of acceptance of a proposal. "Order"means an Order placed by the Customer with VIKING FENCE CO.,LTD for the rental of a Fence System,Portable Sanitation Device and/or Traffic Control Device or any other rental product "Viking Fence"means VIKING FENCE Co.,LTD and includes,where appropriate,its employees and authorized agents. 2. RENTAL PRODUCTS a. Unless otherwise agreed by the parties,Viking Fence does not warrant that any Rental Product is new or unused or will be unaffected by the conditions(including weather and ground conditions)of the Job Site. b. The Customer must use the Rental Product at all times in a safe and prudent workmanlike manner,in accordance to all applicable laws,by-laws,regulations and statutes. C. No other advertising material,signs or other materials such as shade cloth,alterations or modifications are to be performed to the Rental Product without Viking Fence's prior written consent d. The Customer may not transfer,sell,mortgage or otherwise deal with the Rental Product or allow the Rental Product to be removed from the Job Site,by a third party. e. The Customer must not alter,move,install or uninstall the Rental Product,without Viking Fence's prior written consent E The Rental Fence System is a temporary fence solution and should not be relied upon to provide any of the structural characteristics of a permanent fence solution.PLEASE BE AWARE THAT IF TEMPORARY PANELS BLOW OVER DUE TO EXTREME WEATHER,VIKING FENCE IS NOT RESPONSIBLE FOR THE COST TO REINSTALL. g. All Rental Products remain the property of Viking Fence. 3. DELIVERY AND INSTALLATION a. Upon receipt of an ORDER and/or a notice to proceed with installation,Viking Fence will deliver and/or install the Rental Product to a Job Site in accordance with the terms of the Agreement. b. Viking Fence will not be liable for a delay or failure to deliver and or install the Rental Product at the Job Site,if the delay arises as a result of a circumstance beyond the control of Viking Fence.Notwithstanding late delivery,the Customer must accept and pay for the Rental Product in accordance with the terms of the Agreement C. The Customer hereby assumes full responsibility for the locating and staking the Rental Fence System line upon which the Rental Fence System materials are to be installed.The Customer also agrees to defend and hold harmless and indemnify Viking Fence from and against all claims,liabilities,and expense for injury,death,or damage to person or property,trespass,and all other damage or loss arising out of the installation or location of the Rental Fence System. d. The Customer shall have a representative on site to direct the Rental Product installation location and confirm the quantity of materials delivered and/or installed.If a Customer representative is not available verbal directions or a plan of the site with the Rental Product location shall be made available to Viking Fence.All underground services within the line of proposed Rental Fence System shall be marked on site with marker paint and a plan provided to Viking Fence.If a Customer representative cannot be present upon the completion of the Rental Product installation/delivery,the Customer agrees to accept the quantity and condition of the Rental Product installed/delivered by VIKING FENCE. e. Customer is responsible for obtaining all necessary permits unless noted in the Agreement f. Viking Fence will not be responsible for damage to sod,landscaping,trees,shrubs,asphalt or concrete that is damaged during the Rental Product installation. g. Customer is to provide all traffic control unless noted in the Agreement 4. TERM The term of the Agreement will commence on the Commencement Date and terminate at the expiration of Agreement term. Customer agrees to notify Viking Fence to schedule removal of any Rental Product before the expiration date. In the event that Viking Fence is not notified by Customer before the end of rental period,to remove any Rental Product, the rental will automatically renew at Viking Fence's standard monthly rental rate,billed monthly in advance. S. PRICING AND PAYMENT CONDITIONS a. Customer will be charged and invoiced by Viking Fence from the Commencement Date.Viking Fence will not refund Agreement charges for early return of any Rental Product b. The Agreement includes one installation/delivery to the Job Site and one removal of the Rental Product from the Job Site. Rental Products are to be measured/counted on completion and billed accordingly. Rental Fence and Portable Sanitation is taxable per Texas state law. Price may vary per rental period.Viking Fence offers monthly, 3,6,9,12 and other term rates. Portable Sanitation and Traffic Control Device pricing is based on a 28-day advance billing cycle. C. Agreement charges for the Rental Fence System for the full term of the Agreement are due and payable immediately upon receipt of invoice unless noted in the Agreement d. Customer shall pay amounts due,without any offsets(including retainage),in full at the time of the rental unless Viking Fence approves Customer's executed credit application. Customer must notify Viking Fence in writing of any disputed amounts,including credit card charges,within 1S days after the receipt of the invoice or Customer shall be deemed to have irrevocably waived its right to dispute such amounts.At Viking Fence's discretion,any credit account with a delinquent balance may be placed on a cash,hold or no-service basis,deposits may be required and the Rental Products may be picked up without notice. Customer agrees that a service charge equal to the lesser of 1.S%per month or the maximum rate permitted by Texas state law shall be assessed on all delinquent accounts,until all balances are paid in full. Customer agrees that if a credit card is presented to pay for charges or to guarantee payment Customer authorizes Viking Fence to charge their credit card all amounts due per the Agreement and charges subsequently incurred by Customer,including but not limited to,loss of or damage to the Rental Products and extension of the rental period. e. Damage Waiver Rate. Damage waiver rate protects Customer against back-charges,as long as damage to installed temporary fence does not exceed 20%of the total fence length. Standard rate allows Viking Fence to back-charge customer for any and all damage to temporary fence. Normal wear and tear does not apply. E Automatic Renewal.Customer agrees to notify Viking Fence to schedule removal of Rental Products. In the event,that Viking Fence is not notified by Customer before the end of rental period,the rental will automatically renew at Viking Fence's standard monthly or 28-day rental rate. 6. REMOVAL OF RENTAL PRODUCTS Customer shall notify Viking Fence that a Rental Product is ready to be picked up. Customer is responsible for contacting Viking Fence to schedule pick up,otherwise Customer will automatically be invoiced for additional rent at standard monthly rate.The Rental Product shall be returned to Viking Fence in the same condition it was received,less Ordinary Wear and Tear. The Rental Period and this Agreement shall not terminate until Viking Fence has had an opportunity to confirm that the material is being returned in the condition required herein. The Customer agrees to have a representative on site to confirm the quantity of materials removed and to confirm any and all damaged and/or lost material. If a Customer representative cannot be present during the Rental Product removal,the Customer agrees to accept the quantity and condition of the Rental Product materials documented and removed by Viking Fence. Viking Fence agrees to send confirmation of removed and damaged/lost material to Customer. 7. DAMAGED/LOST MATERIAL Customer agrees to compensate Viking Fence for any damaged and/or last Rental Products.Damaged and/or lost Rental Products shall be billed at the following rates: 6'Chain Link Fence Fabric $3.09/ft 8'Chain Link Fence Fabric 54.09/ft 6'x12'Fence Panels $175.00/ea. 8'x12'Fence Panels $225.00/ea. Fence Bases $48.00/ea. 8'Fence posts $28.95/ea. 10'Fence Posts $36.95/ea. Top Rail $3.50/ft 6'x24'Swing Gate $365/ea. 8'x24'Swing Gate $455/ea. Standard Toilet $750/ea. Water Barricades $670/ea. Holding Tank $550/ea. Water Barricade Fencing $90/ea. Other items not listed above shall be invoiced at the current cost to replace that specific rental asset RDSS(please inquire about replacement costs as prices vary by equipment-please note that this agreement requires the Customer to insure RDSS equipment against any and all damage). 8. INDEMNITIES AND LIMITATION OF LIABILITY Customer agrees to fully indemnify and defend Viking Fence(including its agents and employees)against all costs,claims,lawsuits,litigation fees,expenses,judgements,and arbitral costs or awards arising from or related to any Rental.Product,the fence location and property lines,damage to any underground lines or pipes,and all property damage(collectively, the"Indemnities"). Customer agrees that Viking Fence's liability to Customer,whether under contract,tort,or public law shall never exceed the total sums paid to Viking Fence under this Agreement,and Customer waives all consequential,statutory additional,and indirect damage claims,and all claims for lost profits. Venue for any disputes between the parties shall be exclusively in Travis County,Texas. 9. CUSTOMER DEFAULT Customer shall be in default if Customer:(a)fails to pay sums when due,(b)breaches any provision of this Agreement,(c)becomes a debtor in a bankruptcy proceeding or goes into receivership. Viking Fence shall have,in addition to all rights in remedies at law or in equity,the right to repossess the Rental Product without judicial process or prior notice. For purposes of Texas Property Code Liens,our Rental Products are deemed to be provided on a monthly basis,and because it is material and used in the improvement of real property, Viking Fence may,during any month of the rental term,file a lien for all accrued but unpaid rent 10. SPECIFIC TERMS AND CONDITIONS RELATED TO SURVEILLANCE SYSTEMS: The Paragraphs below detail some ofthe key terms and conditions related to Rapid Deployment Surveillance Systems(RDSS). For a complete list of all terms and conditions related to the rental of these products please reference httns//www.vikingfence.com/about-us/rdss-terms-and-conditions/ Disclaimer of Warranty: Disclaimer Of Warranty. The Equipment And Services Are Provided"As Is"Without Warranty,Either Express Or Implied,Including Without Limitation Any Warranties Of Accuracy, Timeliness, Completeness,Merchantability,Non-Infringement,Fitness For A Particular Purpose(Even If That Purpose Is Known To Viking Fence and/or Wcctv),Or Arising From Course Of Dealing,Usage Or Trade Practice.Viking Fence and it's partner,Wcctv,Disclaim Any And All Liability To Any Person Or Entity For The Proper Performance Of The Equipment Or Service.Viking Fence Does Not Represent Or Warrant That The Services Are Complete Or Free From Error Or Will Be Available 24 Hours Per Day,Seven Days Per Week, And Does Not Assume,And Expressly Disclaims,Any Liability To Any Person Or Entity For Any Loss,Injury,Or Damage Caused By Errors Or Omissions In The Equipment Or Services, Whether Such Errors Or Omissions Result From Negligence,Accident,Or Other Cause. Viking Fence Makes No Representations Or Warranties About The Legality Or Propriety Of The Use Of The Services In Any Geographic Area. In No Event Will Viking Fence Have Any Liability For Events Or Causes Beyond Its Reasonable Control,Including Without Limitation As Set Forth In Condition 12. Viking Fence Does Not Give Any Warranty,Guaranty Or Other Undertaking That The Provision Of Any Service Or Equipment Under The Contract Will Avert, Prevent Or Protect Against Occurrences Of Which The Equipment And/Or Services Are Intended To Record Or Give Warning. Furthermore,Viking Fence Disclaims All Liability For Any Losses That Are Covered Under A Warranty For Equipment Provided By A Third Party. IndemN6cation by Customer. Customer agrees to indemnify,defend,and hold Viking Fence Co.and its affiliates harmless from and against all claims,losses,liabilities,damages,costs and expenses(including, without limitation,reasonable attorneys'fees)arising from a claim,suit or proceeding brought against Viking Fence by a third party arising out of or related to(1)the removal, handling,use,disposition,possession,transportation or conveyance of the Equipment and/or Services by you or your permitted users or(2)your misrepresentation or breach of this Contract Use of Rented Surveillance Equipment: At all times when the Rented Equipment is in your possession you will:(a)insure the Rented Equipment for its full replacement value,naming us as an additional insured party,(b) make no alteration to the Rented Equipment and not remove any existing components from the Rented Equipment;(c)keep us fully informed of all material matters relating to the Rented Equipment;(d)keep the Rented Equipment or any part thereof at all times at the Delivery Address and not move to any other location or site,(e)ensure that at all times the Rented Equipment remains identifiable as being our property and if requested ensure that a visible sign to that effect is attached to the Rented Equipment You agree that we are not an insurer and no insurance coverage is offered.At or directly after delivery,you shall furnish us with a certificate of insurance.You shall maintain such insurance in full force and effect at your sole expense during the Lease Period. Data Plan: For Rental Equipment, unless your Lease expressly includes the cost of the Data Plan,such cost will be separately invoiced as a Data Plan Fee for Rental Equipment at the same time we invoice for the Lease during the Data Plan Period.For Purchased Equipment,we will invoice you for the Data Plan Fee at the time or times stated in the Proposal.If you exceed the Data Plan usage allowance,you will be charged at$50.00 for every 5 GB over the allowance. If the Data Plan Fee is in arrears we may suspend provision of the Data without affecting your obligation to pay the Data Plan Fee for the entire Data Plan Period.We may increase the Data Plan Fee by the percentage of increase imposed upon us by the network provider. Any such increase will take effect 30 days after we notify you of the change.We will invoice you for the increase in the Data Plan Fee from the effective date of such increase to the end of the Data Plan Period. 12. FORCE MAJEURE Viking Fence will not be liable to Customer for any failure or delay by us or for the consequences of any failure or delay in performance of the Contract if it is due to any event beyond our reasonable control including acts of God,war,labor strikes or industrial disputes,protests,fire,flood,storm,tempest,epidemic,explosion,an act of terrorism,acts of or authorized by government,inability to obtain materials or components and national emergencies or any supervening illegality. 13. MERGER AND INTEGRATION OF DOCUMENTS This Agreement supersedes all prior oral and written agreements between the parties,all of which are merged into this Agreement Modifications and amendments to this agreement,including any exhibit or appendix,shall be enforceable only if they are in writing and are signed by authorized representatives of both parties. f INVOICE ! CMC construction Services 1 No. 468484 J11811 East Freeway, Ste 660 Page 1 Houston, TX 77029 04/20/2022 1-877-785-4497 INVOICE RCVD APR 22 20-22 EMAIL Bill-to: 103228 Ship-to: 349 THALLE CONSTRUCTION CO. INC BRUSHY CREEK REGION 10110 E FM 917 PLANT EXP TO 30 MGD ALVARADO TX 76009-5203 3939 E PALM VALLEY ROUND ROCK TX 78665 REFERENCE# SHIPPED OSP TERMS ISP DOC# WH SHIP VIA OSCAR 04/20/22 CDD Net 30 Days TR 665384 05 WC ITEM DESCRIPTION SHIPPED UN PRICE UM EXTENSION 17000410 FL ORG CONST MARKING U/D PAI 1 FS 9.630 EA 9.63 1702 AERVOE 247 49150 SHOVEL LHRP 5400 WOOD HANDLE 4 ET 24.610 EA * 98.44 W/POWER COLLAR 49138 DRAIN SPADE 16 BLD 5500 RD 3 Ell 41.95C EA 125.85 WOOD HDL STEEL D GRIP MERCHANDISE MISC TAX FREIGHT TOTAL DUE Payment Options 233. 92 .00 18.51 .00 1 252.43 ACH Payllents Online Payllents: check Payments to: Bank of America, N.A. New York htt s: www.cmcconstructionservices.com a ments CMC construction services ABA# 111000012 art paying y t e tax amount, a sa es PO Box 844573 Account# 3756666300 tax exemption certificate must be included Dallas, TX 75284-4573 For credit to: CMC Construction Services with your remittance. CMC Construction Services PICK TICKET PRINT Louisiana /Oklahoma /Texas 1-877-785-4497 ����rr nuuuuuuuuuuuuuuuuuuu CMC Commerciall Metals Nnmber 665384 Date 04/21/2022 Time 8:13 AM Page 1 Ship-to. 349 Bill-to: 103228 BRUSHY CREEK REGIONAL WWTP E THALLE CONSTRUCTION CO.INC PLANT EXP TO 30 MGD J# 20-349 10110 E FM 917 3939 E PALM VALLEY BLVD ALVARADO TX 76009-5203 ROUND ROCK TX 78665-9443 Reference# Ordered Requested Osp tsp Terms Whse I Freight Ship Via OSCAR 04/20/2022 0412012022 COD TR Net 30 Days 05 PREPAID WC Item Description Ordered Ship Back um Weight Loe Ordered By OSCAR 17000410 FL ORG CONST MARKING UID PAINT I EA 1.5 ROW1R 170Z AERVOE 247 49150 SHOVEL LHRP S400 WOOD HANDLE 4 EA 17.6 BCLF W/POWER COLLAR 49138 DRAIN SPADE 16" BLD S500 RD 3 EA 12.0 BCLF WOOD HDL STEEL D GRIP i I I I BACKUP RC D FIELD Total Weight: 31.1 SIGNATURE DATE Do not write below this inei ling Last Page SODOC 02-665384 1111111111111111 I IIIII Ill 111111111111111 I II II�I��II I I I ILII [ Ill Barnsco(Hutto) Sales Invoice 50 Ironhorse Drive B!AA`>R SCQ Hutto,Texas 78634 Invoice No 169694 T x A 5 Phone: (512)354-4970 http://texas.barnsco.com Account# 4713 Sales Order No. 870010 INVOICE RCVD Ship Point Barnsco(Hutto) Terms Net 30 Days Shipped 04/20/2022 APR 2 1 2022 Invoiced 04/20/2022 Due Date 05/20/2022 EMAIL BILL TO SHIP TO THALLE CONSTRUCTION COMPANY 29- BRUSHY CREEK WASTEWATER 900 NC 86 NORTH 3939 EAST PALM VALLEY HILSBOROUGH NC, 27278 ROUND ROCK,TX,78665 Page 1 of 1 Taken By Brad Wilcox Isale Type I CPU Pickup Isales Rep I Audrey McClana I Placed By OSCAR MORE Customer PO 1 20-549 Instructions I Ln # Product and UPC Quantity Quantity Quantity Qty Unit Price Amount Description Item# Ordered B.O. Shipped UM Price UM (Net) 1 TLS3052 06088197 4 0 4 ea 2475 ea 99 00 T TIE DOWN W/RATCHET 2"X27'SK.60501 2"X 27'Flat Hook 1 OK Load Hugger Poly Tiedown with Ratchet 2 POL2058 0764666t 1 0 1 BOX 13 23 BOX 13 23 T CONTRACTOR BAGS,2 5 MIL,42 GAL 20/RL 100/PLT These contractor bags are perfect for construction and demolition waste disposal.Made from super strong low density material. 3 PNT4054 0043281( 1 0 1 ea 454 ea 4 54 NT MARKING PAINT,PINK FLUORESCENT 12/CS PRECISION LINE INVERTED MARKING PAINT.A general purpose inverted marking paint 4 TLS3752 0765139 1 0 1 ea 4.90 ea 4.90 T UTILITY KNIFE 3 WAY(DW042) Professional Utility Knife with Retractable Blade Total Weight: 261400 Total Amount $121.6 Sales Tax $9.611 Invoice Total $131,3 Remit To:PO BOX 541087 Dallas TX 75354-1087 www.bamsco.com (214)352-9091 Credit Card Payments subject to 2.5% surcharge;ACH payments -no surcharge INVOICE Longhorn Portables, LLC PO Box 1436 Pflugerville, TX 78691 Tel: (512)801-5292 Fax: (512) 252-9133 Invoice#: 15864 Invoice Date: May 01, 2022 Page#: 1 Thalle Construction Company PO Number: 10110 E FM 917 Alvarado, TX 76009 Quantity Description Rental Period Unit Price Days Rent Extension (2)Thalle Construction Company Gattis School Rd&Greenlawn Blvd Round Rock,TX 78664 Construction Units 1 Once a Week Apr 20.2022-May 31,2022 125 00 1 > 173 39 Fuel Surcharge 12 14 Sales Tax 825 5 14 30 Invoice Total $199.83 Due Date: 05/20/2022 Current 30-60 60-90 90-120 120+ Project Balance Due $199.83 $0.00 $000 $0 00 $0 Oli $199.83 TEAR OFF HEADER AND RETURN LOWER PORTION WITH YOUR PAYMENT Thalle Construction Company Customer#: 001355-000002 Invoice#: 15864 Invoice Date: May 01,2022 PO Number: Invoice Total $ 199,83 Longhorn Portables, LLC PI FASF WRITE IN AMOUNT OF PAYMENT FN(I OSFD PO Box 1436 Pflugerville, TX 78691 Credit Card #: / / / / / / / / / / / / / / / / / / Exp: Signature: OUnited Rentals- IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII RENTAL RETURN BRANCH D77 INVOICE 10300 N INTERSTATE 35 FRONTAGE ROAD # 205690231-001 AUSTIN TX 78753-3709 512-491-6100 tomer # 4779777 Invoice Date US/U2/22 �) BRUSHY CREEK PROJECT Rental Out 04/2//22 Ui:38 PM ♦0 Rental In US/U2/22 IU:J4 AM 'fl 3939 E PAL VALLEY BLVD UR Job Loe 3939 E PAL VALLEY BL ROUND ROCK TX 78665 Cu Job# 22 Customer Job ID P.O. # 20349 Requested By MIKE COOK 1"J Office: 919-245-1490 Cell: 919-741-7498 written By THOMAS RATHKE Salesperson PRESTON ARMSTRONG THALLE CONSTRUCTION-TX Invoice Amount: $508.78 900 NC 86 NORTH Terms Due Upon Receipt HILLSBOROUGH NC 27278-2540 Payment options: Contact our credit office 704-916-0858 REMIT TO: UNITED RENTALS(NORTH AMERICA),INC. PO BOX 100711 ATLANTA GA 303840711 RENTAL ITEMS: me ri 1- DescriEtion Minimum "t---- ��- - - AP-"- 1 11352564 BREAKER PAVEMENT AIR 90# 76.00 77.00 235.00 458.00 235.00 Make: TAMCO Model: TOKUPB-90-1-1/4 Serial: 2021J119 1 11352558 BREAKER PAVEMENT AIR 90# 76.00 77.00 235.00 458.00 235.00 Make: TAMCO Model: TOKUPB-90-1-1/4 Serial: 2021JO25 Rental Subtotal: 470.00 Agreement Subtotal: 470.00 Tax: 38.78 Total: 508.78 COMMENTS/NOTES: CONTACT: GARY DOWDY CELL#: 270-619-6787 Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8\ for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tan in soiiitiiiiit jurisdictions. NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page, 1 Exhibit "B" 00700 GENERAL CONDITIONS Exhibit "B" City of Round Rock Contract Forms General Conditions Section 00700 TABLE OF CONTENTS OF GENERAL CONDITIONS Article Page Number& Title Number 1. DEFINITIONS.................................................................................................................................................2 2. PRELIMINARY MATTERS.............................................................................................................................5 3. CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE.........................................................................7 4. AVAILABILITY OF LANDS, SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS ..........................................................................................................8 5. BONDS AND INSURANCE............................................................................................................................10 6. CONTRACTOR'S RESPONSIBILITIES .........................................................................................................16 7. OTHER WORK...............................................................................................................................................24 8. OWNER'S RESPONSIBILITIES.....................................................................................................................25 9. ENGINEER/ARCHITECT'S STATUS DURING CONSTRUCTION................................................................26 10. CHANGES IN THE WORK.............................................................................................................................27 11. CHANGE OF CONTRACT AMOUNT.............................................................................................................28 12. CHANGE OF CONTRACT TIMES.................................................................................................................31 13. TESTS AND INSPECTIONS, AND CORRECTION ORREMOVAL OF DEFECTIVE WORK........................................................................................................32 14. PAYMENTS TO CONTRACTOR AND COMPLETION..................................................................................35 15. SUSPENSION OF WORK AND TERMINATION ...........................................................................................39 16. DISPUTE RESOLUTION................................................................................................................................41 17 RIGHT TO AUDIT...........................................................................................................................................42 18. MISCELLANEOUS.........................................................................................................................................43 00700 04-2020 Page 1 General Conditions 00443641 Exhibit "B" GENERAL CONDITIONS ARTICLE 1 -DEFINITIONS Whenever used in these General Conditions or in the other Contract Documents,the term printed with initial capital letters or all capital letters, including the term's singular and plural forms, will have the meaning indicated in the definitions below or as defined in these General Conditions or other Contract Documents: 1.1 Addenda -Written or graphic instruments issued prior to the receipt of Proposals or the opening of Bids that clarify, correct or change the proposal or bidding requirements or the Contract Documents. 1.2 Agreement-Prescribed form, referenced as Section 00500. 1.3 Alternative Dispute Resolution-The process by which a disputed Claim may be settled if the OWNER and the CONTRACTOR cannot reach an agreement between themselves, as an alternative to litigation. 1.4 Bid - Proposal of bidder on prescribed forms setting forth prices for performing the Work described in the Contract Documents. 1.5 Bid Documents-The advertisement or invitation for bids, instructions to bidders,the bid form, the Contract Documents and Addenda. 1.6 Calendar Day-Any day of the week; no days being excepted. Work on Saturdays, Sundays, and/or Legal Holidays shall only be conducted with prior express written consent of the OWNER. 1.7 Change Directive-A written directive to the CONTRACTOR, signed by the OWNER, ordering a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Amount or Contract Time, or both. A Change Directive may be used in the absence of total agreement on the terms of a Change Order. A Change Directive does not change the Contract Amount or Contract Time, but is evidence that the parties expect that the change directed or documented by a Change Directive will be incorporated in a subsequently issued Change Order. 1.8 Change Orders - Written agreements entered into between the CONTRACTOR and the OWNER authorizing an addition, deletion, or revision to the Contract, issued on or after the Execution Date of the Agreement and within the Contract term. 1.9 Claim - A written demand seeking, as a matter of right, adjustment or interpretation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. 1.10 Contract - The Contract represents the entire and integrated agreement between the OWNER and the CONTRACTOR for performance of the Work, as evidenced by the Contract Documents. 1.11 Contract Amount-The amount payable by the OWNER to the CONTRACTOR for completion of the Work in accordance with the Contract Documents. 1.12 Contract Documents — Includes the Invitation to Bid, Instructions to Bidders, Agreement, General Conditions, Supplemental General Conditions, Special Conditions, Specifications, Project Manual, Drawings, Addenda and Change Orders. 1.13 Contract Time-The number of days allowed for completion of the Work as defined by the Contract. When any period is referred to in days, it will be computed to exclude the first and include the last day of such period. A day of twenty-four(24) hours measured from midnight to the next midnight will constitute a day. 1.14 CONTRACTOR - The individual, firm, corporation, or other business entity with whom the OWNER has entered into the Contract. 00700 04-2020 Page 2 General Conditions Exhibit "B" 1.15 Drawings - Those portions of the Contract Documents which are graphic representations of the scope, extent and character of the Work to be furnished and performed by the CONTRACTOR and which have been approved by the OWNER. Drawings may include plans, elevations, sections, details, schedules and diagrams. Shop Drawings are not Drawings as so defined. 1.16 Engineer/Architect (E/A) - The OWNER's design professional identified as such in the Agreement. The titles of"Architect/Engineer,""Architect"and"Engineer" used in the Contract Documents shall be read the same as Engineer/Architect (E/A). Nothing contained in the Contract Documents shall create any contractual or agency relationship between E/A and the CONTRACTOR. 1.17 Equal-The terms"equal"or"approved equal"shall have the same meaning. 1.18 Execution Date-Date of last signature of the parties to the Agreement. 1.19 Field Order-A written order issued by Owner's Representative which orders minor changes in the Work and which does not involve a change in the Contract Amount or the Contract Time. 1.20 Final Acceptance—The stage in the Contract process when, in the OWNER's opinion, Final Completion of the Work has been attained and a Certificate of Acceptance approved by the OWNER is issued. 1.21 Final Completion -The stage in the progress of the Work when, in the OWNER's opinion, the entire Work has been completed, the CONTRACTOR's obligations under the Contract Documents have been fulfilled, and the OWNER is processing or has made final payment to the CONTRACTOR, as evidenced by a Certificate of Acceptance approved by the OWNER. 1.22 Inspector-The authorized representative of any regulatory agency that has jurisdiction over any portion of the Work. 1.23 Legal Holidays 1.23.1 The following are recognized by the OWNER: Holiday Date Observed New Year's Day January 1 Martin Luther King, Jr.'s Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Veteran's Day November 11 Thanksgiving Day Fourth Thursday in November Friday after Thanksgiving Friday after Thanksgiving Christmas Eve December 24 Christmas Day December 25 00700 04-2020 Page 3 General Conditions Exhibit "B" 1.23.2 If a Legal Holiday falls on Saturday, it will be observed on the preceding Friday. If a Legal Holiday falls on Sunday, it will be observed on the following Monday. 1.23.3 If Christmas Eve falls on a Saturday or a Sunday, the preceding Friday is observed as the Christmas Eve holiday. 1.23.4 If Christmas Day falls on a Saturday or a Sunday, the following Monday is observed as the Christmas Day holiday. 1.24 Milestones-A significant event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work. 1.25 Notice to Proceed - A Written Notice given by the OWNER to the CONTRACTOR notifying the CONTRACTOR to commence the Work and which may also fix the date on which the Contract Times will commence to run and on which the CONTRACTOR shall start to perform the CONTRACTOR's obligations under the Contract Documents. 1.26 OWNER—The City of Round Rock, Texas, a municipal corporation, home-rule city and political subdivision organized and existing under the laws of the State of Texas, acting through the City Manager or his/her designee, officers, agents or employees to administer design and construction of the Project. 1.27 Owner's Representative-The designated representative of the OWNER. 1.28 Partial Occupancy or Use - Use by the OWNER of a partially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 1.29 Proiect - The total construction of which the Work to be provided under the Contract Documents may be the whole, or a part, as indicated elsewhere in the Contract Documents. 1.30 Prosect Manual - That portion of the Contract Documents which may include the following: introductory information; bidding requirements, Contract forms and General and Supplemental General Conditions; General Requirements; Specifications; Drawings; Project Safety Manual; and Addenda. 1.31 Proposal—Proposal of Offeror, on prescribed forms setting forth prices for performing the Work described in the Contract Documents. 1.32 Proposal Documents—The advertisement or invitation for Proposals, Instruction to Offerors, the Proposal form, the Contract Documents and Addenda. 1.33 Resident Project Representative - The authorized representative of E/A who may be assigned to the site or any part thereof. 1.34 Shop Drawings -All drawings, diagrams, illustrations, schedules and other data or information which are specifically prepared or assembled by or for the CONTRACTOR and submitted by the CONTRACTOR as required by the Contract Documents. 1.35 Specifications - Those portions of the Contract Documents consisting of written technical descriptions as applied to the Work, which set forth to the CONTRACTOR, in detail, the requirements which must be met by all materials, equipment, construction systems, standards, workmanship, equipment and services in order to render a completed and useful project. 1.36 Substantial Completion - The stage in the progress of the Work when the Work, or designated portions thereof, may still require minor modifications or adjustments but, in the OWNER's opinion,the Work has progressed to the point such that all parts of the Work under consideration are fully operational and the beneficial use and occupancy of which can be assumed by the Owner, as evidenced by a Certificate of Substantial Completion approved by the OWNER. 00700 04-2020 Page 4 General Conditions Exhibit T" 1.37 Subcontractor-An individual, firm, or corporation having a direct contract with the CONTRACTOR for the performance of a part of the Work. 1.38 Sub-subcontractor-A person or entity who has a direct or indirect contract with a Subcontractor or a Sub- subcontractor of any tier to perform a portion of the Work. 1.39 Superintendent - The representative of the CONTRACTOR authorized in writing to receive and fulfill instructions from Owner's Representative, and who shall supervise and direct construction of the Work. 1.40 Supplemental General Conditions-The part of the Contract Documents which either amends or supplements the General Conditions. All General Conditions which are not so amended or so supplemented shall be considered as remaining in full force and effect. 1.41 Supplier-An individual or entity having a direct contract with the CONTRACTOR or with any Subcontractor or Sub-subcontractor to furnish materials or equipment to be incorporated in the Work by the CONTRACTOR or any Subcontractor. 1.42 Time Extension Request-An approved request for time extension on a form acceptable to the OWNER. 1.43 Work - The entire completed construction, or the various separately identifiable parts thereof, required to be furnished under the Contract Documents. 1.44 Working Day - Any day of the week, not including Saturdays, Sundays, or Legal Holidays, in which conditions not under the CONTRACTOR's control will permit work for at least seven(7)hours of the Working Times. Upon authorization by the Owner's Representative, work on Saturdays, Sundays and/or Legal Holidays may be allowed and, in that event, a Working Day will be counted for each such day. 1.45 Workinq Times — Times of day(s) during which work may be performed. Unless authorized by Owner's Representative, all Work shall be performed between 7:00 a.m. and 6:00 p.m. on weekdays and, if previously authorized as provided for in paragraph 1.44 or paragraph 1.6 herein, as applicable, between 9:00 a.m. and 6:00 p.m. on Saturdays, Sundays or Legal Holidays. When the CONTRACTOR has been authorized to perform Work during hours outside Working Times, such hours shall be considered time worked on Working Day contracts. Notwithstanding the preceding, emergency work may be done without prior permission only as provided in paragraph 6.11.5 herein. 1.46 Written Notice-Written communication between the OWNER and the CONTRACTOR. Written Notice shall be deemed to have been duly served if delivered in person to Owner's Representative or to the CONTRACTOR's duly authorized representative, or if such Written Notice is delivered to or sent by registered or certified mail to the attention of Owner's Representative or to the CONTRACTOR's duly authorized representative at the last business address known to the party giving notice. ARTICLE 2-PRELIMINARY MATTERS 2.1 Delivery of Agreement, Bonds, Insurance,and Other Documentation: Within ten (10)Calendar Days after written notification of award of Contract, the CONTRACTOR shall deliver to the OWNER signed Agreement, Bond(s), Insurance Certificate(s) and other documentation required for execution of the Contract. 2.2 Copies of Documents: The OWNER shall furnish to the CONTRACTOR two (2) copies of the Contract Documents unless otherwise specified. 00700 04-2020 Page 5 General Conditions Exhibit T" 2.3 Commencement of Contract Times; Notice to Proceed: The Contract Time(s) commence on the date indicated in the Agreement or in the Notice to Proceed. Notice to Proceed will be given at any time within sixty(60)Calendar Days after the Execution Date of the Agreement, unless extended by written agreement of the parties. 2.4 Before Starting Construction: 2.4.1 No Work shall be done at the site prior to the preconstruction conference without the OWNER's approval. Before undertaking each part of the Work, the CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. The CONTRACTOR shall promptly report in writing to Owner's Representative any conflict, error, ambiguity or discrepancy which the CONTRACTOR may discover and shall obtain a written interpretation or clarification from Owner's Representative before proceeding with any Work affected thereby. The CONTRACTOR shall be liable to the OWNER for failure to report any conflict, error, ambiguity or discrepancy in the Contract Documents of which the CONTRACTOR knew or reasonably should have known. 2.4.2 The CONTRACTOR shall submit the following to Owner's Representative for review and approval no later than the preconstruction conference: .1 a preliminary progress schedule indicating the times (number of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents, identifying when all Subcontractors will be utilized, and taking into consideration any limitations on Working Hours; .2 a preliminary schedule of Shop Drawing and sample submittals; .3 a preliminary schedule of values for all of the Work, subdivided into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work. The preliminary schedule of values submitted by the CONTRACTOR should include a reasonable estimation of value of each item included and shall not contain disproportionate values assigned to any item or items; .4 a letter designating CONTRACTOR's Superintendent; .5 a letter from the CONTRACTOR and Subcontractor(s) listing any salaried specialists,- .6 pecialists;.6 if applicable, a letter designating the "Competent Person(s)" on general safety and trench safety measures; .7 if applicable, a trench safety system plan; .8 if applicable, a plan illustrating proposed locations of temporary facilities; .9 if applicable, a traffic control plan; .10 a completed Non-Use of Asbestos Affidavit(Prior to Construction); and .11 if applicable, a letter designating the Texas Registered Professional Land Surveyor for layout of the Work. 2.5 Preconstruction Conference: Prior to commencement of Work at the site,a preconstruction conference attended by the CONTRACTOR, Owner's Representative and others will be held. 00700 04-2020 Page 6 General Conditions Exhibit "B" 2.6 Initially Acceptable Schedules: Unless otherwise provided in the Contract Documents, the CONTRACTOR shall obtain approval of Owner's Representative on final versions of the schedules submitted in accordance with paragraph 2.4.2 before the first progress payment will be made to the CONTRACTOR. The progress schedule must provide for an orderly progression of the Work to completion within any specified Milestones and Contract Times. Acceptance of the schedule by Owner's Representative will neither impose on Owner's Representative responsibility for the sequencing, scheduling or progress of the Work nor interfere with or relieve the CONTRACTOR from the CONTRACTOR's full responsibility therefor. The CONTRACTOR's schedule of Shop Drawings and sample submissions must provide an arrangement agreeable to the parties for reviewing and processing the required submittals. 2.7 Electronic Transmittals: 2.7.1 Except as otherwise stated elsewhere in the Contract Documents, the OWNER, E/A, and CONTRACTOR may transmit, and shall except, Project-related correspondence,texts,data, documents, drawings, information, and graphics, including but not limited to Shop Drawings and other submittals, in electronic media or digital format,either directly, or through access to a secure Project website. 2.7.2 When transmitting items in electronic media or digital format, the transmitting party makes no representations as to long term compatibility, usability, or readability of the items resulting from the recipient's use of software application packages, operating systems,or computer hardware differing from those used in the drafting or transmittal of the items. ARTICLE 3-CONTRACT DOCUMENTS: INTENT,AMENDING, REUSE 3.1 Intent: 3.1.1 The intent of the Contract Documents is to include all information necessary for the proper execution and completion of the Work by the CONTRACTOR. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. In cases of disagreement, the following order of precedence shall govern (top item receiving priority of interpretation): Change Orders Modifications to the Contract Documents made after the Execution Date Signed Agreement Addenda to the Contract Documents Special Conditions Supplemental General Conditions General Conditions Other Bidding Requirements and Contract Forms Special Provisions to the Standard Technical Specifications Special Specifications Standard Technical Specifications Drawings(figured dimensions shall govern over scaled dimensions) Project Safety manual, if applicable 3.1.2 Unless otherwise stated in the Contract Documents,words which have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. 3.2 Reporting and Resolving Discrepancies: Prior to commencing the Work, the CONTRACTOR shall review the Contract Documents for the purpose of discovering any conflict, error, ambiguity or discrepancy in the Contract Documents. If, at any time, the CONTRACTOR discovers any conflict, error, ambiguity or discrepancy within the Contract Documents or between the Contract Documents and any provisions of any such law or regulation applicable to the performance of the Work 00700 04-2020 Page 7 General Conditions Exhibit "B" or of any such standard, specification, manual or code or instructions of any Supplier, the CONTRACTOR shall immediately report it to Owner's Representative in writing, and the CONTRACTOR shall not proceed with the Work affected thereby until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in paragraph 3.3.1 or paragraph 3.3.2. The CONTRACTOR shall be liable to the OWNER for failure to report any such conflict, error, ambiguity or discrepancy of which the CONTRACTOR knew or reasonably should have known. 3.3 Amending and Supplementing Contract Documents: 3.3.1 The Contract Documents may be amended to provide for additions, deletions and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: .1 Change Order. .2 Change Directive. 3.3.2 In addition, the requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, in one or more of the following ways: .1 Field Order. .2 Review of a Shop Drawing or sample. .3 Written interpretation or clarification. 3.4 Reuse of Documents Prohibited: The CONTRACTOR and any Subcontractor or Supplier or other person or organization performing or furnishing any of the Work under a direct or indirect contract with the OWNER: (i) shall not have or acquire any title to or ownership rights in any of the Drawings, Specifications or other documents (or copies of any thereof) prepared by or bearing the seal of E/A or E/A's consultants, and (ii) shall not reuse any of such Drawings, Specifications, other documents or copies on extensions of the Project or any other project without written consent of the OWNER and E/A. ARTICLE 4-AVAILABILITY OF LANDS: SUBSURFACE AND PHYSICAL CONDITIONS: REFERENCE POINTS 4.1 Availability of Lands: The OWNER shall furnish, as indicated in the Contract Documents, all required rights to use the lands upon which the Work is to be performed, rights-of-way and easements for access thereto, and such other lands which are designated for the use of the CONTRACTOR. The OWNER shall identify any encumbrances or restrictions not of general application but specifically related to use of lands so furnished with which the CONTRACTOR will have to comply in performing the Work. Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by the OWNER, unless otherwise provided in the Contract Documents. If the OWNER fails to furnish these lands, rights-of-way or easements in a timely manner, the CONTRACTOR may make a Claim for adjustments in the Contract Times. The CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. 4.2 Subsurface and Physical Conditions: 4.2.1 The CONTRACTOR hereby covenants that it has examined the site of the proposed Work and is familiar with all of the conditions surrounding construction of the Project, having conducted all inquiries, tests and investigations deemed necessary and proper. Unless the CONTRACTOR, prior to the execution of the Agreement, has notified the OWNER in writing of any condition of the site of the proposed Work that would adversely impact 00700 04-2020 Page 8 General Conditions Exhibit "B" the performance of the Work by the CONTRACTOR, CONTRACTOR covenants that there are no conditions at the site of the proposed work which would adversely impact the performance of Work by the CONTRACTOR. 4.2.2 If conditions are encountered at the site which are (1) subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract Documents or(2) unknown physical conditions of an unusual nature, that differ materially from those normally encountered in the type of work being performed under this Contract, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than seven (7) calendar days after first observance of the conditions. Owner's Representative will promptly investigate such conditions with E/A and, if they differ materially and cause an increase or decrease in the CONTRACTOR's cost of, or time required for, performance of any part of the Work, OWNER will consider an equitable adjustment in the Contract Amount or Contract Time, or both. If Owner's Representative determines that the conditions at the site are not materially different from those indicated in the Contract Documents and that no change in the terms of the Contract is justified, the CONTRACTOR shall be notified in writing, stating the reasons. Any disputes arising from Owner's Representative's determination shall be resolved in accordance with Article 16. 4.2.3 Notwithstanding any other provision of this Contract,the CONTRACTOR shall be solely responsible for the location and protection of any and all public lines and utility customer service lines in the Work area. For the purposes of this section, "public lines"means the utility distribution and supply system within public rights-of-way or easements, and "utility customer service lines" (service) means any utility line connecting a utility customer to the utility distribution system. Generally, existing service connections within right-of-way or easements are not shown on the Drawings. The CONTRACTOR shall notify the OWNER and "One Call"and exercise due care to locate and to mark, uncover or otherwise protect all such lines in the construction zone and any of the CONTRACTOR's work or storage areas. The CONTRACTOR's obligation hereunder shall be primary and nondelegable. The CONTRACTOR shall indemnify or reimburse the OWNER for such expenses or costs (including fines that may be levied against the OWNER) that may result from unauthorized or accidental damage to all public lines and utility customer service lines in the Work area. The OWNER reserves the right to repair such damage the CONTRACTOR may cause, at the CONTRACTOR's expense. 4.2.4 The CONTRACTOR shall take reasonable precaution to avoid disturbing primitive records and antiquities of archaeological, paleontological or historical significance. No objects of this nature shall be disturbed without written permission of the OWNER and the Texas Department of Antiquities Protection. When such objects are uncovered unexpectedly, the CONTRACTOR shall stop all Work in close proximity and notify Owner's Representative and the Texas Department of Antiquities Protection of their presence and shall not disturb them until written permission and permit to do so is granted.All primitive rights and antiquities uncovered on the OWNER's property shall remain property of the State of Texas, the Texas Department of Antiquities Protection conforming to the Texas Natural Resources Code. If it is determined by the OWNER, in consultation with the Texas Department of Antiquities Protection,that exploration or excavation of primitive records or antiquities on Project site is necessary to avoid loss, the CONTRACTOR shall cooperate in salvage work attendant to preservation. If the Work stoppage or salvage work causes an increase in the CONTRACTOR's cost of, or time required for, performance of the Work, the Contract Amount and/or Contract Time may be equitably adjusted. 4.3 Reference Points: Unless otherwise specified, the OWNER will furnish all reference points, benchmarks, survey monuments, and control points which, in the OWNER's opinion,are suitable for laying out the Work. Such benchmarks and reference points will be placed at intervals not to exceed 1,500 feet. All reference points, benchmarks, survey monuments and control points shall be carefully preserved by the CONTRACTOR by use of flags, laths or other appropriate measures and, in case of destruction or removal by the CONTRACTOR or its employees, such reference points, benchmarks, survey monuments, and control points shall be replaced by a Registered Professional Land Surveyor at the CONTRACTOR's expense. When reference points, benchmarks, survey monuments, or control points are in conflict with the Work, then reestablishment will be the OWNER's responsibility during or upon completion of the Work. 4.4 Hazardous Materials: 00700 04-2020 Page 9 General Conditions Exhibit "B" 4.4.1 The OWNER shall be responsible for any hazardous material uncovered or revealed at the site which was not shown, indicated or identified in the Contract Documents to be within the scope of the Work and which may present a substantial danger to persons or property exposed thereto in connection with the Work at the site. The CONTRACTOR shall immediately notify Owner's Representative of any suspected hazardous materials encountered before or during performance of the Work and shall take all necessary precautions to avoid further disturbance of the materials. 4.4.2 The CONTRACTOR shall be responsible for any hazardous materials brought to the site by the CONTRACTOR. Subcontractor. Suppliers or anyone else for whom the CONTRACTOR is responsible. 4.4.3 No asbestos-containing materials shall be incorporated into the Work or brought on the Project site without prior approval of the OWNER. 4.4.4 TO THE FULLEST EXTENT PERMITTED BY LAWS AND REGULATIONS, CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS OWNER, AND ITS COUNCIL MEMBERS, EMPLOYEES, AGENTS, AND CONSULTANTS FROM AND AGAINST ALL CLAIMS, COSTS, LOSSES, AND DAMAGES (INCLUDING BUT NOT LIMITED TO ALL FEES AND CHARGES OF ENGINEERS, ARCHITECTS, ATTORNEYS, AND OTHER PROFESSIONALS AND ALL COURT OR ARBITRATION OR OTHER DISPUTE RESOLUTION COSTS) ARISING OUT OF OR RELATING TO FAILURE TO CONTROL, CONTAIN OR REMOVE A HAZARDOUS MATERIAL BROUGHT TO THE SITE BY CONTRACTOR OR BY ANYONE FOR WHOM CONTRACTOR IS RESPONSIBLE, OR TO A HAZARDOUS ENVIRONMENTAL CONDITION CREATED BY CONTRACTOR OR BY ANYONE FOR WHOM CONTRACTOR IS RESPONSIBLE. ARTICLE 5- BONDS AND INSURANCE 5.1 Surety and Insurance Companies: All bonds and insurance required by the Contract Documents shall be obtained from solvent surety or insurance companies that are duly licensed by the State of Texas and authorized to issue bonds or insurance policies for the limits and coverages required by the Contract Documents. The bonds shall be in a form acceptable to the OWNER and shall be issued by a surety which complies with the requirements of Chapter 3503. Texas Insurance Code (2005) and which is otherwise acceptable to the OWNER. OWNER may require the surety to obtain reinsurance for any portion of the risk that exceeds 10% of the surety's capital and surplus. For bonds exceeding $100,000, the surety must also hold a certificate of authority from the U.S. Secretary of the Treasury or have obtained reinsurance from a reinsurer that is authorized as a reinsurer in Texas and holds a certificate of authority from the U.S. Secretary of the Treasury. 5.2 Workers'Compensation Insurance Coverage: 5.2.1 Definitions: .1 Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on the Project, for the duration of the Project. .2 Duration of the Project - includes the time from the beginning of the Work on the Project until the CONTRACTOR's/person's Work on the Project has been completed and accepted by the OWNER. .3 Persons providing services on the Project ("subcontractor" herein) - includes all persons or entities performing all or part of the services the CONTRACTOR has undertaken to perform on the Project, regardless of whether that person contracted directly with the CONTRACTOR and regardless of whether that person has employees. This includes, by way of illustration and not of limitation, 00700 04-2020 Page 10 General Conditions Exhibit "B" independent contractors, Subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the Project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 5.2.2 The CONTRACTOR shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the CONTRACTOR providing services on the Project, for the duration of the Project. 5.2.3 The OWNER will not execute the Contract prior to the CONTRACTOR providing all required certificates of coverage. 5.2.4 If the coverage period shown on the CONTRACTOR's current certificate of coverage ends during the duration of the Project, the CONTRACTOR must, prior to the end of the coverage period, file a new certificate of coverage with the OWNER showing that coverage has been extended. 5.2.5 The CONTRACTOR shall obtain from each person providing services on the Project, and provide to the OWNER: .1 a certificate of coverage, prior to that person beginning Work on the Project, so the OWNER will have on file certificates of coverage showing coverage for all persons providing services on the Project; and .2 no later than seven (7)days after receipt by the CONTRACTOR, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. 5.2.6 The CONTRACTOR shall retain all required certificates of coverage for the duration of the Project and for one (1) year thereafter. 5.2.7 The CONTRACTOR shall notify the OWNER in writing by certified mail or personal delivery within ten (10) days after the CONTRACTOR knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project. 5.2.8 The CONTRACTOR shall post at its office or on each Project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 5.2.9 The CONTRACTOR shall contractually require each person with whom it contracts to provide services on a Project to: .1 provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44)for all of its employees providing services on the Project, for the duration of the Project; .2 provide to the CONTRACTOR, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project, for the duration of the Project; .3 provide the CONTRACTOR, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 00700 04-2020 Page 11 General Conditions Exhibit T" .4 obtain from each other person with whom it contracts, and provide to the CONTRACTOR: a) a certificate of coverage, prior to the other person beginning Work on the Project; and b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; .5 retain all required certificates of coverage on file for the duration of the Project and for one (1) year thereafter; .6 notify the OWNER in writing by certified mail or personal delivery within ten (10) days after the person knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project; and .7 contractually require each person with whom it contracts,to perform as required by paragraphs 5.2.9.1 -5.2.9.7, with the certificates of coverage to be provided to the person for whom they are providing services. 5.2.10 By signing this Contract or providing or causing to be provided a certificate of coverage, the CONTRACTOR is representing to the OWNER that all employees of the CONTRACTOR who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the CONTRACTOR to administrative penalties, criminal penalties, civil penalties, or other civil actions. 5.2.11 The CONTRACTOR's failure to comply with any of these provisions is a breach of Contract by the CONTRACTOR which entitles the OWNER to declare the Contract void if the CONTRACTOR does not remedy the breach within ten (10) days after receipt of notice of breach from the OWNER. 5.3 Contractor Insurance Requirements: For specific bond requirements and additional insurance requirements, refer to the Supplemental General Conditions. 5.3.1.1 General Requirements: .1 CONTRACTOR shall carry insurance in the types and amounts indicated below for the duration of the Contract, which shall include items owned by OWNER in the care, custody and control of CONTRACTOR prior to and during construction and warranty period. .2 CONTRACTOR must complete and forward the required Certificates of Insurance to OWNER before the Contract is executed as verification of coverage required below. CONTRACTOR shall not commence Work until the required insurance is obtained and until such insurance has been reviewed by OWNER. Approval of insurance by OWNER shall not relieve or decrease the liability of CONTRACTOR hereunder and shall not be construed to be a limitation of liability on the part of CONTRACTOR. CONTRACTOR must also complete and forward the required Certificates of Insurance to OWNER whenever a previously identified policy period has expired as verification of continuing coverage. .3 CONTRACTOR's insurance coverage is to be written by companies licensed to do business in the State of Texas at the time the policies are issued and shall be written by companies with A.M. Best ratings of B+VII or better, except for hazardous material insurance which shall be written by companies with A.M. Best ratings of A-or better. 00700 04-2020 Page 12 General Conditions Exhibit "B" .4 All endorsements naming the OWNER as additional insured, waivers, and notices of cancellation endorsements as well as the Certificate of Insurance shall indicate: City of Round Rock, 221 E. Main St., Round Rock, Texas 78664. .5 The "other" insurance clause shall not apply to the OWNER where the OWNER is an additional insured shown on any policy. It is intended that policies required in the Contract, covering both OWNER and CONTRACTOR, shall be considered primary coverage as applicable. .6 If insurance policies are not written for amounts specified below, CONTRACTOR shall carry Umbrella or Excess Liability Insurance for any differences in amounts specified. If Excess Liability Insurance is provided, it shall follow the form of the primary coverage. .7 OWNER shall be entitled, upon request and without expense, to receive certified copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modification of particular policy terms, conditions, limitations, or exclusions except where policy provisions are established by law or regulations binding upon either of the parties hereto or the underwriter on any such policies. .8 OWNER reserves the right to review the insurance requirements set forth during the effective period of this Contract and to make reasonable adjustments to insurance coverage, limits, and exclusions when deemed necessary and prudent by OWNER based upon changes in statutory law, court decisions, the claims history of the industry or financial condition of the insurance company as well as CONTRACTOR. .9 CONTRACTOR shall not cause any insurance to be canceled nor permit any insurance to lapse during the term of the Contract or as required in the Contract. .10 CONTRACTOR shall be responsible for premiums, deductibles and self-insured retentions, if any, stated in policies. All deductibles or self-insured retentions shall be disclosed on the Certificate of Insurance. .11 CONTRACTOR shall provide OWNER thirty (30) days written notice of erosion of the aggregate limits below occurrence limits for all applicable coverages indicted within the Contract. .12 If OWNER-owned property is being transported or stored off-site by CONTRACTOR, then the appropriate property policy will be endorsed for transit and storage in an amount sufficient to protect OWNER's property. .13 The insurance coverages required under this contract are required minimums and are not intended to limit the responsibility or liability of CONTRACTOR. 5.3.1.2 Business Automobile Liability Insurance. Provide coverage for all owned, non-owned and hired vehicles. The policy shall contain the following endorsements in favor of OWNER: a) Waiver of Subrogation endorsement TE 2046A; b) 30 day Notice of Cancellation endorsement TE 0202A; and c) Additional Insured endorsement TE 9901 B. Provide coverage in the following types and amounts: 00700 04-2020 Page 13 General Conditions Exhibit "B" .1 A minimum combined single limit of$500,000 per occurrence for bodily injury and property damage. Alternate acceptable limits are $250,000 bodily injury per person, $500,000 bodily injury per occurrence and at least$100,000 property damage liability each accident. 5.3.1.3 Workers'Compensation and Employers'Liability Insurance: Coverage shall be consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Section 401). CONTRACTOR shall assure compliance with this Statute by submitting two(2) copies of a standard certificate of coverage (e.g. ACCORD form) to Owner's Representative for every person providing services on the Project as acceptable proof of coverage. The required Certificate of Insurance must be presented as evidence of coverage for CONTRACTOR. Workers' Compensation Insurance coverage written by the Texas Workers Compensation Fund is acceptable to OWNER. CONTRACTOR's policy shall apply to the State of Texas and include these endorsements in favor of OWNER: a) Waiver of Subrogation, form WC 420304; and b) 30 day Notice of Cancellation,form WC 420601. The minimum policy limits for Employers'Liability Insurance coverage shall be as follows: .1 $100,000 bodily injury per accident, $500,000 bodily injury by disease policy limit and $100,000 bodily injury by disease each employee. 5.3.1.4 Commercial General Liability Insurance. The Policy shall contain the following provisions: a) Blanket contractual liability coverage for liability assumed under the Contract and all contracts relative to this Project. b) Completed Operations/Products Liability for the duration of the warranty period. c) Explosion, Collapse and Underground (X, C& U)coverage. d) Independent Contractors coverage. e) Aggregate limits of insurance per project, endorsement CG 2503. f) OWNER listed as an additional insured, endorsement CG 2010. g) 30 day notice of cancellation in favor of OWNER, endorsement CG 0205. h) Waiver of Transfer of Recovery Against Others in favor of OWNER, endorsement CG 2404. Provide coverages A&B with minimum limits as follows: .1 A combined bodily injury and property damage limit of$500,000 per occurrence. 5.3.1.5 Builders' Risk Insurance. CONTRACTOR shall maintain Builders' Risk Insurance or Installation Insurance on an all risk physical loss form in the Contract Amount. Coverage shall continue until the Work is accepted by OWNER. OWNER shall be a loss payee on the policy. If off site storage is permitted, coverage shall include transit and storage in an amount sufficient to protect property being transported or stored. 5.4 Bonds: 00700 04-2020 Page 14 General Conditions Exhibit "B" 5.4.1 General. .1 Bonds, when required, shall be executed on forms furnished by or acceptable to OWNER. All bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act. .2 If the surety on any bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of the preceding paragraph, CONTRACTOR shall within ten (10)days thereafter substitute another bond and surety, both of which must be acceptable to OWNER. .3 When Performance Bonds and/or Payment Bonds are required, each shall be issued in an amount of one hundred percent (100%) of the Contract Amount as security for the faithful performance and/or payment of all CONTRACTOR's obligations under the Contract Documents. Performance Bonds and Payment Bonds shall be issued by a solvent surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. Any surety duly authorized to do business in Texas may write Performance and Payment Bonds on a project without reinsurance to the limit of 10 percent of its capital and surplus. Such a surety must reinsure any obligations over 10 percent. .4 If CONTRACTOR has failed to obtain or maintain a required bond, OWNER may exclude the CONTRACTOR from the site of the Project and exercise OWNER's suspension and/or termination rights under the Contract Documents. 5.4.2 Performance Bond. .1 If the Contract Amount exceeds $100,000, CONTRACTOR shall furnish OWNER with a Performance Bond in the form set out by OWNER. .2 If the Contract Amount exceeds $25,000 but is less than or equal to $100,000, CONTRACTOR shall furnish OWNER with a Performance Bond in the form set out by OWNER, unless the original Contract Time is 60 Calendar Days/40 Working Days or less, in which case CONTRACTOR can agree to the following terms and conditions for payment in lieu of providing a Performance Bond: no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER,- CONTRACTOR WNER;CONTRACTOR shall be entitled to receive 95%of the Contract Amount following Final Completion, and the remaining 5%of the Contract Amount following the one year warranty period. .3 If the Contract Amount is less than or equal to $25,000, CONTRACTOR will not be required to furnish a Performance Bond; provided that no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER under the following terms and conditions: CONTRACTOR shall be entitled to receive 95%of the Contract Amount following Final Completion, and the remaining 5%of the Contract Amount following the one year warranty period. .4 If a Performance Bond is required to be furnished, it shall extend for the one year warranty period. 5.4.3 Payment Bond. .1 If the Contract Amount exceeds $50,000, CONTRACTOR shall furnish OWNER with a Payment Bond in the form set out by OWNER. .2 If the Contract Amount is less than or equal to $50,000, CONTRACTOR will not be required to furnish a Payment Bond; provided that no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER under the terms and conditions specified in paragraph 5.4.2.3. 00700 04-2020 Page 15 General Conditions Exhibit "B" ARTICLE 6-CONTRACTOR'S RESPONSIBILITIES 6.1 Supervision and Superintendence: 6.1.1 The CONTRACTOR shall supervise, inspect and direct the Work competently and efficiently,devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Unless otherwise directed by the OWNER in the Contract Documents, the CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. The CONTRACTOR shall be responsible to see that the completed Work complies accurately with the Contract Documents. 6.1.2 The CONTRACTOR shall have an English-speaking, competent Superintendent on the Work at all times that work is in progress. Upon request of Owner's Representative, the CONTRACTOR shall present the resume of the proposed Superintendent to Owner's Representative showing evidence of experience and successful superintendence and direction of work of a similar scale and complexity. If, in the opinion of Owner's Representative, the proposed Superintendent does not indicate sufficient experience in line with the Work, he/she will not be allowed to be the designated Superintendent for the Work. The Superintendent shall not be replaced without Written Notice to Owner's Representative. If the CONTRACTOR deems it necessary to replace the Superintendent, the CONTRACTOR shall provide the necessary information for approval, as stated above, on the proposed new Superintendent. A qualified substitute Superintendent may be designated in the event that the designated Superintendent is temporarily away from the Work, but not to exceed a time limit acceptable to Owner's Representative. The CONTRACTOR shall replace the Superintendent upon the OWNER's request in the event the Superintendent is unable to perform to the OWNER's satisfaction. The Superintendent will be the CONTRACTOR's representative on the Work and shall have the authority to act on behalf of the CONTRACTOR. All communications given to the Superintendent shall be as binding as if given to the CONTRACTOR. Either the CONTRACTOR or the Superintendent shall provide an emergency and home telephone number at which one or the other may be reached if necessary when work is not in progress. 6.2 Labor, Materials and Equipment: 6.2.1 The CONTRACTOR agrees to employ only orderly and competent workers, skillful in performance of the type of Work required under this Contract. The CONTRACTOR, Subcontractors, Sub-subcontractors, and their employees may not use or possess any firearms, alcoholic or other intoxicating beverages, illegal drugs or controlled substances while on the job or on the OWNER's property, nor may such workers be intoxicated, or under the influence of alcohol or drugs, on the job. If the OWNER or Owner's Representative notifies the CONTRACTOR that any worker is incompetent, disorderly or disobedient, has knowingly or repeatedly violated safety regulations, has possessed any firearms, or has possessed or was under the influence of alcohol or drugs on the job, the CONTRACTOR shall immediately remove such worker from performing Contract Work, and may not employ such worker again on Contract Work without the OWNER's prior written consent. The CONTRACTOR shall at all times maintain good discipline and order on or off the site in all matters pertaining to the Project. The CONTRACTOR shall pay workers no less than the wage rates established in Section 00900, and maintain weekly payroll reports as evidence thereof. 6.2.2 Unless otherwise specified, the CONTRACTOR shall provide and pay for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone,water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary for the furnishing, performance, re-testing of defective work, start-up and completion of the Work. 6.2.3 All materials and equipment shall be of good quality and new (including new products made of recycled materials), except as otherwise provided in the Contract Documents. If required by Owner's Representative, the CONTRACTOR shall furnish satisfactory evidence (reports of required tests, manufacturer's certificates of compliance with material requirements, mill reports, etc.) as to the kind, quantity and quality of materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with instructions of the applicable Supplier, except as otherwise provided in the Contract Documents. 00700 04-2020 Page 16 General Conditions Exhibit "B" 6.2.4 Substitutes and"Approved Equal" Items: 6.2.4.1 Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type,function and quality required. Unless the specification or description contains words reading that no like, equivalent or"approved equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to Owner's Representative under the following circumstances: .1 "Approved Equal": If, in the OWNER's sole discretion, an item of material or an item of equipment proposed by the CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by the OWNER as an "approved equal" item, in which case review of the proposed item may, in the OWNER's sole discretion, be accomplished without compliance with some or all of the requirements for evaluation of proposed substitute items. The CONTRACTOR shall provide the OWNER with the documentation required for the OWNER to make its determination. .2 Substitute Items: If, in the OWNER's sole discretion, an item of material or an item of equipment proposed by the CONTRACTOR does not qualify as an "approved equal" item under paragraph 6.2.4.1.1, then it will be considered a proposed substitute item. The CONTRACTOR shall submit sufficient information to allow the OWNER to determine that the item of material or item of equipment proposed is essentially equivalent to that named and a substitute therefor. 6.2.4.2 Substitute Construction Methods and Procedures: If a specific means, method, technique, sequence or procedure of construction is shown or indicated in and expressly required by the Contract Documents, the CONTRACTOR may with prior approval of the OWNER furnish or utilize a substitute means, method, technique, sequence, or procedure of construction. The CONTRACTOR shall submit sufficient information to Owner's Representative to allow the OWNER, in the OWNER's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. 6.2.4.3 OWNER's Evaluation: The OWNER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to paragraph 6.2.4.1.1 and paragraph 6.2.4.1.2. The OWNER will be the sole judge of acceptability. No "approved equal" or substitute shall be ordered, installed, or utilized until the OWNER's review is complete, which will be evidenced by either a Change Order or completion of the Shop Drawing review procedure. The OWNER may require the CONTRACTOR to furnish at the CONTRACTOR's expense a special performance guarantee or other surety bond with respect to any"approved equal"or substitute. The OWNER shall not be responsible for any delay due to review time for any"approved equal" or substitute. 6.2.4.4 CONTRACTOR's Expense: All data to be provided by the CONTRACTOR in support of any proposed "approved equal"or substitute item will be at the CONTRACTOR's expense. 6.2.5 The CONTRACTOR agrees to assign to the OWNER any rights it may have to bring antitrust suits against its Suppliers for overcharges on materials incorporated in the Project growing out of illegal price fixing agreements. The CONTRACTOR further agrees to cooperate with the OWNER should the OWNER wish to prosecute suits against Suppliers for illegal price fixing. 6.3 Progress Schedule: Unless otherwise directed, the CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.6 as it may be adjusted from time to time as provided below: .1 The CONTRACTOR shall submit to Owner's Representative for acceptance proposed adjustments in the progress schedule that will not change the Contract Times or Milestones. Such adjustments will conform generally to the progress schedule then in effect. 00700 04-2020 Page 17 General Conditions Exhibit "B" .2 Proposed adjustments in the progress schedule that will change the Contract Times or Milestones shall be submitted in accordance with the requirements of Article 12. Such adjustments may only be made by a Change Order or Time Extension Request in accordance with Article 12. 6.4 Concerning Subcontractors,Suppliers and Others: 6.4.1 Assignment: The CONTRACTOR agrees to retain direct control of and give direct attention to the fulfillment of this Contract. The CONTRACTOR agrees not to, by Power of Attorney or otherwise,assign said Contract without the prior written consent of the OWNER. 6.4.2 Award of Subcontracts for Portions of the Work: The CONTRACTOR shall not employ any Subcontractor, Supplier or other person or organization, whether initially or as a substitute, against whom the OWNER may have reasonable objection. The CONTRACTOR must provide the OWNER with a list of all Subcontractors, Suppliers, or other persons or organizations it will use in the Work, and such list must be provided prior to the preconstruction conference. Should the OWNER have objections,the OWNER will communicate such objections by Written Notice. If the OWNER requires a change without good cause of any Subcontractor, person or organization previously accepted by OWNER,the Contract Amount may be increased or decreased by the difference in the cost occasioned by any such change, and an appropriate Change Order shall be issued. The CONTRACTOR shall not substitute any Subcontractor, person or organization that has been accepted by the OWNER, unless the substitute has been accepted in writing by the OWNER. No acceptance by the OWNER of any Subcontractor, Supplier or other person or organization shall constitute a waiver of any right of the OWNER to reject defective Work. 6.4.3 The CONTRACTOR shall enter into written agreements with all Subcontractors and Suppliers which specifically bind the Subcontractors or Suppliers to the applicable terms and conditions of the Contract Documents for the benefit of the OWNER and E/A. The OWNER reserves the right to specify that certain requirements shall be adhered to by all Subcontractors and Sub-subcontractors as indicated in other portions of the Contract Documents and these requirements shall be made a portion of the agreement between the CONTRACTOR and Subcontractor or Supplier. 6.4.4 The CONTRACTOR shall be fully responsible to the OWNER for all acts and omissions of the Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with the CONTRACTOR just as the CONTRACTOR is responsible for the CONTRACTOR's own acts and omissions. Nothing in the Contract Documents shall create for the benefit of any such Subcontractor, Supplier or other person or organization any contractual relationship between the OWNER and any such Subcontractor, Supplier or other person or organization, nor shall it create any obligation on the part of the OWNER or E/A to pay or to see to the payment of any amounts due any such Subcontractor, Supplier or other person or organization except as may otherwise be required by laws and regulations. 6.4.5 The CONTRACTOR shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with the CONTRACTOR. The CONTRACTOR shall require all Subcontractors, Suppliers and such other persons and organizations performing or furnishing any of the Work to communicate with Owner's Representative through the CONTRACTOR. 6.4.6 The divisions and sections of the Specifications and the identifications of any Drawings shall not control the CONTRACTOR in dividing or delineating the Work to be performed by any specific trade. 6.4.7 The CONTRACTOR shall pay each Subcontractor and Supplier their appropriate share of payments made to the CONTRACTOR not later than ten(10)Days after the CONTRACTOR's receipt of payment from the OWNER. 6.5 Patent Fees and Royalties: 6.5.1 The CONTRACTOR shall be responsible at all times for compliance with applicable patents or copyrights encompassing, in whole or in part, any design, device, material, or process utilized, directly or indirectly, in the performance of the Work or the formulation or presentation of its Bid. 00700 04-2020 Page 18 General Conditions Exhibit "B" 6.5.2 The CONTRACTOR shall pay all royalties and license fees and shall provide, prior to commencement of Work hereunder and at all times during the performance of same, for lawful use of any design, device, material or process covered by letters, patent or copyright by suitable legal agreement with the patentee, copyright holder, or their duly authorized representative whether or not a particular design, device, material, or process is specified by the OWNER. 6.5.3 The CONTRACTOR shall defend all suits or claims for infringement of any patent or copyright and shall indemnify and save the OWNER harmless from any and all claims, costs, losses,expenses and damages(including but not limited to attorney's fees and consultant fees), direct or indirect, arising with respect to the CONTRACTOR's process in the formulation of its bid or the performance of the Work or otherwise arising in connection therewith. The OWNER reserves the right to provide its own defense, with counsel of its own choosing, to any suit or claim of infringement of any patent or copyright in which event the CONTRACTOR shall indemnify and save harmless the OWNER from all costs and expenses of such defense as well as satisfaction of all judgments entered against the OWNER. 6.5.4 The OWNER shall have the right to stop the Work and/or terminate this Agreement at any time in the event the CONTRACTOR fails to disclose to the OWNER that the CONTRACTOR's work methodology includes the use of any infringing design, device, material or process. 6.6 Permits,Fees: Unless otherwise provided in the Supplemental General Conditions,the CONTRACTOR shall obtain and pay for all construction permits, licenses and fees required for prosecution of the Work. OWNER will obtain and pay for the following permits, licenses and/or fees, if required: .1 Site Development Permit. .2 Building Permit(s). .3 Texas Department of Transportation permit for work in State rights-of-way. .4 Railroad Utility License Agreement. 6.7 Laws and Regulations: 6.7.1 The CONTRACTOR shall give all notices and comply with all laws and regulations applicable to furnishing and performing the Work. Except where otherwise expressly required by applicable laws and regulations, neither the OWNER nor E/A shall be responsible for monitoring the CONTRACTOR's compliance with any laws and regulations. 6.7.2 The CONTRACTOR shall plan and execute its operations in compliance with all applicable Federal, State and local laws and regulations, including those concerning control and abatement of water pollution and prevention and control of air pollution. 6.7.3 If the CONTRACTOR performs any Work that it is contrary to laws or regulations,then the CONTRACTOR shall bear and shall indemnify, defend and hold OWNER harmless from all claims, costs, losses and damages arising therefrom; however, it shall not be the CONTRACTOR's primary responsibility to make certain that the Specifications and Drawings are in accordance with laws and regulations, but this does not relieve the CONTRACTOR of the CONTRACTOR's obligations under Article 3. 6.8 Taxes: 6.8.1 The CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid by the CONTRACTOR in accordance with the laws and regulations of the State of Texas. 00700 04-2020 Page 19 General Conditions Exhibit "B" 6.8.2 The OWNER is an exempt organization as defined by Chapter 11 of the Property Tax Code of Texas and is thereby exempt from payment of Sales Tax under Chapter 151, Limited Use Sales, Excise and Use Tax, Texas Tax Code, and Chapter 321, Texas Tax Code. 6.9 Use of Premises: 6.9.1 The CONTRACTOR shall confine construction equipment, the storage of materials and equipment and the operations of workers to the site and land and areas identified in and permitted by the Contract Documents and other land and areas permitted by laws and regulations, rights-of-way, permits and easements, and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. The CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any adjacent land or areas, resulting from the performance of the Work. Should any claim be made by any such owner or occupant because of the performance of the Work, the CONTRACTOR shall promptly settle with such other party by negotiation or otherwise resolve the claim by dispute resolution proceeding or at law. The CONTRACTOR shall indemnify, defend and hold harmless the OWNER, E/A, E/A's consultants and anyone directly or indirectly employed by any of them from and against all claims, costs, losses and damages (including court costs and reasonable attorneys' fees) arising out of or resulting from any claim or action, legal or equitable, brought by any such owner or occupant against the OWNER, E/A or any other party indemnified hereunder to the extent caused by or based upon performance of the Work or failure to perform the Work. 6.9.2 During the progress of the Work and on a daily basis, the CONTRACTOR shall keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the Work. At the completion of the Work, the CONTRACTOR shall remove all waste materials, rubbish and debris from and about the premises as well as all tools, appliances, construction equipment and machinery and surplus materials. The CONTRACTOR shall leave the site clean and ready for occupancy by the OWNER at Substantial Completion of the Work. The CONTRACTOR shall, at a minimum, restore to original condition all property not designated for alteration by the Contact Documents. 6.9.3 The CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall the CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.10 Record Documents: The CONTRACTOR shall maintain in a safe place at the site, or other location acceptable to the OWNER, one (1) record copy of all Drawings, Specifications,Addenda, Change Orders, Change Directives, Field Orders and written interpretations and clarifications (issued pursuant to paragraph 9.5) in good order and annotated to show all changes made during construction. These record documents, together with all final samples and all final Shop Drawings,will be available to the OWNER and E/A for reference during performance of the Work. Upon Substantial Completion of the Work, these record documents, samples and Shop Drawings showing the final "as built" construction of the Project shall be promptly delivered to Owner's Representative. 6.11 Safety and Protection: 6.11.1 The CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Upon request, and prior to installation of measures,the CONTRACTOR shall submit a site security and safety plan for approval by the OWNER. By reviewing the plan or making recommendations or comments, the OWNER will not assume liability nor will the CONTRACTOR be relieved of liability for damage, injury or loss. The CONTRACTOR shall take all necessary precautions for the safety of and shall provide the necessary protection to prevent damage, injury or loss to: .1 all persons on the Work site or who maybe affected by the Work; .2 all the Work and materials and equipment to be incorporated therein, whether in storage on or off the site; and 00700 04-2020 Page 20 General Conditions Exhibit "B" .3 other property at the site or adjacent thereto, including but not limited to, trees, shrubs, lawns, walks, pavements, roadways, structures, utilities and underground facilities not designated for removal, relocation or replacement in the course of construction. 6.11.2 The CONTRACTOR shall comply with all applicable laws and regulations of any public body having jurisdiction for safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. The CONTRACTOR shall notify owners of adjacent property and of underground facilities, and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation and replacement of their property. All damage, injury or loss to any property referred to in paragraph 6.11.1.2 and paragraph 6.11.1.3 caused, directly or indirectly, in whole or in part, by the CONTRACTOR, Subcontractor, Supplier or any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be responsible, shall be remedied by the CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of the OWNER, or E/A, or E/A's consultant or anyone employed by any of them or anyone for whose acts any of them may be responsible, and not attributable, directly or indirectly, in whole or in part, to the faults or negligence of the CONTRACTOR or any Subcontractor, Supplier or other person or organization directly or indirectly employed by any of them). The CONTRACTOR's duties and responsibilities for safety and protection of the Work shall continue until such time as all the Work is completed and Owner's Representative has issued a notice to the OWNER and the CONTRACTOR in accordance with Article 14 that the Work is acceptable(except as otherwise expressly provided in connection with Substantial Completion). 6.11.3 Safety Representative: The CONTRACTOR shall designate a qualified and experienced safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs. Upon request of the OWNER, the CONTRACTOR shall provide certifications or other documentation of the safety representative's qualifications. At a minimum, the safety representative shall have received the OSHA thirty (30) hour training and a certificate evidencing that the safety representative has received such training within the last five (5) years shall be provided to the OWNER's representative. 6.11.4 Hazard Communication Programs: The CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with laws and regulations. 6.11.5 Emergencies: 6.11.5.1 In emergencies affecting the safety or protection of persons or the Work at the site or adjacent thereto, the CONTRACTOR, without special instruction or authorization from the OWNER or E/A, is obligated to act reasonably to prevent threatened damage, injury or loss and to mitigate damage or loss to the Work. The CONTRACTOR shall give Owner's Representative prompt written notice if the CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If Owner's Representative determines that a change in the Contract Documents is required because of the action taken by the CONTRACTOR in response to such an emergency,a Change Directive or Change Order will be issued to document the consequences of such action; otherwise the OWNER will not be responsible for the CONTRACTOR's emergency action. 6.11.5.2 Authorized agents of the CONTRACTOR shall respond immediately to call-out at any time of any day or night when circumstances warrant the presence on Project site of the CONTRACTOR or its agent to protect the Work or adjacent property from damage, restriction or limitation or to take such action or measures pertaining to the Work as may be necessary to provide for the safety of the public. Should the CONTRACTOR and/or its agent fail to respond and take action to alleviate such an emergency situation, the OWNER may direct other forces to take action as necessary to remedy the emergency condition,and the OWNER will deduct any cost of such remedial action from the funds due to the CONTRACTOR under this Contract. 6.11.5.3 In the event there is an accident involving injury to any individual on or near the Work, the CONTRACTOR shall notify Owner's Representative within twenty-four (24) hours of the event and shall be responsible for recording the location of the event and the circumstances surrounding the event through 00700 04-2020 Page 21 General Conditions Exhibit "B" photographs, interviewing witnesses, obtaining medical reports and other documentation that describes the event. Copies of such documentation shall be provided to Owner's Representative, for the OWNER's and E/A's records, within forty-eight (48) hours of the event. 6.12 Continuing the Work: The CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with the OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as the OWNER and the CONTRACTOR may agree in writing. 6.13 CONTRACTOR's General Warranty and Guarantee: 6.13.1 The CONTRACTOR warrants and guarantees to the OWNER that all Work will be performed in a good and workmanlike manner in accordance with the Contract Documents and will not be defective. The CONTRACTOR's warranty and guarantee hereunder excludes defects or damage caused by: .1 abuse, modification or improper maintenance or operation by persons other than the CONTRACTOR, Subcontractors or Suppliers; or .2 normal wear and tear under normal usage. 6.13.2 The CONTRACTOR's obligation to perform and complete the Work in a good and workmanlike manner in accordance with the Contract Documents shall be absolute. None of the following will constitute acceptance of Work not in accordance with the Contract Documents or a release of the CONTRACTOR's obligation to perform the Work in accordance with the Contract Documents: .1 observations by Owner's Representative and/or E/A; .2 recommendation of any progress or final payment by Owner's Representative; .3 the issuance of a certificate of Substantial Completion or any payment by the OWNER to the CONTRACTOR under the Contract Documents; .4 use or occupancy of the Work or any part thereof by the OWNER; .5 any acceptance by the OWNER or any failure to do so; .6 any review of a Shop Drawing or sample submittal; .7 any inspection,test or approval by others; or .8 any correction of defective Work by the OWNER. .9 the failure of the OWNER, E/A or any other person or entity acting on behalf of the OWNER or E/A to observe, detect or discover any defect in the Work or any non-conformance of the Work with any requirement of the Contract Documents. CONTRACTOR hereby waives any claim or defense to any claim by the OWNER that any failure by the OWNER, E/A, or any other person or entity acting on behalf of the OWNER or E/A to observe, detect or discover any defect in the Work relieves or releases, in whole or in part, CONTRACTOR from any obligations or responsibility for the correction of such defects or any other obligation of CONTRACTOR under the Contract Documents. 6.14 Indemnification: 00700 04-2020 Page 22 General Conditions Exhibit "B" 6.14.1 TO THE FULLEST EXTENT PERMITTED BY LAW, AND IN ADDITION TO ANY OTHER OBLIGATIONS OF CONTRACTOR UNDER THE CONTRACT OR OTHERWISE, CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS OWNER, ITS COUNCIL MEMBERS , EMPLOYEES, AGENTS, AND CONSULTANTS INCLUDING, BUT NOT LIMITED TO THE E/A (THE "INDEMNIFIED PARTIES" OR INDEMNIFIED PARTY", FROM AND AGAINST ALL CLAIMS, COSTS, LOSSES, AND DAMAGES (INCLUDING BUT NOT LIMITED TO ALL FEES AND CHARGES OF ENGINEERS, ARCHITECTS, ATTORNEYS, CONSULTANTS, EXPERTS AND OTHER PROFESSIONALS AND ALL COURT OR ARBITRATION OR OTHER DISPUTE RESOLUTION COSTS) ARISING OUT OF OR RELATING TO THE PERFORMANCE OF THE WORK, REGARDLESS OF WHETHER SUCH CLAIMS, COSTS, LOSSES, AND DAMAGES ARE CAUSED, IN WHOLE OR IN PARTY BY THE ACTS, ACTIONS, ERRORS OR OMISSIONS OF AN INDEMNIFIED PARTY. BECAUSE OWNER IS A MUNICIPALITY,THE TERMS AND PROVISIONS OF SUBCHAPTER C OF CHAPTER 151 OF THE TEXAS INSURANCE CODE ("CHAPTER 151") DOES NOT APPLY TO THE OWNER. IF, HOWEVER, ANY PROVISION OF CHAPTER 151 APPLIES TO THE OWNER, IT IS THE INTENT OF THE OWNER THAT IF THE PROVISIONS OF CHAPTER 151 DO APPLY, NOTHING HEREIN SHALL IMPOSE ANY REQUIREMENTS ON CONTRACTOR THAT ARE PROHIBITED BY CHAPTER 151 AND THAT ANY OF THE PROVISIONS HEREOF THAT ARE NOT PROHIBITED BY CHAPTER 151 SHALL REMAIN IN FULL FORCE AND EFFECT. ACCORDINGLY, IN THE EVENT THAT IN CONSTRUING AND INTERPRETING THE CONTRACT DOCUMENTS, A COURT OF COMPETENT JURISDICTION OR, IF APPLICABLE, AN ARBITRATOR, DETERMINES THAT CHAPTER 151 APPLIES TO THE OWNER, THEN THE COURT OR ARBITRATOR SHALL REFORM THE PROVISIONS HEREOF SO AS TO COMPLY WITH CHAPTER 151 AND SUCH REFORMATION SHALL NOT AFFECT THE VALIDITY OF ANY PROVISIONS HEREOF THAT ARE NOT PROHIBITED BY CHAPTER 151. 6.14.2 The indemnification obligation under paragraph 6.14.1 shall not be limited in any way by any limitation on the amount or type of damages, or compensation or benefits payable by or for the CONTRACTOR or any such Subcontractor. Supplier or other person or organization under workers'compensation acts. disability benefit acts or other employee benefit acts. 6.14.3 The obligations of the CONTRACTOR under paragraph 6.14.1 shall not extend to the liability of the OWNER, E/A, E/A's consultants. and their officers, directors, partners, employees or agents caused primarily by negligent preparation of maps, drawings, surveys, designs or specifications upon which is placed the applicable state-authorized design professional seal of the OWNER's, E/A's or E/A's consultant's officers, directors, partners, employees or agents. 6.14.4 In the event the CONTRACTOR fails to follow the OWNER's directives concerning use of the site, scheduling or course of construction, or engages in other conduct which proximately causes damage to property based on inverse condemnation or otherwise. then and in that event, the CONTRACTOR shall indemnify the OWNER against all costs resulting from such claims. 6.14.5 In the event the CONTRACTOR unreasonably delays progress of the work being done by others on the site so as to cause loss for which the OWNER becomes liable, then the CONTRACTOR shall reimburse the OWNER for such loss. 6.15 Survival of Obligations: All representations, indemnifications, warranties and guarantees made in, required by or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion and acceptance of the Work and termination or completion of the Agreement. 6.16 Losses from Natural Causes: Unless otherwise specified, all loss or damage to the CONTRACTOR arising out of the nature of the Work to be done or from action of the elements, floods or from unforeseeable circumstances in prosecution of the Work or from 00700 04-2020 Page 23 General Conditions Exhibit "B" unusual obstructions or difficulties which may be encountered in prosecution of the Work, shall be sustained and borne by the CONTRACTOR at its own cost and expense. 6.17 Notice of Claim: Should the CONTRACTOR suffer injury or damage to person or property because of any error, omission or act of the OWNER or of any of the OWNER's employees or agents or others for whose acts the OWNER is liable, a Claim will be made to the other party within thirty (30) calendar days of the event giving rise to such injury or damage. The provisions of this paragraph 6.17 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations, statute of repose, or any other provision of the Contract Documents. 6.18 Liquidated Damages: At set forth in the Agreement, paragraph 1.2, the CONTRACTOR or its Surety shall be liable for Liquidated Damages for the CONTRACTOR's failure to timely complete the Work or any portion thereof within the Contract Time. See Supplemental Conditions for amount of Liquidated Damages. ARTICLE 7 -OTHER WORK 7.1 The OWNER may perform other work related to the Project at the site by the OWNER's own forces, or let other contracts therefor, or have other work performed by utility owners. If the CONTRACTOR believes that delay or additional cost is involved because of such action by the OWNER, the CONTRACTOR may make a Claim as provided in Article 11 or Article 12. 7.2 The CONTRACTOR shall afford other contractors who are in a contract with the OWNER and each utility owner (and the OWNER, if the OWNER is performing the additional work with the OWNER's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, the CONTRACTOR shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. The CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of Owner's Representative and the other contractors whose work will be affected. The CONTRACTOR shall promptly remedy damage caused by the CONTRACTOR to completed or partially completed construction or to property of the OWNER or separate contractors. 7.3 If the proper execution or results of any part of the CONTRACTOR's Work depends upon work performed by others under this Article 7, the CONTRACTOR shall inspect such other work and promptly report to Owner's Representative in writing any delays, defects or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of the CONTRACTOR's Work. The CONTRACTOR's failure to report will constitute an acceptance of such other work as fit and proper for integration with the CONTRACTOR's Work except for latent or non-apparent defects and deficiencies in such other work. 7.4 The OWNER shall provide for coordination of the activities of the OWNER's own forces and of each separate contractor with the Work of the CONTRACTOR, who shall cooperate with them. The CONTRACTOR shall participate with other separate contractors and Owner's Representative in reviewing their construction schedules when directed to do so. The CONTRACTOR shall make any revisions to the construction schedule deemed necessary after a joint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the CONTRACTOR, separate contractors and the OWNER until subsequently revised. 7.5 Unless otherwise stated herein, costs caused by delays or by improperly timed activities or defective construction shall be borne by the party responsible therefor. 7.6 If CONTRACTOR damages,delays, disrupts or interferes with the work of any other contractor,or any utility owner performing other work at or adjacent to the site of the Project, through CONTRACTOR's failure to take reasonable and customary measures to avoid such impacts, or if any claim arising out of CONTRACTOR's actions, 00700 04-2020 Page 24 General Conditions Exhibit "B" inactions or negligence in performance of the Work at or adjacent to the site of the Project is made by any such other contractor or utility owner against CONTRACTOR, OWNER, or E/A. then CONTRACTOR shall (1) promptly attempt to settle the claim as to all parties through negotiations with such other contractor or utility owner, or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law. and (2) INDEMNIFY AND HOLD HARMLESS THE INDEMNIFIED PARTIES, INCLUDING, BUT NOT LIMITED TO THE E/A FROM AND AGAINST ANY SUCH CLAIMS,AND AGAINST ALL COSTS, LOSSES,AND DAMAGES(INCLUDING BUT NOT LIMITED TO ALL FEES AND CHARGES OF ENGINEERS, ARCHITECTS, ATTORNEYS, AND OTHER PROFESSIONALS AND ALL COURT OR ARBITRATION OR OTHER DISPUTE RESOLUTION COSTS) ARISING OUT OF OR RELATING TO SUCH DAMAGE, DELAY, DISRUPTION, OR INTERFERENCE. ARTICLE 8 -OWNER'S RESPONSIBILITIES 8.1 Prior to the start of construction, the OWNER will designate in writing a person or entity to act as Owner's Representative during construction. Except as otherwise provided in these General Conditions, the OWNER shall issue all communications to the CONTRACTOR through Owner's Representative. 8.2 The OWNER will not supervise, direct, control or have authority over or be responsible for the CONTRACTOR's means, methods, techniques, sequences or procedures of construction or the safety precautions and programs incident thereto. The OWNER is not responsible for any failure of the CONTRACTOR to comply with laws and regulations applicable to furnishing or performing the Work. The OWNER is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. Failure or omission of the OWNER to discover, or object to or condemn any defective Work or material shall not release the CONTRACTOR from the obligation to properly and fully perform the Contract. 8.3 The OWNER is not responsible for the acts or omissions of the CONTRACTOR, or of any Subcontractor. any Supplier, or of any other person or organization performing or furnishing any of the Work. 8.4 Information or services under the OWNER's control shall be furnished by the OWNER with reasonable promptness to avoid delay in the orderly progress of the Work. 8.5 The foregoing are in addition to other duties and responsibilities of the OWNER enumerated herein and especially those in respect to Article 4 (Availability of Lands, Subsurface and Physical Conditions: Reference Points). Article 7 (Other Work) and Article 14 (Payments to the CONTRACTOR and Completion). 8.6 Notice of Claim: Should the OWNER suffer injury or damage to person or property because of any error, omission or act of the CONTRACTOR or of any of the CONTRACTOR's employees or agents or others for whose acts the CONTRACTOR is liable, a notice of such injury or damage will be sent to the CONTRACTOR within thirty (30) calendar days of the event giving rise to such injury or damage. The provisions of this paragraph 8.6 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations or statute of repose. 8.7 The OWNER is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. The failure or omission of the OWNER, E/A or any other person or entity acting on behalf of the OWNER or the E/A to observe, detect, discover, or object to or condemn any defective Work or material shall not release the CONTRACTOR from CONTRACTOR's obligation to properly and fully perform the Work pursuant to the Contract Documents. The OWNER shall not be responsible for the acts, errors or omissions of the CONTRACTOR, or any Subcontractor. Supplier or any other person or entity performing or furnishing any of the Work on behalf of the CONTRACTOR. ARTICLE 9 -ENGINEER/ARCHITECT'S STATUS DURING CONSTRUCTION 9.1 E/A's Authority and Responsibilities: 9.1.1 The duties and responsibilities and the limitations of authority of E/A during construction are set forth in the Contract Documents and shall not be extended without written consent of the OWNER and E/A. The assignment 00700 04-2020 Page 25 General Conditions Exhibit "B" of any authority, duties or responsibilities to E/A under the Contract Documents, or under any agreement between the OWNER and E/A, or any undertaking, exercise or performance thereof by E/A, is intended to be for the sole and exclusive benefit of the OWNER and is not for the benefit of the CONTRACTOR, Subcontractor, Sub- subcontractor, Supplier, or any other person or organization, or for any surety or employee or agent of any of them. 9.1.2 E/A will not supervise, direct, control or have authority over or be responsible for the CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto. E/A is not responsible for any failure of the CONTRACTOR to comply with laws and regulations applicable to the furnishing or performing the Work. E/A is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. Failure or omission of E/A to discover, or object to or condemn any defective Work or material shall not release the CONTRACTOR from the obligation to properly and fully perform the Work. 9.1.3 E/A is not responsible for the acts or omissions of the CONTRACTOR, or of any Subcontractor, any Supplier, or of any other person or organization performing or furnishing any of the Work. 9.1.4 If the OWNER so directs, E/A will review the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, bonds and certificates of inspection,tests and approvals and other documentation required to be delivered by Article 14, but only to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with, the Contract Documents. 9.1.5 The limitations upon authority and responsibility set forth in this paragraph 9.1 shall also apply to E/A's Consultants, Resident Project Representative and assistants. 9.2 E/A as Owner's Representative: 9.2.1 E/A may be designated as Owner's Representative under paragraph 8.1. 9.3 Visits to Site: If the OWNER so directs, E/A will make visits to the site at intervals appropriate to the various stages of construction as is necessary in order to observe as an experienced and qualified design professional the progress that has been made and the quality of the various aspects of the CONTRACTOR's executed Work. Based on information obtained during such visits and observations, E/A will endeavor for the benefit of the OWNER to determine if the Work is proceeding in accordance with the Contract Documents. E/A will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. E/A's efforts will be directed toward providing for the OWNER a greater degree of confidence that the completed Work will conform to the Contract Documents. On the basis of such visits and on-site observations, E/A will keep the OWNER informed of the progress of the Work and will endeavor to guard the OWNER against defective Work. E/A's visits and on-site observations are subject to all the limitations on E/A's authority and responsibility set forth in paragraph 9.1. 9.4 Project Representative: If the OWNER and E/A agree, E/A will furnish a Resident Project Representative to assist E/A in providing more continuous observation of the Work. The responsibilities and authority and limitations of any such Resident Project Representative and assistants will be as provided in paragraph 9.1 and in the Supplemental General Conditions. The OWNER may designate another representative or agent to represent the OWNER at the site who is not E/A, E/A's consultant, agent or employee. 9.5 Clarifications and Interpretations: E/A may determine that written clarifications or interpretations of the requirements of the Contract Documents (in the form of drawings or otherwise) are necessary. Such written clarifications or interpretations will be consistent with the intent of and reasonably inferable from the Contract Documents,will be issued with reasonable promptness by Owner's Representative and will be binding on the OWNER and the CONTRACTOR. If the OWNER or the 00700 04-2020 Page 26 General Conditions Exhibit "B" CONTRACTOR believes that a written clarification or interpretation justifies an adjustment in the Contract Amount or the Contract Times, the OWNER or the CONTRACTOR may make a Claim therefor as provided in Article 11 or Article 12. 9.6 Rejecting Defective Work: E/A may recommend that the OWNER disapprove or reject Work which E/A believes to be defective, or believes will not produce a completed Project that conforms to the Contract Documents or will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ARTICLE 10 -CHANGES IN THE WORK 10.1 Changes: 10.1.1 Without invalidating the Contract and without notice to any surety, the OWNER, at anytime or from time to time, may order additions, deletions or revisions in the Work. Such changes in the Work will be authorized by Change Order, Change Directive or Field Order. 10.1.2 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the CONTRACTOR shall proceed promptly, unless otherwise provided in the Change Order, Change Directive or Field Order. 10.1.3 The CONTRACTOR shall not be entitled to an increase in the Contract Amount or an extension of the Contract Times with respect to any Work performed that is not required by the Contract Documents as amended, modified and supplemented as provided in paragraph 3.3.1 and paragraph 3.3.2, except in the case of an emergency as provided in paragraph 6.11.5 or in the case of uncovering Work as provided in paragraph 13.4. 10.1.4 Except in the case of an emergency as provided in paragraph 6.11.5, a Change Order or Change Directive is required before the CONTRACTOR commences any activities associated with a change in the Work which, in the CONTRACTOR 's opinion, will result in a change in the Contract Amount and/or Contract Times. 10.1.5 If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Amount or Contract Times) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be the CONTRACTOR's responsibility, and the amount of each applicable Bond will be adjusted accordingly. 10.2 Change Orders: 10.2.1 The OWNER and the CONTRACTOR shall execute appropriate written Change Orders covering: .1 a change in the Work; .2 the amount of the adjustment in the Contract Amount, if any; and .3 the extent of the adjustment in the Contract Time, if any. 10.2.2 An executed Change Order shall represent the complete, equitable, and final amount of adjustment in the Contract Amount and/or Contract Time owed to the CONTRACTOR or the OWNER as a result of the occurrence or event causing the change in the Work encompassed by the Change Order. 10.3 Change Directives: 10.3.1 The OWNER may by written Change Directive,without invalidating the Contract,order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Amount 00700 04-2020 Page 27 General Conditions Exhibit "B" and Contract Time being adjusted as necessary. A Change Directive shall be used in the absence of complete and prompt agreement on the terms of a Change Order. 10.3.2 If the Change Directive provides for an adjustment to the Contract Amount, the adjustment shall be based on the method provided for in paragraph 11.5. 10.3.3 A Change Directive shall be recorded later by preparation and execution of an appropriate Change Order. 10.3.4 Upon receipt of a Change Directive, CONTRACTOR shall promptly proceed with the change in the Work involved. 10.4 Field Order: 10.4.1 Owner's Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Amount or the Contract Times and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These shall be accomplished by written Field Order and shall be binding on the OWNER and on the CONTRACTOR who shall perform the Work involved promptly. 10.4.2 If the CONTRACTOR believes that a Field Order would require an adjustment in the Contract Amount and/or Contract Times, the CONTRACTOR shall make written request to Owner's Representative for a Change Order. Any request by the CONTRACTOR for an adjustment in Contract Amount and/or Contract Times shall be made in writing prior to beginning the work covered by the Field Order. 10.5 No Damages for Delay: Except as otherwise provided in the Contract Documents, the CONTRACTOR shall receive no compensation for delays or hindrances to the Work. If delay is caused by specific orders given by the OWNER to stop Work for reasons for which the CONTRACTOR is not responsible, or such delay is not caused by active interference in the Work by OWNER for reasons for which the CONTRACTOR is not responsible, then such delay will entitle the CONTRACTOR only to an equivalent extension of time, the CONTRACTOR's application for which shall, however, be subject to approval of the OWNER. No such extension of time shall release the CONTRACTOR or surety on its performance bond from all the CONTRACTOR's obligations hereunder which shall remain in full force until discharge of the Contract. ARTICLE 11 -CHANGE OF CONTRACT AMOUNT 11.1 The Contract Amount is stated in the Agreement and, including authorized adjustments, is the total amount payable by the OWNER to the CONTRACTOR for performance of the Work under the Contract Documents. 11.2 The original Contract Amount may not be increased by more than twenty-five percent(25%)and it may not be decreased more than twenty-five percent (25%)without the consent of the CONTRACTOR to such decrease. 11.3 The Contract Amount shall only be changed by a Change Order. Any claim for an adjustment in the Contract Amount shall be made by Written Notice delivered by the party making the Claim to the other party promptly (but in no event later than thirty(30)calendar days)after the start of the occurrence or event giving rise to the Claim and stating the general nature of the Claim. Notice of the amount of the Claim with supporting data shall be delivered within thirty (30) calendar days after Written Notice of Claim is delivered by claimant, and shall represent that the adjustment claimed covers all known amounts to which claimant is entitled as a result of said occurrence or event. If the OWNER and the CONTRACTOR cannot otherwise agree, all Claims for adjustment in the Contract Amount shall be determined as set out in Article 16. 11.4 Determination of Value of Work: 00700 04-2020 Page 28 General Conditions Exhibit "B" 11.4.1 The value of any Work covered by a Change Order or of any Claim for an adjustment in the Contract Amount will be determined by one or more of the following methods: .1 by application of unit prices contained in the Contract Documents to the quantities of the items involved. .2 by a mutually agreed lump sum properly itemized and supported by sufficient substantiating data to permit evaluation. .3 by cost of Work plus the CONTRACTOR's fee for all overhead costs and profit(determined as provided in paragraph 11.5). 11.4.2 Before using the method described in paragraph 11.4.1.3, the OWNER and the CONTRACTOR agree to negotiate a Change Order using the methods identified in paragraph 11.4.1.1 and paragraph 11.4.1.2, as appropriate, to determine the adjustment in the Contract Amount. 11.5 Cost of Work: If neither of the methods defined in paragraph 11.4.1.1 or paragraph 11.4.1.2 can be agreed upon before a change in the Work is commenced which will result in an adjustment in the Contract Amount, the OWNER may issue a Change Directive to the CONTRACTOR. If the OWNER elects to issue a Change Directive, CONTRACTOR shall perform the Changed Work and payment will be made as follows: .1 For all personnel, the CONTRACTOR will receive the rate or wage specified in the prevailing wage rates established in Section 00900 for each hour that said personnel are actually engaged in such Work, to which will be added an amount equal to twenty-five percent (25%) of the sum thereof as compensation for the CONTRACTOR's and any affected Subcontractor's total overhead and profit. No separate charge will be made by the CONTRACTOR for organization or overhead expenses. For the cost of premiums on public liability insurance, workers' compensation insurance, social security and unemployment insurance, an amount equal to fifty-five percent (55%) of the wages paid personnel, excluding the twenty-five(25%)compensation provided above,will be paid to the CONTRACTOR. The actual cost of the CONTRACTOR's bond(s) on the extra Work will be paid based on invoices from surety. No charge for superintendence will be made unless considered necessary and ordered by the OWNER. .2 The CONTRACTOR will receive the actual cost, including freight charges, of the materials used on such Work, to which costs will be added a sum equal to twenty-five percent (25%) thereof as compensation for the CONTRACTOR's and any affected Subcontractor's total overhead and profit. In case material invoices indicate a discount may be taken, the actual cost will be the invoice price minus the discount. .3 For machinery,trucks, power tools, or other similar equipment agreed to be necessary by the OWNER and the CONTRACTOR, the OWNER will allow the CONTRACTOR the rate as given in the latest edition of the Associated General Contractors of America "Contractor's Equipment Cost Guide" as published by Dataquest for each hour that said tools or equipment are in use on such work, which rate includes the cost of fuel, lubricants and repairs. No additional compensation will be allowed on the equipment for the CONTRACTOR's overhead and profit. .4 The compensation, as herein provided for, shall be received by the CONTRACTOR and any affected Subcontractor as payment in full for work done by Change Directive and will include use of small tools, and total overhead expense and profit. The CONTRACTOR and the Owner's Representative shall compare records of work done by Change Directive at the end of each day. Copies of these records will be made upon forms provided for this purpose by the OWNER and signed by both Owner's Representative and the CONTRACTOR, with one (1) copy being retained by the OWNER and one(1) by the CONTRACTOR. Refusal by the CONTRACTOR to sign these records within two (2) working days of presentation does not invalidate the accuracy of the record. 00700 04-2020 Page 29 General Conditions Exhibit "B" 11.6 Unit Price Work: 11.6.1 Where the Contract Documents provide that all or part of the Work is to be unit price Work, initially the Contract Amount will be deemed to include for all unit price work an amount equal to the sum of the established unit price for each separately identified item of unit price work times the estimated quantity of each item as indicated in the Bid. The estimated quantities of items of unit price work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Amount. Determinations of the actual quantities and classifications of unit price work performed by the CONTRACTOR will be made by Owner's Representative. Owner's Representative will review with the CONTRACTOR the preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or otherwise). 11.6.2 When "plan quantity" is indicated for a bid item, the CONTRACTOR shall be paid the amount specified in the Contract Documents without any measurements. 11.6.3 Each unit price will be deemed to include an amount considered by the CONTRACTOR to be adequate to cover the CONTRACTOR's overhead and profit for each separately identified item. 11.6.4 A Major Item is any individual bid item in the Bid that has a total cost equal to or greater than five percent (5%) of the original Contract Amount or $50,000, whichever is greater, computed on the basis of bid quantities and Contract unit prices. 11.6.5 The OWNER or the CONTRACTOR may make a Claim for an adjustment in the Contract Amount in accordance with Article 11 if: .1 the actual quantity of any Major Item should become as much as twenty percent (20%) more than or twenty percent (20%) less than in the Bid; or .2 The CONTRACTOR presents proper documentation contesting the accuracy of "plan quantity," and Owner's Representative verifies quantity and determines original quantity is in error by five percent (5%) or more. 11.6.6 Right to Verify Information: The CONTRACTOR agrees that any designated representative of the OWNER shall have the right to examine the CONTRACTOR's records to verify the accuracy and appropriateness of the pricing data used to price change proposals. Even after a Change Order Proposal has been approved, the CONTRACTOR agrees that if the OWNER later determines the cost and pricing data submitted was inaccurate, incomplete, not current or not in compliance with the terms of this Agreement regarding pricing of change orders, then an appropriate contract price reduction will be made. 11.6.7 Pricing Information Requirements: The CONTRACTOR agrees to provide and require all subcontractors to provide a breakdown of allowable labor and labor burden cost information as outlined herein. This information will be used to evaluate the potential cost of labor and labor burden related to change order work. It is intended that this information represent an accurate estimate of the CONTRACTOR's actual labor and labor burden cost components. This information is not intended to establish fixed billing or change order pricing labor rates. However, at the time change orders are priced the submitted cost data for labor rates may be used to price change order work. The accuracy of any such agreed-upon labor cost components used to price change orders will be subject to later audit. Approved change order amounts may be adjusted later to correct the impact of inaccurate labor cost components if the agreed-upon labor cost components are determined to be inaccurate. ARTICLE 12-CHANGE OF CONTRACT TIMES 12.1 Working Day and Calendar Day Contracts: 12.1.1 The Contract Times (or Milestones) shall only be changed by Change Order or Time Extension Request duly executed by both the CONTRACTOR and Owner's Representative. Any claim for an adjustment of the Contract Times(or Milestones)shall be made by Written Notice delivered by the party making the Claim to the other 00700 04-2020 Page 30 General Conditions Exhibit "B" party promptly (but in no event later than thirty (30) calendar days) after the start of the occurrence or event giving rise to the delay and stating the general nature of the delay. Notice of the extent of the delay with supporting data shall be delivered within thirty (30) calendar days after Written Notice of Claim is delivered by claimant, and shall represent that the adjustment claimed is the entire adjustment to which claimant is entitled as a result of said occurrence or event. If the OWNER and the CONTRACTOR cannot otherwise agree, all Claims for adjustment in the Contract Times (or Milestones) shall be determined as set out in Article 16. No Claim for an adjustment in the Contract Times(or Milestones)will be valid if not submitted in accordance with the requirements of this paragraph. 12.1.2 When the CONTRACTOR is at fault and the OWNER stops the Work so that corrections in the Work can be made by the CONTRACTOR, then no extension in time will be allowed. 12.1.3 When the CONTRACTOR is prevented from completing any part of the Work within the Contract Times(or Milestones) due to delay for which the CONTRACTOR is not responsible, an extension of the Contract Times (or Milestones) in an amount equal to the time lost due to such delay will be considered by OWNER. Any extension of the Contract Time shall be the CONTRACTOR's sole and exclusive remedy for such delay. However, adverse weather shall not be considered justification for extension of Contract Times on Calendar Day contracts, except as provided for in paragraph 12.2. 12.1.4 The OWNER will consider time extension requests and may grant the CONTRACTOR an extension of time because of: .1 Changes ordered in the Work which justify additional time. .2 Failure of materials or products being at the Project site due to delays in transportation or failures of Suppliers,for which the CONTRACTOR, a Subcontractor or a Supplier is not responsible. The request for an extension of time shall be supported by a recitation of acts demonstrating that such delays were beyond the control of the CONTRACTOR, a Subcontractor or a Supplier including but not limited to, the CONTRACTOR's, the Subcontractor's or the Supplier's efforts to overcome such delays documented as follows: a) Copy of purchase order for delayed item(s) indicating date ordered by the CONTRACTOR/Subcontractor and date purchase order received by Supplier. b) If item(s) require Shop Drawings or other submittal information in accordance with the Contract Documents, provide record of date submittal(s) forwarded to Owner's Representative, date submittal(s) returned to the CONTRACTOR, and date submittal(s) forwarded to Supplier. c) Copy of document(s) from Supplier, on Supplier's letterhead, indicating date(s) item(s) would be ready for shipment and/or actual shipment date(s). d) Copies of all correspondence between the CONTRACTOR/Subcontractor and Supplier indicating the CONTRACTOR/Subcontractor's efforts to expedite item(s). e) If item(s) are being purchased by a Subcontractor, provision of meeting notes, correspondence, and the like which reflect the CONTRACTOR's efforts with the Subcontractor to expedite delivery of the item(s). .3 When acts of the OWNER, E/A, utility owners or other contractors employed by the OWNER delay progress of work through no fault of the CONTRACTOR. .4 When the CONTRACTOR is delayed by strikes, lockouts, fires, losses from natural causes, or other unavoidable cause or causes beyond the CONTRACTOR's control. 12.2 Calendar Day Contracts: 00700 04-2020 Page 31 General Conditions Exhibit "B" Under a Calendar Day Contract, the CONTRACTOR may also be granted an extension of time because of unusual inclement weather that is beyond the normal weather expected for the Williamson and Travis Counties. Texas area. Normal weather which prevents the CONTRACTOR from performing Work is expected during a Calendar Day Contract, and is not a justification for an extension of time. The following delineates the number of days per month for which, for purposes of Calendar Day Contracts. expected normal weather will prevent performance of Work: January................................7 days February...............................7 days March...................................7 days April......................................7 days May......................................8 days June. ....................................6 days July.......................................6 days August..................................5 days September. ..........................7 days October. ...............................7 days November..................... 7 days December. ...........................7 days Days per month exceeding the number shown above may be credited as Rain Days if a Claim is made in accordance with paragraph 12.1.1 and meets the following definition: a "Rain Day" is any day in which a weather event occurs at the site and is sufficient to prevent the CONTRACTOR from performing units of Work critical to maintaining the project schedule during the entire day. ARTICLE 13 -TESTS AND INSPECTIONS: AND CORRECTION OR REMOVAL OF DEFECTIVE WORK 13.1 Notice of Defects: Prompt notice of all defective Work of which the OWNER or E/A has actual knowledge will be given to the CONTRACTOR. All defective Work may be rejected or corrected as provided for in Article 13. 13.2 Access to Work: The OWNER, E/A. E/A's Consultants, other representatives and personnel of the OWNER, independent testing laboratories and governmental agencies having jurisdiction will have unrestricted physical access to the Work site for observing, inspecting and testing. The CONTRACTOR shall provide them proper and safe conditions for such access, and advise them of the CONTRACTOR's site safety procedures and programs so that they may comply therewith as applicable. 13.3 Tests and Inspections: 13.3.1 The CONTRACTOR shall give timely notice of readiness of the Work for all required inspections, tests or approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. 13.3.2 The OWNER shall employ and pay for services of an independent testing laboratory to perform all inspections, tests or approvals required by the Contract Documents except: .1 for inspections, tests or approvals covered by paragraph 13.3.3 below, .2 for reinspecting or retesting defective Work, and .3 as otherwise specifically provided in the Contract Documents. All testing laboratories shall be those selected by the OWNER. 00700 04-2020 Page 32 General Conditions Exhibit "B" 13.3.3 If laws or regulations of any public body having jurisdiction require any Work(or part thereof)specifically to be inspected, tested or approved by an employee or other representative of such public body, the CONTRACTOR shall assume full responsibility for arranging and obtaining such inspections, tests or approvals, pay all costs in connection therewith and furnish Owner's Representative the required certificates of inspection or approval. The CONTRACTOR shall also be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests or approvals required for the OWNER's and E/A's review of materials or equipment to be incorporated in the Work, or of materials, mix designs or equipment submitted for review prior to the CONTRACTOR's purchase thereof for incorporation in the Work. 13.4 Uncovering Work: 13.4.1 If any Work (or the work of others) that is to be inspected, tested or approved is covered by the CONTRACTOR without concurrence of Owner's Representative, or if any Work is covered contrary to the written request of Owner's Representative, it must, if requested by Owner's Representative, be uncovered and recovered at the CONTRACTOR's expense. 13.4.2 If Owner's Representative considers it necessary or advisable that covered Work be observed, inspected or tested, the CONTRACTOR shall uncover, expose or otherwise make available for observation, inspection or testing that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective,the CONTRACTOR shall pay all claims, costs, losses and damages caused by, arising out of or resulting from such uncovering, exposure, observation, inspection and testing and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and the OWNER shall be entitled to an appropriate decrease in the Contract Amount, and may make a Claim therefor as provided in Article 11. If, however, such Work is not found to be defective, the CONTRACTOR shall be allowed an increase in the Contract Amount or an extension of the Contract Times (or Milestones), or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement and reconstruction; and the CONTRACTOR may make a Claim therefor as provided in Article 11 and Article 12. 13.5 OWNER May Stop the Work: 13.5.1 If the Work is defective, or the CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment, or fails to furnish or perform the Work in such a way that the completed Work will conform to the Contract Documents,the OWNER may order the CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of the OWNER to stop the Work shall not give rise to any duty on the part of the OWNER to exercise this right for the benefit of the CONTRACTOR or any surety or other party. 13.5.2 If the CONTRACTOR fails to correct defective Work or submit a satisfactory plan to take corrective action, with procedure and time schedule, the OWNER may order the CONTRACTOR to stop the Work, or any portion thereof, until cause for such order has been eliminated, or take any other action permitted by this Contract. A notice to stop the Work, based on defects, shall not stop calendar or working days charged to the Project. 00700 04-2020 Page 33 General Conditions Exhibit "B" 13.6 Correction or Removal of Defective Work: If required by the OWNER,the CONTRACTOR shall promptly,as directed,either correct all defective Work,whether or not fabricated, installed or completed, or, if the Work has been rejected by Owner's Representative, remove it from the site and replace it with Work that is not defective. The CONTRACTOR shall correct or remove and replace defective Work, or submit a plan of action detailing how the deficiency will be corrected, within the time frame identified in the notice of defective Work. The CONTRACTOR shall pay all claims, costs, losses and damages caused by or resulting from such correction or removal(including but not limited to all costs of repair or replacement of work of others), including but not limited to all consultant, engineering, expert and attorney's fees incurred by the OWNER as a result of such defective work or as necessary for OWNER to investigate such defective Work and/or to determine the appropriate means or methods to address or correct such defective Work. The OWNER shall have the right, in OWNER's sole discretion, to have the E/A or other consultant specify the means and methods that will be followed to correct or address any defective Work. If the OWNER specifies a means or method by which the defective Work will be addressed or corrected, the CONTRACTOR shall perform the specified work necessary to address or correct the defective Work at CONTRACTOR's sole cost and expense. 13.7 Warranty period: 13.7.1 If, at any time after the date of Substantial Completion or such longer period of time as may be prescribed by laws or regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, the CONTRACTOR shall promptly, without cost to the OWNER and in accordance with the OWNER's written instructions: (i) correct such defective Work, or, if it has been rejected by the OWNER, remove it from the site and replace it with Work that is not defective, and (ii) satisfactorily correct or remove and replace any damage to other Work or the work of others resulting therefrom. If the CONTRACTOR does not promptly comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, the OWNER may have the defective Work corrected or the rejected Work removed and replaced, and all claims, costs, losses and damages caused by or resulting from such removal and replacement (including but not limited to all costs of repair or replacement of work of others and all consultant, expert and attorney's fees incurred by OWNER)will be paid by the CONTRACTOR. 13.7.2 In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work, the warranty period for that item may start to run from an earlier date if so provided in the Contract Documents and agreed to by OWNER. 13.8 OWNER May Correct Defective Work: If the CONTRACTOR fails within a reasonable time after Written Notice of the OWNER to correct defective Work, or to remove and replace rejected Work, or if the CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if the CONTRACTOR fails to comply with any other provision of the Contract Documents, the OWNER may, after seven (7) calendar days' Written Notice to the CONTRACTOR, correct and remedy any such deficiency. If, in the opinion of Owner's Representative, significant progress has not been made during this seven (7)calendar day period to correct the deficiency,the OWNER may exercise any actions necessary to remedy the deficiency. In exercising the rights and remedies underthis paragraph,the OWNER shall proceed expeditiously. In connection with such corrective and remedial action, the OWNER may exclude the CONTRACTOR from all or part of the site, take possession of all or part of the Work, and suspend the CONTRACTOR's services related thereto, and incorporate in the Work all materials and equipment stored at the site or for which the OWNER has paid the CONTRACTOR but which are stored elsewhere. The CONTRACTOR shall allow the OWNER, its agents and employees,the OWNER's other contractors, E/A and E/A's consultants access to the site to enable the OWNER to exercise the rights and remedies under this paragraph. All claims, costs, losses and damages incurred or sustained by the OWNER in exercising such rights and remedies will be charged against the CONTRACTOR and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the 00700 04-2020 Page 34 General Conditions Exhibit "B" Work. Such claims, costs, losses and damages will include but not be limited to all costs of repair or replacement of work of others destroyed or damaged by correction, removal or replacement of the CONTRACTOR's defective Work and any and all consultant, expert and attorneys fees incurred by OWNER as a result of OWNER's correction of defective WORK. The CONTRACTOR shall not be allowed an extension of the Contract Times (or Milestones), or claims of damage because of any delay in the performance of the Work attributable to the exercise by the OWNER of the OWNER's rights and remedies hereunder. 13.9 ACCEPTANCE OF DEFECTIVE WORK If, instead of requiring correction or removal and replacement of defective Work, OWNER prefers to accept it, OWNER may do so. CONTRACTOR shall pay all claims, costs, losses, and damages attributable to OWNER's evaluation of and determination to accept such defective Work, including but not limited to any expert, engineering or other consultant's fees incurred by the OWNER to investigate such defective Work and/or to determine the appropriate means or methods and work necessary to allow OWNER to accept the defective Work and CONTRACTOR shall pay for all work required to be performed to allow OWNER to accept the defective Work and any estimated costs, expenses and damages OWNER may sustain in the future as a result of accepting the defective Work, including any diminution in value of the Project as a result of accepting the defective Work. If any such acceptance occurs prior to final payment, the necessary revisions in the Contract Documents with respect to the Work shall be incorporated in a Change Order. If the parties are unable to agree as to the decrease in the Contract Price, then OWNER may impose a reasonable set-off against payments due under the Contract Documents. If the acceptance of defective Work occurs after final payment, CONTRACTOR shall pay to OWNER the above described costs, expenses and damages incurred by OWNER as a result of OWNER's acceptance of defective Work. ARTICLE 14-PAYMENTS TO CONTRACTOR AND COMPLETION 14.1 Application for Progress Payment: 14.1.1 Not more than once per month, the CONTRACTOR shall submit to Owner's Representative for review an Application for Payment, in a form acceptable to the OWNER, filled out and signed by the CONTRACTOR covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents or as required by OWNER. 14.1.2 Such applications shall not include requests for payment on account of changes in the Work which have been properly authorized by Change Directives but not yet included in Change Orders. 14.1.3 Such applications shall not include requests for payment of amounts the CONTRACTOR does not intend to pay to a Subcontractor or Supplier because of a dispute or other reason. 14.1.4 Owner will not pay for materials or equipment not incorporated in the Work but delivered and suitably stored at the site or at another location. Payment will be made by Owner only for Work completed in accordance with the Contract Documents. 14.1.5 Where the original Contract Amount is less than $400,000, the OWNER will pay to the CONTRACTOR the total amount of approved Application for Payment, less ten percent(10%)of the amount thereof, which ten percent (10%)will be retained until final payment, less all previous payments and less all sums that may be retained by the OWNER under the terms of this Agreement. Where the original Contract Amount is$400,000 or more,the OWNER will pay to the CONTRACTOR the total amount of approved Application for Payment, less five percent (5%) of the amount thereof, which five percent (5%)will be retained until final payment, less all previous payments and less all sums that may be retained by the OWNER under the terms of this Agreement. In either case, if the Work is near completion and delay occurs due to no fault or neglect of the CONTRACTOR, the OWNER may pay a portion of the retained amount to the CONTRACTOR. The CONTRACTOR, at the OWNER's option, may be relieved of the obligation to complete the Work and, thereupon, the CONTRACTOR shall receive payment of the balance due under the Contract subject to the conditions stated under paragraph 15.2. 00700 04-2020 Page 35 General Conditions Exhibit "B" 14.1.6 Applications for Payment shall include the following documentation: .1 updated progress schedule, .2 monthly subcontractor report, and .3 any other documentation required under the Supplemental General Conditions. 14.2 CONTRACTOR's Warranty of Title: The CONTRACTOR warrants and guarantees that title to all Work, materials and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to the OWNER not later than the time of payment to the CONTRACTOR free and clear of all liens. 14.3 Review of Applications for Progress Payment: 14.3.1 Owner's Representative will, within seven (7) calendar days after receipt of each Application for Payment, either indicate a recommendation for payment and forward the Application for processing by the OWNER, or return the Application to the CONTRACTOR indicating Owner's Representative's reasons for refusing to recommend payment. In the latter case,the CONTRACTOR may make the necessary corrections and resubmit the Application. 14.3.2 Owner's Representative's recommendation of any payment requested in an Application for Payment will constitute a representation by Owner's Representative, based upon Owner's Representative's on-site observations of the executed Work and on Owner's Representative's review of the Application for Payment and the accompanying data and schedules, that to the best of Owner's Representative's knowledge, information and belief: .1 the Work has progressed to the point indicated, and .2 the quality of the Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for unit price Work, and to any other qualifications stated in the recommendation). 14.3.3 By recommending any such payment, Owner's Representative will not thereby be deemed to have represented that: .1 inspections have been made to check the quality or the quantity of the Work or that the Work has been performed in accordance with the Contract Documents, .2 examination has been made to ascertain how or for what purpose the CONTRACTOR has used money previously paid on account of the Contract Amount, .3 the CONTRACTOR's construction means, methods, techniques, sequences or procedures have been reviewed, or .4 that there may not be other matters or issues between the parties that might entitle the CONTRACTOR to be paid additionally by the OWNER or entitle the OWNER to withhold payment to the CONTRACTOR. 14.4 Decisions to Withhold Payment: 14.4.1 The OWNER may withhold or nullify the whole or part of any payment to such extent as may be necessary on account of: .1 defective Work not remedied: 00700 04-2020 Page 36 General Conditions Exhibit "B" .2 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Amount, .3 damage to the OWNER or another contractor, .4 reasonable evidence that the Work will not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay, .5 failure of the CONTRACTOR to submit a schedule of values in accordance with the Contract Documents, .6 failure of the CONTRACTOR to submit a submittal schedule in accordance with the Contract Documents; .7 failure of the CONTRACTOR to submit or update construction schedules in accordance with the Contract Documents, .8 failure of the CONTRACTOR to maintain a record of changes on drawings and documents, .9 failure of the CONTRACTOR to maintain weekly payroll reports, .10 failure of the CONTRACTOR to submit monthly subcontractor reports, .11 the CONTRACTOR's neglect or unsatisfactory prosecution of the Work, including failure to clean up, or .12 failure of the CONTRACTOR to comply with any provision of the Contract Documents. .13 OWNER's disagreement with the recommendation of the Owner's Representative, provided the OWNER has provided a Written Notice to the CONTRACTOR specifying the reasons why OWNER does not agree with such recommendation. 14.4.2 When the above reasons for withholding payment are removed. the CONTRACTOR shall resubmit a statement for the value of Work performed. Payment will be made within thirty (30) calendar days of receipt of approved Application for Payment. 14.5 Delayed Payments: Should the OWNER fail to make payment to the CONTRACTOR of a sum named in any Application for Payment with which OWNER agrees and has approved for payment within thirty (30) calendar days after the day on which the OWNER received the mutually acceptable Application for Payment, then the OWNER will pay to the CONTRACTOR, in addition to the sum shown as due by such Application for Payment, interest thereon at the rate of one percent (1%) per month from date due until fully paid, which shall fully liquidate any injury to the CONTRACTOR growing out of such delay in payment. 14.6 Arrears: No money shall be paid by the OWNER upon any claim, debt, demand or account whatsoever, to any person, firm or corporation who is in arrears to the OWNER, and the OWNER shall be entitled to counterclaim and offset against any such debt, claim, demand or account so in arrears and no assignment or transfer of such debt, claim, demand or account, shall affect the right of the OWNER to so offset said amounts, and associated penalties and interest if applicable, against the same. 00700 04-2020 Page 37 General Conditions Exhibit "B" 14.7 Substantial Completion: 14.7.1 If a Certificate of Occupancy is required by public authorities having jurisdiction over the Work, said certificate shall be issued before the Work or any portion thereof is considered substantially complete. When the CONTRACTOR considers that the Work, or a portion thereof which the OWNER agrees to accept separately, is substantially complete, the CONTRACTOR shall notify Owner's Representative and request a determination as to whether the Work or designated portion thereof is substantially complete. If Owner's Representative does not consider the Work substantially complete, Owner's Representative will notify the CONTRACTOR giving reasons therefor. Failure on the OWNER's part to list a reason does not alter the responsibility of the CONTRACTOR to complete all Work in accordance with the Contract Documents. After satisfactorily completing items identified by Owner's Representative, the CONTRACTOR shall then submit another request for Owner's Representative to determine substantial completion. If Owner's Representative considers the Work substantially complete, Owner's Representative will prepare and deliver a certificate of Substantial Completion which shall establish the date of Substantial Completion, shall include a punch list of items to be completed or corrected before final payment, shall establish the time within which the CONTRACTOR shall finish the punch list, and shall establish responsibilities of the OWNER and the CONTRACTOR for security, maintenance, heat, utilities, damage to the Work, warranty and insurance. Failure to include an item on the punch list does not alter the responsibility of the CONTRACTOR to complete all Work in accordance with the Contract Documents. The certificate of Substantial Completion shall be signed by the OWNER and the CONTRACTOR to evidence acceptance of the responsibilities assigned to them in such certificate. 14.7.2 The OWNER shall have the right to exclude the CONTRACTOR from the Work after the date of Substantial Completion, but the OWNER will allow the CONTRACTOR reasonable access to complete or correct items on the punch list. 14.8 Partial Utilization: The OWNER, at the OWNER's sole option, shall have the right to take possession of and use any completed or partially completed portion of the Work regardless of the time for completing the entire Work. The OWNER's exercise of such use and possession shall not be construed to mean that the OWNER acknowledges that any part of the Work so possessed and used is substantially complete or that it is accepted by OWNER, and the OWNER's exercise of such use and possession shall not relieve the CONTRACTOR of its responsibility to complete all Work in accordance with the Contract Documents. 14.9 Final Inspection: Upon Written Notice from the CONTRACTOR that the entire Work or an agreed portion thereof is complete, Owner's Representative will make a final inspection with the CONTRACTOR and provide Written Notice of all particulars in which this inspection reveals that the Work is incomplete or defective. The CONTRACTOR shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 14.10 Final Application for Payment: The CONTRACTOR may make application for final payment following the procedure for progress payments after the CONTRACTOR has completed all such corrections to the satisfaction of Owner's Representative and delivered the following documents: .1 Three (3) complete operating and maintenance manuals, each containing maintenance and operating instructions, schedules, guarantees, and other documentation required by the Contract Documents; .2 Record documents (as provided in paragraph 6.10); .3 Consent of surety, if any, to final payment. If surety is not provided, complete and legally effective releases or waivers (satisfactory to the OWNER) of all claims arising out of or filed in connection with the Work; 00700 04-2020 Page 38 General Conditions Exhibit "B" .4 Certificate evidencing that insurance required by the Supplemental General Conditions will remain in force after final payment and through any warranty period; .5 Non-Use of Asbestos Affidavit(After Construction); and .6 Any other documentation called for in the Contract Documents. 14.11 Final Payment and Acceptance: 14.11.1 If, on the basis of observation of the Work during construction, final inspection, and review of the final Application for Payment and accompanying documentation as required by the Contract Documents, Owner's Representative is satisfied that the Work has been completed and the CONTRACTOR's other obligations under the Contract Documents have been fulfilled, Owner's Representative will recommend the final Application for Payment and thereby notify the OWNER. If the OWNER agrees with the recommendation of the Owner's Representative, the OWNER will pay to the CONTRACTOR the balance due the CONTRACTOR under the terms of the Contract. 14.11.2 As Contract Time is measured to Final Completion, Owner's Representative will issue a letter of final acceptance to the CONTRACTOR which establishes the Final Completion date and initiates any warranty period. 14.11.3 Final payment is considered to have taken place when the CONTRACTOR or any of its representatives negotiates the OWNER's final payment check, whether labeled final or not, for cash or deposits check in any financial institution for its monetary return. 14.12 Waiver of Claims: The making and acceptance of final payment will constitute: .1 a waiver of claims by the OWNER against the CONTRACTOR, except claims arising from unsettled claims, from defective Work appearing after final inspection, from failure to comply with the Contract Documents or the terms of any warranty specified therein, or from the CONTRACTOR's continuing obligations under the Contract Documents; and .2 a waiver of all claims by the CONTRACTOR against the OWNER other than those previously made in writing and still unsettled. ARTICLE 15-SUSPENSION OF WORK AND TERMINATION 15.1 OWNER May Suspend Work Without Cause and for Convenience: At any time and without cause and for convenience, the OWNER may suspend the Work or any portion thereof for a period of not more than ninety(90)calendar days by written agreement or by Written Notice to the CONTRACTOR which will fix the date on which the Work will be resumed. The CONTRACTOR shall resume the Work on the date so fixed. The CONTRACTOR may be allowed an adjustment in the Contract Amount or an extension of the Contract Times,or both,directly attributable to any such suspension if the CONTRACTOR makes an approved Claim therefor as provided in Article 11 and Article 12. 15.2 OWNER May Terminate Without Cause: Upon seven (7)calendar days'Written Notice to the CONTRACTOR, the OWNER may, without cause and without prejudice to any right or remedy of the OWNER, elect to terminate the Agreement. In such case, the CONTRACTOR shall be paid (without duplication of any items): .1 for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination; 00700 04-2020 Page 39 General Conditions Exhibit "B" .2 for all claims incurred in settlement of terminated contracts with Suppliers, Subcontractors, and others. The CONTRACTOR agrees to negotiate in good faith with Subcontractors, Suppliers and others to mitigate the OWNER's cost CONTRACTOR shall include in any subcontract or purchase order language that provides that if the Agreement is terminated without cause, the Subcontractor and Suppliers will only be paid for work performed or materials and equipment supplied and shall not have any other claims against CONTRACTOR or OWNER; CONTRACTOR shall not be paid for any profit or overhead for Work not completed. 15.3 OWNER May Terminate With Cause: 15.3.1 Upon the occurrence of any one or more of the following events: .1 if the CONTRACTOR persistently fails to perform the Work in accordance with the Contract Documents; .2 if the CONTRACTOR disregards laws or regulations of any public body having jurisdiction; .3 if the CONTRACTOR disregards the authority of Owner's Representative; .4 if the CONTRACTOR makes fraudulent statements; .5 if the CONTRACTOR fails to maintain a work force adequate to accomplish the Work within the Contract Time; .6 if the CONTRACTOR fails to make adequate progress and endangers successful completion of the Contract; or .7 if the CONTRACTOR otherwise violates any provisions of the Contract Documents; The OWNER may, after giving the CONTRACTOR (and the surety, if any) seven (7) calendar days'Written Notice terminate the services of the CONTRACTOR. The OWNER, at its option, may proceed with negotiation with surety for completion of the Work. Alternatively,the OWNER may under these circumstances exclude the CONTRACTOR from the site and take possession of the Work (without liability to the CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the site or for which the OWNER has paid the CONTRACTOR but which are stored elsewhere, and finish the Work as the OWNER may deem expedient. In such case the CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Amount exceeds all claims, costs, losses and damages sustained by the OWNER arising out of or resulting from completing the Work, such excess will be paid to the CONTRACTOR. If such claims, costs, losses and damage exceed such unpaid balance, the CONTRACTOR or surety shall pay the difference to the OWNER. 15.3.2 Where the CONTRACTOR's services have been so terminated by the OWNER, the termination will not affect any rights or remedies of the OWNER against the CONTRACTOR and surety then existing or which may thereafter accrue. Any retention or payment of amounts due the CONTRACTOR by the OWNER will not release the CONTRACTOR from liability. In the event the OWNER terminates the Contract with cause, the OWNER may reject any and all bids submitted by the CONTRACTOR for up to three(3)years. 00700 04-2020 Page 40 General Conditions Exhibit "B" 15.4 CONTRACTOR May Stop Work or Terminate: If through no act or fault of the CONTRACTOR,the Work is suspended for a period of more than ninety(90)calendar days by the OWNER or under an order of court or other public authority, or (except during disputes) Owner's Representative fails to forward for processing any mutually acceptable Application for Payment within thirty (30) calendar days after it is submitted, or(except during disputes)the OWNER fails for sixty (60)calendar days after it is submitted to pay the CONTRACTOR any sum finally determined by the OWNER to be due, then the CONTRACTOR may, upon seven (7)calendar days'Written Notice to the OWNER,and provided the OWNER does not remedy such suspension or failure within that time, terminate the Agreement and recover from the OWNER payment on the same terms as provided in paragraph 15.2. In lieu of terminating the Agreement and without prejudice to any other right or remedy, if(except during disputes) Owner's Representative has failed to forward for processing any mutually acceptable Application for Payment within thirty(30)calendar days after it is submitted, or (except during disputes) the OWNER has failed for sixty (60) calendar days after it is submitted to pay the CONTRACTOR any sum finally determined by the OWNER to be due, the CONTRACTOR may upon seven (7) calendar days' Written Notice to the OWNER stop the Work until payment of all such amounts due the CONTRACTOR, including interest thereon. The provisions of this paragraph 15.4 are not intended to preclude the CONTRACTOR from making a Claim under Article 11 and Article 12 for an increase in Contract Amount or Contract Times or otherwise for expenses or damage directly attributable to the CONTRACTOR's stopping Work as permitted by this paragraph. ARTICLE 16-DISPUTE RESOLUTION 16.1 Filing of Claims: 16.1.1 Claims arising from the circumstances identified in paragraphs 3.2, 4.1, 4.2.2, 4.2.4, 6.4.2, 6.11.5.2, 6.17, 7.5, 8.6, 9.5, 10.4.2, 13.8, 15.1, 15.2, 15.3, or 15.4, or other occurrences or events, shall be made by Written Notice delivered by the party making the Claim to the other party within thirty (30) calendar days after the start of the occurrence or event giving rise to the Claim and stating the general nature of the Claim. Notice of the amount of the Claim with supporting data shall be delivered within thirty (30) calendar days after Written Notice of Claim is delivered by claimant and shall represent that the adjustment claimed covers all known amounts to which claimant is entitled. 16.1.2 Within thirty(30)calendar days of receipt of notice of the amount of the Claim with supporting data, Owner's Representative and the CONTRACTOR shall meet to discuss the Claim, after which an offer of settlement or notification of no settlement offer will be made to claimant. If claimant is not satisfied with the proposal presented, claimant shall have thirty (30) calendar days in which to: .1 submit additional supporting data requested by the other party; .2 modify the initial Claim; or .3 request Alternative Dispute Resolution. 16.2 Alternative Dispute Resolution: 16.2.1 If a dispute exists concerning a Claim, the parties agree to use the following procedure prior to pursuing any other available remedies. The OWNER reserves the right to include E/A as a party. 16.2.2 Negotiating with Previously Uninvolved Personnel: Either party may make a written request for a meeting to be held between representatives of each party within fourteen (14) calendar days of the request or such later period that the parties may agree to. Each party shall endeavor to include, at a minimum, one (1) previously uninvolved senior level decision maker empowered to negotiate on behalf of their organization. The purpose of this and subsequent meetings will be good faith negotiations of the matters constituting the dispute. Negotiations shall be concluded within thirty(30)calendar days of the first meeting, unless mutually agreed otherwise. This step may 00700 04-2020 Page 41 General Conditions Exhibit "B" be waived by written agreement of both parties, in which event the parties may proceed directly to mediation as described below. 16.2.3 Mediation: 16.2.3.1 If the procedure described in paragraph 16.2.2 proves unsuccessful or is waived pursuant to its terms, the parties shall initiate the mediation process. The parties agree to select within thirty (30) calendar days one (1) mediator trained in mediation skills, to assist with resolution of the dispute. The OWNER and the CONTRACTOR agree to act in good faith in the selection of the mediator and to give consideration to qualified individuals nominated to act as mediator. Nothing in this agreement prevents the parties from relying on the skills of a person who also is trained in the subject matter of the dispute and/or a contract interpretation expert. 16.2.3.2 Mediation is a forum in which an impartial person, the mediator, facilitates communication between parties to promote reconciliation, settlement, or understanding among them. The parties hereby agree that mediation, at a minimum, shall provide for 1)conducting an on-site investigation, if appropriate, by the mediator for fact-gathering purposes, 2) a meeting of all parties for the exchange of points of view and 3) separate meetings between the mediator and each party to the dispute for the formulation of resolution alternatives. The parties agree to participate in mediation in good faith for up to thirty(30)calendar days from the date of the first mediation session, unless mutually agreed otherwise. Should the parties fail to reach a resolution of the dispute through mediation, then each party is released to pursue other remedies available to them. ARTICLE 17—RIGHT TO AUDIT 17.1 Right to Audit: Whenever the OWNER enters into any type of contractual arrangement with the CONTRACTOR, then the CONTRACTOR's "records" shall upon reasonable notice be open to inspection and subject to audit and/or reproduction during normal business working hours. The OWNER's representative, or an outside representative engaged by the OWNER, may perform such audits. The CONTRACTOR shall maintain all records relating to this Agreement for four (4) years from the date of final payment under this Agreement, or until pending litigation has been completely and fully resolved, whichever occurs later. 17.1.1 The OWNER shall have the exclusive right to examine the records of the CONTRACTOR. The term "records"as referred to herein shall include any and all information, materials and data of every kind and character, including without limitation records, books, papers, documents, contracts, schedules, commitments, arrangements, notes, daily diaries, reports, drawings, receipts, vouchers and memoranda, and any and all other agreements, sources of information and matters that may, in the OWNER's judgment, have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any contract document. Such records shall include (hard copy, as well as computer-readable data if it can be made available), written policies and procedures, time sheets, payroll registers, cancelled checks, personnel file data, correspondence, general ledger entries, and any other record in the CONTRACTOR's possession which may have a bearing on matters of interest to the OWNER in connection with the CONTRACTOR's dealings with the OWNER (all of the foregoing are hereinafter referred to as "records"). In addition,the CONTRACTOR shall permit interviews of employees as well as agents, representatives, vendors, subcontractors and other third parties paid by the CONTRACTOR to the extent necessary to adequately permit evaluation and verification of the following: a) The CONTRACTOR's compliance with contract requirements; b) The CONTRACTOR's compliance with the OWNER'S business ethics policies; and c) If necessary, the extent of the Work performed by the CONTRACTOR at the time of contract termination. 17.1.2 The CONTRACTOR shall require all payees(examples of payees include subcontractors, insurance agents, material suppliers, etc.) to comply with the provisions of this Article 17 by securing the requirements hereof in a 00700 04-2020 Page 42 General Conditions Exhibit "B" written agreement between the CONTRACTOR and payee. Such requirements include a flow-down right of audit provision in contracts with payees that also apply to subcontractors and sub-subcontractors, material suppliers, etc. The CONTRACTOR shall cooperate fully and shall require Related Parties and all of the CONTRACTOR's subcontractors to cooperate fully in furnishing or in making available to the OWNER from time to time whenever requested, in an expeditious manner, any and all such information, materials, and data. 17.1.3 The OWNER's authorized representative or designee shall have reasonable access to the CONTRACTOR's facilities, shall be allowed to interview all current or former employees to discuss matters pertinent to the performance of this Agreement, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with this Article 17. 17.1.4 If an audit inspection or examination in accordance with this Article 17 discloses overpricing or overcharges of any nature by the CONTRACTOR to the OWNER in excess of one-half of one percent(.5%) of the total contract billings, then the reasonable actual cost of the OWNER's audit shall be reimbursed to the OWNER by the CONTRACTOR. Any adjustments and/or payments,which must be made as a result of any such audit or inspection of the CONTRACTOR's invoices and/or records, shall be made within a reasonable amount of time (not to exceed 90 days)from presentation of the OWNER's findings to the CONTRACTOR. 17.1.5 The CONTRACTOR shall take reasonable actions to prevent any actions or conditions which could result in a conflict with the OWNER's best interests. These obligations shall apply to the activities of the CONTRACTOR's employees, agents, subcontractors, etc. in their dealings and relations with the OWNER's current and former employees and their relatives. For example,the CONTRACTOR's employees, agents or subcontractors should not make or provide to be made any employment, gifts, extravagant entertainment, payments, loans or other considerations to the OWNER's representatives, employees or their relatives. 17.1.6 It is also understood and agreed by the CONTRACTOR that any solicitation of gifts or any other item of value by anyone representing the OWNER is to be reported within two (2) business working days to the OWNER at the following telephone number: 512-218-5401. Failure to report any such solicitations or offers shall be deemed a material breach of contract entitling the OWNER to pursue damages resulting from the failure to comply with this provision. ARTICLE 18—MISCELLANEOUS 18.1 Venue: In the event of any suit at law or in equity involving the Contract, venue shall be in Williamson County, Texas and the laws of the state of Texas shall apply to Contract interpretation and enforcement. 18.2 Extent of Agreement: This Contract represents the entire and integrated agreement between the OWNER and the CONTRACTOR and supersedes all prior negotiations, representations or agreements, either written or oral. 18.3 Cumulative Remedies: The rights and remedies available to the parties are not to be construed in any way as a limitation of any rights and remedies available to any or all of them which are otherwise imposed or available by laws or regulations, by special warranty or guarantees or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply. 00700 04-2020 Page 43 General Conditions Exhibit "B" 18.4 Severability: If any word, phrase, clause, sentence or provision of the Contract, or the application of same to any person or set of circumstances is for any reason held to be unconstitutional, invalid or unenforceable, that finding shall only effect such word, phrase, clause, sentence or provision, and such finding shall not effect the remaining portions of this Contract; this being the intent of the parties in entering into the Contract; and all provisions of the Contract are declared to be severable for this purpose. 18.5 Independent Contractor The Contract shall not be construed as creating an employer/employee relationship,a partnership,or a joint venture. The CONTRACTOR's services shall be those of an independent contractor. The CONTRACTOR agrees and understands that the Contract does not grant any rights or privileges established for employees of the OWNER. 18.6 Prohibition of Gratuities The OWNER may, by Written Notice to the CONTRACTOR, terminate the Contract without liability if is determined by the OWNER that gratuities were offered or given by the CONTRACTOR or any agent or representative of the CONTRACTOR to any officer or employee of the OWNER with a view toward securing the Contract or securing favorable treatment with respect to the awarding or amending or the making of any determinations with respect to the performing of such Contract. In the event the Contract is terminated by the OWNER pursuant to this provision, the OWNER shall be entitled, in addition to any other rights and remedies, to recover or withhold the amount of the cost incurred by the CONTRACTOR in providing such gratuities. 18.7 Prohibition Against Personal Interest in Contracts No officer, employee, independent consultant, or elected official of the OWNER who is involved in the development, evaluation, or decision-making process of the performance of any solicitation shall have a financial interest, direct or indirect, in the Contract resulting from that solicitation. Any violation of this provision, with the knowledge, expressed or implied, of the CONTRACTOR shall render the Contract voidable by the OWNER. End of General Conditions 00700 04-2020 Page 44 General Conditions