Loading...
Contract - Prota, Inc - 5/12/2022 CITY OF ROUND ROCK UTILITIES AND ENVIRONMENTAL SERVICES �µ ProjectROUND ROCK TEXA5 Water Treatment Plant Pressure Control Valves February 2 Prepared By: 7 Allen Woelke, P.F. i R N Vice President CDMSmith„ Inc. & Mp(?Y�RYYb�,kyRyy...N{N{/N/Nq.�.,.yN�YNCbNb�yY*b 9430 Research Blvd b .. Y .bYNNN. APPROVED BY ST Suite 1-2.00 ; c543ea� C1 T�"-.III JN Ek Austin, TX 75759 SrQNA (512) 346-1100 14- LS022— 4 rr "N"M31'E Firm Re#;istratiar� Na F-3043 No Text Water Treatment Plant Pressure Control Valves TABLE OF CONTENTS SectionQ!Lse�rition No. of Pages 00020 Notice to Bidders I 00100 Instructions to Bidders 4 Exhibit A 1 00200 Bid Bond 5 00300 Bid Form 4 00410 Statement of Bidder's Safety Experience 8 00500 Agreement 5 Attachment A 1 00600 Insurance& Construction Bond Forms Performance & Payment Bond Instructions I Insurance Instructions 1 00610 Performance Bond 2 00620 Payment Bond 5 00650 Certificate of Liability Insurance 2 00700 General Conditions 44 00800 Supplemental General Conditions 1 00900 Special Conditions 5 01000 Technical Specifications 4 Attachment A 476 02000 Plans, Details and Notes I Included as a separate document. 8-20�6 COHIC11B 00090665 No Text 00020 NOTICE TO BIDDERS No Text NOTICE TO BIDDERS Pursuant to the provisions of Texas Government Code,Section 2269.101, it is the intention of the City of Round Rock to select a prime contractor by using the Competitive Bidding Method for the construction of the Water Treatment Plant Pressure Control Valves as generally described herein. Scaled bids addressed to Kaitlyn Saucedo,City of Round Rock, Utilities & Environmental Services, 3400 Sunrise Road,Round Rock, TX 78665, for furnishing all labor, material, and equipment and performing all work required for the project titled, Water Treatment Plant Pressure Control Valves (project includes the addition of two (2)pressure control valves,vaults, and associated piping to the City of Round Rock Water Treatment Plant,), will be received until March 10th, 2022, at 10 a.m., then publicly opened and read aloud at the same address. Bid envelopes shall state the date and time of bid and "Water Treatment Plant Pressure Control Valves." Bids must also be ace " included in Section 410 of the Project Manual.No bids may be withdrawn after the scheduled opening time. Any bids received after the scheduled bid opening time will be returned unopened. Bids must be submitted on City of Round Rock bid forms and must be accompanied by an acceptable bid security as outlined in the Instructions to Bidders, payable to the City of Round Rock,Texas, equal to five percent (5°,'O)of the total bid amount, Plans, Bid Forms, Specifications, and Instructions to Bidders may be obtained at roundrocktexa, gov/solicitatio s. Bidders shall be responsible for printing or obtaining prints of the aforementioned documents as necessary. For questions, please contact the City's Project Manager, Kaitlyn Saucedo, 512-21 -'7076. In case of ambiguity,duplication,or obscurity in the bids,the City of Round Rock reserves the right to construe the meaning thereof, The City of Round Rock further reserves the right to reject any or all bids and to waive any informalities and irregularities in the bids received. The successful bidder will be expected to execute the City of Round Rock's standard contract and to furnish performance and payment bonds, all as described in the bid documents. Contractors and subcontractors shall pay to laborers,workmen,and mechanics the prevailing wage rates as determined by the City of Round Rock, A non-mandatory Pre-Bid Conference will be held at 3400 Sunrise Road, Round Rock,Texas, on March 3rd, 2022, at 10 a.m. Publish Dates: Round Rock Leader: 2/24/2022 3/3/2022 PfluLyerville Pflag: 2/23/2022 3/112022 00020 0,2,0M Nwwc uw Bidders 0019309: Page I No Text 00100 INSTRUCTIONS TO BIDDERS No Text INSTRUCTIONS TO BIDDERS I Prior to submitting any bid, bidders are required to read all drawings (plans), specifications, and all other Project Manual and/or Contract Documents carefully; to inform themselves by their independent research, test and investigation of the difficulties to be encountered and judge for themselves of the accessibility of the Work and all attending circumstances affecting the cost of doing the Work and the time required for its completion and obtain all information required to make a bid.The aforementioned documents may only be obtained from the City's website at the following web address: round rocktexa"LID'ov/Sol iCitations. Bidders shall be responsible for printing or obtaining prints of the aforementioned documents as necessary. 2. Should the bidder find discrepancies in, or omissions from the drawings (plans), specifications,or other Project Manual and/or Contract Documents, or should he be in doubt as to their meaning, he should notify at once the City and obtain clarification or addendum prior to submitting any bid. Any addenda issued will be posted with the documents at the web address mentioned in I above no later than two business days prior tote Bid Opening Date. Prior to submitting a bid, the bidder is responsible for determining if any addenda have been issued and for following any instructions required in any addenda issued. 1 It shall be the responsibility of the bidder to see that his bid is received at the place and time named in the Notice to Bidders in the Project Manual. Bids received after the scheduled opening time will be returned unopened, 4. Bids shall be submitted in scaled envelopes plainly marked "Scaled Bid" and showing the name of the project, the job number if applicable, and the opening date and time. S. Bidders shall be responsible for submitting a copy of the City's Bid Form, Bid and Form, and Statement of Bidder's Safety Experience from the Project Manual documents posted at the web address as described in I above. 6. Bids shall be accompanied by a bid security consisting of a certified cashier's check in an amount not less than five percent (51/°�) of the total maximum bid price, payable without recourse to the City of Round Rock, or a bid bond in the same amount from a reliable surety company, as a guarantee that the bidder will enter into a contract and execute performance and payment bonds,as stipulated by item 16 below,within ten(10)days after notice of award of contract to him. Bid securities must be submitted in the same scaled envelope with the bid. Bids submitted without a bid security may not be considered at the sole discretion of the City. Page I 00 100 1"2021 00426497 7. If awarded the bid, bidder must submit Form 1295 on the Texas Ethics Commission (TEC)Website at httns://www.ethics.state.tx.us/whatsnew/elf info for 19 .htm and submit the signed Form 1295 to the City Clerk atwhiitee( ',,rouE&Qghj xas. ov within ten(10) business days of notification of the award. Instructions for completing a Form 1295 are attached as Exhibit"A"to the Instructions to Bidders. 8. No conditional bids will be accepted. 9. A bidder wishing to withdraw his submitted sealed bid prior to the scheduled bid opening time must do so by presenting in person a written request signed by an authorized representative of the bidder to a City employee at the location for which sealed bids are to be addressed. No telephone, facsimile, or email requests will be accepted. The City will expend the time and effort that the City in its sole discretion determines is necessary to investigate the authenticity of a request before complying with a request. The City shall in its sole discretion determine if the City will comply with a request and the City shall not be held liable for not complying with a request. If the City does not comply with a request, the request shall automatically become null and void, 10. A bidder wishing to revise his sealed bid after submittal but before the scheduled bid opening time must first withdraw his bid as provided for in the Instructions to Bidders and then submit a sealed bid in accordance with the Instructions to Bidders. No revisions to a bid will be allowed after the scheduled bid opening time. The bidder shall be responsible for ensuring the amount of the bid security is as specified in the Instructions to Bidders. 11. All bid securities will be returned to the respective bidders within twenty-five(25)days after bids are opened, except those which the City elects to hold until the successful bidder has executed the Agreement. Thereafter, all remaining securities, including security of the successful bidder, will be returned within sixty (60)days. 12. Until the award of the contract, the City reserves the right to reject any and all bids and to waive technicalities; to advertise for new bids; or to do the work otherwise when the best interest of the City will be thereby promoted. 13. In case of ambiguity or lack of clarity in the statement of prices in the bids,the City reserves the right to consider the most favorable analysis thereof, or to reject the bid. Unreasonable and/or unbalanced prices submitted in a bid may result in rejection of such bid or other bids. 14. Award of the contract, if awarded, will be made based upon the criteria set forth in Section 2269.055 of the Texas Government Code. In determining the award of a contract under Chapter 2269, the City may consider; 1) the price; 2) the bidder's experience; 3)the quality of the bidder's goods or services;4)the impact on the ability of the City to comply with rules relating to historically underutilized business; 5) the bidder's safety record; 6) the bidder's proposed personnel;7)whether the bidder's financial capability is appropriate to the size and scope of the project;and 8)any other relevant factor specifically listed in the request for bids. Page 2 00100 2.21721 Instructions to Bidders 00426487 15. Award of the contract, if awarded, will be made within sixty (60) days after opening of the bids, and no bidder may withdraw his bid within said sixty (60)day period of time unless a prior award is made. A Notice to Proceed will be issued within sixty(60) days after contract Execution Date as defined in the General Conditions, 16. Within ten (10)days after written notification of award of the contract, the successful bidder must furnish a performance bond and a payment bond in the amount of one hundred percent (100"/"�) of the total Contract Amount. Said performance bond and payment bond shall be from an approved surety company holding a pcn-nit from the State of Texas, indicating it is authorized and admitted to write surety bonds in this state. In the event the bond exceeds $100,000.00, the surety must also (1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or(2) have obtained reinsurance for any liability in excess of$100,000.00 from a reinsurer that is authorized and admitted as a reinsurer in this state and is the holder of a certificate of authority frorn the United States secretary of the treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. In detennining whether the surety or reinsurer holds a valid certificate of authority, the City may rely on the list of companies holding certificates of authority as published in the Federal Register covering the date oil which the bond is to be executed, 17. Failure to execute the Agreement within ten (10) days of written notification of award or failure to furnish the performance bond and payment bond as required by item 15 above, shall be just cause for the annulment of the award. In case of annulment of the award, the bid security shall become the property of the City, not as a penalty, but as liquidated damages. 18. No contract shall be binding upon the City until it has been signed by its Mayor after having been duly authorized to do so by the City Council, 19, The Contractor shall not commence Work under the Agreement until he has furnished certification of all insurance required and such has been approved by the City, nor shall the Contractor allow any Subcontractor to commence work oil his subcontract until proof of all similar insurance that is required of the subcontractor has been furnished and approved. The Contractor's insurer shall use the certificate of insurance form included in the bid documents or the standard ACORD form. 20. If the bidder's insurance company is authorized, pursuant to its agreement with bidder, to arrange for the replacement of a loss, rather than by making a cash payment directly to the City, the insurance company must furnish or have furnished by bidder, a performance bond in accordance with Section 2253.02 1(b), Texas Government Code, and a payment bond in accordance with Section 2253.021(c). 21. Any quantities given in any portion of the Bid Documents, including the drawings (plans), are estimates only, and the actual amount of work required may differ somewhat from the Page 3 00400 2-202 d Instructions to Badders 00420487 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS,That the ZURICH AMERICAN INSURANCE COMPANY,a corporation of the State of New York,the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the Stare of lllinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois(heroin collectively called the"Companies"),by Robert D.Murray. Vice President,in pursuance of authority granted by Article V,Section 8,of the By Laws of said Companies,which arc set forth on the reverse side hercofand arc hereby certified to be in full farce and effect on the date hereof,do hereby nominate,constitute,and appoint Peter PINCOFFS,Barbara A. SHAMARD,Chris BR.ANDT, Rob BRIDGES,John S. BURNS, Jr.,George S. SYKES,JR.,Todd DAVIS and Christina SCOTT,of Austin,Texas,its Iruc and lawful agent and Attorney-in-Fact. to make, execute,seal and deliver,for, and on its behalf as surety,and as its act and deed: any and all bonds and undertakings,and the execution of such bonds or undertakings in pursuance of these presents,shall be as binding upon said Companies,as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York, the regularly elected offccrs of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills,Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mitts, Marytand.,in their own proper persons.The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V.Section 8,of the By Laws of said Companies and is now in force. IN WITNESS WHEREOF, the said Vice-President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY,COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,and FIDELITY AND DEPOSIT COMPANY OF MARYLAND,this 19th day of August A D 2020 ATTEST: ZURICH ANIERICAN INSURANCE COMPANY COLONIAL AM1IERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND 1}1: PCobert D.Murray Vice President vy e BY: Liavvn B.BroWn Secreiar.v State of Maryland County of Bald"Were On this 19th day of August. 2020.before the subscirlicr,a Ncaary Public of the State of Maryland,duly commissioned and qualified,Robert D. Murroy,Vice President and Down E.Brown,Secretary of the Companiesto me personally known to be the individuals and officers described in and who executed the procdrrig rnstromort,and acknowledged the execution of same.and being,by me duly swom,deposedt and saiih,that he she is the said olficcrof the Company aforesaid,and that the seals affixed to the preceding instrument arc the Corporate Seals of said Companies,and that the said Corporate Seals and the signature as such olToccr were duly affixed and subscribed to the said nsstrurnent by the authority and dtrccuon or the said Corporations. IN TFSTIMONY Wilf REOF,i have hereunto set my hand and affixed my Official Seal the day and year first above wnuen •191YYft yyut�m%��w",ypr�d / c,e4 ' =rt.„, CorssianceA.Dunn,Notary Public "'AI;i%isrv.�` My Commission Expires:July 9,202,1 elrearaN"`' Residen ge t of Surety� Signarmu 'Ir Barbara Sharnard Printed Name Street Address /G,» City,State,Zip 00200 4-2020 Nd Bond 00443,638 BID BOND THE STATE OF TEXAS § KNOW ALL BY THESE PRESENTS; COUNTY OF WILLIAMSON § That Prota,Inc. of the City of .. Austin County of Trot State of TQM as Principal, and Fidelity and De"it Company of Maryland authorized under the laws of the State of Texas to act as surety on bonds for principals,are held and firmly bound unto the CITY OF ROUND RUCK,TEXAS("Owner"), in the penal sum of Five Percent(5%)of the total amount of the Bid of the Principal submitted to the Owner, for the Work described below;for the payment whereof,well and truly to be made,and the said Principal and Surety do herby bind themselves and their heirs, administrators, executors, successors and assigns, jointly and severally,as follows: In no case shall the liability of the Surety hereunder exceed the sum of( ten i.er m of";,reatest amount bid .Dollars IS t0 ..... . ..........: THE CONDITIONS OF THIS OBLIGATION ARE SUCH that,whereas,the Principal has submitted the above-referenced Bid to the Owner, for construction of the Work under the "Specifications for Construction of Water Treatment Plant Pressure Control Valves for which Bids are....to. .. ...,be opened at the office of Owner on the . _II)th ® daa y of March 20 22 � NOW,THEREFORE,if the Principal is awarded the Contract,and within the time and manner required under the"Instructions to Bidders,"after the prescribed forms arc presented to her/him for signature,enters into a written Agreement substantially in the form contained in the Bid Documents,in accordance with the Bid,and files the two(2)bonds with the Owner,one to guarantee faithful performance and the other to guarantee payment for labor and materials,then this obligation shall be null and void;otherwise,it shall be and remain in full force and effect. If, however,Pnncipal fails to enter into a written Agreement with the Owner in accordance with the Bid or Principal and Surety fail to timely deliver to Owner the performance and payment bonds required by the Bid Documents,Surety within five(5)business days after receipt of written demand from Owner shall pay to Owner the full penal sum of this Bid Bond,subject to the limitation described herein. In the event that suit is brought upon this Bond by the Owner and judgment is recovered,said Surety shall pay all costs incurred by the Owner in such suit,including a reasonable attorney's fee to be fixed by the Court. IN WITNESS WHEREOF, the said Principal and Surety have signed this instrument on this the day of the month of M&Ch 202. Fideiilp aru3 OpPo5i1 Comm«iny_af Mrylande Pri ipaI Surety M� „ f Printe Prints By. By. Titley Title: N.. r Address' 4805 s Road Address 3WO E Palm Vail Blvd 5te..3... Austink TX 78665 TX 78734 Round Rock 002004 2020 Pap:w Bid Hovid 00443638 00200 BID BOND No Text 15, Award of the contract, if awarded, will be made within sixty (60) days after opening of the bids, and no bidder may withdraw his bid within said sixty (60)day period of time unless a prior award is made, A Notice to Proceed will be issued within sixty (60)days after contract Execution Date as defined in the General Conditions. 16. Within ten(10)days after written notification of award of the contract, the successful bidder must furnish a performance bond and a payment bond in the amount of one hundred percent (1000,"o) of the total Contract Amount, Said perfon-nance bond and payment bond shall be from an approved surety company holding a pen-nit from the State of Texas, indicating it is authorized and admitted to write surety bonds in this state. In the event the bond exceeds $100,000.00, the surety must also (1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or(2)have obtained reinsurance for any liability in excess of$100,000.00 from a reinsurer that is authorized and admitted as a reinsurer in this state and is the holder of a certificate of authority from the United States secretary of tire treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. In determining whether the surety or reinsurer holds a valid certificate of authority, the City may rely on the list of companies holding certificates of authority as published in the Federal Register covering the date on which the bond is to be executed. 17. Failure to execute the Agreement within ten (10) days of written notification of award or failure to furnish the performance bond and payment bond as required by item 15 above, shall be just cause for the annulment of the award. In case of annulmentof the award,the bid security shall become the property of the City, not as a penalty, but as liquidated damages. I& No contract shall be binding upon the City until it has been signed by its Mayor after having been duly authorized to do so by the City Council. 19. The Contractor shall riot commence Work Linder the Agreement until he has furnished certification of all insurance required and such has been approved by the City, nor shall the Contractor allow any Subcontractor to commence work on his subcontract until proof of all similar insurance that is required of the subcontractor has been furnished and approved. The Contractor's insurer shall use the certificate of insurance form included in the bid docurnents or the standard ACORD form. 20. If the bidder's insurance company is authorized, pursuant to its agreement with bidder, to arrange for the replacement of a loss, rather than by making a cash payment directly to the City, the insurance company must furnish or have furnished by bidder, a performance bond in accordance with Section 2253.02 1(b), Texas Government Code, and a payment bond in accordance with Section 2253.021(c). 21. Any quantities given in any portion of the Bid Documents, including the drawings (plans), are estimates only, and the actual amount of work required may differ somewhat from the Page 3 001 W 2-2021 Instnictions to Bidders 00426487 estimates. The basis for payment shall be the actual amount of work done and/or material furnished as specified in the General Conditions. 22, Bids shall be submitted on a separated contract basis. No Texas sales tax shall be included in the prices bid for materials consumed or incorporated into the Work.This contract is issued by an organization which is qualified for exemption pursuant to the provisions of Section 151.309(5) of the Texas Tax Code. The City will issue an exemption certificate to the Contractor. The Contractor must then issue a resale certificate to the material supplier for materials purchased. The Contractor must have a valid sales tax permit in order to issue a resale certificate. Upon obtaining consumable materials, the Contractor will issue a resale certificate in lieu of payment of sales tax,and the following conditions shall be observed; 1) The Contractor will transfer title of consumable, but not incorporated, materials to the City at the time and point of receipt by the Contractor; 2) The Contractor will be paid for these consumable materials by the City as soon as practicable.Payment will not be made directly but considered subsidiary to the pertinent bid item. The Contractor's monthly estimate will state that the estimate includes consumables that were received during the month covered by the estimate;and 3) The designated representative of the City must be notified as soon as possible of the receipt of these materials so that an inspection can be made by the representative.Where practical, the materials will be labeled as the property of the City. 23. The Contractor, after execution of the contract and pursuant to Internal Revenue Service (IRS) regulations, shall furnish its Taxpayer Identification Number (TIN) to the City. The Contractor shall provide the appropriate information on a W-9 form (which can be provided by the City upon request). This form shall be submitted directly to the City's Accounts Payable Department to ensure security of the information. 24. If the Bid Form includes Add and/or Deduct Alternate bid items and/or otherwise provides for Alternate bids, the City will determine whether to select or not select one or more of the Add and/or Deduct Alternate bid items and/or Alternate bids at the City's sole discretion and for its greatest advantage. If the City selects any Add and/or Deduct Alternate bid items, the total bid amount will be determined by adding the amount of the selected Add Altemate(s) to, and deducting the amount of the selected Deduct Alternate(s) from the Base Bid or the selected Alternate bid. Page 4 00100 2-2021 Instructions to Bidders 00426487 EXHIBIT 66A99 FORM 1295 INSTRUCTIONS Pursuant to Section 2252.90 of the Texas Government Code, as of January 1,2016, any business entity entering into a contract with a local government that requires approval of the governing body must submit a disclosure of interested parties (Form 1295) to the local government prior to the execution of the contract. The Texas Ethics Commission (TEC) has created an electronic filing application for business entities to submit the required information and generate the required fon-n. The City of Round Rock may not enter into a contract that requires the approval of the City Council until the business entity files a For 1295 with the City Clerk. Please follow the instructions below to file your Form 1295 with the TEC and the City of Round Rock: • Upon being notified of bid award,the award recipient("business entity")must go to the following websitc: htt,lis:y',,'wwwl,lclthilcls.stlalt,el.ltx,u,s,"filillillrlig,li,qR ,,P2,Siatid follow the login instructions on the website application to complete a Form 1295, ✓ If this is a business entity's first time logging on to the website application,the business entity must create a Username and Password and then follow the application's instructions to complete a Form 1295, V The City does not have a Contract ID Number System. Please insert 000000 and the 2EQj�gct name. in this box. Do not put the resolution number of the initial agreement if this is a supplemental agreement-only put the project name. v" Even if a business entity has no interested parties, Form 1295 still must be completed using the website application and filed with the City Clerk. Please note that therc are very few instances that a business will not havc an interested artics, Visit theTEC's,F � definition of an interested party. y---------- �,p ,agg,for the If a business is publicly traded,they are exempt from having to complete a Form 1295. Please e-mail the City Clerk stating such. • The business entity MUST print and sign the completed Form 1295 once it has been accepted by the TEC and no longer has DRAFTstamped on it, V The signed Form 1295 must be scanned and e-mailed directly to the City Clerk at tpspinks(a roundrocktexasy,,rav as soon as it is completed. DO NOT send the form back to the Purchasing Department, Project Manager, or mail it with signed original agreements/contracts. The City Clerk only has 30 days from receipt to acknowledge the form in the TEC system. If you do not return it to the City Clerk promptly,and the 30 days has expired when she receives it, you WILL have to complete another one. A new Form 1295 is required for each contract a business entity enters into with the City of Round Rock, including Supplementais, Amendments,and Change Orders, A Form 1295 cannot be handwritten It must be completed electronically through the TEC website application If you have any questions regarding the process of filing Fenn 1295 with the City,please contact: Meagan Spinks,City Clerk Phone: (512)218-6644 E mail-, u�iispiruks,L�;rotin(li�ocktcxas,,,aov If you have questions regarding the actual form or the online filing application,please visit the T ECs FAQ page: http,.,,-,,;'%vw%v eth ic s,state.I x.us�resource sf, A s.1. _Lgra[p!,Z�pjjp Q Remsed W/27 2021 M,Spnks Page t of t No Text a ZURICH Texas Important Notice IMPORTANT NOTICE AVISO IMPORTANTE To obtain information or make a complaint: Para obtener informaci6n o pars presentar una quee: You may call Zurich Norlh America's toll-free telephone Usted puede liamar at n6mero,do tel6fono gratuito do number for Information or to make a complaint at: Zurich North America's para obtener informacl6n o para 1-800-382-2150 pre tar una queja at: 1-800-382-2150 You may contact the Texas Department of Insurance to obtain information on companies,coverages,rights,or listed puede comun`carse con el Departamento do So- complaints at: guros do Texas Para obtener Informacl6n sobre com- 1-800-252-3439 pahlas,robe urns,derechos,o quejas al: 1-800-252-3439 You may write the Texas Department of Insurance: list ed puede escribir at Departamento P.O. Box 149104 do Seguros de Texas a: Austin,TX 78714-9104 P.O. Box 149104 Fax: (512)490-1007 Austin,TX 78714-9104 Web: www.tdi.texas gov Fax:(612)490-1007 E-mail:ConsumerProtection@tdi.texas,gov Sitio web: www.tdi.texas.gov E-mail: ConsumerProtecfion@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or DISPUTAS POR PRIMAS DE SEGUROS 0 about a claim, you should contact the company first. If RECLAMACIONES: the dispute is not resolved,you may contact the Texas Si tiene una dispute relacionada con su prima de saguro Department of Insurance, o con una reclarnaci6n, usted dabs comunicarse con la comparlia primero. Si la disputa no as resuella, usted ATTACH THIS NOTICE TO YOUR POLICY: puede comunicarse con at Departamento de Seguros de This notice is for information only and does not become Texas. a part or condition of the attached document ADJUNTE ESTE AVISO A SU P6LIZA: Este aviso es, solament e para prop6sitos informativos y no se con - vierte an parts o en condicl6n,del documento adjunto. U-GU-296-E(06115) Page I of 9 No Text 00300 BID FORM No Text DID-LUM Round Rock Water Treatment Plant Improvements-Pressure Control Globe PROJECT NAME: Valves PROJECT LOCAT`ION: Round Rock,Texas O%WER: City of Round Rock,Texas DATE: Gentlemen: Pursuant to the foregoing Notice to Bidders and Instructions to Bidders, the undersigned bidder hereby proposes to do all the Work, to furnish all necessary superintendence, labor, machinery, equipment, tools, materials, insurance and miscellaneous items,to complete all the Work on which he bids as provided by the attached Bid Documents,and as shown on the plans for the construction of Round Rock Water Treatment Plant Improvements-Pressure Control Globe Valves and binds himself on acceptance of this bid to execute the Agreement and bond for completing said or within the time stated, for the following prices,to wit: Any addenda issued will be posted with the Project Manual and/or Contract Documents on the City's website at ni'll 1 1, 1 1 1 Al, !I' i 11:11,1�tion by the close of business on Prior to submitting a bid, the bidder is responsible for determining if any addenda have been issued and for following any instructions in any addenda issued. Bidder acknowledges receipt of the following Addenda by listing Addendum"number"and"date", 01 _ March 8,2022 Bid Approx. to Description Item Rtit it rind Written Unit Price it Price Amount Bonding, Insurance,Mobilization, and Demobilization. Move-in related expenses not to exceed 51`0 of total bid, complete in place per La for dollars and,_Zg" cents. 19 142-oo '79,142.00 00300-9-20B5 Pe8e I of 3 Bid Forin BASE BID Bid Approx. .Item Description Item f uantit Unit and'Written Unit Price Unit Price Amount 2. M LE Trench Safety Plan and Implementation,as required for all excavations deeper than five feet, complete in place as detailed and specified. complete in place per LF for dollars and__ ­_-­cents. i A4.,O oo 2 I5 Pressure Control Globe Valves (Cla•Val)and associated erasion control,tree protection,trench safety plan,trenching,valve vaults,gate valves,blowoff valves, piping,fittings,FCAs, restraints,tapping sleeves and valves,electrical,instrumentation, controls,connections,testing, disinfection,grading,paving,sod, landscape restoration,repair of all damaged existing facilities and utilities,driveway repair,and appurtenances required to complete the scope of work as defined in the bid documents. in Tete in i er Lam", fo� � a.tnz ,r ,��i�c4-ydol.airs°CG ands °vc. cents. { «a0 t 00300-9-20B Page 2 of 3 Bid Form RAMM& Bid Approx. Item Description Item.—22—anti( —Unit Ind Written Unit Price it Price Amount 4 1 Control Panels USA Inc. controls programming and installation as detailed and specified. Contractor to include any profit and overhead for this line item with other bid items. J6LC.4AC092M$=1ctein lace per Lj for A44.3 3 0,dollars and 0 cents. $ 8433000 $ 84330-00 La Allowance to be used for additional site improvements, landscaping and miscellaneous modifications,only if approved by Owner. complete in place per La 25,000 dollars and y 0 cents, $ 2500000 $ 25000.00 010300-9-201kS Page 3 of 3 Bid Form TOTAL BASE BID(Items 1 thru 5 Materials; 544,2xo.oo All Other Charges: * Total: *Note:This total must be the same amount as shown above for"Total Base Bid" If this bid is accepted,the undersigned agrees to execute the Agreement and provide necessary bonds and insurance certification as per the Instructions to Bidders. The undersigned certifies that the bid prices contained in the bid have been carefully checked and are submitted as correct and final The Owner reserves the right to reject any or all bids and may waive any informalities or technicalities. Jespc ally Submi P.Q.Box 342495ure _Mich 1e Bar Austin,TX 78734 Print Name Address CEO $42.535-2555 Title Telephone Prota,Inc. Name of Firm / 3/912022 Date Secretary, if Bidder is a Corporation 00200-9-2015 Page l of 1 Bid Form 00410 STATEMENT OF BIDDER'S SAFETY EXPERIENCE Page 1 00,410,8.2014 Simemew of Bidder's Safety Expenence 00090654 No Text ntract Statement of Bidder's Safety Experience Section 00410 Bidder must submit a signed Statement of Bidder's Safety Experience form with his Bid; failure to do so will constitute an incomplete Bid that may be rejected. In order to make a responsive Bid, Bidder must provide evidence that it meets minimum OSHA construction safety program requirements, has not been fined by OSHA for any willful safety violations in the past three years, and has a lost time injury rate that doesn't exceed the limits established below. All questions must be answered and data given must be clear and comprehensive, If necessary, questions may be answered on separate attached sheets. Company Name: Prota,Inc, Address: P.0, Box 342195,Austin,TX 78734 Phone: 512-535-2555 Completed by: Michelle Borg -Date: 3/9/2022 1. Does the company have a written construction Safety program? (RlYes [3 No 2. Does the company conduct construction safety inspections? Elyes []No 3. Does the company have an active construction safety-training program? OYes 0 No 4, Has the company been fined by OSHA for any willful safety violations in the post (3Yes EJ No three years? 5. Does the company have a lost time injury rate of 7.8 for SIC 15,or 7,6 for SIC 16, 0Yes 2 No or less over the past three years? Attach the company's OSHA 2001300 logs for the past three years. 6. Does the company or affected subcontractors have competent persons in the following Areas? A. Scaffolding [3 Yes No ON/A B. Excavation E)Yes No [)N/A C. Cranes [ Yes ONo El WA D� Electrical 8 Yes DNo 0 N/A E. Fall Protection [a Yes No []N'A F, Confined Spaces E5 Yes ®No [3 N/A I hereby certify that t above information is true and correct. Signature , Title Michelle Borg, CEO ........... Page 1 00410 8.2014 Statement of Bidder's Safen Expenence 00090654 fit fit fill oca It I Ills a NJ 0i 0 0 -�i�Vfl I fit Hit els RNMv a mom ANA Bid. 1011 POD Lo U. ... .................... n �9 0G n8 OSHA's Form 300A mw.o ) Year Summary of Work-Related Injuries and Illnesses bY Ful g .~M'S ID Maw ow Log OD Loa OW w Wnacam ft OQL�See 29 CFR Pad TWs c€ Cky A ToW number of TbW number of ToW numbcr of 1w number of dmft cases V.A 4M cas=withjob Other recordable zwzy fr5sm trms&rarresvictian zases 5 (A&, OR $ (c. y Tool number efdris rway TbWx;umbcr*fdarofJw from work 0 a%ry hare I Tof... {1}injuries 4 pniwninp [ I {6}Hming 3 , (2)Side ifincon a"owwwawy~grew re6pawy I toApig 20 of Cho yaw ftft�Ow VaWOO�JDY 00 INKS, a cv, o 0 Egli sig 0 �a Qp o all � . 1, 4 4 1 1, 4 4 � e Ilia .. 0 0 0 C3 0 w 0 fill I f1b jib aj till. LC �, to OSHA-s Form 301 pmtecU V*vxftervloW of empbyees to the eMM Injury and Illness Incident Report gP-La='0*-&r*m-00"'s bem"" a-4 heath peoses- 000speft-0 'INS 1107 aw Imam IMMew Rqwt is 0M of the fim form yoo must ED t when awork- related ;� t# €SS or 1 tap tt LheIegof am the Amtru aceompanymg stwwory,these forms help the car 15$ ANIM 0 employer p a picuum of the exwnt of WGFk4Cb1Cd madenm A t t 3 "Wdhm 7 cakndar days afiff you recerve 40 00.bi.4a®t® a budder vb* mformawa a recordable vmrk rchaed xqyMor t AlDrus has oomrred.you must EM out tho fwm or an or other reports may be acaqMthk Tobe conidered an equivaka form, aat 7 ribadrute murt the' a , 26ta for on this form doodOrd anvem lovda am elm, A=Ydkng t*Public Law 91-596 and 29 CM 1904,0SHNs rcomikeeping ndc,you MUSE keep tho form on Sk fbr 5 ycars IbRowing the year to which . t it If you Deed addidona ODPKS of a may Photocopy aw use as many as you Dec& sma 17) s "4rsb&- QW0.ftd by JkCL� Clark C3 Me Office Nl;ara Ecr rame 5j 2 15 Do. t lc} tt OSHA ' o, Year _L Surnrnary of Wbik-Related Injuries and Illnesses &jwnwypag%own w ° I'rola,I nc r 4&i I o;>Rd Bid,R. a PO Box 342195 1 nundw of Tow ymniber of munber off ) tdo Contracior `F 1 5 2 3} Q of _41'.5 i Toal number of ... (1)I 9 Po—inp lmufy dw I to the bmcfmy M Meating I ill a Ca eta IE: a a lilt lilt lilt lit qfti3 to«, 0 Q :1 1% �:o �.ro Minutes of Corporate Meeting of Board of Directors of Prntn Inr A meeting of the Board of Directors of the above-captioned Corporation was held on May 20, 2022 at the Corporate Office. There where present the following: Michelle Borg Cornelius Tamboer being all members of the Board of Directors. The meeting was called to order by Cornelius Tamboer, It was moved,seconded and unanimously resolved that Michelle Borg as Chief Executive Officer be authorized to sign on the behalf of the Corporation all contracts and documentation required for the City of Round Rock"Round Rock Water Treatment Plant Improvements-Pressure Control Globe Valves"project.There being no other business to come before the meeting it was adjourned upon a motion duty made,seconded and unanimously carried. Secretary Attest: B+Ertl of Directors I hereby certify that this document is one of the two originals(The other being kept in the Corporate Record Book).The sole purpose of the document is the authorization of Michelle Borg to sign on behalf of the corporation the mentioned documentation. Cornelius"I"amboer° Secretary May 20,2022 No Text 00500 AGREEMENT No Text Standard Form of Agreement: Section 00500 City of Round Rock, Texas Standard Form of Agreement between QLvner and Contractor AGREEMENT made as of the (1)day of J.U.LsJCin the year 20 .....................- c 2z BETWEEN the Owner City of Round Rock,Texas(hereafter"Owner"or"City") 221 East Main Street Round Rock,Texas 78664 and the Contractor Prota.Inc. ("Contractor") P.O.Box 342195 Austin,TX 78734 The Project is described as: Water Treatment Plant Pressure Control Valves The Engineer is; CDM Smith,Inc. Allen Woelke,P.E.,Vice President 9430 Research Blvd, Suite 1-200.Austin.TX 78-759 (512)346-1100 For and in consideration of the mutual terms, conditions and covenants of this Agreement and all accompanying documents between Owner and Contractor, the receipt and sufficienc3 of iN hick are hereby acknowledged..Owner and Contractor agree as follows: ARTICLE I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions),Drawings, Specifications, Addenda issued prior to execution of this Agreement,other documents listed in this Agreement and Modcations issued after execution of this Agreement;these form the Contract,and are as full),a part of the Contract as if attached to this Agreement or repeated herein.The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements, either written or oral.An enumeration of the Contract Documents,other than Modifications,appears in Article 7, ARTICLE 2 THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents,except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 00500 4-2020 Page I of 5 Standard Form of Agreement 00443647 No Text ARTICLE 3 DATE OF COMMENCEMENT;DATE OF SUBSTANTIAL COMPLETION; DATE OF FINAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by Owner. 3.2 The Contract Time shall be measured front the date delineated in the Notice to Proceed. 3.3 Contractor shall continence Work within ten (j�O calendar days from the date delineated in the Notice to Proceed, 3.4 Contractor shall achieve Substantial Completion of the items of Work listed on Attachment A to this Agreement no later than two hundred _C100 )calendar days from issuance by Owner of Notice to Proceed, and Contractor shall achieve Substantial Completion of the entire Work no later than two huqd�fort,five (_245 )calendar days from issuance by Owner of Notice to Proceed,subject to adjustments of this Contract Time as provided in the Contract Documents, 3.5 If Contractor fails to achieve Substantial Completion of the Work(or any portion thereof) on or before the date(s)specified for Substantial Completion in the Agreement,Contractor shall pay to Owner,as liquidated damages, the sum of one thousand and No/100 Dollars($-!-O-0-0,,0-_0 for each calendar day that Substantial Completion is delayed after the date(s) specified for Substantial Completion. It is hereby agreed that the liquidated damages to which Owner is entitled hereunder are a reasonable forecast of just compensation for the harm that would be caused by Contractor's failure to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s)specified for Substantial Completion in the Agreement and is not a penalty. It is agreed that the harm that would be caused by such failure, which includes loss of expected use of the Project areas,provision of alternative storage facilities and rescheduling of moving and occupancy dates, is one that is incapable or very difficult of accurate estimation, It is hereby agreed that if Substantial Completion of the Work(or any portion thereof)is not achieved on or before thirty(30)days after the date(s) specified for Substantial Completion in the Agreement, the Owner shall have the option to either collect liquidated damages as set forth herein or to thereafter rely on its remedies under the Contract Documents and at law and in equity, including without limitation, the recovery of actual damages. The date(s) specified for Substantial Completion of the Work(or any portion thereof)in the Agreement shall be subject to adjustment as provided in the Contract Documents, 3.6 Contractor shall achieve Final Completion of the entire Work no later than (_275.._ )calendar days from issuance by Owner of Notice to Proceed, ARTICLE 4 CONTRACTSUM 4.1 Owner shall pay Contractor the Contract Sum in current funds for Contractor's full and complete performance of the Work and all of Contractor's obligations under this Agreement. The Contract Sum shall be One million fire hundred ions a ei ht thousand ei ht hundred six seven dollars and no cents ($ 1,598,867.00 subject to additions and deductions as provided in the Contract Documents. 4.2 Does the Contract Sum include alternates which are described in the Bid Form? No X Yes .I - f),es,please provide details below. .......................................----................ ........................ --------------- ........................................................... ............. ----------------------- .............. ............ 00%) 4-2020 Page 2 of 5 Standard 1'onu of reeinent 00443647 No Text ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to Engineer and Owner by Contractor.and Certificates for Payment issued by Engineer and not disputed by Owner and/or Owner's tender.Owner shall make progress payments on account of the Contract Sum to Contractor as provided below, in Article 14 of the General Conditions, and elsewhere in the Contract Documents, 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, 5.1.3 Provided that an Application for Payment is received by Engineer and Owner,, and Engineer issues a Certificate of Payment not later than the tenth(10th)day of a month, Owner shall make payment to Contractor of amounts approved by the Owner not later than the tenth(10th)day of the next month. If an Application for Payment is received by Engineer and Owner after the application date fixed above,payment shall be made by Owner not later than one month after the Engineer issues a Certificate for Payment.The ChN,ner shall not have an), obligation to pay any amount covered by the Engineer's Certificate for Payment that is disputed by the Owner. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by Contractor in accordance with the Contract Documents,The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as Engineer and Owner may require.This schedule,unless objected to by Engineer or Ovner, shall be used as a basis for reviewing Contractor's Applications for Payment. 5.1.5 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents. the amount of each progress payment shall be computed as provided in Article 14 of the General Conditions. 5.1.7 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when: 11 Contractor has fully performed the Contract except for Contractor's responsibility to correct Work. and to satisfy other requirements, if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by Engineer and approved by the Owner. 5.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the issuance of Engineer's final Certificate for Payment, In no event shall final payment be required to be made prior to thirty(30) days after all Work on the Contract has been fully performed,Defects in the Work discovered prior to final payment shall be treated as non-conlonning Work and shall be corrected by Contractor prior to final payment,and shall not be treated as warranty items, ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by Owneror Contractoras provided in Article 15 of the General Conditions. 00500 4.2020, Page 3 of 5 standard Fonii of Agreement 00443647 No Text 6.2 The Work may be suspended by Owner as provided in Article 15 of the General Conditions, ARTICLE 7 ENUMERATION OF CONTRACT DOCUMENTS 7.1 The Contract Documents,except for Modifications issued after execution of this Ag mens,are enumerated as folloii s: 7.1.1 The Agreement is this executed version of the City, of Round Rock, Texas Standard Form of Agreement between Owner and Contractor,as modified, 7.1.2 The General Conditions are the "City of Round Rock Contract Forms 00700," General Conditions, as modified. 7.1.3 The Supplementary'.Special,and other Conditions of the Contract are those contained in the Project Manual dated Februan,2022 7.1.4 The Specifications are those contained in the Project Manual dated Februan,2022 7.1.5 The Drawings.if any,are those contained in the Project Manual dated_ Februan,2022­ 7.1.6 The Insurance&Construction Bond Forms of the Contract are those contained in the Project Manual dated Februar),2022 7.1.7 The Notice to Bidders,Instructions to Bidders,Bid Form.and Addenda,if any,.are those contained in the Project Manual dated February 2022 7.1.8 If this Agreement covers construction involving federal funds, thereby requiring inclusion of mandated contract clauses, such federally required clauses are those contained in the "City, of Round Rock Contract Forms 03000,"Federally Required Contract Clauses,as modified. 7.1.9 Other documents,if any.forming part of the Contract Documents are as follows: 00500-Attachment A.0 1 000-Attachment A ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of am, document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Owner's representative is: Kaitivn Saucedo.Engineer Associate 3400 Sunrise Road,Round Rock,TX 78665 ksaucedw&roundrocktexas.gov (512)218-7076 8.3 Contractor's representative is: Hector Brace(512)992-7200 errtrith Flores fµ515 375-2770 itifo(a-),t)rotaconstruction.coin 8.4 Neither Owner's nor Contractor's representative shall be changed without ten(10)days'%�ritten notice to the other party. 00.500 4-2020 Page 4 of 5 Standard Fon rk of greeiwwnt 00443647 No Text 8.5 Waiver of any breach of this Agreement shall not constitute waiver of any subsequent breach, 8.6 Owner agrees to pay Contractor from available funds for satisfactory performance of this Agreement in accordance with the bid or proposal submitted therefor,subject to proper additions and deductions.all as provided in the General Conditions, Supplemental Conditions, and Special Conditions of this Agreement, and N ner agrees to make payments on account thereof as provided therein. Lack of funds shall render this Agreement null and void to the extent funds are not available. This Agreement is a conunitment of City of Round Rock's current revenues only. 8.7 Although this Agreement is drawn by Owner,both parties hereto expressly agree and assert that,in the event of any dispute over its meaning or application.this Agreement shall be interpreted reasonably and fairly,and neither more strongly for nor against either party. 8.8 This Agreement shall be enforceable in Round Rock,Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein,exclusive venue for same shall lie in Williamson County. Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8.9 Both parties hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by an arbitration proceeding,including without limitation,any proceeding under the Federal Arbitration Act(9 USC Section 1-14)or any applicable state arbitration statute. 8.10 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. This Agreement is entered into as of the day and year first written above and is executed in at least two(2) original copies, of which one is to be delivered to Owner, OWNER CONTRACTOR CITY OF UND R T XAS mm UNDR .......... ............... ...... Printed Natne, Printed Name Title Date SignNed:.. Date Signed: ATTEST: City, Clerk. FORQVY, PPROVEDAS' OFORM. City Atto tto 00500 4-2020 Page 5 of 5 Siandird goon of%prtenievit 000 443647 No Text 00500 Attachment No Text Attachment A The contractor shall obtain Substantial Completion, within 200 calendar days of the Notice to Proceed, of the northern pressure control valve,vault,and associated 10" pipeline(see Shect 7), This work is located near the northernmost 1.5 million-gallon clearwell of the Water Treatment Plant. The valve, vault, and associated 10"pipeline should be substantially completed prior to the rest of the project. Page I No Text 00600 INSURANCE AND CONSTRUCTION BOND FORMS No Text BONDS AND INSURANCE INSTRUCTIONS Instruction Sheet 1, Insurance Company must be licensed by State of Texas. 2. Agent signing bonds must be licensed in Texas. Agent signing bonds must have Power of Attorney on behalf of insurance company. 4. If Agent signing bonds has Power of Attorney, but not licensed in Texas, then the bond must be counter-signed by Texas local recordin �aent. ALL THE ABOVE INFORMATION CAN BE FOUND AT TexaLftartnaent of Insurance website 5. Make sure the dollar amount on both Performance and Payment Bonds match the amount of the Agreement & Bid Form Sheet. 6. Both Performance and Payment Bonds should be signed by Authorized Person. If the contractor is a corporation, then it should be signed by the President or the Vice-President. If the contractor is not incorporated, then it may be signed by the Owner. Please state the title of the authorized person. CERTIFICATE OF LIABILITY INSURANCE Instruction Sheet CERTIFICATE OF LIABILITY INSURANCE FORM The City of Round Rock's Certificate of Liability Insurance form provided herein or a standard ACORD form. 2. PRODUCER and INSURED- Please list name,address,phone number and e-mail. 3. COMPANIES AFFORDING COVERAGE — TDI number required. The TDI number can be obtained from the Texas Dept of Insurance Website: ht ;//www,,tdi,state,tx,us,`. - Company Lookup. Note:Exception to this rule. In certain instances where there is unusual risks involved,Surplus Lines Insurance Carriers can be used.Below are the guidelines: a. Insurance Company does not have to be"licensed in Texas",but they do have to be"LUX_ible for a Texas license." Please verify with the Texas Dept of Insurance Website:h(!p:,;,;www.tdi state.1x,u%f. ,,Company Lookup b. Policy has to be written by licensed surplus lines Aaent. Also verify with the Texas Dept of Insurance Website:jh tp,/,,www.tdrstate.tx usJ-Agent Lookup 4. TYPES OF INSURANCE COVERAGE.— CONSTRUCTION CONTRACT: Please double check the General Conditions and the Supplemental General Conditions for the types and amounts of insurance required. The Supplemental General Conditions usually state the following: a. Business Automobile Liability Insurance b. Workers'Compensation and Employers' Liability Insurance C. Commercial General Liability Insurance d. Builders' Risk Insurance ­ (Generally required for all "vertical"construction. Check with Project Manager for requirements.) FOR ALL OTHER CONTRACTS, PLEASE REFER TO THE INSURANCE SECTION FOR TYPE OF INSURANCE REQUIRED. (For example Engineering Service Contracts usually require"professional liability insurance".) S. EFFECTIVE DATE& EXPIRATION DATE Please make sure dates are current. 6. City of Round Rock must be listed on the Certificate of Insurance as an additional insured (except Workers Compensation and Builders Risk). T Certificate must indicate that the insurance Company must give the City of Round Rock notice of any changes,cancellation ,etc. at least thirty (30)days prior to date of change, 8. Make sure Certificate is signed by an Agent Licensed in the State of Texas, this can also be found on the BOND NO PRF9396803 PAYMENTBOND THE STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Prptn Inc. of the City of Austin County of,Travis and State of Texas as Principal, and Fidelity and Deposit Comp under the laws of the State of Texas to act p ,4qy_9f MAalapo�, authorized as Surety on Bonds for Principals,are held and firmly bound unto the CITY OF ROUND ROCK, TEXAS (OWNER), and all subcontractors, workers, laborers, mechanics and suppliers as their interest may appear, all of whom shall have the right to sue upon this bond, in the penal sum of One million five hundred hundred sixtysqvendollars and no cents ............ Dollars($ 1,59 t Es7 Ofl —--)forthe payment whereof,well and truly be made the said Principal and Surely bind themselves and their heirs, administrators, executors, successors, and assigns,jointly and severally,by these presents: WHEREAS,the Principal has ante dint certain written Agreement with the Owner,dated the day of...._, " , 20 22 to which Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of: Water Treatment Plant Pressure Control Valves .................... .....................---,.................................. ....... ............... ........................................................................................................................... .......... ............. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall welt and truly pay all subcontractors, workers, laborers, mechanics, and suppliers, all monies to them owing by said Principals for subcontracts,work, labor,equipment, supplies and materials done and furnished for the construction of the improvements of said Agreement, then this obligation shall be and become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of'Chapter 2253, Texas Government Code, as arnended, and all liabilities on this bond shall be determined in accordance with the provisions of'said Chapter 2253 to the same extent as if it were copied at length herein, Page 1 00620 04 2020 Paymem Bmid M437699 No Text PAYMENT BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the plans, specifications or drawings accompanying the sarne shall in anywise affect its obligation on this bond,and it does hereby waive notice of any such change,extension of time,alteration or addition to the terrns of the contract,or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this Instrument this., day of 20_22' Prota, Inc. Fidelity and Deposit Company of'Mgyland Pi ipal Surety it e., Barbara A. Sh rd P Tame Printed Name ................ By: T4 Title: Attompy-11n-Fact, ,-1................... Ad 'rens: P. 0. Box 342195 Address. ..................................................... -Palm yallcy'-'Rlyo,'$tq, Austin T7873 .. ....... Round Rock, TX 78665 h CY )0 Resideni iftqf Surety: Signature Barbara A. Shamard Printed Nai e 3500 E Palm Val Street Address Round.Rock:,,TX 78665 City, State&Zip Code Page 2 00620V2020 Paynx w Bond 00090656 �r v A BOND NO PRF9396803 PERFORMANCE BOND THE STATE OF "TEXAS § § KNOW ALL ICY T ESE PRESENTS: COUNTY OF WILLIAMSON That Prcita,.[no....... , of the City of Austin,TX 78756 ....... ... County of Travis m_ , and State of Texas, ,as Principal,and Fidelity and De�lasit Com pan of Ma authorized under the law of the_._ y State of Texas to act as surety on bonds for principals, are held and firmly bound unto the CITY OF ROUNDROCK,TEXAS (Owner), to the penal !gum of one aniHion Iivc hundred ninety cight thma sand eight hundred sixty scam dollars and no cents ........ .._.w......, Dollars (S_11.,15198,867.00 for the mme the payent whereof, well and truly to be adsaid Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally,by these presents: WHEREAS,IFAS, the Principal has entered into a certain written Agreement with the Owner dated the day of..... 20,22_to which the Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of: .....—.1111..........---- 1-11111. ,,, "I'll–,W-11"allt-elr-,LrgatrMnY P , Pm !Ar e CPiAl al Ya,lv es MOW, THEREFORE, TETE CONDITIONS OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Agreement and shall, in all respects, duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said Agreement, agreed and covenanted by the Principal to be observed and performed, including but not limited to, the repair of any and all defects in said work occasioned by and resulting from defects in materials furnished by or workmanship of,the Principal in performing the'fork covered by said Agreement and occurring within a period of twelve (12) months from the date of Final Completion and all other covenants and conditions, according to the true intent and meaning of said Agreement and the Plans and Specifications hereto annexed,then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER,ER, that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the sarne extent as if it were copied at length herein. Mage 1 006 10 4 2020 Pa^r ormaunce Band 0044309 No Text PERFORMANCE BOND(continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the Plans, Specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond,and it does hereby waive notice of any such change,extension of time,alteration or addition to the terms of the Agreement,or to the work to be performed thereunder. If Principal fails to faithfully perform said Agreement, Surety, after receipt of written notice of Principal's default,shall perforin all of Principal's duties and obligations under the Agreement. If, within ten (10) days after receipt of such notice frorn Owner, Surety does not commence to complete the obligations of Principal with a contractor acceptable to Owner and diligently complete the performance of the Principal's duties and obligations, Owner shall have the right but not the obligation to have the duties and obligations of Principal performed. In such event,Surety shall pay to Owner,upon demand, all costs,expenses and damages sustained by Owner as a result of Principal's failure to perform its duties and obligations under the Agreement up to the full sum of this Performance Bond, plus all costs and expenses, including attorney's fees and expert and consultant fees incurred by Owner to enforce its rights under this Performance Bond. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this ...... .............day of.................... > 20 22 Prota, [tic. Fidelity and Dep ,gsilC,orplta,nY,ofMary,land r Pr,lnci al Surety r n c' a' Barbara A. Sh rd Printed Name By By: fit c- 'fit 1 c: Title: AttgTite -1n Fact Addr ss.- P, O. Box 342195 Address 0 Palm ss. P' o - '-Valley Blvd,Ste 3 Austin,TX 78734 Resident A ni" f Surety: n Signature Barbara ALaniard,aard ' �4ra A. Printed Nam 3500 E Palin alley Blvd, Ste 3 Street Address Round Rock, TX 78665 City, State& Zip Code Page 2 NMI 0 4 2020 PM'winancc Bond (10443639 No Text ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSITCOMPANY OF MARYLAND POWER OF ATTORNEY KNOW AIA,MEN BY THESE PRESENTS:That the ZURICH AMERICAN INSURANCE COMPANY,as corporation of the State of New York,the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the Store of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois(hereon collectively called the"Companies"),by Robert D.Murray, Vice President,in pursuance of authority granted by Article V,Section 8,of the By-Laws of said Companies,which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute,and appoint Peter PINCOFFS, Barbara A. SHAMARD,Chris BRANDT, Rob BRIDGES, John S. BURNS,Jr.,George S. SYKES, JR., Todd DAVIS and Christina SCOTT,of Austin,Texas,its trite and lawful agent and Attorney-in-Fact, to make, execute,seal and deliver,for, and on its behalf as surety,and as its act and deed: any and all bonds and undertakings,and the execution of such bonds or undertakings in pursuance of these presents,shall he as binding upon said Companies,as fully and amply, to all intcras and purposes, as ifilicy had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its of in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills,Maryland., and the regularly elected officers of the FIDELITY AND DEPOSITCOMPANY OF MARYLAND at its office in Owings Mills, Maryland.,in their own proper persons.The said Vice President does hereby certify that the extract set forth on the reverse side hereof is true copy of'Articic V, Section 8,of the By-Laws of said Companies and is now in force. IN WITNESS WHEREOF, the said Vice-president has hereunto subscribed his her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY,COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,and FIDELITY AND DEPOSITCOMPANY OF MARYLAND,this 191h day of August A.D.2020. ZURICH AMEXICAN INSURANCE COMPANY COLONIAL ANIFRICAN CASUAt.'ry AND SUREWCOMPANY FIDELITY AND DEPosi r comPANN,(icr MARYLAND hj,: Robert L), .. .......... Vice President Bv: Set's elw_c' State of Maryland Cou city or Baltimore On thus I%h day of Arigust,202CD. befrue the subsenkii,a Notary Pubhc of the Suire,of Maryland,difly coircaussioncd and quifified,Robert D. Murray,Vice Presideno and Dawn E,Brown,Secretary of ulna:Conipaunc ,w nic personally known tcc be chc 4cdividuals and olficem&scrobed ul acrd'who cxecured the preceding,uunstrnturncunt,and acknowledged die executron of sanic,and being b�y one duty sworn,dcNowth jrcd saah,that he she 4s the said orficerof 4a:Company nfbresand,and chat the scall affixed to the preceding instrunicni:are the Corporate Seals ofsaid Conipannes.and that dic salad Conoratc Scafs and the sigruakne as such officer were d0y affixed acid subsorcbed to Ote said criscrurnent by dw auchonty and dnrection of'gic said Corliorafiore, 1NTE$TfMONN'WfI11'R11T()F,I lncc Urea-enntowj my hand and affixed army OfflicW Seat chc Clay acid year first above micien .......................... Conslarccc A.Duccn,Nwary Public '4 M 4,"ononission rxprres:July 9,2023 No Text EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V,Section 8,Attorneys-in-Fac. The Chief Lxccutive Officer,the President,orany Executive Vice President or Vice['resident may, by written instrument under the attested corporate seal, appoint attorneys-in-fact with authority to execute bonds, policies, recognizanccs,stipulations, undcrtakings, or other like instruments on behalf of the Company, and may authonze,any officer or any such attorney in fact to affix(lie corporate seal thereto,and may with or without cause modify of"revoke any such appointment or authority at any tome." CERTIFICATE 1, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN (.'ASUALTY AND SVRETY COMPANY, and the FID1,11TY AND DEPOSITCOMPANY OF MARYLAND,do hereby certify that the foregoing Power ol"Attorney is still in full force and of on the date of this certificate„arid I do torther certify that Article V,Section 8,of the bly.Laws of the Companies is still in force This Power of'Attorney and Certificate may be signed by facsimfle under and by authority of the following resolution of the Board of Directors ofthe ZURICH AMERICAN INSURANCE COMPANY at a meeting duty called and held on the 15th day ol'December 1998, RESOLVED: "That the signature of the President or a View;President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Cornpany may be affixed by facsimile on any Power of Atiomcy..Any such Power or any certificate thereorbearing Such facsimile signature and seal shall be valid and binding on the Company." This Power of'Attorney and Cerfificatc may be signed by Ricsunfle under and by authority of the following resolution of the Board of Directors ofthc COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and field on(lie 5th day of May, 094,and the following resolution of the Board of Directors of the FIDELITY AND DEPOSITCOMPANY OF MARYLAND at a mecting duly called and held on the 10th(lay of-May, 1990 RESOLVED: "That the fiacsinule or mechanically reproduced seat of the company and fircsimile or mechanically,reproduced signature of any Vivo-President, Secretary,or Assistant Secretary of the Company,whether made heretofore or licreaher,wherever appearing upon a certified copy of any power oraitorney issued by the Company,shall be valid and binding upon the Company with the same force and effect as though manually affixed IN TESTIMONY WHEREOF,I have hereunto subscribed any namc and affixed the corporate seals of thesaid Companies, this IRM day of m.y 7021 Bnan M,[lodges,Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND,PLEASE SUBMIT A COMPLETE DESCRIPTION OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND,THE BOND NUMBER,AND YOUR CONTACT` INFORMATION TO: Zurich Surety laims 1299 Zurich Way Schauinburp IL 601961'r 1056 ---------- trp ................................I.......... 800-6264577 r ZURICH Texas Important Notice IMPORTANT NOTICE AVIS O IMPORTANTE To obtain information or make a complaint' Para obtener informaci6n o pare presenter una queja: You may call Zurich North America's toll-free telephone Usted puede Ilamar al n6mero de tel6fono gratuito de number for information or to make a complaint at: Zurich North America's para obtener informaci6n o pare 1-800-382-2160 presenter una queja al: 1-800-382-2150 You may contact the Texas Department of Insurance to obtain information on companies,coverages, rights, or Usted puede comunicarse con el Departamento de Se- complaints e- complaints at: gurus de Texas pare obtener informaci6n sobre com- 1-800-252-3439 pahlas,coberturas,derechos, o quejas at: 1.800-252-3439 You may write the Texas Department of Insurance: Usted puede escribir al Departamento P,O. Box 149104 de Seguros de Texas a: Austin,TX 78714-9104 P.O. Box 149104 Fax: (512)490-1007 Austin,TX 78714-9104 Web: www.tdi.texas.gov Fax:(512)490-1007 E-mail: ConsumerProtection@tdi.texas.gov Sitio web: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or IS UT POR PRIMAS DE SEGUROS 0 about a claim,you should contact the company first. If REDL AMACIONPS; the dispute is not resolved,YOU may contact the Texas Si fiene una disputa relacionada con su prima de seguro Department of Insurance. o con una reclamaci6n, usted debe comunicarse con [a compahla primero. Si la dispute no es resuelta, usted ATTACH THIS NOTICE TO YOUR POLICY: puede comunicarse con el Departamento de Seguros de This notice is for information only and does not become Texas. a part or condition of the attached document, ADJUNTE ESTE AVIS O A SU P6LIZA: Este aviso es solamente pare prop6silos informativos y no se con- vierte en parte o en condici6n del documento adjunto, U-GUI-296-E(06/15) Page I of I �I � I� PROTINCO2C DATE(MWDDtmy) CERTIFICATE OF LIABILITY INSURANCE.,, ...._.-._..........".....""......w..._.."..-........_._ ............................. 6/1812022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER,THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER, IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed, If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement, A statement on this certificate does not confer rights to the cerifficate holder In lieu of such endorsem PRODUCER CT Lesa May,CIC INSUPJCATXInsurance Services Inc JAI'c NNE.� X 9900 Great Hills Trail Dr,Suite 226W E.,, 61�2 �8 1-�366 C No 8661 52-931�1 ....................................................... Austin,TX 78759 _Les_a_May.@L 1�S!U RICA.com 1NAQR0JPk AFFORDING COVERAGE ............................................................................ INSURER A:FCC I Incur ance Co 10178 ----------— Col ----------- INSURED INSURER B: _ .._.____.____________________v___ Prota,Inc. 1q RER.!C.:................................................................ ——---------------------------- P.0.Box 342196 j9WftR D Austin,TX 79734 INSURER E, INSURER F COVERAGES CERTIFICATE NUMBER, ———-------------— REVISION NUM§gEL ................. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWTHSTANDING ANY REQUIREMENT, TERM OR CONDITION OFA CONTRACT OR OTHER DOCUMENT VATH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN AYHAVE BEEN REDUCED BY PAID CLAIMS. "Rik..................................................- ADDL SUER .... . M.._............................... IMAD VVVOL POLICY EFF POLICY EXP TYPE OF INSURANCE POLICY NUMBER LIMITS A CO—MM-L*-R-'C-�-A--LGEN F-"R'A-L-LIABILI—TY 1,000,00 CLAM&MADE OCCUR CPPI00077172 4/2812022 4/2812023 DAMAGE TO RENTED 100,00 MED EXP An one ptg�w 5,00 .-RER92t�6LA-&CZ�L!NJURY S 1,000,00 -GEN't AGGREGATE LIMIT APPLICS PER GENERALAqGREGATE 2,000,00 i 1� LOC X0,00 POLICY EL1!Q9kQLq t�QP G G ---99L _A- H R: 1-07T-Iul-�D-Ryl—XI . ............................................ A AUTOMOBILE LIABILITY (COMBINED SINGLE LIMIT. ...... 1,000,00 - D...................... ANYAUTO CA100077174 4120/2022 412812023gqj���Lzamqol OWNED SCHEDULED _ AUTOS ONLY AUTOS -kQ21LYINJURY Per aceoderR X00 GE MRS ONLY 'A6%%M A UMBRELLA LIAROCCUR - 6,000,00 i k-Agt!_�-CURR EXCESS LIAO CLAIMS-MADE UM8100077176 412012022 41281202361000,00 AGGREGATE RETENTIONS 0 A WORKERS COMPENSATION z:=OIH. AND EMPLOY RV LIABILITY ANY PROPRIETORIPARTNER/EXECUTIVE YIN WC0100077176 412812022 4/2812023 1,000,00 i E L EACH A K'AWM I NIA —L CODENT EXCLUDE( EL DISEASE.EA EMPLOYEE 1,000,00 Iles,describe under 1,000,00 2FSC_RIPTLO_N_Ofk�glIATLONSbt�M__ E L DISEASE-PO IC --- --—-——----------------------------- Y LIET _t....... .....................................I DESCRIPTION OF OPERAT ONSI LOCATIONS I VEHICLES(ACORD 1101,Addrdonal Remarks Schoduki.may be,attached If more space Is requires) Ic Project,,Water Treatment Plant Pressure Control Valves COMPLETE CERTIFICATE HOLDER/ADDITIONAL INSURED TO READ: City of Round Rock SEE ATTACHED ACORD 101 CERTIFICATE HOLDER CAN-EL T N SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Round Rock ACCORDANCE WITH THE POLICY PROVISIONS, 221 East Main Street Round Rock,TX 78664 ------------- AUTHORIZED REPRESENTATIVE tt -------------------------- e ----------- ACORD 28(2016103) X31988-2015 ACORD CORPORATION. Ali rights reserved The ACORD name and logo are registered marks of ACORD No Text AGENCY CUSTOMER ID:PROTINCO2C LMA LOC#: 1 ADDITIONAL REMARKS SCHEDULEPage 1..of 1 ...........................-,.,,,,,,,,,.,,,,,,,,,,,,,,,,,,...............,,,,,,,,,,,,,,,,,,,„,,,,,,,,,..............."I'l”"I'll""I'll'll"I'll"I'll",'ll"I'll"I'll'll""I'll""I'll""I"....,_-,---,..-. __.,.,�.,..—------ ---------------------------- ........................_,�-.,,�-,. ..,.-,-__.. .a AGENCY NAMED INSURED NSURICA TX Insurance Services,Inc. P.0..lox*U2196 POLICY NUMBER _Austin,TX 78734 Travis "EE PAGE 1 CARRIER NAIL CDDE . . ................................................ EE PAGE 1 SEE P 1 EFFECCTIVEDATE° _....... o...................................... ..�... .............. ---------------.. �.....-...-.-_ '„ ......................................... .. ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER; -AgQRQ26„ FORM TITLE: Certificate o1 Llabitlt I sur ar�ce,,_ ... Description of OperationslLocationsNehicles: Project.Water Treatment Plant Pressure Control Valves COMPLETE CERTIFICATE HOLDER/ADDITIONAL INSURED TO READ: City of Round Rock -The General Liability policy includes a blanket automatic additional insured endorsement that provides additional Insured status for On-Going&Completed Operations with Primary and Noncontributory wording to the certificate holder only when there Is a written contract between the named insured and the certificate holder that requires such status. -The Automobile policy includes a blanket automatic additional Insured endorsement that provides additional Insured status to the certificate holder only when there is a written contract between the named Insured and the certificate holder that requires such status. -The General Liability,Automobile and Workers Compensation policies Include a blanket waiver of subrogation endorsement that provides this feature only when there is a written contract between the named Insured and the certificate holder that requires it. -The policies include an endorsement providing that 30 day notice of cancellation will be furnished to the certificate holder. W ...... ..................................................................................................................................................................................... ..............................................................................._-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ ACORD 101 (2008101) 02008 ACORD CORPORATION. All rights reserved. The ACORO name and logo are registered marks of ACORD No Text 00700 GENERAL CONDITIONS No Text City of Round Rock Contract Forms General Conditions Section 00700 TABLE OF CONTENTS OF GENERAL.CON I"TI NS fficle paq(,) Number& T"Idle !Number 1. DEFINITIONS.. ............ . 2 2 PRELIMINARY R"W MAT"TERS....... ....... . . . .. .... ......... .. .... ... 5 S. CONTRAC'T`CCC FR`TS: INTENT,AMENDING,REUSE..... . ........ ... ................ .......... ...................a" 4. AVAILABILITY OF II NM SUBSURFACE AND PHYSICAL L CCNC TIONSo REFF;RFNCF POINTS .......... .......... . .................. .. ..................... .......5 S. CONTRACTOR'S RFSR i SIfflU "1IF'S .. 16 7'. OTHER WORK , 24 S. OWNER'S RESRC,RSII ISI II S........... .......... ........... . ................. . ........,.,.. ....,..,, .. .....,._ , .._....... .....25 S. ENGINEER/ARCHITECT'S STATUS DURING CONSTRUCTION . .. ........ 26 '10. CHARGES IN 1" WWC R 27 11. CHANGE OF CONTRACT AMOUNT ... .... 28 12, CHANGE OFCOR'T`R G1TIMES..... 31 13 TESTS AND INSPECTIONS,AND CORRECTION OR REMOVAL OF DEFECTIVE WORK, 3 14 PAYMENTS,ro C(;YNmA TOR.AND COI PLE'TION 15 15. SUSPENSION OF WORK AND TERMINATION- _ 39 16. DISPUTE RESOLUTION— -41 17' RIGHTTOAUONT ..... . ... ............. .......... ......... .. ...... ...... . . ...... 18, MIISCEL.IANEOUS ... ...,. . ... ... .. .. . . .... 3 00700 04-2020 Page 1 General Conditions 00443641 GENERAL CONDITIONS ARTICLE I -DEFINITIONS Whenever used inthese General CmndidonmorintheothevCnntrac Documents,the term printed with initial capital letters o, all capital letters, including the term's singular and plural forms, will have the meaning indicated in the definitions below or as defined in these General Conditions or other Contract Documents: 1.1 Addenda -VVhtten or graphic instruments issued prior tmthe receipt of Proposals nrthe opening of Bids that clarify, correct orchange the proposal orbidding requirements o/the Contract Documents. 1.2 Agreement-Prescribed form, referenced omSection OU5OO. 1-3 Alternative Dispute Resolution-TheprooeasbywhichmdimputedC|mimmabe settled ifthe OWNER and the CONTRACTOR cannot reach anagreement between themselves,es an alternative to litigation. 1.4 Bid 'Proposal ofbidder on prescribed forms setting forth prices for performing the Work described in the Contract Documents. 1.5The advertisement or invitation for bids, instructions to bidders,the bid form,the Contract Documents and Addenda. 1.6 Any day ofthe week; modays being excepted. Work onSaturdays, Sundays,and/or Legal Holidays shall only be conducted with prior express written consent of the OWNER. 1,7 written directive tothe CONTRACTOR, signed bythe OWNER, ordering achange in the Work and stating a proposed basis for adjustment, if any, in the Contract Amount or Contract Time, or both. A Change Directive may be used in the absence of total agreement on the terms of a Change Order A Change Directive does not change the Contract Amount mrContract Time, but is evidence that the parties expect that the change directed or documented by a Change Directive will be incorporated in a subsequently issued Change Order, 1.8 agreements entered into between the CONTRACTOR and the OWNER authorizing an addition,deletion,or revision to the Contract,issued on or after the Execution Date of the Agreement and within the Contract term, 1.9 Avvritten demand seeking, as a matter pfright, adjustment or interpretation of Contract tenns, payment ofmoney, extension o[time orother relief with respect tothe terms ofthe Contract. 1.10 The Contract represents the entire and integrated agreement between the OWNER and the CONTRACTOR for performance of the Work, asevidenced bythe Contract Documents. 1.11 Contract Amount'The amount payable bythe OWNER tothe CONTRACTOR for completion ofthe Work inaccordance with the Contract Documents. 1.12 Contract Documents — Includes the Invitation to Bid, Instructions to Bidders, AAnoernonL General Conditions, Supplemental General Conditions, Special Condidonm, Speoifioatmne, Project Manual, Drawingo, Addenda and Change Orders. 1.13 Contract Time-The number ofdays allowed for completion oftheVVorkosdefined by theContract.When any periodi referred hoindays, itwill bocomputed hoemc|udethe first and include the last day ofsuch period. A day oftwenty-four(24) hours measured from midnight to the next midnight will constitute oday, 1.14 CONTRACTOR - The individum|, firm, oorpondion, or other business entity with whom the OWNER has entered into the Contract. 00700 04-2020 Page 2 General Conditions 1.15 Drawings - Those portions of the Contract Documents which are graphic representations of the scope, extent and character of the Work to be furnished and performed by the CONTRACTOR and which have been approved by the OWNER. Drawings may include plans, elevations, sections, details, schedules and diagrams, Shop Drawings are not Drawings as so defined. 1.16 Enaineer/ArchitectAE/A) - The OWNER's design professional identified as such in the Agreement. The titles of"Architect/Engineer,""Architect"and"Engineer'used in the Contract Documents shall be read the same as Engineer/Architect {E/A). Nothing contained in the Contract Documents shall create any contractual or agency relationship between E/A and the CONTRACTOR. 1.17 Equal -The terms"equal"or"approved equal"shall have the same meaning. 118 Execution Date-Date of last signature of the parties to the Agreement. 1.19 Field Order - A written order issued by Owner's Representative which orders minor changes in the Work and which does not involve a change in the Contract Amount or the Contract Time. 1.20 Final Acceptance—The stage in the Contract process when, in the OWNER's opinion, Final Completion of the Work has been attained and a Certificate of Acceptance approved by the OWNER is issued. 1.21 Final Completion -The stage in the progress of the Work when, in the OWNER's opinion, the entire Work has been completed,the CONTRACTOR's obligations under the Contract Documents have been fulfilled, and the OWNER is processing or has made final payment to the CONTRACTOR, as evidenced by a Certificate of Acceptance approved by the OWNER. 1,22 Inspector-The authorized representative of any regulatory agency that has jurisdiction over any portion of the Work. 1.23 LftggLU2!jdW 1.23.1 The following are recognized by the OWNER: Holiday Date Observed New Year's Day January I Martin Luther King, Jr.'s Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Veteran's Day November 11 Thanksgiving Day Fourth Thursday in November Friday after Thanksgiving Friday after Thanksgiving Christmas Eve December 24 Christmas Day December 25 00700 04-2020 Page 3 General Conditions 1.23.2 If a Legal Holiday falls on Saturday, it will be observed on the preceding Friday. If a Legal Holiday falls on Sunday, it will be observed on the following Monday. 1.23.3 If Christmas Eve falls on a Saturday or a Sunday,the preceding Friday is observed as the Christmas Eve holiday. 1.23.4 If Christmas Day falls on a Saturday or a Sunday, the following Monday is observed as the Christmas Day holiday. 1.24 Milestones-A significant event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work. 1.25 Notice to Proceed - A Written Notice given by the OWNER to the CONTRACTOR notifying the CONTRACTOR to commence the Work and which may also fix the date on which the Contract Times will commence to run and on which the CONTRACTOR shall start to perform the CONTRACTOR's obligations under the Contract Documents. 1.28 OWNER—The City of Round Rock,Texas,a municipal corporation, home-rule city and political subdivision organized and existing under the laws of the State of Texas, acting through the City Manager or his/her designee, officers, agents or employees to administer design and construction of the Project. 1.27 Owner's Representative-The designated representative of the OWNER. 1.28 Partial Occupancy or Use- Use by the OWNER of a partially completed part of the Work for the purpose for which it is intended(or a related purpose)prior to Substantial Completion of all the Work. 1.29 Proiect -The total construction of which the Work to be provided under the Contract Documents may be the whole,or a part,as indicated elsewhere in the Contract Documents. 1.30 Proiect Manual - That portion of the Contract Documents which may include the following: introductory information; bidding requirements, Contract forms and General and Supplemental General Conditions; General Requirements; Specifications; Drawings; Project Safety Manual;and Addenda. 1.31 Proposal—Proposal of Offeror,on prescribed forms setting forth prices for performing the Work described in the Contract Documents. 1.32 Proposal Documents—The advertisement or invitation for Proposals, Instruction to Offerors, the Proposal form,the Contract Documents and Addenda. 1.33 Resident Project Representative-The authorized representative of E/A who may be assigned to the site or any part thereof. 1.34 Shop Drawings -All drawings, diagrams, illustrations, schedules and other data or information which are specifically prepared or assembled by or for the CONTRACTOR and submitted by the CONTRACTOR as required by the Contract Documents. 1.35 Specifications -Those portions of the Contract Documents consisting of written technical descriptions as applied to the Work, which set forth to the CONTRACTOR, in detail, the requirements which must be met by all materials,equipment, construction systems, standards,workmanship,equipment and services in order to render a completed and useful project. 1.38 Substantial Completion - The stage in the progress of the Work when the Work, or designated portions thereof, may still require minor modifications or adjustments but,in the OWNER's opinion,the Work has progressed to the point such that all parts of the Work under consideration are fully operational and the beneficial use and occupancy of which can be assumed by the Owner, as evidenced by a Certificate of Substantial Completion approved by the OWNER. 00700 04-2020 Page 4 General Conditions 1.37 Subcontractor-An individual, firm, or corporation having a direct contract with the CONTRACTOR for the performance of a part of the Work. 138 Sub-subcontractor-A person or entity who has a direct or indirect contract with a Subcontractor or a Sub- subcontractor of any tier to perform a portion of the Work. 1.39 Superintendent - The representative of the CONTRACTOR authorized in writing to receive and fulfill instructions from Owner's Representative, and who shall supervise and direct construction of the Work. 1.40 Supplemental General Conditions-The part of the Contract Documents which either amends or supplements the General Conditions. All General Conditions which are not so amended or so supplemented shall be considered as remaining in full force and effect. 1.41 Supplier-An individual or entity having a direct contract with the CONTRACTOR or with any Subcontractor or Sub-subcontractor to furnish materials or equipment to be incorporated in the Work by the CONTRACTOR or any Subcontractor. 1.42 Time Extension Re ue�st-An approved request for time extension on a form acceptable to the OWNER. 1.43 Work-The entire completed construction, or the various separately identifiable parts thereof, required to be furnished under the Contract Documents. 1.44 Working Day - Any day of the week, not including Saturdays, Sundays, or Legal Holidays, in which conditions not underthe CONTRACTOR's control will permit work for at least seven(7)hours of the Working Times. Upon authorization by the Owner's Representative, work on Saturdays, Sundays and/or Legal Holidays may be allowed and, in that event,a Working Day will be counted for each such day. 1.45 Working Times —Times of day(s) during which work may be performed. Unless authorized by Owner's Representative, all Work shall be performed between 7:00 a.m. and 6M p.m. on weekdays and, if previously authorized as provided for in paragraph 1.44 or paragraph 1.6 herein, as applicable, between 9:00 a.m. and 6:00 p.m, on Saturdays, Sundays or Legal Holidays. When the CONTRACTOR has been authorized to perform Work during hours outside Working Times, such hours shall be considered time worked on Working Day contracts. Notwithstanding the preceding, emergency work may be done without prior permission only as provided in paragraph 6.11.5 herein. 1.46 Written Notice-Written communication between the OWNER and the CONTRACTOR, Written Notice shall be deemed to have been duly served if delivered in person to Owner's Representative or to the CONTRACTOR's duly authorized representative, or if such Written Notice is delivered to or sent by registered or certified mail to the attention of Owners Representative or to the CONTRACTOR's duly authorized representative at the last business address known to the party giving notice. ARTICLE 2-PRELIMINARY MATTERS 2.1 Delivery of Agreement, Bonds,Insurance,and Other Documentation: Within ten (10)Calendar Days after written notification of award of Contract,the CONTRACTOR shall deliver to the OWNER signed Agreement, Bond(s), Insurance Certificate(s) and other documentation required for execution of the Contract. 2.2 Copies of Documents: The OWNER shall furnish to the CONTRACTOR two (2) copies of the Contract Documents unless otherwise specified. 00700 04-2020 Page 5 General Conditions 2.3 Commencement pfContract Times; Notice ho Proceed: The ContractTime(a) commence on the date indicated in the Agreement nrhlthe Notice hz Proceed. Notice to Proceed will be given at any time within sixty(60)Calendar Days after the Execution Date of the Agreement,unless extended bywritten agreement cf the parties. 2.4 Before Starting Construction: 2.4,1 NoWork shall bedone atthe site prior Vuthe pnaconm|mm%ionconference without the OVVNER`oapproval. Before undertaking each part ofthe Work, the CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. The CONTRACTOR shall promptly rt in writing to C)wme/o Representative any cmnOiot, er/or, ambiguity discrepancy which the CONTRACTOR may discover and shall obtain o written interpretation or clarification from Owner's Representative before proceeding with any Work affected thereby. The CONTRACTOR shall heliable to the OWNER for failure horeport any conflict, error, ambiguity or discrepancy in the Contract Documents of which the CONTRACTOR knew orreasonably should have known. 2'4.2 TheCONTRACTORahaUsubm|tthehzUmwing(oC)wne/sRepreaentativcforneiewandappnuve|no|aher than the pnaoonstmctiunconference: .i m preliminary progress schedule indicating the times (number of days or dates) for starting and completing the various stages of the VVork, including any Milestones specified in the Contract Documen|m, identifying when all Subcontractors will be utilized, and taking into consideration any limitations onWorking Hours; .2 a preliminary schedule ofShop Drawing and sample submittals; 3 epreliminary schedule nfvalues for all cf the Work,subdivided into component parts insufficient detail to serve asthe basis for progress payments durin truction.Such prices will include an appropriate amount of overhead and profit applicable to each item of Work. The preliminary schedule mfvalues submitted bythe CONTRACTOR should include a reasonable estimation of value of each item included and shall not contain disproportionate values assigned toany item oritems; .4 aletter designating CONTRACTOR's Superintendent; .5 aletter from the CONTRACTOR and Subcontnaoor(s) listing any salaried specialists; .6 if applicable, a letter designating the "Competent Person(s)" on general safety and trench safety measures; .7 if applicable, a\nenmh safety system plan; '8 if applicable, a plan illustrating proposed locations of temporary facilities; .9 if app|iceb|e, a traffic control plan; .10 acompleted Non-Use ofAsbestos Affidavit(Prior hmConstmcikon); and .11 if applicable, a letter designating the Texas Registered Professional Land Surveyor for layout of the Work. 2'5 Pw*constrm«t|omCmmwemoncm: Prior to commencement of Work at the site,a preconstruction conference attended by the CONTRACTOR,Owner's Representative and others will beheld. 00700 04~2020 Page 6 General Conditions 2.6 Initially Acceptable Schedules: Unless otherwise provided in the Contract Documents, the CONTRACTOR shall obtain approval of Owner's Representative on final versions of the schedules submitted in accordance with paragraph 2.4.2 before the first progress payment will be made to the CONTRACTOR. The progress schedule must provide for an orderly progression of the Work to completion within any specified Milestones and Contract Times. Acceptance of the schedule by Owners Representative will neither impose on Owner's Representative responsibility for the sequencing, scheduling or progress of the Work nor interfere with or relieve the CONTRACTOR from the CONTRACTOR's full responsibility therefor, The CONTRACTOR's schedule of Shop Drawings and sample submissions must provide an arrangement agreeable to the parties for reviewing and processing the required submittals. 2.7 Electronic Transmittals: 2,7,1 Except as otherwise stated elsewhere in the Contract Documents,the OWNER, E/A, and CONTRACTOR may transmit, and shall except, Project-related correspondence,texts,data,documents,drawings,information,and graphics, including but not limited to Shop Drawings and other submittals,in electronic media or digital format,either directly, or through access to a secure Project website, 2.7.2 When transmitting items in electronic media or digital format, the transmitting party makes no representations as to long term compatibility, usability, or readability of the items resulting from the recipient's use of software application packages,operating systems,or computer hardware differing from those used in the drafting or transmittal of the items. ARTICLE 3 -COT RAglDOC UKgNjaLNTENT AMEN2!NG FUSE 3.1 Intent: 3.1.1 The intent of the Contract Documents is to include all information necessary for the proper execution and completion of the Work by the CONTRACTOR. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. In cases of disagreement, the following order of precedence shall govern (top item receiving priority of interpretation): Change Orders Modifications to the Contract Documents made after the Execution Date Signed Agreement Addenda to the Contract Documents Special Conditions Supplemental General Conditions General Conditions Other Bidding Requirements and Contract Forms Special Provisions to the Standard Technical Specifications Special Specifications Standard Technical Specifications Drawings(figured dimensions shall govern over scaled dimensions) Project Safety manual, if applicable 3.1.2 Unless otherwise stated in the Contract Documents,words which have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. 12 Reporting and Resolving Discrepancies: Prior to commencing the Work, the CONTRACTOR shall review the Contract Documents for the purpose of discovering any conflict, error, ambiguity or discrepancy in the Contract Documents. If, at any time, the CONTRACTOR discovers any conflict, error, ambiguity or discrepancy within the Contract Documents or between the Contract Documents and any provisions of any such law or regulation applicable to the performance of the Work 00700 04-2020 Page 7 General Conditions or of any such standard, specification, manual or code or instructions of any Supplier, the CONTRACTOR shall immediately report it to Owners Representative in writing,and the CONTRACTOR shall not proceed with the Work affected thereby until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in paragraph 3.3.1 or paragraph 3.3.2. The CONTRACTOR shall be liable to the OWNER for failure to report any such conflict,error,ambiguity or discrepancy of which the CONTRACTOR knew or reasonably should have known. 3.3 Amending and Supplementing Contract Documents: 3.3.1 The Contract Documents may be amended to provide for additions,deletions and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: .1 Change Order. .2 Change Directive. 3.3.2 In addition,the requirements of the Contract Documents may be supplemented,and minor variations and deviations in the Work may be authorized, in one or more of the following ways: .1 Field Order. .2 Review of a Shop Drawing or sample. .3 Written interpretation or clarification. 3.4 Reuse of Documents Prohibited: The CONTRACTOR and any Subcontractor or Supplier or other person or organization performing or furnishing any of the Work under a direct or indirect contract with the OWNER: (i) shall not have or acquire any title to or ownership rights in any of the Drawings, Specifications or other documents(or copies of any thereof)prepared by or bearing the seal of E/A or E/A's consultants, and(ii)shall not reuse any of such Drawings, Specifications, other documents or copies on extensions of the Project or any other project without written consent of the OWNER and E/A. ARTICLE 4-AVAILABILITY OF LANDS:SUBSURFACE AND PHYSICAL CONDITIONS:REFERENCE POINTS 4.1 Availability of Lands: The OWNER shall furnish,as indicated in the Contract Documents, all required rights to use the lands upon which the Work is to be performed, rights-of-way and easements for access thereto, and such other lands which are designated for the use of the CONTRACTOR. The OWNER shall identify any encumbrances or restrictions not of general application but specifically related to use of lands so furnished with which the CONTRACTOR will have to comply in performing the Work.Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by the OWNER, unless otherwise provided in the Contract Documents. If the OWNER fails to furnish these lands, rights-of-way or easements in a timely manner,the CONTRACTOR may make a Claim for adjustments in the Contract Times. The CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. 4.2 Subsurface and Physical Conditions: 4.2.1 The CONTRACTOR hereby covenants that it has examined the site of the proposed Work and is familiar with all of the conditions surrounding construction of the Project, having conducted all inquiries, tests and investigations deemed necessary and proper. Unless the CONTRACTOR,prior to the execution of the Agreement, has notified the OWNER in writing of any condition of the site of the proposed Work that would adversely impact 00700 04-2020 Page 8 General Conditions the performance of the Work by the CONTRACTOR, CONTRACTOR covenants that there are no conditions at the site of the proposed work which would adversely impact the performance of Work by the CONTRACTOR. 4.2.2 If conditions are encountered at the site which are (1) subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract Documents or(2)unknown physical conditions of an unusual nature, that differ materially from those normally encountered in the type of work being performed under this Contract, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than seven (7) calendar days after first observance of the conditions. Owner's Representative will promptly investigate such conditions with E/A and, if they differ materially and cause an increase or decrease in the CONTRACTOR's cost of,or time required for, performance of any part of the Work, OWNER will consider an equitable adjustment in the Contract Amount or Contract Time, or both, If Owner's Representative determines that the conditions at the site are not materially different from those indicated in the Contract Documents and that no change in the terms of the Contract is justified, the CONTRACTOR shall be notified in writing, stating the reasons. Any disputes arising from Owner's Representative's determination shall be resolved in accordance with Article 16, 4.2.3 Notwithstanding any other provision of this Contract,the CONTRACTOR shall be solely responsible for the location and protection of any and all public lines and utility customer service lines in the Work area. For the purposes of this section,"public lines"means the utility distribution and supply system within public rights-of-way or easements, and "utility customer service lines"(service) means any utility line connecting a utility customer to the utility distribution system. Generally, existing service connections within right-of-way or easements are not shown on the Drawings, The CONTRACTOR shall notify the OWNER and"One Call"and exercise due care to locate and to mark, uncover or otherwise protect all such lines in the construction zone and any of the CONTRACTOR's work or storage areas. The CONTRACTOR's obligation hereunder shall be primary and nondelegable. The CONTRACTOR shall indemnify or reimburse the OWNER for such expenses or costs(including fines that may be levied against the OWNER) that may result from unauthorized or accidental damage to all public lines and utility customer service lines in the Work area.The OWNER reserves the right to repair such damage the CONTRACTOR may cause, at the CONTRACTOR's expense. 4.2.4 The CONTRACTOR shall take reasonable precaution to avoid disturbing primitive records and antiquities of archaeological, paleontological or historical significance. No objects of this nature shall be disturbed without written permission of the OWNER and the Texas Department of Antiquities Protection. When such objects are uncovered unexpectedly, the CONTRACTOR shall stop all Work in close proximity and notify Owner's Representative and the Texas Department of Antiquities Protection of their presence and shall not disturb them until written permission and permit to do so is granted.All primitive rights and antiquities uncovered on the OWNER's property shall remain property of the State of Texas,the Texas Department of Antiquities Protection conforming to the Texas Natural Resources Code, If it is determined by the OWNER, in consultation with the Texas Department of Antiquities Protection,that exploration or excavation of primitive records or antiquities on Project site is necessary to avoid loss,the CONTRACTOR shall cooperate in salvage work attendant to preservation. If the Work stoppage or salvage work causes an increase in the CONTRACTOR's cost of,or time required for,performance of the Work, the Contract Amount and/or Contract Time may be equitably adjusted, 4.3 Reference Points: Unless otherwise specified, the OWNER will furnish all reference points, benchmarks, survey monuments, and control points which,in the OWNER's opinion,are suitable for laying out the Work. Such benchmarks and reference points will be placed at intervals not to exceed 1,500 feet All reference points, benchmarks, survey monuments and control points shall be carefully preserved by the CONTRACTOR by use of flags, laths or other appropriate measures and, in case of destruction or removal by the CONTRACTOR or its employees, such reference points, benchmarks, survey monuments, and control points shall be replaced by a Registered Professional Land Surveyor at the CONTRACTOR's expense. When reference points, benchmarks, survey monuments, or control points are in conflict with the Work, then reestablishment will be the OWNER's responsibility during or upon completion of the Work, 4.4 Hazardous Materials: 00700 04-2020 Page 9 General Conditions 4.4.1 The OWNER shall be responsible for any hazardous material uncovered or revealed at the site which was not shown, indicated or identified in the Contract Documents to be within the scope of the Work and which may present a substantial danger to persons or property exposed thereto in connection with the Work at the site. The CONTRACTOR shall immediately notify Owner's Representative of any suspected hazardous materials encountered before or during performance of the Work and shall take all necessary precautions to avoid further disturbance of the materials. 4.4.2 The CONTRACTOR shall be responsible for any hazardous materials brought to the site by the CONTRACTOR, Subcontractor, Suppliers or anyone else for whom the CONTRACTOR is responsible. 4.4.3 No asbestos-containing materials shall be incorporated into the Work or brought on the Project site without prior approval of the OWNER. 4.4.4 TO THE FULLEST EXTENT PERMITTED BY LAWS AND REGULATIONS, CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS OWNER,AND ITS COUNCIL MEMBERS, EMPLOYEES,AGENTS,AND CONSULTANTS FROM AND AGAINST ALL CLAIMS, COSTS, LOSSES, AND DAMAGES (INCLUDING BUT NOT LIMITED TO ALL FEES AND CHARGES OF ENGINEERS, ARCHITECTS, ATTORNEYS, AND OTHER PROFESSIONALS AND ALL COURT OR ARBITRATION OR OTHER DISPUTE RESOLUTION COSTS)ARISING OUT OF OR RELATING TO FAILURE TO CONTROL, CONTAIN OR REMOVE A HAZARDOUS MATERIAL BROUGHT TO THE SITE BY CONTRACTOR OR BY ANYONE FOR WHOM CONTRACTOR IS RESPONSIBLE, OR TO A HAZARDOUS ENVIRONMENTAL CONDITION CREATED BY CONTRACTOR OR BY ANYONE FOR WHOM CONTRACTOR IS RESPONSIBLE. ARTICLE 5-BONDS AND INSURANCE 5.1 Surety and Insurance Companies: All bonds and insurance required by the Contract Documents shall be obtained from solvent surety or insurance companies that are duly licensed by the State of Texas and authorized to issue bonds or insurance policies for the limits and coverages required by the Contract Documents. The bonds shall be in a form acceptable to the OWNER and shall be issued by a surety which complies with the requirements of Chapter 3503, Texas Insurance Code (2005)and which is otherwise acceptable to the OWNER. OWNER may require the surety to obtain reinsurance for any portion of the risk that exceeds 10%of the surety's capital and surplus. For bonds exceeding $100,000, the surety must also hold a certificate of authority from the U.S. Secretary of the Treasury or have obtained reinsurance from a reinsurer that is authorized as a reinsurer in Texas and holds a certificate of authority from the U.S. Secretary of the Treasury. 5.2 Workers'Compensation Insurance Coverage: 5.2.1 Definitions: .1 Certificate of coverage("certificate") -A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on the Project,for the duration of the Project. .2 Duration of the Project - includes the time from the beginning of the Work on the Project until the CONTRACTOR's/person's Work on the Project has been completed and accepted by the OWNER. .3 Persons providing services on the Project ("subcontractor" herein) - includes all persons or entities performing all or part of the services the CONTRACTOR has undertaken to perform on the Project, regardless of whether that person contracted directly with the CONTRACTOR and regardless of whether that person has employees. This includes, by way of illustration and not of limitation, 00700 04-2020 Page 10 General Conditions independent contractors, Subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project, "Services"does not include activities unrelated to the Project, such as food/beverage vendors,office supply deliveries, and delivery of portable toilets. 5.21 The CONTRACTOR shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44)for all employees of the CONTRACTOR providing services on the Project, for the duration of the Project, 51.3 The OWNER will not execute the Contract prior to the CONTRACTOR providing all required certificates of coverage, 5.2.4 If the coverage period shown on the CONTRACTOR's current certificate of coverage ends during the duration of the Project, the CONTRACTOR must, prior to the end of the coverage period, file a new certificate of coverage with the OWNER showing that coverage has been extended. 5.2.5 The CONTRACTOR shall obtain from each person providing services on the Project, and provide to the OWNER: .1 a certificate of coverage, prior to that person beginning Work on the Project, so the OWNER will have on file certificates of coverage showing coverage for all persons providing services on the Project; and .2 no later than seven(7)days after receipt by the CONTRACTOR,a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. 5.2.6 The CONTRACTOR shall retain all required certificates of coverage for the duration of the Project and for one(1)year thereafter. 5.2.7 The CONTRACTOR shall notify the OWNER in writing by certified mail or personal delivery within ten (10) days after the CONTRACTOR knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project. 5.2.8 The CONTRACTOR shall post at its office or on each Project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 5,2.9 The CONTRACTOR shall contractually require each person with whom it contracts to provide services on a Project to: .1 provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44)for all of its employees providing services on the Project,for the duration of the Project; ,2 provide to the CONTRACTOR, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project, for the duration of the Project; .3 provide the CONTRACTOR, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 00700 04-2020 Page 11 General Conditions .4 obtain from each other person with whom it contracts,and provide to the CONTRACTOR: a) a certificate of coverage, prior to the other person beginning Work on the Project; and b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period,if the coverage period shown on the current certificate of coverage ends during the duration of the Project; .5 retain all required certificates of coverage on file for the duration of the Project and for one (1) year thereafter; .6 notify the OWNER in writing by certified mail or personal delivery within ten(10) days after the person knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project;and .7 contractually require each person with whom it contracts,to perform as required by paragraphs 5.2.9.1 - 5.2.9.7, with the certificates of coverage to be provided to the person for whom they are providing services. 5.2.10 By signing this Contract or providing or causing to be provided a certificate of coverage, the CONTRACTOR is representing to the OWNER that all employees of the CONTRACTOR who will provide services on the Project will be covered by workers'compensation coverage for the duration of the Project, that the coverage will be based on proper reporting of classification codes and payroll amounts,and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the CONTRACTOR to administrative penalties, criminal penalties, civil penalties,or other civil actions. 5.2.11 The CONTRACTOR's failure to comply with any of these provisions is a breach of Contract by the CONTRACTOR which entitles the OWNER to declare the Contract void if the CONTRACTOR does not remedy the breach within ten(10)days after receipt of notice of breach from the OWNER. 5.3 Contractor Insurance Requirements: For specific bond requirements and additional insurance requirements, refer to the Supplemental General Conditions. 5.3.1.1 General Requirements: .1 CONTRACTOR shall carry insurance in the types and amounts indicated below for the duration of the Contract, which shall include items owned by OWNER in the care, custody and control of CONTRACTOR prior to and during construction and warranty period. .2 CONTRACTOR must complete and forward the required Certificates of Insurance to OWNER. before the Contract is executed as verification of coverage required below. CONTRACTOR shall not commence Work until the required insurance is obtained and until such insurance has been reviewed by OWNER. Approval of insurance by OWNER shall not relieve or decrease the liability of CONTRACTOR hereunder and shall not be construed to be a limitation of liability on the part of CONTRACTOR. CONTRACTOR must also complete and forward the required Certificates of Insurance to OWNER whenever a previously identified policy period has expired as verification of continuing coverage. .3 CONTRACTOR's insurance coverage is to be written by companies licensed to do business in the State of Texas at the time the policies are issued and shall be written by companies with A.M. Best ratings of B+VII or better, except for hazardous material insurance which shall be written by companies with A.M. Best ratings of A-or better. 00700 04-2020 Page 12 General Conditions .4 All endorsements naming the OWNER as additional insured, waivers, and notices of cancellation endorsements as well as the Certificate of Insurance shall indicate: City of Round Rock, 221 E. Main St., Round Rock, Texas 78664. .5 The"other" insurance clause shall not apply to the OWNER where the OWNER is an additional insured shown on any policy. It is intended that policies required in the Contract, covering both OWNER and CONTRACTOR, shall be considered primary coverage as applicable. .6 If insurance policies are not written for amounts specified below, CONTRACTOR shall carry Umbrella or Excess Liability Insurance for any differences in amounts specified. If Excess Liability Insurance is provided, it shall follow the form of the primary coverage. .7 OWNER shall be entitled, upon request and without expense,to receive certified copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modification of particular policy terms, conditions, limitations, or exclusions except where policy provisions are established by law or regulations binding upon either of the parties hereto or the underwriter on any such policies. .8 OWNER reserves the right to review the insurance requirements set forth during the effective period of this Contract and to make reasonable adjustments to insurance coverage, limits, and exclusions when deemed necessary and prudent by OWNER based upon changes in statutory law, court decisions, the claims history of the industry or financial condition of the insurance company as well as CONTRACTOR. .9 CONTRACTOR shall not cause any insurance to be canceled nor permit any insurance to lapse during the term of the Contract or as required in the Contract. A0 CONTRACTOR shall be responsible for premiums,deductibles and self-insured retentions, if any, stated in policies. All deductibles or self-insured retentions shall be disclosed on the Certificate of Insurance. .11 CONTRACTOR shall provide OWNER thirty (30) days written notice of erosion of the aggregate limits below occurrence limits for all applicable coverages indicted within the Contract. .12 If OWNER-owned property is being transported or stored off-site by CONTRACTOR, then the appropriate property policy will be endorsed for transit and storage in an amount sufficient to protect OWNER's property. A3 The insurance coverages required under this contract are required minimums and are not intended to limit the responsibility or liability of CONTRACTOR. 5,11.2 Business Automobile Liability Insurance. Provide coverage for all owned, non-owned and hired vehicles. The policy shall contain the following endorsements in favor of OWNER: a) Waiver of Subrogation endorsement TE 2046A; b) 30 day Notice of Cancellation endorsement TE 0202A;and c) Additional Insured endorsement TE 9901 B. Provide coverage in the following types and amounts: 00700 04.2020 Page 13 General Conditions .1 A minimum combined single limit of$500,000 per occurrence for bodily injury and property damage. Alternate acceptable limits are $250,000 bodily injury per person, $500,000 bodily injury per occurrence and at least$100,000 property damage liability each accident. 5.3.1.3 Workers`Compensation and Employers' Liability Insurance: Coverage shall be consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Section 401). CONTRACTOR shall assure compliance with this Statute by submitting two(2)copies of a standard certificate of coverage (e.g. ACCORD form) to Owner's Representative for every person providing services on the Project as acceptable proof of coverage. The required Certificate of Insurance must be presented as evidence of coverage for CONTRACTOR. Workers' Compensation Insurance coverage written by the Texas Workers Compensation Fund is acceptable to OWNER. CONTRACTOR's policy shall apply to the State of Texas and include these endorsements in favor of OWNER: a) Waiver of Subrogation,form WC 420304; and b) 30 day Notice of Cancellation,form WC 420601. The minimum policy limits for Employers'Liability Insurance coverage shall be as follows: .1 $100,000 bodily injury per accident, $500,000 bodily injury by disease policy limit and $100,000 bodily injury by disease each employee. 5.3.1.4 Commercial General Liability Insurance. The Policy shall contain the following provisions: a) Blanket contractual liability coverage for liability assumed under the Contract and all contracts relative to this Project. b) Completed Operations/Products Liability for the duration of the warranty period. c) Explosion, Collapse and underground (X,C&U)coverage. d) Independent Contractors coverage. e) Aggregate limits of insurance per project, endorsement CG 2503. f) OWNER listed as an additional insured, endorsement CG 2010. g) 30 day notice of cancellation in favor of OWNER,endorsement CG 0205. h) Waiver of Transfer of Recovery Against Others in favor of OWNER,endorsement CG 2404. Provide coverages A&B with minimum limits as follows: .1 A combined bodily injury and property damage limit of$500,000 per occurrence. 5.3.1.5 Builders'Risk Insurance. CONTRACTOR shall maintain Builders' Risk Insurance or Installation Insurance on an all risk physical loss form in the Contract Amount. Coverage shall continue until the Work is accepted by OWNER. OWNER shall be a loss payee on the policy. If off site storage is permitted,coverage shall include transit and storage in an amount sufficient to protect property being transported or stored. 5.4 Bonds: 00700 04-2020 Page 14 General Conditions 5.4.1 General. .1 Bonds, when required, shall be executed on forms furnished by or acceptable to OWNER. All bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act. .2 If the surety on any bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of the preceding paragraph, CONTRACTOR shall within ten(10)days thereafter substitute another bond and surety, both of which must be acceptable to OWNER. .3 When Performance Bonds and/or Payment Bonds are required,each shall be issued in an amount of one hundred percent (100%) of the Contract Amount as security for the faithful performance and/or payment of all CONTRACTOR's obligations under the Contract Documents. Performance Bonds and Payment Bonds shall be issued by a solvent surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. Any surety duly authorized to do business in Texas may write Performance and Payment Bonds on a project without reinsurance to the limit of 10 percent of its capital and surplus. Such a surety must reinsure any obligations over 10 percent. .4 If CONTRACTOR has failed to obtain or maintain a required bond, OWNER may exclude the CONTRACTOR from the site of the Project and exercise OWNER's suspension and/or termination rights under the Contract Documents. 5.4.2 Performance Bond. .1 If the Contract Amount exceeds $100,000, CONTRACTOR shall furnish OWNER with a Performance Bond in the form set out by OWNER, .2 If the Contract Amount exceeds $25,000 but is less than or equal to $100,000, CONTRACTOR shall furnish OWNER with a Performance Bond in the form set out by OWNER, unless the original Contract Time is 60 Calendar Days/40 Working Days or less, in which case CONTRACTOR can agree to the following terms and conditions for payment in lieu of providing a Performance Bond: no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER; CONTRACTOR shall be entitled to receive 95%of the Contract Amount following Final Completion, and the remaining 5%of the Contract Amount following the one year warranty period. .3 If the Contract Amount is less than or equal to $25,000, CONTRACTOR will not be required to furnish a Performance Bond; provided that no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER under the following terms and conditions: CONTRACTOR shall be entitled to receive 95%of the Contract Amount following Final Completion, and the remaining 5%of the Contract Amount following the one year warranty period. .4 If a Performance Bond is required to be furnished, it shall extend for the one year warranty period. 5.4.3 Payment Bond. .1 If the Contract Amount exceeds $50,000, CONTRACTOR shall furnish OWNER with a Payment Bond in the form set out by OWNER. .2 If the Contract Amount is less than or equal to $50,000, CONTRACTOR will not be required to furnish a Payment Bond; provided that no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER under the terms and conditions specified in paragraph 5.421 00700 04.2020 Page 15 General Conditions ARTICLE 6-CONTRACTOR'S RESPONSIBILITIES 6.1 Supervision and Superintendence: 6.1.1 The CONTRACTOR shall supervise,inspect and direct the Work competently and efficiently,devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Unless otherwise directed by the OWNER in the Contract Documents, the CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. The CONTRACTOR shall be responsible to see that the completed Work complies accurately with the Contract Documents. 6.1.2 The CONTRACTOR shall have an English-speaking, competent Superintendent on the Work at all times that work is in progress. Upon request of Owner's Representative, the CONTRACTOR shall present the resume of the proposed Superintendent to Owner's Representative showing evidence of experience and successful superintendence and direction of work of a similar scale and complexity. If, in the opinion of Owner's Representative,the proposed Superintendent does not indicate sufficient experience in line with the Work, he/she will not be allowed to be the designated Superintendent for the Work. The Superintendent shall not be replaced without Written Notice to Owner's Representative. If the CONTRACTOR deems it necessary to replace the Superintendent,the CONTRACTOR shall provide the necessary information for approval,as stated above,on the proposed new Superintendent. A qualified substitute Superintendent may be designated in the event that the designated Superintendent is temporarily away from the Work, but not to exceed a time limit acceptable to Owner's Representative. The CONTRACTOR shall replace the Superintendent upon the OWNER's request in the event the Superintendent is unable to perform to the OWNER's satisfaction. The Superintendent will be the CONTRACTOR's representative on the Work and shall have the authority to act on behalf of the CONTRACTOR. All communications given to the Superintendent shall be as binding as if given to the CONTRACTOR. Either the CONTRACTOR or the Superintendent shall provide an emergency and home telephone number at which one or the other may be reached if necessary when work is not in progress. 6.2 Labor,Materials and Equipment: 6.2.1 The CONTRACTOR agrees to employ only orderly and competent workers, skillful in performance of the type of Work required under this Contract. The CONTRACTOR, Subcontractors, Sub-subcontractors, and their employees may not use or possess any firearms, alcoholic or other intoxicating beverages, illegal drugs or controlled substances while on the job or on the OWNER's property,nor may such workers be intoxicated, or under the influence of alcohol or drugs,on the job. If the OWNER or Owner's Representative notifies the CONTRACTOR that any worker is incompetent, disorderly or disobedient, has knowingly or repeatedly violated safety regulations, has possessed any firearms, or has possessed or was under the influence of alcohol or drugs on the job, the CONTRACTOR shall immediately remove such worker from performing Contract Work,and may not employ such worker again on Contract Work without the OWNER's prior written consent. The CONTRACTOR shall at all times maintain good discipline and order on or off the site in all matters pertaining to the Project. The CONTRACTOR shall pay workers no less than the wage rates established in Section 00900,and maintain weekly payroll reports as evidence thereof. 6.2.2 Unless otherwise specified, the CONTRACTOR shall provide and pay for all materials, equipment, labor, transportation,construction equipment and machinery,tools,appliances, fuel, power, light, heat,telephone,water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary for the furnishing, performance, re-testing of defective work,start-up and completion of the Work. 6.2.3 All materials and equipment shall be of good quality and new (including new products made of recycled materials), except as otherwise provided in the Contract Documents. If required by Owner's Representative, the CONTRACTOR shall furnish satisfactory evidence (reports of required tests, manufacturer's certificates of compliance with material requirements, mill reports, etc.) as to the kind, quantity and quality of materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with instructions of the applicable Supplier,except as otherwise provided in the Contract Documents. 00700 04-2020 Page 16 General Conditions 6.2.4 Substitutes and"Approved Equal"Items: 6.2.4.1 Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type,function and quality required. Unless the specification or description contains words reading that no like,equivalent or"approved equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to Owner's Representative under the following circumstances: .1 "Approved Equal": If, in the OWNER's sole discretion, an item of material or an item of equipment proposed by the CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by the OWNER as an"approved equal" item,in which case review of the proposed item may, in the OWNER's sole discretion,be accomplished without compliance with some or all of the requirements for evaluation of proposed substitute items. The CONTRACTOR shall provide the OWNER with the documentation required for the OWNER to make its determination. .2 Substitute Items: If, in the OWNER's sole discretion, an item of material or an item of equipment proposed by the CONTRACTOR does not qualify as an "approved equal" item under paragraph 6.2.4.1.1, then it will be considered a proposed substitute item. The CONTRACTOR shall submit sufficient information to allow the OWNER to determine that the item of material or item of equipment proposed is essentially equivalent to that named and a substitute therefor, 6.2.4.2 Substitute Construction Methods and Procedures: If a specific means, method, technique, sequence or procedure of construction is shown or indicated in and expressly required by the Contract Documents, the CONTRACTOR may with prior approval of the OWNER furnish or utilize a substitute means, method, technique, sequence, or procedure of construction. The CONTRACTOR shall submit sufficient information to Owner's Representative to allow the OWNER, in the OWNER's sole discretion,to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. 6.2.4.3 OWNER's Evaluation: The OWNER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to paragraph 6.2.4.1.1 and paragraph 6.2.4.1.2. The OWNER will be the sole judge of acceptability. No"approved equal"or substitute shall be ordered, installed, or utilized until the OWNER's review is complete, which will be evidenced by either a Change Order or completion of the Shop Drawing review procedure. The OWNER may require the CONTRACTOR to furnish at the CONTRACTOR's expense a special performance guarantee or other surety bond with respect to any"approved equal"or substitute. The OWNER shall not be responsible for any delay due to review time for any"approved equal"or substitute. 6.2.4.4 CONTRACTOR's Expense: All data to be provided by the CONTRACTOR in support of any proposed "approved equal"or substitute item will be at the CONTRACTOR's expense. 6.2.5 The CONTRACTOR agrees to assign to the OWNER any rights it may have to bring antitrust suits against its Suppliers for overcharges on materials incorporated in the Project growing out of illegal price fixing agreements. The CONTRACTOR further agrees to cooperate with the OWNER should the OWNER wish to prosecute suits against Suppliers for illegal price fixing. 6.3 Progress Schedule: Unless otherwise directed, the CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.6 as it may be adjusted from time to time as provided below: .1 The CONTRACTOR shall submit to Owner's Representative for acceptance proposed adjustments in the progress schedule that will not change the Contract Times or Milestones. Such adjustments will conform generally to the progress schedule then in effect. 00700 04-2020 Page 17 General Conditions .2 Proposed adjustments in the progress schedule that will change the Contract Times mMilestones shall besubmitted inaccordance with the requirements ofArticle 12. Such adjustments may only bemade byoChange Order o,Time Extension Request inaccordance with Article 12. 6'4 Concerning Subcontractors,Suppliers and Others: 6.4-1 Assignment: The CONTRACTOR agrees k»retain direct control ofand give direct attention huthe fulfillment o*this Contract. The CONTRACTOR agrees npt to,byPower cfAttorney cr otherwise,assign said Contract without the prior written consent ofthe OWNER. 6.4.2 Award of Subcontracts for Portions of the Work: The CONTRACTOR shall not employ anySubcontractor, Supplier prother person cxorganization,vxhetharinbiaUyoramamubaditote. aQainotvvhumtheOVVNERmayhave reasonable objection. The CONTRACTOR must provide the OWNER with a list of all Subcontractors, Suppliers, or other persons or organizations it will use in the Work,and such list must be provided prior to the preconstruction conference. Should the OWNER have objections,the OWNER will communicate such objections by Written Notice. ifthe OWNER requires a change without good cause of any Subcontnaoor, person or organization previously accepted by OWNER,the Contract Amount may be increased or decreased by the difference in the costoccasioned byany such change, and anappropriate Change Order shall heissued. The CONTRACTOR shall not substitute any Subcontractor, person or organization that has been accepted by the OWNER, unless the substitute has been accepted imwriting bythe OWNER. Noacceptance bythe OWNER ofany Subcontractor,Supplier orother person or organization shall constitute a waiver of any right of the OWNER to reject defective Work. 0.4.3 The CONTRACTOR shall enter into written agreements with all Subcontractors and Suppliers which specifically bind the Subcontractors orSuppliers tothe applicable terms and conditions ofthe Contract Documents for the benefit pf the OWNER and E/A. The OWNER reserves the right hospecify that certain requirements shall be adhered to by all Subcontractors and Sub-subcontractors as indicated in other portions of the Contract Documents and these requirements shall bamade aportion nfthe agreement between the CONTRACTOR and Subcontractor orSupplier. 6^4.4 The CONTRACTOR shall be fully responsible to the OWNER for all acts and omissions of the Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with the CONTRACTOR just as the CONTRACTOR is responsible for the C0NTRACTOR'eown acts and omissions. Nothing inthe Contract Documents shall create for the benefit mfany such Subcontractor,Supplieror other person or organization any contractual relationship between the OWNER and any such Subuontnactor. Supplier orother person or organization, nor shall it create any obligation om the part oy the OWNER prE6Atppay ortosee tothe payment ofmnyamountsdueanysuchSuboontnsdor. Supp|ierorcdher person or organization except as may otherwise be required by laws and regulations, 6,4.5 The CONTRACTOR ahmU be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers and other persons and organizations rfh ingorfumimh|nganyoftheVVorkundere direct orindirect contract with the CONTRACTOR. The CONTRACTOR shall require all Subcontractors,Suppliers and such other persons and organizations performing o,furnishing any ufthe Work tocommunicate with Owner's Representative through the CONTRACTOR. 6,4.6 The divisions and sections of the Specifications and the identifications of any Drawings shall not control the CONTRACTOR in dividing or delineating the Work to be performed by any specific trade. 6'4.7 The CONTRACTOR shall pay each Subcontractor and Supplier their appropriate share of payments made (othe CONTRACTOR not later than ten(18)Days after the CONTRACTOR'mreceipt ofpayment from the OWNER. 6.5 Patent Fees and Royalties: 6.5.1 The CONTRACTOR shall be responsible at all times for compliance with applicable patents or copyrights encompoaoing, in whole or in part, any desiQn, device, material, or process uh|ized, directly orindirectly, in the performance nfthe Work orthe formulation nrpresentation ofits Bid. 00700 04^2020 Page 18 General Conditions 6.5.2 The CONTRACTOR shall pay all royalties and license fees and shall provide, prior to commencement of Work hereunder and at all times during the performance of same, for lawful use of any design, device, material or process covered by letters, patent or copyright by suitable legal agreement with the patentee, copyright holder, or their duly authorized representative whether or not a particular design, device, material, or process is specified by the OWNER. 6.5.3 The CONTRACTOR shall defend all suits or claims for infringement of any patent or copyright and shall indemnify and save the OWNER harmless from any and all claims,costs, losses,expenses and damages(including but not limited to attorney's fees and consultant fees),direct or indirect, arising with respect to the CONTRACTOR's process in the formulation of its bid or the performance of the Work or otherwise arising in connection therewith. The OWNER reserves the right to provide its own defense,with counsel of its own choosing,to any suit or claim of infringement of any patent or copyright in which event the CONTRACTOR shall indemnify and save harmless the OWNER from all costs and expenses of such defense as well as satisfaction of all judgments entered against the OWNER. 6.5.4 The OWNER shall have the right to stop the Work and/or terminate this Agreement at any time in the event the CONTRACTOR fails to disclose to the OWNER that the CONTRACTOR's work methodology includes the use of any infringing design,device, material or process. 6.6 Permits, Fees: Unless otherwise provided in the Supplemental General Conditions, the CONTRACTOR shall obtain and pay for all construction permits, licenses and fees required for prosecution of the Work. OWNER will obtain and pay for the following permits, licenses and/or fees, if required: .1 Site Development Permit. 1 Building Permit(s). .3 Texas Department of Transportation permit for work in State rights-of-way. .4 Railroad Utility License Agreement. 61 Laws and Regulations: 6.7.1 The CONTRACTOR shall give all notices and comply with all laws and regulations applicable to furnishing and performing the Work. Except where otherwise expressly required by applicable laws and regulations, neither the OWNER nor E/A shall be responsible for monitoring the CONTRACTOR's compliance with any laws and regulations. 6.7.2 The CONTRACTOR shall plan and execute its operations in compliance with all applicable Federal, State and local laws and regulations, including those concerning control and abatement of water pollution and prevention and control of air pollution. 6.7.3 If the CONTRACTOR performs any Work that it is contrary to laws or regulations,then the CONTRACTOR shall bear and shall indemnify, defend and hold OWNER harmless from all claims, costs, losses and damages arising therefrom; however, it shall not be the CONTRACTOR's primary responsibility to make certain that the Specifications and Drawings are in accordance with laws and regulations, but this does not relieve the CONTRACTOR of the CONTRACTOR's obligations under Article 3. 6.8 Taxes: 6.8.1 The CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid by the CONTRACTOR in accordance with the laws and regulations of the State of Texas, 00700 04-2020 Page 19 General Conditions 6.8.2 The OWNER is an exempt organization as defined by Chapter 11 of the Property Tax Code of Texas and is thereby exempt from payment of Sales Tax under Chapter 151, Limited Use Sales, Excise and Use Tax, Texas Tax Code, and Chapter 321, Texas Tax Code. 6.9 Use of Premises: 6.9.1 The CONTRACTOR shall confine construction equipment,the storage of materials and equipment and the operations of workers to the site and land and areas identified in and permitted by the Contract Documents and other land and areas permitted by laws and regulations, rights-of-way, permits and easements, and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. The CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any adjacent land or areas, resulting from the performance of the Work. Should any claim be made by any such owner or occupant because of the performance of the Work, the CONTRACTOR shall promptly settle with such other party by negotiation or otherwise resolve the claim by dispute resolution proceeding or at law. The CONTRACTOR shall indemnify, defend)and hold harmless the OWNER, EIA, E/A's consultants and anyone directly or indirectly employed by any of them from and against all claims, costs, losses and damages (including court costs and reasonable attorneys'fees) arising out of or resulting from any claim or action, legal or equitable, brought by any such owner or occupant against the OWNER, EIA or any other party indemnified hereunder to the extent caused by or based upon performance of the Work or failure to perform the Work. 6.9.2 During the progress of the Work and on a daily basis, the CONTRACTOR shall keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the Work. At the completion of the Work, the CONTRACTOR shall remove all waste materials, rubbish and debris from and about the premises as well as all tools, appliances, construction equipment and machinery and surplus materials. The CONTRACTOR shall leave the site clean and ready for occupancy by the OWNER at Substantial Completion of the Work. The CONTRACTOR shall, at a minimum, restore to original condition all property not designated for alteration by the Contact Documents. 6.9.3 The CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall the CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.10 Record Documents: The CONTRACTOR shall maintain in a safe place at the site,or other location acceptable to the OWNER, one(1) record copy of all Drawings,Specifications,Addenda,Change Orders,Change Directives,Field Orders and written interpretations and clarifications (issued pursuant to paragraph 9.5) in good order and annotated to show all changes made during construction. These record documents, together with all final samples and all final Shop Drawings,will be available to the OWNER and E/A for reference during performance of the Work. Upon Substantial Completion of the Work, these record documents, samples and Shop Drawings showing the final "as built" construction of the Project shall be promptly delivered to Owner's Representative. 6.11 Safety and Protection: 6.11.1 The CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Upon request,and prior to installation of measures,the CONTRACTOR shall submit a site security and safety plan for approval by the OWNER. By reviewing the plan or making recommendations or comments, the OWNER will not assume liability nor will the CONTRACTOR be relieved of liability for damage, injury or loss. The CONTRACTOR shall take all necessary precautions for the safety of and shall provide the necessary protection to prevent damage, injury or loss to: .1 all persons on the Work site or who may be affected by the Work; .2 all the Work and materials and equipment to be incorporated therein, whether in storage on or off the site;and 00700 04-2020 Page 20 General Conditions .3 other property at the site or adjacent thereto, including but not limited to, trees, shrubs, lawns, walks, pavements, roadways, structures, utilities and underground facilities not designated for removal, relocation or replacement in the course of construction, 6.11.2 The CONTRACTOR shall comply with all applicable laws and regulations of any public body having jurisdiction for safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. The CONTRACTOR shall notify owners of adjacent property and of underground facilities, and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation and replacement of their property. All damage, injury or loss to any property referred to in paragraph 6.11.1.2 and paragraph 6.11.1.3 caused, directly or indirectly, in whole or in part, by the CONTRACTOR, Subcontractor, Supplier or any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be responsible, shall be remedied by the CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of the OWNER, or E/A, or E/A's consultant or anyone employed by any of them or anyone for whose acts any of them may be responsible, and not attributable, directly or indirectly, in whole or in part, to the faults or negligence of the CONTRACTOR or any Subcontractor, Supplier or other person or organization directly or indirectly employed by any of them). The CONTRACTOR's duties and responsibilities for safety and protection of the Work shall continue until such time as all the Work is completed and Owner's Representative has issued a notice to the OWNER and the CONTRACTOR in accordance with Article 14 that the Work is acceptable(except as otherwise expressly provided in connection with Substantial Completion). 6.11.3 Safety Representative: The CONTRACTOR shall designate a qualified and experienced safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs. Upon request of the OWNER, the CONTRACTOR shall provide certifications or other documentation of the safety representative's qualifications. At a minimum, the safety representative shall have received the OSHA thirty (30) hour training and a certificate evidencing that the safety representative has received such training within the last five (5) years shall be provided to the OWNER's representative. 6.11.4 Hazard Communication Programs: The CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with laws and regulations, 6.11.5 Emergencies: 6.11.5.1 In emergencies affecting the safety or protection of persons or the Work at the site or adjacent thereto, the CONTRACTOR, without special instruction or authorization from the OWNER or E/A, is obligated to act reasonably to prevent threatened damage, injury or loss and to mitigate damage or loss to the Work, The CONTRACTOR shall give Owner's Representative prompt written notice if the CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby, If Owner's Representative determines that a change in the Contract Documents is required because of the action taken by the CONTRACTOR in response to such an emergency,a Change Directive or Change Orderwill be issued to document the consequences of such action; otherwise the OWNER will not be responsible for the CONTRACTOR's emergency action. 6.11.5.2 Authorized agents of the CONTRACTOR shall respond immediately to call-out at any time of any day or night when circumstances warrant the presence on Project site of the CONTRACTOR or its agent to protect the Work or adjacent property from damage, restriction or limitation or to take such action or measures pertaining to the Work as may be necessary to provide for the safety of the public, Should the CONTRACTOR and/or its agent fail to respond and take action to alleviate such an emergency situation, the OWNER may direct other forces to take action as necessary to remedy the emergency condition,and the OWNER will deduct any cost of such remedial action from the funds due to the CONTRACTOR under this Contract. 6.111.53 In the event there is an accident involving injury to any individual on or near the Work, the CONTRACTOR shall notify Owner's Representative within twenty-four (24) hours of the event and shall be responsible for recording the location of the event and the circumstances surrounding the event through 00700 04-2020 Page 21 General Conditions photographs, interviewing witnesses, obtaining medical reports and other documentation that describes the event. Copies of such documentation shall be provided to Owner's Representative, for the OWNER's and E/A's records, within forty-eight(48)hours of the event. 6.12 Continuing the Work: The CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with the OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements,except as the OWNER and the CONTRACTOR may agree in writing, 6.13 CONTRACTOR's General Warranty and Guarantee: 6.13.1 The CONTRACTOR warrants and guarantees to the OWNER that all Work will be performed in a good and workmanlike manner in accordance with the Contract Documents and will not be defective. The CONTRACTOR's warranty and guarantee hereunder excludes defects or damage caused by: A abuse, modification or improper maintenance or operation by persons other than the CONTRACTOR, Subcontractors or Suppliers; or .2 normal wear and tear under normal usage. 6.13.2 The CONTRACTOR's obligation to perform and complete the Work in a good and workmanlike manner in accordance with the Contract Documents shall be absolute. None of the following will constitute acceptance of Work not in accordance with the Contract Documents or a release of the CONTRACTOR's obligation to perform the Work in accordance with the Contract Documents: .1 observations by Owner's Representative and/or E/A; .2 recommendation of any progress or final payment by Owner's Representative; .3 the issuance of a certificate of Substantial Completion or any payment by the OWNER to the CONTRACTOR under the Contract Documents; .4 use or occupancy of the Work or any part thereof by the OWNER; .5 any acceptance by the OWNER or any failure to do so; .6 any review of a Shop Drawing or sample submittal; .7 any inspection,test or approval by others; or 8 any correction of defective Work by the OWNER. .9 the failure of the OWNER, E/A or any other person or entity acting on behalf of the OWNER or E/A to observe, detect or discover any defect in the Work or any non-conformance of the Work with any requirement of the Contract Documents. CONTRACTOR hereby waives any claim or defense to any claim by the OWNER that any failure by the OWNER, E/A, or any other person or entity acting on behalf of the OWNER or E/A to observe, detect or discover any defect in the Work relieves or releases, in whole or in part, CONTRACTOR from any obligations or responsibility for the correction of such defects or any other obligation of CONTRACTOR under the Contract Documents. 6.14 Indemnification: 00700 04-2020 Page 22 General Conditions 6.14.1 TO THE FULLEST EXTENT PERMITTED BYLAW,AND IN ADDITION TO ANY OTHER OBLIGATIONS OF CONTRACTOR UNDER THE CONTRACT OR OTHERWISE,CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS OWNER, ITS COUNCIL MEMBERS , EMPLOYEES,AGENTS, AND CONSULTANTS INCLUDING, BUT NOT LIMITED TO THE EPA (THE "INDEMNIFIED PARTIES" OR INDEMNIFIED PARTY", FROM AND AGAINST ALL CLAIMS, COSTS, LOSSES, AND DAMAGES (INCLUDING BUT NOT LIMITED TO ALL FEES AND CHARGES OF ENGINEERS, ARCHITECTS,ATTORNEYS, CONSULTANTS, EXPERTS AND OTHER PROFESSIONALS AND ALL COURT OR ARBITRATION OR OTHER DISPUTE RESOLUTION COSTS) ARISING OUT OF OR RELATING TO THE PERFORMANCE OF THE WORTS, REGARDLESS OF WHETHER SUCH CLAIMS, COSTS, LOSSES,AND DAMAGES ARE CAUSED, IN WHOLE OR IN PARTY BY THE ACTS, ACTIONS, ERRORS OR OMISSIONS OF AN INDEMNIFIED PARTY. BECAUSE OWNER IS A MUNICIPALITY,THE TERMS AND PROVISIONS OF SUBCHAPTER C OF CHAPTER 151 OF THE TEXAS INSURANCE CODE ("CHAPTER 151") DOES NOT APPLY TO THE OWNER. IF, HOWEVER, ANY PROVISION OF CHAPTER 151 APPLIES TO THE OWNER, IT IS THE INTENT OF THE OWNER THAT IF THE PROVISIONS OF CHAPTER 151 DO APPLY, NOTHING HEREIN SHALL IMPOSE ANY REQUIREMENTS ON CONTRACTOR THAT ARE PROHIBITED BY CHAPTER 151 AND THAT ANY OF THE PROVISIONS HEREOF THAT ARE NOT PROHIBITED BY CHAPTER 151 SHALL REMAIN IN FULL FORCE AND EFFECT. ACCORDINGLY, IN THE EVENT THAT IN CONSTRUING AND INTERPRETING THE CONTRACT DOCUMENTS, A COURT OF COMPETENT JURISDICTION OR, IF APPLICABLE, AN ARBITRATOR, DETERMINES THAT CHAPTER 151 APPLIES TO THE OWNER, THEN THE COURT OR ARBITRATOR SHALL REFORM THE PROVISIONS HEREOF SO AS TO COMPLY WITH CHAPTER 151 AND SUCH REFORMATION SHALL NOT AFFECT THE VALIDITY OF ANY PROVISIONS HEREOF THAT ARE NOT PROHIBITED BY CHAPTER 151. 6.14.2 The indemnification obligation under paragraph 6.14.1 shall not be limited in any way by any limitation on the amount or type of damages, or compensation or benefits payable by or for the CONTRACTOR or any such Subcontractor, Supplier or other person or organization under workers'compensation acts, disability benefit acts or other employee benefit acts. 6.14.3 The obligations of the CONTRACTOR under paragraph 5.14.1 shall not extend to the liability of the OWNER, E/A, E/A's consultants, and their officers, directors, partners, employees or agents caused primarily by negligent preparation of maps, drawings, surveys, designs or specifications upon which is placed the applicable state-authorized design professional seal of the OWNER's, E/A's or E/A's consultant's officers,directors, partners, employees or agents. 6.14.4 In the event the CONTRACTOR fails to follow the OWNER's directives concerning use of the site, scheduling or course of construction, or engages in other conduct which proximately causes damage to property based on inverse condemnation or otherwise, then and in that event, the CONTRACTOR shall indemnify the OWNER against all costs resulting from such claims. 6.14.5 In the event the CONTRACTOR unreasonably delays progress of the work being done by others on the site so as to cause loss for which the OWNER becomes liable, then the CONTRACTOR shall reimburse the OWNER for such loss. 6.15 Survival of Obligations: All representations, indemnifications,warranties and guarantees made in, required by or given in accordance with the Contract Documents,as well as all continuing obligations indicated in the Contract Documents,will survive final payment,completion and acceptance of the Work and termination or completion of the Agreement. 6.16 Losses from Natural Causes: Unless otherwise specified, all loss or damage to the CONTRACTOR arising out of the nature of the Work to be done or from action of the elements,floods or from unforeseeable circumstances in prosecution of the Work or from 00700 04-2020 Page 23 General Conditions unueum}obstructions cndifficulties which may be encountered in prosecution ofthe Work, shall be sustained and borne bythe CONTRACTOR at its own cost and expense. 6.17 Notice ofClaim: Should the CONTRACTOR suffer injury or damage to person or property because of anyerror, omission cxact of the OWNER oroYany mfthe OVVNER's employees oragents orothers for whose acts the OWNER isliable,aClaim will be made bmthe other party within thirty (30) calendardmys of the event giving rise to such injury or damage. The provisions ufthis paragraph G17shaUnotbeoons\medaaa substitute for orowaiver uythe provisions ofany applicable statute cflimitations,statute ofrepose, orany other provision cfthe Contract Documents. 6.18 Liquidated Damages: At set forth in the Agreement,paragraph 1.2,the CONTRACTOR or its Surety shall be liable for Liquidated Damages for the CONTRACTOR's failure to timely complete the Work or any portion thereof within the Contract Time. See Supplemental Conditions for amount ofLiquidated Damages, ARTICLE 7-OTHER WORK T.1 The OWNER may perform other work related tothe Project odthe site hythe O\NNER'sown forces,cvlet other contracts therefor, orhave other work performed byutility owners. If the CONTRACTOR believes that delay or additional cosi is involved because of such action by the OWNER, the CONTRACTOR may make a Claim as provided in Article 11 or Article 12. 7.2 The CONTRACTOR shall afford other contractors who are in a contract with the OWNER and each utility owner (and the OWNER, if the OWNER is performing the additional work with the OVVNER'o employees) proper and safe access tothe she and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents,the CONTRACTOR mheU do all cuM|ng, fitting and patching of the Work that may be required to make its mavano| parts come together properly and integrate with such other work. The CONTRACTOR shall not endanger any work ofothers hycutting, excavating orotherwise altering their work and will only cut or o|hsr their work with the written consent of Owner's Representative and the other contractors whose work will be affected. The CONTRACTOR shall promptly remedy damage caused by the CONTRACTOR tocompleted orpartially completed construction mrb»property cf the OWNER orseparate contractors. 7.3 |fthe proper execution orresults cf any part ofthe CONTRACTOR'mWork depends upon work performed by others under this Article 7. the CONTRACTOR shall inspect such other work and promptly report to Owner's Representative in writing any de|mym, defects ordeficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of the CONTR4CTOR'a Work. The CONTRACTOR's failure to report will constitute anacceptance cfsuch other work es fit and proper for integration with the OUNTRACTUR's Work except for latent or non-apparent defects and deficiencies in such other work. 7.4 The OWNER shall provide for coordination of the activities of the OVVNER'e own hz#ee and of each separate contractor with the Work of the CONTRACTOR, who shall cooperate with them. The CONTRACTOR shall participate with other separate contractors and Owner's Representative in reviewing their construction schedules when di/acted to do so. The CONTRACTOR shall make any revisions hothe construction schedule deemed necessary after ajoint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the CONTRACTOR, separate contractors and the OWNER until subsequently revised. 7.5 Unless otherwise stated henein, costs caused bydelays orby improperly timed activities ordefective construction shall beborne bythe party responsible therefor. 7.6 |fCONTRACTOR damages,delays,disrupts orinterferes with the work ofany other contractor,orany utility owner performing other work at or acUocerd to the site of the Project, through CQNTFOACTOR`m failure to take reasonable and customary measures to avoid such impacts,or if any claim arising out of CONTRACTOR's actions. 00700 04^2020 Page 24 General Conditions inactions or negligence in performance of the Work at or adjacent to the site of the Project is made by any such other contractor or utility owner against CONTRACTOR, OWNER, or EIA, then CONTRACTOR shall (1)promptly attempt to settle the claim as to all parties through negotiations with such other contractor or utility owner, or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law,and(2)INDEMNIFY AND HOLD HARMLESS THE INDEMNIFIED PARTIES, INCLUDING, BUT NOT LIMITED TO THE EIA FROM AND AGAINST ANY SUCH CLAIMS,AND AGAINST ALL COSTS,LOSSES,AND DAMAGES(INCLUDING BUT NOT LIMITED TO ALL FEES DCAHARGES OF ENGINEERS, ARCHITECTS, ATTORNEYS, AND OTHER PROFESSIONALS AND ALL COURT ORARBITRATION OR OTHER DISPUTE RESOLUTION COSTS) ARISING OUT OF OR RELATING TO SUCH DAMAGE, DELAY, DISRUPTION, OR INTERFERENCE. ARTICLE 8-OWNER'S RESPONSIBILITIES 8.1 Prior to the start of construction, the OWNER will designate in writing a person or entity to act as Owner's Representative during construction. Except as otherwise provided in these General Conditions,the OWNER shall issue all communications to the CONTRACTOR through Owner's Representative. 81 The OWNER will not supervise, direct, control or have authority over or be responsible for the CONTRACTOR's means,methods,techniques, sequences or procedures of construction or the safety precautions and programs incident thereto. The OWNER is not responsible for any failure of the CONTRACTOR to comply with laws and regulations applicable to furnishing or performing the Work. The OWNER is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. Failure or omission of the OWNER to discover, or object to or condemn any defective Work or material shall not release the CONTRACTOR from the obligation to properly and fully perform the Contract. 8.3 The OWNER is not responsible for the acts or omissions of the CONTRACTOR, or of any Subcontractor, any Supplier,or of any other person or organization performing or furnishing any of the Work. 8.4 Information or services under the OWNER's control shall be furnished by the OWNER with reasonable promptness to avoid delay in the orderly progress of the Work. 8.5 The foregoing are in addition to other duties and responsibilities of the OWNER enumerated herein and especially those in respect to Article 4 (Availability of Lands; Subsurface and Physical Conditions; Reference Points),Article 7(Other Work) and Article 14(Payments to the CONTRACTOR and Completion). 8.6 Notice of Claim: Should the OWNER suffer injury or damage to person or property because of any error, omission or act of the CONTRACTOR or of any of the CONTRACTOR's employees or agents or others for whose acts the CONTRACTOR is liable, a notice of such injury or damage will be sent to the CONTRACTOR within thirty (30) calendar days of the event giving rise to such injury or damage. The provisions of this paragraph 8.6 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations or statute of repose, 81 The OWNER is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. The failure or omission of the OWNER,EIA or any other person or entity acting on behalf of the OWNER or the EIA to observe,detect,discover,or object to or condemn any defective Work or material shall not release the CONTRACTOR from CONTRACTOR's obligation to properly and fully perform the Work pursuant to the Contract Documents. The OWNER shall not be responsible for the acts, errors or omissions of the CONTRACTOR, or any Subcontractor, Supplier or any other person or entity performing or furnishing any of the Work on behalf of the CONTRACTOR. ARTICLE a-gNgINEER/ARCHITECT'S STATUS DURING CONSTRUCTION 9.1 E/A's Authority and Responsibilities: 9,11.1 The duties and responsibilities and the limitations of authority of EIA during construction are set forth in the Contract Documents and shall not be extended without written consent of the OWNER and EIA, The assignment 00700 04-2020 Page 25 General Conditions of any authority, duties or responsibilities to E/A under the Contract Documents,or under any agreement between the OWNER and EIA, or any undertaking, exercise or performance thereof by E/A, is intended to be for the sole and exclusive benefit of the OWNER and is not for the benefit of the CONTRACTOR, Subcontractor, Sub- subcontractor,Supplier,or any other person or organization,or for any surety or employee or agent of any of them. 9.1.2 E/A will not supervise, direct, control or have authority over or be responsible for the CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto. E/A is not responsible for any failure of the CONTRACTOR to comply with laws and regulations applicable to the furnishing or performing the Work. E/A is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. Failure or omission of E/A to discover,or object to or condemn any defective Work or material shall not release the CONTRACTOR from the obligation to properly and fully perform the Work. 9.1.3 E/A is not responsible for the acts or omissions of the CONTRACTOR, or of any Subcontractor, any Supplier,or of any other person or organization performing or furnishing any of the Work. 9.1.4 If the OWNER so directs, E/A will review the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, bonds and certificates of inspection,tests and approvals and other documentation required to be delivered by Article 14,but only to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with,the Contract Documents. 9.1.5 The limitations upon authority and responsibility set forth in this paragraph 9.1 shall also apply to E/A's Consultants, Resident Project Representative and assistants. 9.2 E/A as Owner's Representative: 9.2.1 E/A may be designated as Owner's Representative under paragraph 8.1. 9.3 Visits to Site: If the OWNER so directs,E/A will make visits to the site at intervals appropriate to the various stages of construction as is necessary in order to observe as an experienced and qualified design professional the progress that has been made and the quality of the various aspects of the CONTRACTOR's executed Work. Based on information obtained during such visits and observations, E/A will endeavor for the benefit of the OWNER to determine if the Work is proceeding in accordance with the Contract Documents. EIA will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. E/A's efforts will be directed toward providing for the OWNER a greater degree of confidence that the completed Work will conform to the Contract Documents. On the basis of such visits and on-site observations, E/A will keep the OWNER informed of the progress of the Work and will endeavor to guard the OWNER against defective Work. E/A's visits and on-site observations are subject to all the limitations on E/A's authority and responsibility set forth in paragraph 9.1. 9.4 Project Representative: If the OWNER and E/A agree, E/A will furnish a Resident Project Representative to assist E/A in providing more continuous observation of the Work. The responsibilities and authority and limitations of any such Resident Project Representative and assistants will be as provided in paragraph 9.1 and in the Supplemental General Conditions. The OWNER may designate another representative or agent to represent the OWNER at the site who is not E/A, E/A's consultant,agent or employee. 9.5 Clarifications and Interpretations: E/A may determine that written clarifications or interpretations of the requirements of the Contract Documents (in the form of drawings or otherwise) are necessary. Such written clarifications or interpretations will be consistent with the intent of and reasonably inferable from the Contract Documents,will be issued with reasonable promptness by Owner's Representative and will be binding on the OWNER and the CONTRACTOR. If the OWNER or the 00700 04-2020 Page 26 General Conditions CONTRACTOR believes that a written clarification or interpretation justifies an adjustment in the Contract Amount or the Contract Times,the OWNER or the CONTRACTOR may make a Claim therefor as provided in Article 11 or Article 12. 9.6 Rejecting Defective Work: E/A may recommend that the OWNER disapprove or reject Work which E/A believes to be defective, or believes will not produce a completed Project that conforms to the Contract Documents or will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ARTICLE 10-CHANGES IN THE WORK 10.1 Changes: 10.1.1 Without invalidating the Contract and without notice to any surety,the OWNER,at anytime or from time to time, may order additions, deletions or revisions in the Work. Such changes in the Work will be authorized by Change Order, Change Directive or Field Order. 10.1.2 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the CONTRACTOR shall proceed promptly,unless otherwise provided in the Change Order,Change Directive or Field Order. 10.1.3 The CONTRACTOR shall not be entitled to an increase in the Contract Amount or an extension of the Contract Times with respect to any Work performed that is not required by the Contract Documents as amended, modified and supplemented as provided in paragraph 3.3.1 and paragraph 3.3.2, except in the case of an emergency as provided in paragraph 6.11.5 or in the case of uncovering Work as provided in paragraph 13.4. 10.1.4 Except in the case of an emergency as provided in paragraph 6.11.5,a Change Order or Change Directive is required before the CONTRACTOR commences any activities associated with a change in the Work which, in the CONTRACTOR's opinion, will result in a change in the Contract Amount and/or Contract Times. 10.1.5 If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Amount or Contract Times) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be the CONTRACTOR's responsibility, and the amount of each applicable Bond will be adjusted accordingly. 10.2 Change Orders: 10.2.1 The OWNER and the CONTRACTOR shall execute appropriate written Change Orders covering: A a change in the Work; .2 the amount of the adjustment in the Contract Amount, if any" and .3 the extent of the adjustment in the Contract Time, if any. 10.2.2 An executed Change Order shall represent the complete, equitable, and final amount of adjustment in the Contract Amount and/or Contract Time owed to the CONTRACTOR or the OWNER as a result of the occurrence or event causing the change in the Work encompassed by the Change Order. 10.3 Change Directives: 10.31 The OWNER may by written Change Directive,without invalidating the Contract,order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Amount 00700 04-2020 Page 27 General Conditions and Contract Time being adjusted as necessary. A Change Directive shall be used in the absence of complete and prompt agreement on the terms of a Change Order. 10.3.2 If the Change Directive provides for an adjustment to the Contract Amount,the adjustment shall be based on the method provided for in paragraph 11.5. 10.3.3 A Change Directive shall be recorded later by preparation and execution of an appropriate Change Order. 10.3.4 Upon receipt of a Change Directive, CONTRACTOR shall promptly proceed with the change in the Work involved. 10.4 Field Order: 10.4.1 Owner's Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Amount or the Contract Times and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These shall be accomplished by written Field Order and shall be binding on the OWNER and on the CONTRACTOR who shall perform the Work involved promptly. 10.4.2 If the CONTRACTOR believes that a Field Order would require an adjustment in the Contract Amount and/or Contract Times, the CONTRACTOR shall make written request to Owner's Representative for a Change Order, Any request by the CONTRACTOR for an adjustment in Contract Amount and/or Contract Times shall be made in writing prior to beginning the work covered by the Field Order. 10.5 No Damages for Delay: Except as otherwise provided in the Contract Documents, the CONTRACTOR shall receive no compensation for delays or hindrances to the Work. If delay is caused by specific orders given by the OWNER to stop Work for reasons for which the CONTRACTOR is not responsible, or such delay is not caused by active interference in the Work by OWNER for reasons for which the CONTRACTOR is not responsible, then such delay will entitle the CONTRACTOR only to an equivalent extension of time,the CONTRACTOR's application for which shall, however, be subject to approval of the OWNER No such extension of time shall release the CONTRACTOR or surety on its performance bond from all the CONTRACTOR's obligations hereunder which shall remain in full force until discharge of the Contract. ARTICLE 11 -CHANGE OF CONTRACT AMOUNT 11.1 The Contract Amount is stated in the Agreement and, including authorized adjustments, is the total amount payable by the OWNER to the CONTRACTOR for performance of the Work under the Contract Documents. 11.2 The original Contract Amount may not be increased by more than twenty-five percent(25%)and it may not be decreased more than twenty-five percent(25%)without the consent of the CONTRACTOR to such decrease. 11.3 The Contract Amount shall only be changed by a Change Order. Any claim for an adjustment in the Contract Amount shall be made by Written Notice delivered by the party making the Claim to the other party promptly (but in no event later than thirty(30)calendar days)after the start of the occurrence or event giving rise to the Claim and stating the general nature of the Claim. Notice of the amount of the Claim with supporting data shall be delivered within thirty(30)calendar days after Written Notice of Claim is delivered by claimant,and shall represent that the adjustment claimed covers all known amounts to which claimant is entitled as a result of said occurrence or event. If the OWNER and the CONTRACTOR cannot otherwise agree,all Claims for adjustment in the Contract Amount shall be determined as set out in Article 16. 11.4 Determination of Value of Work: 00700 04.2020 Page 28 General Conditions 11.4.1 The value of any Work covered by a Change Order or of any Claim for an adjustment in the Contract Amount will be determined by one or more of the following methods: J by application of unit prices contained in the Contract Documents to the quantities of the items involved. .2 by a mutually agreed lump sum properly itemized and supported by sufficient substantiating data to permit evaluation. .3 by cost of Work plus the CONTRACTOR's fee for all overhead costs and profit(determined as provided in paragraph 11.5). 11.4.2 Before using the method described in paragraph 11.4.1.3, the OWNER and the CONTRACTOR agree to negotiate a Change Order using the methods identified in paragraph 11.4.1,1 and paragraph 11.4.1.2, as appropriate,to determine the adjustment in the Contract Amount. 11.5 Cost of Work: If neither of the methods defined in paragraph 11.4.1.1 or paragraph 11 AA.2 can be agreed upon before a change in the Work is commenced which will result in an adjustment in the Contract Amount, the OWNER may issue a Change Directive to the CONTRACTOR. If the OWNER elects to issue a Change Directive, CONTRACTOR shall perform the Changed Work and payment will be made as follows: A For all personnel, the CONTRACTOR will receive the rate or wage specified in the prevailing wage rates established in Section 00900 for each hour that said personnel are actually engaged in such Work, to which will be added an amount equal to twenty-five percent (25%) of the sum thereof as compensation for the CONTRACTOR's and any affected Subcontractor's total overhead and profit. No separate charge will be made by the CONTRACTOR for organization or overhead expenses, For the cost of premiums on public liability insurance, workers' compensation insurance, social security and unemployment insurance, an amount equal to fifty-five percent (55%) of the wages paid personnel, excluding the twenty-five(25%)compensation provided above,will be paid to the CONTRACTOR. The actual cost of the CONTRACTOR's bond(s) on the extra Work will be paid based on invoices from surety. No charge for superintendence will be made unless considered necessary and ordered by the OWNER. .2 The CONTRACTOR will receive the actual cost, including freight charges, of the materials used on such Work, to which costs will be added a sum equal to twenty-five percent (25%) thereof as compensation for the CONTRACTOR's and any affected Subcontractor's total overhead and profit. In case material invoices indicate a discount may be taken, the actual cost will be the invoice price minus the discount .3 For machinery,trucks, power tools, or other similar equipment agreed to be necessary by the OWNER and the CONTRACTOR, the OWNER will allow the CONTRACTOR the rate as given in the latest edition of the Associated General Contractors of America "Contractor's Equipment Cost Guide" as published by Dataquest for each hour that said tools or equipment are in use on such work, which rate includes the cost of fuel, lubricants and repairs. No additional compensation will be allowed on the equipment for the CONTRACTOR's overhead and profit. .4 The compensation, as herein provided for, shall be received by the CONTRACTOR and any affected Subcontractor as payment in full for work done by Change Directive and will include use of small tools, and total overhead expense and profit, The CONTRACTOR and the Owner's Representative shall compare records of work done by Change Directive at the end of each day. Copies of these records will be made upon forms provided for this purpose by the OWNER and signed by both Owner's Representative and the CONTRACTOR, with one(1) copy being retained by the OWNER and one(1) by the CONTRACTOR, Refusal by the CONTRACTOR to sign these records within two (2) working days of presentation does not invalidate the accuracy of the record. 00700 04-2020 Page 29 General Conditions 11/6 Unit Price Work: 11'6.1 Where the Contract Documents provide that all or part of the Work is to be unit price Work, initially the Contract Amount will bedeemed hzinclude for all unit price work anamount equal tothe sum nfthe established unit price for each separately identified item ofunit price work times the estimated quantity oYeach item aeindicated in the Bid. The estimated quantities of items of unit price work are not guaranteed and are solely for the purpose of comparison of Bids and determining on initial Contract Amount. Determinations of the actual quantities and classifications of unit price work performed by the CONTRACTOR will be made by Owner's Representative. Owner's Representative will review with the CONTRACTOR the preliminary determinations on such matters before rendering awritten decision thereon(by recommendation cf anApplication for Payment or otherwise). 11.6.2 When "plan quantity"imindicated for abid item, the CONTRACTOR shall bepaid the amount specified in the Contract Documents without any measurements. 11.6'3 Each unit price will be deemed toinclude onamount considered bythe CONTRACTOR tobeadequate tn cover the CONTFD\CTOR'soverhead and profit for each separately identified item. 11.6.4 AMajor Item isany individual bid item|nthe Bid that has a total cost equal toorgreater than five percent (594) of the original Contract Amount or $50.000. whichever is Qneoder, computed on the basis of bid quantities and Contract unit prices. 11,6.5 The OWNER o/ the CONTRACTOR may make a Claim for an adjustment in the Contract Amount in accordance with Article 11 if: .i the actual quantity of any Major Item should become aamuch aatwenty percent(2096) more than or twenty percent(2O96)less than inthe 8id� mr .2 The CONTRACTOR presents proper documentation contesting the accuracy of"plan quantity," and Owner's Representative verifies quantity and determines original quantity is in error byfive percent (596)ormore. 11.6.6 Right hrVerify Information: The CONTRACTOR agrees that any designated representative ofthe OWNER shall have the right to examine the CONTF0ACTOR's records to verify the accuracy and appropriateness of the pricing data usedtoprice change proposals. Even after aChange Order Proposal has been approved, the CONTRACTOR agrees that if the OWNER later determines the cost and pricing data submitted was inaccurate, incomplete, not current ornot ivcompliance with the terms oithis Agreement regarding pricing m[change orders, then onappropriate contract price reduction will bemade. 11,0.7 Pricing Information Requirements: The CONTRACTOR agrees toprovide and require all subcontractors to provide a breakdown of allowable labor and labor burden cost information as outlined herein. This information will beused toevaluate the potential cost pflabor and labor burden related tochange order work. |timintended that this information represent an accurate estimate of the CONTRACT[>R's actual labor and labor burden cost components. This information is not intended to establish fixed billing or change order pricing labor rates. However, sdthe time change orders are priced the submitted cost data for labor rates may beused Loprice change order work. The accuracy of any such agreed-upon labor cost components used to price change orders will be subject tolater audit. Approved change order amounts may beadjusted later hocorrect the impact cfinaccurate labor cost components ifthe agreed-upon labor cost components are determined tobeinaccurate. ARTICLE 12-CHANGE OF CONTRACT TIMES 12-1 Working Day and Calendar Day Contracts: 12^1.1 The Contract Times (or Milestones) shall only be changed by Change Order orTime Extension Request duty executed byboth the CONTRACTOR and Owner's Representative. Any claim for an adjustmentofthe Contract Times(or Milestones)shall be made by Written Notice delivered by the party making the Claim to the other 00700 04~2820 Page 30 General Conditions party promptly(but in no event later than thirty (30)calendar days)after the start of the occurrence or event giving rise to the delay and stating the general nature of the delay. Notice of the extent of the delay with supporting data shall be delivered within thirty(30) calendar days after Written Notice of Claim is delivered by claimant, and shall represent that the adjustment claimed is the entire adjustment to which claimant is entitled as a result of said occurrence or event. If the OWNER and the CONTRACTOR cannot otherwise agree, all Claims for adjustment in the Contract Times (or Milestones) shall be determined as set out in Article 16. No Claim for an adjustment in the Contract Times(or Milestones)will be valid if not submitted in accordance with the requirements of this paragraph 12.1.2 When the CONTRACTOR is at fault and the OWNER stops the Work so that corrections in the Work can be made by the CONTRACTOR, then no extension in time will be allowed. 12,1,3 When the CONTRACTOR is prevented from completing any part of the Work within the Contract Times(or Milestones)due to delay for which the CONTRACTOR is not responsible, an extension of the Contract Times(or Milestones)in an amount equal to the time lost due to such delay will be considered by OWNER. Any extension of the Contract Time shall be the CONTRACTOR's sole and exclusive remedy for such delay. However, adverse weather shall not be considered justification for extension of Contract Times on Calendar Day contracts, except as provided for in paragraph 12.2. 12.1.4 The OWNER will consider time extension requests and may grant the CONTRACTOR an extension of time because of: .1 Changes ordered in the Work which justify additional time. .2 Failure of materials or products being at the Project site due to delays in transportation or failures of Suppliers,for which the CONTRACTOR,a Subcontractor or a Supplier is not responsible. The request for an extension of time shall be supported by a recitation of acts demonstrating that such delays were beyond the control of the CONTRACTOR, a Subcontractor or a Supplier including but not limited to, the CONTRACTOR's, the Subcontractor's or the Supplier's efforts to overcome such delays documented as follows: a) Copy of purchase order for delayed item(s) indicating date ordered by the CONTRACTOR/Subcontractor and date purchase order received by Supplier. b) If item(s) require Shop Drawings or other submittal information in accordance with the Contract Documents, provide record of date submittal(s) forwarded to Owner's Representative, date submittal(s)returned to the CONTRACTOR,and date submittal(s)forwarded to Supplier. c) Copy of document(s) from Supplier, on Suppliers letterhead, indicating date(s) item(s) would be ready for shipment and/or actual shipment date(s). d) Copies of all correspondence between the CONTRACTOR/Subcontractor and Supplier indicating the CONTRACTOR/Subcontractor's efforts to expedite item(s). e) If item(s) are being purchased by a Subcontractor, provision of meeting notes, correspondence, and the like which reflect the CONTRACTOR's efforts with the Subcontractor to expedite delivery of the item(s). .3 When acts of the OWNER, E/A, utility owners or other contractors employed by the OWNER delay progress of work through no fault of the CONTRACTOR. .4 When the CONTRACTOR is delayed by strikes, lockouts, fires, losses from natural causes, or other unavoidable cause or causes beyond the CONTRACTOR's control. 12.2 Calendar Day Contracts: 00700 042020 Page 31 General Conditions Under a Calendar Day Contract,the CONTRACTOR may also be granted an extension of time because of unusual inclement weather that is beyond the normal weather expected for the Williamson and Travis Counties,Texas area. Normal weather which prevents the CONTRACTOR from performing Work is expected during a Calendar Day Contract,and is not a justification for an extension of time. The following delineates the number of days per month for which,for purposes of Calendar Day Contracts,expected normal weather will prevent performance of Work; January.......................... 7 days February........................ 7 days March........... ................. 7 days April............................... 7 days May................................ 8 days June................................ 6 days July.................. .............. 6 days August........................... 5 days September..................... 7 days October.......................... 7 days November..................... 7 days December...................... 7 days Days per month exceeding the number shown above may be credited as Rain Days if a Claim is made in accordance with paragraph 12.1.1 and meets the following definition: a"Rain Day"is any day in which a weather event occurs at the site and is sufficient to prevent the CONTRACTOR from performing units of Work critical to maintaining the project schedule during the entire day. ARTICLE 13 -TESTS AND INSPECTIONS; AND CORRECTION OR REMOVAL OF DEFECTIVE WORK 13.1 Notice of Defects: Prompt notice of all defective Work of which the OWNER or E/A has actual knowledge will be given to the CONTRACTOR. All defective Work may be rejected or corrected as provided for in Article 13. 13.2 Access to Work: The OWNER, E/A, E/A's Consultants, other representatives and personnel of the OWNER, independent testing laboratories and governmental agencies having jurisdiction will have unrestricted physical access to the Work site for observing, inspecting and testing. The CONTRACTOR shall provide them proper and safe conditions for such access, and advise them of the CONTRACTOR's site safety procedures and programs so that they may comply therewith as applicable. 13.3 Tests and Inspections: 13.3.1 The CONTRACTOR shall give timely notice of readiness of the Work for all required inspections,tests or approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. 13.3.2 The OWNER shall employ and pay for services of an independent testing laboratory to perform all inspections,tests or approvals required by the Contract Documents except: .1 for inspections,tests or approvals covered by paragraph 13.3.3 below; .2 for reinspecting or retesting defective Work; and .3 as otherwise specifically provided in the Contract Documents. All testing laboratories shall be those selected by the OWNER. 00700 04.2020 Page 32 General Conditions 113.3 If laws or regulations of any public body having jurisdiction require any Work(or part thereof)specifically to be inspected,tested or approved by an employee or other representative of such public body, the CONTRACTOR shall assume full responsibility for arranging and obtaining such inspections, tests or approvals, pay all costs in connection therewith and furnish Owner's Representative the required certificates of inspection or approval. The CONTRACTOR shall also be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests or approvals required for the OWNER's and E/A's review of materials or equipment to be incorporated in the Work, or of materials, mix designs or equipment submitted for review prior to the CONTRACTOR's purchase thereof for incorporation in the Work, 13.4 Uncovering Work: 13.4.1 If any Work (or the work of others) that is to be inspected, tested or approved is covered by the CONTRACTOR without concurrence of Owner's Representative, or if any Work is covered contrary to the written request of Owner's Representative, it must, it requested by Owners Representative, be uncovered and recovered at the CONTRACTOR's expense, 13.4.2 If Owner's Representative considers it necessary or advisable that covered Work be observed, inspected or tested, the CONTRACTOR shall uncover, expose or otherwise make available for observation, inspection or testing that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective,the CONTRACTOR shall pay all claims, costs, losses and damages caused by,arising out of or resulting from such uncovering, exposure, observation, inspection and testing and of satisfactory replacement or reconstruction(including but not limited to all costs of repair or replacement of work of others); and the OWNER shall be entitled to an appropriate decrease in the Contract Amount, and may make a Claim therefor as provided in Article 11, If, however, such Work is not found to be defective, the CONTRACTOR shall be allowed an increase in the Contract Amount or an extension of the Contract Times (or Milestones), or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement and reconstruction; and the CONTRACTOR may make a Claim therefor as provided in Article 11 and Article 12. 13.5 OWNER May Stop the Work: 113.5,11 If the Work is defective,or the CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment, or fails to furnish or perform the Work in such a way that the completed Work will conform to the Contract Documents,the OWNER may order the CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however,this right of the OWNER to stop the Work shall not give rise to any duty on the part of the OWNER to exercise this right for the benefit of the CONTRACTOR or any surety or other party. 13,5.2 If the CONTRACTOR fails to correct defective Work or submit a satisfactory plan to take corrective action, with procedure and time schedule, the OWNER may order the CONTRACTOR to stop the Work, or any portion thereof,until cause for such order has been eliminated,or take any other action permitted by this Contract. A notice to stop the Work, based on defects, shall not stop calendar or working days charged to the Project. 00700 04.2020 Page 33 General Conditions 13.6 Correction wrRemoval mfDefective Work: If required by the OWNER,the CONTRACTOR shall promptly,as directed,either correct all defective Work,whether ornot fabricated, installed o,completed, or, if the Work has been rejected byOwner's Representative, remove it from the site and replace it with Work that is not defective.The CONTRACTOR shall correct or remove andreplace dahsct|wa VVork, or submit u p|sm of action detailing how the deficiency will be cnrnmced, within the time frame identified in the notice of defective Work. The CONTRACTOR shall pay all claims, costs, losses and damages caused by or resulting from such correction or removal(including but not limited to all costs of repair or replacement ofwork m[otherm). including but not limited tnall consultant,engineering,expert and attorney's fees incurred bythe OWNER as a result of such defective work or as necessary for OWNER to investigate such defective Work and/or to determine the appropriate means or methods to address or correct such defective Work. The OWNER mhe|| have the right, in QVVNER'a sole discnaUon, to have the E/A orother consultant specify the means and methods that will befollowed hmcorrect oraddress any defective Work. Ifthe OWNER specifies ameans ormethod bywhich the defective Work will be addressed or corrected, the CONTRACTOR shall perform the specified work necessary tnaddress orcorrect the defective Work otCONTRACTOR'esole cost and expense. 13.7 Warranty period: 13.7.1 If, at any time after the date ofSubstantial Completion orsuch longer period oftime asmay beprescribed by laws or regulations or bythe terms ofany applicable special guaranteerequired bythe Contract Documents ar byany specific provision ofthe Contract Documents, any Work iafound tobedefective, the CONTRACTOR shall promptly,without cost hmthe OWNER and inaccordance with the C}VVNER'mwritten instructions: (i) correct such defective VVork, or, if it has been rejected by the OVVNER, remove it from the site and replace bwith Work that ienot defective, and (ii) satisfactorily correct or remove and replace any damage to other Work or the work of others resulting therefrom. If the CONTRACTOR does not promptly comply with the terms of such inshudions, or in an emergency where delay would cause serious risk ofloss ordamage, the OWNER may have the defective Work corrected or the rejected Work removed and replaced,and all claims, costs, losses and damages caused by or resulting from such removal and replacement (including but not limited to all costs of repair orreplacement ofwork ofothers and all consultant, expert and attorney's fees incurred by OWNER)will be paid by the CONTRACTOR. 13.7.2 In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion oyall the Work, thewanan(ypehodYorthsditemmeymtart torun from mnearlier date ifso provided inthe Contract Documents and agreed tobyOWNER. 13.* OWNER May Correct Defective Work: |fthe CONTRACTOR fails within a reasonable time after Written Notice of the OWNER to correct defective Work, ortoremove and replace rejected Work, or if the CONTRACTOR fails to perform the Work in accordance with the Contract Documents, wrifthe CONTRACTOR fails to comply any other provision of the Contract Documents, the OWNER may, after eve (7) calendar days' VVhtte Notice to the CONTRACTOR, correct and remedy any such deficiency, If, in the opinion of Owner's Representative, significant progress has not been made during this seven(7)calendar day period to correct the deficiency,the OWNER may exercise any actions necessary to remedy thedeficiency. In exercising the rights and remedies under this paragraph,the OWNER shall proceed expeditiously. In connection with such corrective and remedial action, the OWNER may exclude the CONTRACTOR from all or part of the site, take possession of all or part of the Work, and suspend the CONTRACTOR's services related thereto, and incorporate in the Work all materials and equipment stored at the site or for which the OWNER has paid the CONTRACTOR but which are stored elsewhere. The CONTRACTOR shall allow the OWNER, its agents and employees,the OWNER's other contractors,E/A and E/A's consultants access to the site to enable the OWNER to exercise the rights and remedies under this paragraph. All claims, costs, losses and damages incurred or sustained by the OWNER in exercising such rights and remedies will be charged against the CONTRACTOR and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the 00700 04~2020 Page 34 General Conditions Work. Such claims, costs, losses and damages will include but not be limited to all costs of repair or replacement of work of others destroyed or damaged by correction, removal or replacement of the CONT CTOR's defective Work and any and all consultant,expert and attorneys fees incurred by OWNER as a result of OWNER's correction of defective WORK. The CONTRACTOR shall not be allowed an extension of the Contract Times(orMilestones), or claims of damage because of any delay in the performance of the Work attributable to the exercise by the OWNER of the OWNER's rights and remedies hereunder. 13.9 ACCEPTANCE OF DEFECTIVE WORK If, instead of requiring correction or removal and replacement of defective Work„ OWNER prefers to accept it, OWNER may do so. CONTRACTOR shall pay all claims, costs, losses„ and damages attributable to OWNER's evaluation of and determination to accept such defective Work, including but not limited to any expert, engineering or other consultant's fees incurred by the OWNER to investigate such defective Work and/or to determine the appropriate means or methods and work necessary to allow OWNER to accept the defective Work and CONTRACTOR shall pay for all work required to be performed to allow OWNER to accept the defective Work and any estimated costs, expenses and damages OWNER may sustain in the future as a result of accepting the defective Work, including any diminution in value of the Project as a result of accepting the defective Work, If any such acceptance occurs prior to final payment,the necessary revisions in the Contract Documents with respect to the Work shall be incorporated in a Change Order. If the parties are unable to agree as to the decrease in the Contract Price, then OWNER may impose a reasonable set-off against payments due under the Contract Documents. If the acceptance of defective Work occurs after final payment, CONTRACTOR shall pay to OWNER the above described costs, expenses and damages incurred by OWNER as a result of OWNER"s acceptance of defective Work. ARTICLE 14-PAYMENTS TO CONTRACTOR AND gQMELETION 14.1 Application for Progress Payment: 14.1.1 Not more than once per month, the CONTRACTOR shall submit to Owner's Representative for review an Application for Payment, in a form acceptable to the OWNER,filled out and signed by the CONTRACTOR covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents or as required by OWNER. 14.1.2 Such applications shall not include requests for payment on account of changes in the Work which have been properly authorized by Change Directives but not yet included in Change Orders. 14.1.3 Such applications shall not include requests for payment of amounts the CONTRACTOR does not intend to pay to a Subcontractor or Supplier because of a dispute or other reason. 14.1.4 Owner will not pay for materials or equipment not incorporated in the Work but delivered and suitably stored at the site or at another location. Payment will be made by Owner only for Work completed in accordance with the Contract Documents. 14.1.5 Where the original Contract Amount is less than$400,000, the OWNER will pay to the CONTRACTOR the total amount of approved Application for Payment, less ten percent(10%)of the amount thereof,which ten percent (10%)will be retained until final payment, less all previous payments and less all sums that may be retained by the OWNER under the terms of this Agreement. Where the original Contract Amount is$400,000 or more,the OWNER will pay to the CONTRACTOR the total amount of approved Application for Payment, less five percent(5%)of the amount thereof,which five percent(5%)will be retained until final payment, less all previous payments and less all sums that may be retained by the OWNER under the terms of this Agreement. In either case, if the Work is near completion and delay occurs due to no fault or neglect of the CONTRACTOR, the OWNER may pay a portion of the retained amount to the CONTRACTOR. The CONTRACTOR, at the OWNER's option, may be relieved of the obligation to complete the Work and, thereupon, the CONTRACTOR shall receive payment of the balance due under the Contract subject to the conditions stated under paragraph 15.2. 00700 04-2020 Page 35 General Conditions 14.1.6 Applications for Payment shall include the following documentation: .1 updated progress schedule; .2 monthly subcontractor report;and .3 any other documentation required under the Supplemental General Conditions. 14.2 CONTRACTOR's Warranty of Title: The CONTRACTOR warrants and guarantees that title to all Work, materials and equipment covered by any Application for Payment,whether incorporated in the Project or not,will pass to the OWNER not later than the time of payment to the CONTRACTOR free and clear of all liens. 14.3 Review of Applications for Progress Payment: 14.3.1 Owner's Representative will,within seven (7)calendar days after receipt of each Application for Payment, either indicate a recommendation for payment and forward the Application for processing by the OWNER,or return the Application to the CONTRACTOR indicating Owner's Representative's reasons for refusing to recommend payment. In the latter case,the CONTRACTOR may make the necessary corrections and resubmit the Application. 14.3.2 Owners Representative's recommendation of any payment requested in an Application for Payment will constitute a representation by Owner's Representative, based upon Owner's Representative's on-site observations of the executed Work and on Owner's Representative's review of the Application for Payment and the accompanying data and schedules,that to the best of Owners Representative's knowledge,information and belief: .1 the Work has progressed to the point indicated; and 2 the quality of the Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents,to a final determination of quantities and classifications for unit price Work,and to any other qualifications stated in the recommendation). 14.3.3 By recommending any such payment, Owner's Representative will not thereby be deemed to have represented that: .1 inspections have been made to check the quality or the quantity of the Work or that the Work has been performed in accordance with the Contract Documents; 2 examination has been made to ascertain how or for what purpose the CONTRACTOR has used money previously paid on account of the Contract Amount; .3 the CONTRACTOR's construction means, methods,techniques, sequences or procedures have been reviewed;or .4 that there may not be other matters or issues between the parties that might entitle the CONTRACTOR to be paid additionally by the OWNER or entitle the OWNER to withhold payment to the CONTRACTOR. 14.4 Decisions to Withhold Payment: 14.4.1 The OWNER may withhold or nullify the whole or part of any payment to such extent as may be necessary on account of: .1 defective Work not remedied; 00700 04-2020 Page 36 General Conditions .2 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Amount; .3 damage to the OWNER or another contractor; A reasonable evidence that the Work will not be completed within the Contract Time,and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay: .5 failure of the CONTRACTOR to submit a schedule of values in accordance with the Contract Documents; .6 failure of the CONTRACTOR to submit a submittal schedule in accordance with the Contract Documents; I failure of the CONTRACTOR to submit or update construction schedules in accordance with the Contract Documents; .8 failure of the CONTRACTOR to maintain a record of changes on drawings and documents; .9 failure of the CONTRACTOR to maintain weekly payroll reports; .10 failure of the CONTRACTOR to submit monthly subcontractor reports; ,11 the CONTRACTOR's neglect or unsatisfactory prosecution of the Work, including failure to clean up;; or .12 failure of the CONTRACTOR to comply with any provision of the Contract Documents. .13 OWNER's disagreement with the recommendation of the Owner's Representative, provided the OWNER has provided a Written Notice to the CONTRACTOR specifying the reasons why OWNER does not agree with such recommendation. 14.4.2 When the above reasons for withholding payment are removed, the CONTRACTOR shall resubmit a statement for the value of Work performed. Payment will be made within thirty (30) calendar days of receipt of approved Application for Payment. 14.5 Delayed Payments: Should the OWNER fail to make payment to the CONTRACTOR of a sum named in any Application for Payment with which OWNER agrees and has approved for payment within thirty(30)calendar days after the day on which the OWNER received the mutually acceptable Application for Payment, then the OWNER will pay to the CONTRACTOR, in addition to the sum shown as due by such Application for Payment, interest thereon at the rate of one percent (1%) per month from date due until fully paid, which shall fully liquidate any injury to the CONTRACTOR growing out of such delay in payment. 14.6 Arrears: No money shall be paid by the OWNER upon any claim,debt,demand or account whatsoever, to any person,firm or corporation who is in arrears to the OWNER; and the OWNER shall be entitled to counterclaim and offset against any such debt, claim, demand or account so in arrears and no assignment or transfer of such debt,claim,demand or account, shall affect the right of the OWNER to so offset said amounts, and associated penalties and interest if applicable, against the same. 04704 04-2020 Page 37 General Conditions 14.7 Substantial Completion: 14.7.1 M a Certificate ofOccupancy is required by public authorities having jurisdiction over the Work, id certificate shall be issued before the Work or any portion thereof is considered substantially complete. When the CONTRACTOR considers that the Work, or a portion thereof which the OWNER agrees to accept separately, is substantially complete, the CONTRACTOR shall notify Owner's Representative and request a determination as to whether the Work or designated portion thereof is substantially complete. If Owner's Representative does not consider the Work substantially complete, Owner's Representative will notify the CONTRACTOR giving reasons therefor. Failure on the OWNER's part to list a reason does not alter the responsibility of the CONTRACTOR to complete all Work in accordance with the Contract Documents. After satisfactorily completing items identified by Owner's Representative, the CONTRACTOR shall then submit another request for Owner's Representative to determine substantial completion If Owners Representative considers the Work substantially complete, Owner's Representative will prepare and deliver a certificate of Substantial Completion which shall establish the date of Substantial Completion, shall include a punch list of items to be completed or corrected before final payment, shall establish the time within which the CONTRACTOR shall finish the punch list,and shall establish responsibilities of the OWNER and the CONTRACTOR for security, maintenance, heat, utilities, damage to the Work,warranty and insurance. Failure to include an item on the punch list does not alter the responsibility of the CONTRACTOR to complete all Work inaccordance with the Contract Documents. The certificate ofSubstantial Completion shall be signed by the OWNERand the CONTRACTOR toevidence acceptance ufthe responsibilities assigned bothem in such certificate. 14.7.2 The OWNER shall have the right to exclude the CONTRACTOR from the Work after the date of Substantial Completion, but the OWNER will allow the CONTRACTOR reasonable access to complete or correct items on the punch list. 14.8 Partial Utilization; The OWNER, at the OVNER's sole option, shall have the right to take possession of and use any completed or partially completed portion of the Work regardless of the time for completing the entire Work. The OVVNER'm exercise ofsuch use and possessionshall not beconstrued h»mean that the OWNER acknowledges that any part of the Work mo possessed and used is substantially complete or that it is accepted by OVVNER,and the OWNER'o exercise of such use and possession shall not relieve the CONTRACTOR of its responsibility to complete all Work inaccordance with the Contract Documents. 14.9 Final Inspection: Upon Written Notice from the CONTRACTOR that the entire Work or an agreed portion thereof icomplete, Owner's Representative will make a final inspection with the CONTRACTOR and provide Written Notice of all particulars in which this inspection reveals that the Work iaincomplete ordefective. The CONTRACTOR shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 14.10 Final Application for Payment: The CONTRACTOR may make application for final payment following the procedure for progress payments after the CONTRACTOR has completed all such corrections tothe satisfaction nfOwners Representative and delivered the following documents: ,1 Three(3)complete operating and maintenance manuals, each containing maintenance and operating instructions, schedules,guarantees, and other documentation required by the Contract Documents; .2 Record documents(as provided inparagraph 8.1O); .3 Consent of surety, if any, to final payment. If surety is not provided, complete and legally effective releases orwaivers(satisfactory to the OWNER) oyall claims arising out oforfiled inconnection with theVVork� 00700 04-2020 Page 38 General Conditions .4 Certificate evidencing that insurance required by the Supplemental General Conditions will remain in force after final payment and through any warranty period; .5 Non-Use of Asbestos Affidavit(After Construction);and .6 Any other documentation called for in the Contract Documents. 14.11 Final Payment and Acceptance: 14.11.1 If, on the basis of observation of the Work during construction, final inspection, and review of the final Application for Payment and accompanying documentation as required by the Contract Documents, Owner's Representative is satisfied that the Work has been completed and the CONTRACTOR's other obligations under the Contract Documents have been fulfilled, Owner's Representative will recommend the final Application for Payment and thereby notify the OWNER. If the OWNER agrees with the recommendation of the Owner's Representative, the OWNER will pay to the CONTRACTOR the balance due the CONTRACTOR under the terms of the Contract. 14.11.2 As Contract Time is measured to Final Completion, Owner's Representative will issue a letter of final acceptance to the CONTRACTOR which establishes the Final Completion date and initiates any warranty period. 14.11.3 Final payment is considered to have taken place when the CONTRACTOR or any of its representatives negotiates the OWNER's final payment check, whether labeled final or not, for cash or deposits check in any financial institution for its monetary return. 14.12 Waiver of Claims: The making and acceptance of final payment will constitute: .1 a waiver of claims by the OWNER against the CONTRACTOR, except claims arising from unsettled claims, from defective Work appearing after final inspection, from failure to comply with the Contract Documents or the terms of any warranty specified therein, or from the CONTRACTOR's continuing obligations under the Contract Documents; and .2 a waiver of all claims by the CONTRACTOR against the OWNER other than those previously made in writing and still unsettled. ARTICLE 15.SUSPENSION OF WORK AND TERMINATION 15.1 OWNER May Suspend Work Without Cause and for Convenience: At any time and without cause and for convenience,the OWNER may suspend the Work or any portion thereof for a period of not more than ninety(90)calendar days by written agreement or by Written Notice to the CONTRACTOR which will fix the date on which the Work will be resumed. The CONTRACTOR shall resume the Work on the date so fixed. The CONTRACTOR may be allowed an adjustment in the Contract Amount or an extension of the Contract Times,or both,directly attributable to any such suspension if the CONTRACTOR makes an approved Claim therefor as provided in Article 11 and Article 12. 151 OWNER May Terminate Without Cause: Upon seven(7)calendar days'Written Notice to the CONTRACTOR,the OWNER may,without cause and without prejudice to any right or remedy of the OWNER, elect to terminate the Agreement. In such case, the CONTRACTOR shall be paid (without duplication of any items): .1 for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination; 00700 04-2020 Page 39 General Conditions .2 for all claims incurred in settlement of terminated contracts with Suppliers, Subcontractors,and others,. The CONTRACTOR agrees to negotiate in good faith with Subcontractors, Suppliers and others to mitigate the OWNER's cost CONTRACTOR shall include in any subcontract or purchase order language that provides that if the Agreement is terminated without cause, the Subcontractor and Suppliers will only be paid for work performed or materials and equipment supplied and shall not have any other claims against CONTRACTOR or OWNER; CONTRACTOR shall not be paid for any profit or overhead for Work not completed. 15.3 OWNER May Terminate With Cause: 15.3.1 Upon the occurrence of any one or more of the following events: .1 if the CONTRACTOR persistently fails to perform the Work in accordance with the Contract Documents; .2 if the CONTRACTOR disregards laws or regulations of any public body having jurisdiction; .3 if the CONTRACTOR disregards the authority of Owner's Representative„ .4 if the CONTRACTOR makes fraudulent statements; .5 if the CONTRACTOR fails to maintain a work force adequate to accomplish the Work within the Contract Time; .6 if the CONTRACTOR fails to make adequate progress and endangers successful completion of the Contract;or .7 if the CONTRACTOR otherwise violates any provisions of the Contract Documents; The OWNER may,after giving the CONTRACTOR(and the surety, if any)seven(7)calendar days'Written Notice termiinate the services of the CONTRACTOR. The OWNER,at its option, may proceed with negotiation with surety for completion of the Work. Alternatively,the OWNER may under these circumstances exclude the CONTRACTOR from the site and take possession of the Work (without liability to the CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the site or for which the OWNER has paid the CONTRACTOR but which are stored elsewhere,and finish the Work as the OWNER may deem expedient. In such case the CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Amount exceeds all claims, costs, losses and damages sustained by the OWNER arising out of or resulting from completing the Work,such excess will be paid to the CONTRACTOR. If such claims,costs, losses and damage exceed such unpaid balance, the CONTRACTOR or surety shall pay the difference to the OWNER. 15.3.2 Where the CONTRACTOR's services have been so terminated by the OWNER, the termination will not affect any rights or remedies of the OWNER against the CONTRACTOR and surety then existing or which may thereafter accrue, Any retention or payment of amounts due the CONTRACTOR by the OWNER will not release the CONTRACTOR from liability. In the event the OWNER terminates the Contract with cause,the OWNER may reject any and all bids submitted by the CONTRACTOR for up to three(3)years. 00700 44-2020 Page 40 General Conditions 15.4 CONTRACTOR May Stop Work or Terminate: If through no act or fault of the CONTRACTOR,the Work is suspended for a period of more than ninety(90)calendar days by the OWNER or under an order of court or other public authority, or (except during disputes) Owner's Representative fails to forward for processing any mutually acceptable Application for Payment within thirty (30) calendar days after it is submitted, or(except during disputes)the OWNER fails for sixty (60)calendar days after it is submitted to pay the CONTRACTOR any sum finally determined by the OWNER to be due, then the CONTRACTOR may, upon seven(7)calendar days'Written Notice to the OWNER,and provided the OWNER does not remedy such suspension or failure within that time, terminate the Agreement and recover from the OWNER payment on the same terms as provided in paragraph 15.2. In lieu of terminating the Agreement and without prejudice to any other right or remedy, if(except during disputes) Owner's Representative has failed to forward for processing any mutually acceptable Application for Payment within thirty(30)calendar days after it is submitted, or (except during disputes) the OWNER has failed for sixty (60) calendar days after it is submitted to pay the CONTRACTOR any sum finally determined by the OWNER to be due, the CONTRACTOR may upon seven (7) calendar days' Written Notice to the OWNER stop the Work until payment of all such amounts due the CONTRACTOR, including interest thereon. The provisions of this paragraph 15.4 are not intended to preclude the CONTRACTOR from making a Claim under Article 11 and Article 12 for an increase in Contract Amount or Contract Times or otherwise for expenses or damage directly attributable to the CONTRACTOR's stopping Work as permitted by this paragraph. ARTICLE 16-DISPUTE RESOLUTION 16.1 Filing of Claims: 16.1.1 Claims arising from the circumstances identified in paragraphs 3.2,41, 4.2.2,4.2.4,6.4.2, 6.11.52, 6.17, 7.5, 8.6,9.5, 10.4.2, 13.8, 15.1, 15.2, 15.3,or 15.4,or other occurrences or events,shall be made by Written Notice delivered by the party making the Claim to the other party within thirty (30) calendar days after the start of the occurrence or event giving rise to the Claim and stating the general nature of the Claim. Notice of the amount of the Claim with supporting data shall be delivered within thirty (30) calendar days after Written Notice of Claim is delivered by claimant and shall represent that the adjustment claimed covers all known amounts to which claimant is entitled. 16.1.2 Within thirty(30)calendar days of receipt of notice of the amount of the Claim with supporting data,Owner's Representative and the CONTRACTOR shall meet to discuss the Claim, after which an offer of settlement or notification of no settlement offer will be made to claimant. If claimant is not satisfied with the proposal presented, claimant shall have thirty(30)calendar days in which to: .1 submit additional supporting data requested by the other party; .2 modify the initial Claim; or .3 request Alternative Dispute Resolution, 16.2 Alternative Dispute Resolution: 16.2.1 If a dispute exists concerning a Claim, the parties agree to use the following procedure prior to pursuing any other available remedies. The OWNER reserves the right to include EIA as a party. 16.2.2 Negotiating with Previously Uninvolved Personnel: Either party may make a written request for a meeting to be held between representatives of each party within fourteen (14) calendar days of the request or such later period that the parties may agree to. Each party shall endeavor to include, at a minimum, one (1) previously uninvolved senior level decision maker empowered to negotiate on behalf of their organization. The purpose of this and subsequent meetings will be good faith negotiations of the matters constituting the dispute. Negotiations shall be concluded within thirty(30)calendar days of the first meeting, unless mutually agreed otherwise This step may 00700 04-2020 Page 41 General Conditions be waived by written agreement of both parties, in which event the parties may proceed directly to mediation as described below. 16.2.3 Mediation: 16.2.3.1 If the procedure described in paragraph 16.2.2 proves unsuccessful or is waived pursuant to its terms, the parties shall initiate the mediation process. The parties agree to select within thirty(30)calendar days one(1) mediator trained in mediation skills, to assist with resolution of the dispute. The OWNER and the CONTRACTOR agree to act in good faith in the selection of the mediator and to give consideration to qualified individuals nominated to act as mediator. Nothing in this agreement prevents the parties from relying on the skills of a person who also is trained in the subject matter of the dispute and/or a contract interpretation expert. 16.2.3.2 Mediation is a forum in which an impartial person, the mediator, facilitates communication between parties to promote reconciliation, settlement, or understanding among them. The parties hereby agree that mediation,at a minimum, shall provide for 1)conducting an on-site investigation, if appropriate,by the mediator for fact-gathering purposes, 2) a meeting of all parties for the exchange of points of view and 3) separate meetings between the mediator and each party to the dispute for the formulation of resolution alternatives. The parties agree to participate in mediation in good faith for up to thirty(30)calendar days from the date of the first mediation session, unless mutually agreed otherwise. Should the parties fail to reach a resolution of the dispute through mediation, then each party is released to pursue other remedies available to them. ARTICLE 17—RIGHT TO AUDIT 17.1 Right to Audit: Whenever the OWNER enters into any type of contractual arrangement with the CONTRACTOR, then the CONTRACTOR's "records" shall upon reasonable notice be open to inspection and subject to audit and/or reproduction during normal business working hours. The OWNER's representative, or an outside representative engaged by the OWNER, may perform such audits. The CONTRACTOR shall maintain all records relating to this Agreement for four(4) years from the date of final payment under this Agreement, or until pending litigation has been completely and fully resolved,whichever occurs later. 17.1.1 The OWNER shall have the exclusive right to examine the records of the CONTRACTOR. The term "records"as referred to herein shall include any and all information,materials and data of every kind and character, including without limitation records,books,papers,documents,contracts, schedules,commitments,arrangements, notes, daily diaries, reports, drawings, receipts, vouchers and memoranda, and any and all other agreements, sources of information and matters that may, in the OWNER's judgment, have any bearing on or pertain to any matters, rights,duties or obligations under or covered by any contract document. Such records shall include(hard copy, as well as computer-readable data if it can be made available),written policies and procedures,time sheets, payroll registers, cancelled checks, personnel file data, correspondence, general ledger entries, and any other record in the CONTRACTOR's possession which may have a bearing on matters of interest to the OWNER in connection with the CONTRACTOR's dealings with the OWNER (ail of the foregoing are hereinafter referred to as "records"). In addition,the CONTRACTOR shall permit interviews of employees as well as agents,representatives, vendors, subcontractors and other third parties paid by the CONTRACTOR to the extent necessary to adequately permit evaluation and verification of the following: a) The CONTRACTOR's compliance with contract requirements; b) The CONTRACTOR's compliance with the OWNER'S business ethics policies; and c) If necessary, the extent of the Work performed by the CONTRACTOR at the time of contract termination. 17.1.2 The CONTRACTOR shall require all payees(examples of payees include subcontractors,insurance agents, material suppliers, etc.) to comply with the provisions of this Article 17 by securing the requirements hereof in a 00700 042020 Page 42 General Conditions written agreement between the CONTRACTOR and payee. Such requirements include a flow-down right of audit provision in contracts with payees that also apply to subcontractors and sub-subcontractors,material suppliers,etc The CONTRACTOR shall cooperate fully and shall require Related Parties and all of the CONTRACTOR's subcontractors to cooperate fully in furnishing or in making available to the OWNER from time to time whenever requested, in an expeditious manner, any and all such information, materials, and data. 17,11.3 The OWNER's authorized representative or designee shall have reasonable access to the CONTRACTOR's facilities, shall be allowed to interview all current or former employees to discuss matters pertinent to the performance of this Agreement, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with this Article 17, 17.1,4 If an audit inspection or examination in accordance with this Article 17 discloses overpricing or overcharges of any nature by the CONTRACTOR to the OWNER in excess of one-half of one percent(.5%)of the total contract billings, then the reasonable actual cost of the OWNER's audit shall be reimbursed to the OWNER by the CONTRACTOR. Any adjustments and/or payments,which must be made as a result of any such audit or inspection of the CONTRACTOR's invoices and/or records, shall be made within a reasonable amount of time(not to exceed 90 days)from presentation of the OWNER's findings to the CONTRACTOR. 17.1,5 The CONTRACTOR shall take reasonable actions to prevent any actions or conditions which could result in a conflict with the OWNER's best interests. These obligations shall apply to the activities of the CONTRACTOR's employees, agents, subcontractors, etc. in their dealings and relations with the OWNER's current and former employees and their relatives. For example,the CONTRACTOR's employees,agents or subcontractors should not make or provide to be made any employment, gifts, extravagant entertainment, payments, loans or other considerations to the OWNER's representatives, employees or their relatives, 17.1.6 It is also understood and agreed by the CONTRACTOR that any solicitation of gifts or any other item of value by anyone representing the OWNER is to be reported within two (2) business working days to the OWNER at the following telephone number: 512-218-5401. Failure to report any such solicitations or offers shall be deemed a material breach of contract entitling the OWNER to pursue damages resulting from the failure to comply with this provision. ARTICLE 18—MISCELLANEOLOgi 18.1 Venue: In the event of any suit at law or in equity involving the Contract, venue shall be in Williamson County, Texas and the laws of the state of Texas shall apply to Contract interpretation and enforcement. 18.2 Extent of Agreement: This Contract represents the entire and integrated agreement between the OWNER and the CONTRACTOR and supersedes all prior negotiations, representations or agreements, either written or oral. 18.3 Cumulative Remedies: The rights and remedies available to the parties are not to be construed in any way as a limitation of any rights and remedies available to any or all of them which are otherwise imposed or available by laws or regulations, by special warranty or guarantees or by other provisions of the Contract Documents,and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply. 00700 04-2020 Page 43 General Conditions 18.4 Severability: If any word, phrase,clause, sentence or provision of the Contract, or the application of same to any person or set of circumstances is for any reason held to be unconstitutional,invalid or unenforceable,that finding shall only effect such word, phrase, clause, sentence or provision, and such finding shall not effect the remaining portions of this Contract; this being the intent of the parties in entering into the Contract; and all provisions of the Contract are declared to be severable for this purpose. 18.5 Independent Contractor The Contract shall not be construed as creating an employer/employee relationship,a partnership,or a joint venture. The CONTRACTOR's services shall be those of an independent contractor. The CONTRACTOR agrees and understands that the Contract does not grant any rights or privileges established for employees of the OWNER. 18.6 Prohibition of Gratuities The OWNER may, by Written Notice to the CONTRACTOR,terminate the Contract without liability if is determined by the OWNER that gratuities were offered or given by the CONTRACTOR or any agent or representative of the CONTRACTOR to any officer or employee of the OWNER with a view toward securing the Contract or securing favorable treatment with respect to the awarding or amending or the making of any determinations with respect to the performing of such Contract. In the event the Contract is terminated by the OWNER pursuant to this provision, the OWNER shall be entitled, in addition to any other rights and remedies,to recover or withhold the amount of the cost incurred by the CONTRACTOR in providing such gratuities. 18.7 Prohibition Against Personal Interest in Contracts No officer,employee,independent consultant,or elected official of the OWNER,who is involved in the development, evaluation, or decision-making process of the performance of any solicitation shall have a financial interest, direct or indirect, in the Contract resulting from that solicitation. Any violation of this provision, with the knowledge, expressed or implied,of the CONTRACTOR shall render the Contract voidable by the OWNER. End of General Conditions 00700 04-2020 Page 44 General Conditions 00800 SUPPLEMENTAL GENERAL CONDITIONS No Text Supplemental General Conditions Section 00800 SUPPLEMENTAL GENERAL CONDITIONS TO AGREEMENT FOR CONSTRUCTION SERVICES The Supplemental General Conditions contained herein shall amend or supplement the General Conditions, Section 00700, ARTICLE I -DEFINITIONS 1,16 ED&Lineer/ArchitectLE/A Add the following: Name(Representative) Allen Woelke,_P.E. Firm: CDM Smith Inc Address: 9430 Research Blvd,,, Suite 1-200 City, State, Zip: lu 'AlsltliRjp c ,7759. ... .. ............ Telephone: (512)346-1100 Facsimile: n/a Email: W 1.27 Owners Re2resentative: Add the following: Name: Kaitivn Saucedo Title: En incer Associate .................................................................................................................................................................................. Address: 0 Sunrise Road City, State, Zip: Round Rock Texas 78665 Telephone: (512) 218-7076 Facsimile: n/a Email: ksa�—ucedoocgroundrocktexas.Rov ARTICLE 6-CONTRACTOR'S RESPONSIBILITIES 6AB Liquidated Damages Add the following: 1. CONTRACTOR SHALL PAY LIQUIDATED DAMAGES IN THE AMOUNT OF one thousand AND NO/100 DOLLARS $ 1000,00 PER DAY FOR EACH DAY BEYOND THE DATE ESTABLISHED THEREFORTHATTHE CONTRACTOR FAILS TO ACHIEVE SUBSTANTIAL COMPLETION, AND FOR WHICH OWNER IS UNABLE TO UTILIZE THE IMPROVEMENTS AND FACILITIES DUE TO THE FAILURE OF CONTRACTOR TO HAVE ACHIEVED SUBSTANTIAL COMPLETION IN ACCORDANCE WITH THE CONTRACT. END OF SUPPLEMENTAL GENERAL CONDITIONS Pagel 00900 W-2015 Supplernencd Genval Condmons 00090669 No Text 00900 SPECIAL CONDITIONS No Text SECTION 01-INFORMATION 01-01 COPIES OF PLANS AND SPECIFICATIONS FURNISHED The Agreement will be prepared in not less than two (2) (original signed) sets, Tile OWNER will furnish to the CONTRACTOR one (1) copy of conforming Contract Documents and Specifications unless otherwise requested, 01-02 GOVERNING CODES All construction as provided for under the Contract Documents shall be governed by any existing Resolutions,Codes and Ordinances,and any subsequent amendments or revisions thereto as set forth by the O"ER, 01-03 LOCATION The location of work shall be as set forth in the Notice to Bidders and as indicated in the Contract Documents, 01-04 USAGE OF WATER All water used during construction shall be provided by the OWNER and shall be metered. The OWNER shall specify the location from which the CONTRACTOR is to procure water,The CONTRACTOR shall be responsible for obtaining a bulk water permit from the OWNER and providing all apparatus necessary for procuring,storing, transporting and using water during construction. The CONTRACTOR shall strive to use no more water than reasonable to perform the work associated with this Contract and shall avoid waste, The CONTRACTOR will be required to pay for all water used if it is found that waste is occurring during construction. SECTION 02-SPECIAL CONSIDERATIONS 02-01 CROSSING UTILITIES Prior to commencing the Work associated with this Contract, it shall be the CONTRACTOR's responsibility to make arrangements with the owners of utility companies to uncover their particular utility lines or otherwise confirm their location. Certain utility companies perform such services at their own expense,however,where such is not the case, the CONTRACTOR will cause such work to be done at his own expense. 02-02 UTILITY SERVICES FOR CONSTRUCTION The CONTRACTOR will be responsible for providing its own utility services while perfortning the Work associated with this Contract. Provision of said utility services shall be subsidiary to the various bid items and no additional payment will be made for this item. 009004-2020 Page I Special Conditions 00443643 02-03 WAGE RATES Wage Rates(Information From Chapter 2258,Texas Government Code Title 10) 2288.021. Duty of Government Entity to Pay Prevailing Wage Rates a. The State or any political subdivision of the State shall pay a worker employed by it or on behalf of it: (1) not less than the general prevailing rate of per them wages for work of a similar character in the locality in which the work is performed; and (2) not less than the general prevailing rate of per them wages for legal holiday and overtime work. b, Subsection (a)does not apply to maintenance work. C. A worker is employed on a public work for the purposes of this section if a Contractor or Subcontractor in the execution of a contract for the public work with the State, a political subdivision of the State or any officer or public body of the State or a political subdivision of the State,employs the worker. 2258.023. Prevailing Wage Rates to be Paid by Contractor and Subcontractor; Penalty a. The contractor who is awarded a contract by a public body,or a Subcontractor of the Contractor, shall pay not less than the rates determined under Section 2258.022 to a worker employed by it in the execution of the contract. b, A Contractor or Subcontractor who violates this sectio❑ shall pay to the state or a political subdivision of the state on whose behalf the contract is made, $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract.A public body awarding a contract shall specify this penalty in the contract. c, A contractor or Subcontractor does not violate this section if a public body awarding a contract does not determine the prevailing wage rates, and specify the rates in the contract as provided by Section 2258.022. d. The public body shall use any money collected under this section to offset the costs incurred in the administration of this chapter. e. A municipality is entitled to collect a penalty under this section only if the municipality has a population of more than 10,000. 00900-4.2020 Page 2 Special Combdons 00443643 2258.051. Duty of Public Body to Hear Complaints and Withhold Payment A public body awarding a contract, and an agent or officer of the public body,shall: 1. take cognizance of complaints of all violations of this chapter committed in the execution of the contract; and 1 withhold money forfeited or required to be withheld under this Chapter from the payments to the Contractor under the contract,except that the public body may not withhold money from other than the final payment without determination by the public body that there is good cause to believe that the Contractor has violated this chapter. Applicable wage rates to be used in Williamson and/or Travis County may be obtained from the U.S. Department of Labor website at the following web addresses: Construction Types: Heavy (Sewer/I Water Treating Plant and Sewer/Incidental to Highway) 3.6b?w=0 Constniction Types: Heavy and Highway 6,dvb?v=0 Construction Type: Building biip:.E',.'.wmyKA.,,,mvda7l.g,oLydol/scafiles/davisbacon/TX76,dvb?v", I 02-04 LIMIT OF FINANCIAL RESOURCES The OWNER has a limited amount of financial resources committed to this Project; therefore, it shall be understood by all bidders that the OWNER may be required to change and/or delete any items which it may feel is necessary to accomplish all or part of the scope of work within its limit of financial resources. CONTRACTOR shall be entitled to no claim for damages or anticipated profits on any portion of work that may be omitted. At any time during the duration of this contract,the OWNER reserves the right to omit any work from this contract.Unit prices for all items previously approved in this contract shall be used to delete or add work per change order. 02-05 LIMITS OF WORK AND PA VM PNT It shall be the obligation of the CONTRACTOR to complete all work included in this Contract, so authorized by the OWNER, as described in the contract documents and technical specifications. All items of work not specifically paid for in the bid proposal shall be included in the unit price bids. Any question arising as to the limits of work shall be left up to the interpretation of the E/A. 00900-4.2020 Page 3 Specw1l Condiagons 00443643 02-06 LAND FOR WORK OWNER provides, as indicated on Drawings, land upon which work is to be done, right-of-way for access to same and such other lands that are designated for the use of the CONTRACTOR.CONTRACTOR provides,at his expense and without liability of OWNER, any additional land and access thereto that may be required for his construction operations,temporary construction facilities,or for storage of materials. 02-07 DEVIATIONS OCCASIONED BY UTILITY STRUCTURES Whenever existing utilities, not indicated on the Drawings, present obstructions to grade and alignment of proposed improvements immediately notify engineer, who without delay, will determine if existing utilities are to be relocated, or grade and alignment of proposed improvements changed. Where necessary to move existing utilities and appurtenances as deten-nined by the E/A, the E/A and CONTRACTOR will make relocation arrangements with the utility owner. The OWNER will not be liable for delay costs or damages due to relocations of utilities which hinder progress of the work. 02-08 CONSTRUCTION STAKING All construction staking required to complete the work associated with this contract shall be provided by the CONTRACTOR. The CONTRACTOR shall be responsible for determining the layout and extent of staking necessary to construct the improvements to the lines and grades shown in the Drawings and such staking shall be satisfactory to the E/A. The CONTRACTOR shall consult with the E/A and Owners Representative in the field for assistance as necessary. Sufficient staking materials and equipment shall be provided by the CONTRACTOR including but not limited to:paint, flagging, laths,hubs,blue tops,nails,hammers,measuring chains or tapes,transits and levels. The CONTRACTOR shall be responsible for setting and marking control and off-set points for measuring distances and angles, for shooting levels,and for any other items pertaining to construction staking. This item shall not be paid for separately and shall be considered subsidiary to other bid items. 00900-4-2020 Page 4 Special Conditions 00443643 SECTION 03-ACCESS AND TRAFFIC CONTROL Access shall be provided for the public and emergency vehicles at all possible times. When it becomes necessary to restrict access, the CONTRACTOR shall notify the OWNER and coordinate with the OWNER, all applicable agencies (i.e. Fire Department, EMS., Public Works,etc.),residents,and affected parties. If emergency access is required during the work and such access is being hindered by the work, the CONTRACTOR will suspend the work if necessary,and otherwise endeavor to assist emergency personnel in accessing a location restricted by the work. Unless otherwise approved by the E/A, at the end of each day all lanes of traffic shall be opened to the public. The CONTRACTOR shall ensure compliance at all times with the accepted Traffic Control Plan for the project and shall be responsible for all maintenance, signing and safety precautions necessary for traffic control. These items shall be included in the bid item Traffic Control. 00900-4-2020 Page 5 SpevA C I ondmons 00443643 No Text 01000 TECHNICAL SPECIFICATIONS No Text ITEM I GENERAL DESCRIPTION 1.01 SCOPE OF WORK The Work covered by these Specifications consists of furnishing all labor,equipment, appliances, materials and performing all operations in connection with the inspection and testing, complete in accordance with the Plans, and subject to the terms and conditions of the Contract Documents. 1.02 GOVERNING TECHNICAL SPECIFICATIONS ST VEMENTS The Round Rock Standard Specification Criteria Manual is hereby referred to and included in this contract as fully and to the same extent as if copied at length herein, and shall be applied to this project unless modified elsewhere as discussed below.The aforementioned Criteria Manual is the"Standard Specifications"section of the City of Round Rock Design and Construction Standards, The Standard Specifications may be accessed from the City of Round Rock website (war(utLdrQcktcxasgov) at the following web address: wwlwl,,;-Iol,ulidrocktexas.6,ov/(Iacs. Any adjustments,alterations,or additional information regarding Governing Technical Specifications are contained in the Plans (Drawings), Details and Notes described in Section 02000 of the Project Manual or are included in Attachment A at the end of this Technical Specifications Section. IT 2 CONTROL OF WORK 2.01 CLEAN-UP 2. 1.1 CONSTRUCTION SITE During construction, the CONTRACTOR shall keep the site free and clean from all rubbish and debris and shall clean-up the site promptly when notified to do so by the E/A, The CONTRACTOR shall,at its own expense,maintain the streets and roads free from dust, mud, excess earth or debris which constitutes a nuisance or danger to the public using the thoroughfare,or the occupants of adjacent properties. Care shall be taken to prevent spillage on streets and roads over which hauling is done, and any such spillage or debris deposited on streets, due to the CONTRACTOR's operations,shall be immediately removed. Page 1 W000-4-2020 Techmcaa Spmfwauons 00443645 2.01.2 BACKWORK The CONTRACTOR shall coordinate his operations in such a manner as to prevent the amount of clean-up and completion of back works from becoming excessive. Should such a condition exist,the E/A may order all or portions of the work to cease and refuse to allow any work to commence until the back work is done to the E/A's satisfaction. 2.02 GRADING The CONTRACTOR shall do such grading in and adjacent to the construction area associated with this contract as may be necessary to leave such areas in a neat and satisfactory condition approved by the E/A. ITEM 3 EXAMINATION AND REVIEW 3.01 EXAMINATION OF WORK The work covered under this Contract shall be examined and reviewed by the E/A, representatives of all governmental entities which have jurisdiction, and the Owner's Representative. The quality of material and the quality of installation of the improvements shall be to the satisfaction of the E/A. It shall be the CONTRACTOR's responsibility for the construction methods and safety precautions in the undertaking of this Contract. 3.02 NOTIFICATION The E/A and the OWNER must be notified a minimum of 24-hours in advance of beginning construction,testing,or requiring presence of the E/A,Owner's or Owner's Representative. 3.03 CONSTRUCTION STAKING The E/A shall furnish the CONTRACTOR reference points and benchmarks that, in the E"A's opinion, provide sufficient information for the CONTRACTOR to perform construction staking. 3.04 PROTECTION OF STAKES,MARKS,ETC. All engineering and surveyor's stakes, marks,property comers, etc., shall be carefully preserved by the CONTRACTOR, and in case of destruction or removal during the course of this project, such stakes, marks, property comers, etc., shall be replaced by the CONTRACTOR at the CONTRACTOR's sole expense. Page 2 01000-4-2020 Tcchnical Specifications 00443645 ITEM 4 PROTECTION AND PRECAUTION 4.01 WORK INFREEZING WEATHER Portions of the work may continue as directed by the EIA, 4.02 PROTECTION OF TREES, PLANTS AND SHRUBS The CONTRACTOR shall take necessary precautions to preserve all existing trees, plants and shrubs but where it is justifiable and necessary the CONTRACTOR may remove trees and plants for construction righ(-of-way but only with approval of the EFA. 4.03 TRAFFIC CONTROL MEASURES AND BARRICADES Traffic control measures and barricades shall be installed in accordance with the Texas Manual of Uniform Traffic Control Devices and in other locations deemed necessary by the E/A, for the protection life and property. Under no circumstances will any existing road be permitted to remain closed over a weekend. No separate pay will be made for this item. Costs for this item shall be subsidiary to other items of work, 4.04 PROPERTV LINES AND MONUMENTS The CONTRACTOR shall be responsible for the protection,reference and resetting of property comer monuments if disturbed. 4.05 DISPOSAL OF SURPLUS MATERIAL The CONTRACTOR shall at his own expense, make arrangement for the disposal of surplus material, such as rock, trees, brush and other unwanted backfill materials. 4.06 CONTRACTOR'S USE OF PREMISES The Contractor shall,at his own expense,provide additional space as necessary for his operations and storage of materials. ITEM 5 MATERIALS 5.01 TRADE NAMES Except as specified otherwise, wherever in the specifications an article or class of material is designated by a trade name or by the name or catalog number of any maker, patentee,manufacturer,or dealer,such designations shall be taken as intending to mean and specify the articles described or another equal thereto in quality, finish, and serviceability for the purpose intended, as may be determined and judged by the E/A in his sole discretion. 5.02 MATERIALS AND WORKMANSHIP No material which has been used by the CONTRACTOR for any temporary purpose whatever is to be incorporated in the permanent structure without the written consent of the E/A. Where materials or equipment are specified by a trade or brand name, it is not the intention of the OWNER to discriminate against an equal product of another Page 3 01000-4-2020 Technical Specifications 00443645 manufacturer, but rather to set a definite standard of duality for performance, and to establish an equal basis for the evaluation of bids. Where the words "equivalent", "proper"or"equal to"are used,they shall be understood to mean that the item referred to shall be"proper", the "equivalent" of,or"equal to" some other item, in the opinion or judgment of the E/A. Unless otherwise specified, all materials shall be the best of their respective kinds and shall be in all cases fully equal to approved samples. Notwithstanding that the words"or equal to"or other such expressions may be used in the specifications in connection with a material, manufactured article or process, the material, article or process specifically designated shall be used, unless a substitute is approved in writing by the EIA, and the EA will have the right to require the use of such specifically designated material,article or process. Page 4 01000-4-2020 Technical Specifications 00443645 CITY OF ROUND ROCK, TEXAS XM D 7 FtOUNR0(C& PUS IE P mm.PASSION.PROSNMM CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR THE CONSTRUCTION OF Water Treatment Plant Pressure Control Valves February 2022 Attachment A CDM- Smith TBPE FIRM REGISTRATION NO.F-3043 9430 Research Blvd.,Suite 1-200 Austin,Texas 78759 tel 512-346-1100 fax 512-345-1483 CDM Smith Project No.8077-263948 THIS PAGE INTENTIONALLY LEFT BLANK CITY OF ROUND ROCK, TEXAS ROUND 7MC&L"M JEN.P''RP"EItITY CONTRACT DOCUMENTS AND TECHNICAL. SPECIFICATIONS FOR THE CONSTRUCTION OF Water Treatment Plant Pressure Control Valves February 2022 R V .......................... *. CDM- ISTE �.uErra. wo�c�...�M�. sminth� "0 • A' TRPE FIRM REGISTRATION NO.F-3043 9430 Research Blvd„Suite 1-200 Austin,Texas 78759 tel 512-346-1100 fax 512-345-1483 CDM Smith Project No.8077-263948 THIS PAGE INTENTIONALLY LEFT BLANK 1* ,..µ City of Round Rock Water Treat Plant Pressure awes d CERTIFICATIONS low ti Division 01 (All Sections) Division 31 (310515, 310519.13, 312333, 312500) , Division 32All Sections i " Division 33 {All Sections) ; a t` �m s isa n...® Division 40 (400506, 400507, 400551, 400561) +r ' � 258 of 44-1 w Division 3 (All Sections) Division 5 (All Sections) �wOvt ' EUG2NE M11SC K Division 7 (All Sections) . .° Division 9 (All Sections) �,n T 'f OPAL f: 0 Division 26 (All Sections) ." . SHUR " ........................... 112666 J EFFREY D VAIN PELT Division 31 (312000, 312316, 312319, 315000) 111120 s ��c rrso . 2.2-2o2 Division 40 (406100, 406121.20, 406196, aN�alier�aiir� r�p�c .. 407000, 407326, 07856) 12.155 . „e.... _ _ 02/ 2/X!22 D . ........... CDM Smith Project Na 8077.263948 Smith Texas Firm Registration Na.F 304 Nw—R—OCKw. City of Round Rock Water Treatment Plant Pressure Control Valves ................ ........... -—----------- This page intentionally left blank. ............. .................................... CDM SmAh Project No 8077 263948 mith CDM Texas Firm Registration No,F-304 s Or)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 TABLE OF CONTENTS PROCUREMENT AND CONTRACTING DOCUMENTS SPECIFICATIONS DIVISION 01—GENERAL REQUIREMENTS 01 1000 Summary 01 2200 Measurement and Payment 01 2500 Substitution Procedures 01 3100 Project Management and Coordination 01 3200 Construction Progress Documentation 01 3300 Submittal Procedures 01 3544 Environmental Protection Procedures 01 4000 Quality Requirements 01 4200 References 01 5000 Temporary Facilities and Controls 01 6000 Product Requirements 01 7300 Execution 01 7700 Closeout Procedures 01 7823 Operating and Maintenance Data 01 7839 Project Record Documents 01 8000 Forms 019113 General Commissioning Requirements CITY OF ROUND ROCK SPECIFICATIONS Series 100—Earthwork 101 Preparing Right of Way 102 Clearing and Grubbing Series 200—Sub-grade and Base Construction 201 Subgrade Preparation Series 300—Street Surface Courses 301 Asphalt,Oils and Emulsions 302 Aggregates for Surface Treatment 306 Prime Coats 307 Tack Coats 310 Emulsified Asphalt Treatment 311 Emulsified Asphalt Repaving 312 Seal Coat 313 Cleaning and/or Sealing Joints and racks(Asphaltic Concrete) 320 Two Course Surface"Treatment 340 [lot Mix Asphaltic Treatment 341 Paving Fabric :350 Healing, Scarifying,and Repaving 351 Recycling Agent Water Treatment Plant Pressure Control Valves Tabtc of(""ontems City of Round Rock 011111100 - I 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 Series 400—Concrete Structures and Miscellaneous Concrete 436 Concrete Valley Gutters 439 Parking Lot Bumper Curbs Series 500—Underground Piped Utilities 504 Adjusting Structures 508 Miscellaneous Structures and Appurtenances 509 Trench Safety Systems 510 Pipe 511 Water Valves 551 Pipe Underdrains 591 Riprap For Slope Protection Series 600—Environmental Enhancement 610 Preservation of Trees And Other Vegetation Series 700—Incidental Construction 700 Mobilization 701 Fencing 703 Safety Fencing SPECIFICATIONS Facility Construction Subgroup DIVISION 03—CONCRETE 0301 10 Concrete and Reinforcing Steel 0301 30.71 Modifications to Existing Concrete 03 60 00 Grouting DIVISION 05—METALS 0505 19 Post-Installed Anchors and Reinforcing Bars 05 50 00 Metal Fabrications DIVISION 07—THERMAL AND MOISTURE PROTECTION 07 92 00 Joint Sealants DIVISION 09—FINISHES 09 90 10 Shop Priming 09 91 00 Painting Facility Services Subgroup DIVISION 26—ELECTRICAL 2605 19 Low-voltage Electrical Power Conductors and Cables 26 05 23 Control-voltage Electrical Power Cables 26 05 33 Raceways and Boxes for Electrical Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems Water Treatment Plant Pressure Control Valves Table of Contents City of Round Rock 011100-2 3V)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 Site andhifrastructure Subgroup DIVISION 31 -EARTHWORK 31 05 15 Soils and Aggregates for Earthwork 3105 19.13 Geotextiles for Earthwork 31 2333 Trenching and Backfilling 31 2500 Erosion and Sedimentation Controls DIVISION 31—GEOTECHNICAL 31 2000 Earthwork 31 23 16 Rock Removal 31 23 19 Dewatering 31 5000 Excavation Support and Protection DIVISION 32- EXTERIOR IMPROVEMENTS 32 92 00 Turf and Grasses DIVISION 33—UTILITIES-- 33 33 05 0933 Thrust Restraint for Utility Piping 3305 13 Manholes and Structures 3305 19 Ductile-Iron Utility Pipe for Water Service 330526 Utility Identification 33 1300 Disinfecting of Water Utility Distribution process!"quipment Subgroup DIVISION 40-PROCESS INTERCONNECTIONS 40 05 06 Couplings,Adapters,and Specials for Process Piping 400507 Hangers and Supports for Process Piping 40 05 51 Common Requirements for Process Valves 40 05 61 Gate Valves DIVISION 40—INSTRUMENTATION 4061 00 Process Control and Enterprise Management Systems General Provisions 4061 21.20 Process Control System"Testing 4061 96 Process Control Descriptions 40 70 00 Instrumentation for Process Systems 40 73 26 Gauge-pressure'Transmitters 40 78 56 Isolators, Intrinsically Safe Barriers and Surge Suppressors END OF SECTION 011100 w-awr"rrealment Maw Pressure Cw)iurol 'Valvcs Table of Contents Crty of'Round Rc)ek 4U bHOO-3 C)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Table of Contents City of Round Rock 011100-4 k)2022 CDM Satith 8077-263948 All Rights Reserved February 2022 SECTION 011000- SUMMARY PART I GENERAL LI RELATED DOCUMENTS A, Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A, Section Includes: 1. Project information. 1 Work covered by Contract Documents. 3, Contractor's use of site and premises. 4. Coordination with occupants. 5, Work restrictions, 6, Specification and Drawing conventions. 7, Miscellaneous provisions, B. Related Requirements: 1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities. 2. Section 01`7300"Execution"for coordination of'O%vner-installed products. 1.3 DEFINITIONS A, Work Package: A group of specifications,drawings,and schedules prepared by the design team to describe a portion of the Project Work for pricing,permitting, and construction. 1.4 PROJECT INFORMATION A, Project Identification: Round Rock Water Treatment Plant Improvements — Pressure Control Globe Valves I. Project Location: Plant Access is through Texas Crushed Stone at 6200 N IH 35, Georgetown, TX 78626. Turn left immediately after the railroad and continue to the Plant entrance gate, E. Owner: City of Round Rock,221 East Main Street, Round Rock,TX 78664 t, Owner's Representativc° Christopher 'Kit' Perkins,cperkins@roLindrocktexas.gov, C. Engineer: CDM Smith, 9430 Research Blvd, Suite 1-200,Austin,TX 78759. Wator Treatiment Hant Pressure Controll Vallves Suffmary Cay of Round Rock 0 l�(11010., I C�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Engineer's Representative: Allen Woelke, woR4 ee ygdrrii . . 4 gnith.corri and Mariel Sturm, stumims@cdmsmith.com. 1,5 WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Installation of two pressure control globe valves as specified on the Drawings at the Round Rock Water Treatment Plant. Associated materials include two vaults, yard piping,valves,electrical, instrumentation,and appurtenances and other Work indicated in the Contract Documents. B. Type of Contract: I. Project will be constructed under a single prime contract. 1.6 CONTRACTOR'S USE OF SITE AND PREMISES A. Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section. B. Limits on Use of Site: Limit use of Project site to Work Areas indicated, Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. Limits on Use of Site: Confine construction operations to Limits of Construction as shown on Drawings. 1 Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials. a. Schedule deliveries to minimize use of driveways and entrances by construction operations. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site, C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations. D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations. water Treatment Plant Pressure Control Valves Summary City of Round Rock 011000-2 ................ )2022 CDM Smith 8077-263948 All Rights Reserved Febrtiary 2022 L7 COORDINATION WITH OCCUPANTS A. full Owner Occupancy: Owner will occupy Project site and existing building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage, Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated. I Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction. 2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations, B. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction, Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage, Perform the Work so as not to interfere with Owner's operations, Maintain existing exits unless otherwise indicated, I, Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction. 1 Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations, C. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work, Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work, I. Engineer will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to Owner acceptance of the completed Work. 2. Obtain a Certificate of Occupancy from authorities having jurisdiction before limited Owner occupancy. 1 Before limited Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of Work, 4. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of'Work. 1.8 WORK RESTRICTIONS A. Comply with restrictions on construction operations. I Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction. Water TrcamcnMant Pressure Convol VMves Sugnmary Cay of Rotind lZock W 1000 3 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. On-Site Work Hours: Limit work to between 8 a.m. to 5 p.m., Monday through Friday, unless otherwise indicated. Work hours may be modified to meet Project requirements if approved by Owner and authorities having jurisdiction. 1. Weekend Hours:None unless approved by Owner. 2. Early Morning Hours:None unless approved by Owner. 3. Work in Existing Building:None unless approved by Owner. 4. Hours for Utility Shutdowns: As approved by Owner. 5. Hours for High Noise Activities: As approved by Owner. C. On-Site Work Day restrictions: Do not perform work resulting in utility shutdowns on-site during work black-out days. D. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging for temporary utility services according to requirements indicated: I. Notify Owner and Engineer not less than 7 days in advance of proposed utility interruptions. 2. Obtain Owner and Engineer's written permission before proceeding with utility interruptions. E. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration,dust,odors,or other disruption to Owner occupancy with Owner. I. Notify Owner and Engineer not less than 7 days in advance of proposed disruptive operations. 2. Obtain Owner and Engineer's written permission before proceeding with disruptive operations. F. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances on Owner's property is not permitted. G. Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times. H. Employee Screening: Comply with Owner's requirements for drug and background screening of Contractor personnel working on Project site. 1. Maintain list of approved screened personnel with Owner's representative. 1.9 SPECIFICATION AND DRAWING CONVENTIONS A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon()is used within a sentence or phrase. Water Treatment Plant Pressure Control Valves Summary City of hound Rock 011000-4 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 1 Text Color: Text used in(fie Specifications, including units of measure,manufacturer and product narries, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics. 3. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked infon-nation is not part of the Contract Documents. 4. Specification requirements are to be perfon-ned by Contractor unless specifically stated otherwise. B. Division 00 Contracting Requirements: General provisions of the Conti-act, including General and Supplementary Conditions,apply to all Sections of the Specifications, C. Division 01 General Requirements: Requirements of"Sections in Division 01 apply to the Work of all Sections in the Specifications. D. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products: 1. Terminology: Materials and products are identified by the typical genetic terms used in the individual Specifications Sections. 2. Abbreviations: Materials and products are identified by abbreviations scheduled on Drawings. 3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual. 1,10 MISCELLANEOUS PROVISIONS A, SUBSURFACE 1. Assume limestone is the predominant material present at the site and is present throughout the yard piping and valve installation project, Pipeline excavation shall require special equipment to remove the hard limestone. All excavation, including limestone removal, shall be included in the pipeline and related excavation-related bid items. No separate payment will be made, 1 Grade site to accommodate existing ground profile and provides positive drainage away from the existing stnictures, 3. The existing yard piping is shown based on existing records. Field verify the location of all existing yard piping near the Work area prior to any excavation. Protect all existing yard piping from damage and restore all damaged piping to existing or better conditions at no additional cost to the Owner. Irrigation lines near the Work area may be re-routed or removed and re-installed to existing or better conditions at no additional cost to the Owner. B. GENERAL OBLIGATIONS OFTHE CONTRACTOR 1. General obligations are as set forth in the Contract Documents. Unless special payment is specifically provided in the payment paragraphs of the specifications, all incidental work and expense in connection with the completion of work under the contract will be Water'Treannent Plant,Pressure Contrul Wves suinftaauy Cq of Round Rock 01 l0010,-5 r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 considered a subsidiary obligation of the Contractor, and all such costs shall be included in the appropriate items in the Bid Form in connection with which costs are incurred. 2. Trench excavation shall include material of every description and of whatever substance encountered, regardless of the methods or equipment required to remove the material. Pavement shall be cut with a saw, wheel or pneumatic chisel along straight lines before excavating. C. SITE INVESTIGATION AND REPRESENTATION I. Acknowledges satisfaction as to the nature and location of the work;the general and local conditions, particularly those bearing upon availability of transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and uncertainties of weather,fiver/stream stages,or similar physical conditions at the site; the conformation and conditions of the ground; the character of equipment and facilities needed preliminary to and during the prosecution of the work; the quantity and type of materials and equipment to be removed from the site; and all other matters which can in any way affect the work or the cost thereof under this Contract. 2. Further acknowledges that he has satisfied himself as to tile character, quality, and quantity of surface and subsurface materials to be encountered from inspecting the site and from evaluating information derived froth exploratory work that may have been done by the Owner, as well as from information presented in these Contract Documents. Any failure to acquaint with all the available information will not relieve responsibility for properly estimating the difficulty or cost of successfully performing the work. Neither the Owner nor the Engineer will assume responsibility for any conclusion or interpretation made by the Contractor on the basis of the information made available by the Owner or the Engineer. If more information in addition to that provided in the Contract Documents is desired, make arrangements to obtain such information and pay the cost thereof. 3. Perform at own cost any further necessary subsurface investigations. D. RESPONSIBILITY FOR UTILITY PROPERTIES AND SERVICE 1. Known utilities and structures adjacent to or expected to be encountered in the work are shown on the Drawings, The locations shown are taken from field surveys,existing records and the best information available from existing utility plans;however, it is expected that there may be some discrepancies and omissions in the locations and quantities of utilities and structures shown. Those shown are for the convenience of the Contractor only,and no responsibility is assumed by either the Owner or the Engineer for their accuracy or completeness. 2. Neither the Owner nor his officers or agents will be responsible for damages as a result of the Contractor's failure to protect utilities or structures encountered in the work whether or not shown on the Drawings. 3. Provide at all times unobstructed access to fire hydrants,underground conduits,manholes, water or gas valve boxes, and similar devices/facilities, 4. Where the Contractor's operations could cause damage which might result in considerable expense,loss,and inconvenience when his operations are adjacent to or near railway, telegraph,telephone,television,power,oil,gas,water,sewer,irrigation,or other systems or structures,no operations shall be commenced until the Contractor has made all arrangements necessary with the facility's Owner for the protection of these utilities, services and/or structures. Water Treatment Plant Pressure Control Valves Summary City of Round Rock 011000 m 6 .................... 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 5. Notify all utility offices that are affected by the construction operation at least fifteen(15) days in advance of commencing construction operations. Do not expose any utility or structure without first obtaining pen-nission from the affected agency. Once permission has been granted,locate and, if necessary,expose and provide ternporary support for all existing underground utilities or structures in advance of operations, 6. Be solely and directly responsible to the owners and operators of such utility/structure properties for any damage,injury,expense, loss,inconvenience,delay, suits,actions, or claims of any character brought because of any injuries or damage that may result from the construction operations under this Contract, 7. In the event of interruption to domestic water,sewer,storm drain,or other utility services as a result of accidental breakage or damage due to construction operations,promptly notify the proper authority. Cooperate with said authority in restoration of service as promptly as possible and bear all costs of repair. In no event shall interruption of any water or utility service be allowed unless prior approval is granted by the owner of the utility. 8. Replace,at his own expense, any and all other existing utilities or structures removed or damaged during construction,unless otherwise provided for in these Contract Documents, if the utilities or structures were shown on the Drawings. 9. Where existing utility lines or structures shown on the Drawings are so located as to physically conflict with proposed manholes or other penriarent structures to be constructed under this Contract,perrilariently relocate the conflicting utility line or structure at own expense. Such relocations shall be considered to be required by this Contract. 10, Give immediate notice to the Owner and the owner of the utility or structure when a physical conflict is determined to exist. The actual relocation will be accomplished by the owner of the utility or structure at his expense unless otherwise specified in these Contract Documents. Be responsible for any delays resulting front the required relocations of the utilities. 11. Where existing utility lines or structures are so located as to interfere with the prosecution of the work,but do not physically conflict with permanent structures or utilities to be constructed under this Contract,perform any modification,alteration,or relocation of interfering structure or utility,either pen-narient or temporary. 12. Give immediate notice to the Owner and the owner of the utility when interference is determined to exist and shall obtain approval to relocate such utility or to discontinue service therein from the Owner and the owner of the utility. The owner of the utility shall have the right to do all work required to discontinue,relocate,and replace interfering utilities. When approved by the Owner and the owner of the utility, all work required to discontinue,relocate,and replace interfering utilities may be done by,or arranged for,by the Contractor. All such discontinuance,relocation,and replacement shall be accomplished in accordance with all requirements of the owner of the utility. 11 When notified that an interference or conflict has been determined to exist,the Owner will determine whether such interference shall be considered as required by construction or as incidental to construction. E, INTERFERING STRUCTURES 1. Take necessary precautions to prevent damage to existing structures whether on the surface,above ground,or underground. Take precautions as necessary to protect all existing installations in close proximity to the work. An attempt has been made to show major structures and piping on the Drawings. While the inforination has been compiled from the best available sources,its completeness and accuracy cannot be guaranteed,and it is presented as a guide to avoid known possible difficulties. "k ares Plant Pressure Control Valves Summary City of Round Rock 011000 7 >2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. Protect existing structures from damage,whether or not they lie within the right-of-way or the limits of the easements obtained by the Owner. Where existing installations must be removed to properly execute the work,or are damaged during the work,they shall be restored at own expense to at least their original condition and to the satisfaction of the Owner. 3. With the approval of the Owner and without additional compensation,may remove and replace in a condition as good as or better than original,any small interfering structures such as fences and signposts that interfere with operations. F. FIELD RELOCATION 1. During the progress of the work, relocations of the work may be necessary. Such relocations shall be made only with approval of the Owner or Engineer. If existing structures are encountered that will prevent construction as shown, notify the Owner before continuing with the work in order that the Owner may make such field revisions as necessary to avoid conflict with the existing structures. Be responsible for any damage that may occur for failure to notify the Owner when an existing structure is encountered and proceeds with the work despite this interference, . G. LAND MONUMENTS 1. Preserve or replace any existing Federal, State, County, City, and private land monuments encountered. Have all monument replacement performed by a land surveyor licensed in the State of Texas. H. COORDINATION WITH DISTRICT OR CITY AGENCIES 1. Supply the local Police Department, local Fire Department, local water department, and the appropriate Public Works Department, as well as the Bell County Sheriffs Office, with the following information. a. A list of streets and intersections, if any, where work will be in progress to be supplied at intervals as required by the Owner or Engineer. b. Areas where approved detours,if any,are in effect. C. Immediate notification of any gas or water main breaks. 2. Be required to reimburse the City of Round Rock for the actual cost of the services of the District Personnel required during hours other than regular working hours. 1. SHIPMENT AND DELIVERY OF EQUIPMENT I. Also see section 016000"Product Requirements". 2. Equipment shall not be shipped until approved by the Engineer. The intent of this requirement is to reduce site storage time prior to installation and/or operation. Under no circumstances shall equipment be delivered to the site more than one month prior to anticipated installation without written authorization from the Engineer. 3. During shipment and delivery,the following procedures shall apply. a. All parts shall be properly protected so that no damage or deterioration will occur during a prolonged delay between time of shipment and installation, including any prolonged period at the site. Water Treatment Plant Pressure Control Valves Summary City of Round Rock 011000-8 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 b. Factory assembled parts and components shall not be disassembled for shipment unless permission is received in writing from the Engineer. C. Finished surfaces of all exposed parts shall he properly protected against adverse conditions that may prevail from time of shipment until ready for operation, ti. All finished surfaces of all exposed flanges shall be protected by wooden blank flanges,stoutly built,and securely bolted. e. Finished iron and steel surfaces not painted shall be protected against rust and corrosion. L After hydrostatic or other tests, all entrapped water shall be drained, and care taken to prevent the entrance of water during shipment,storage,and handling. g. Each box or package shall be legibly marked to show its net weight and contents, h. At the time of shipment, the shipping list, original bill of lading, shipping memorandum, and invoice shall be mailed in triplicate to the Engineer. Each shipping list shall give the description and net weight of each item, and gross weight of the shipment. Shipment will not be accepted until the list has been received. i. Absorb demurrage,or other charges resulting from failure to furnish these items. j. Make suitable provision for the handling and delivery of all equipment and material at the site. 4. Also refer to Section 01 60 00 for additional Product Requirements, J. STORAGE AND HANDLING OF EQUIPMENT ON SITE- L Special attention shall be given to the storage and handling of equipment on site. As a minimum,the procedure outlined below shall be followed: a. Carefully study and review manufacturer's storage instructions with the Engineer by him. Carefully follow these instructions and keep a written record, b. Also refer to Section 01 60 00 for additional requirements, K, SPARE PARTS I Spare parts for certain equipment have been specified in (fie pertinent Sections of the Specifications. Collect and store all spare parts so required in an area to be designated by the Owner. In addition, furnish to the Owner an inventory listing all spare parts, the equipment they are associated with, the name and address of the supplier and the delivered cost of each item. Copies of actual invoices for each item shall be furnished with the inventory to substantiate the delivery cost. 2. Spare parts shall be packed in cartons, properly labeled with indelible markings with complete descriptive information including manufacturer, part number, part narne and equipment for which the part is to be used and shall be properly treated for one year of storage. L WEATHER PROTECTION I In the event of inclement weather, Protect (lie Work and materials from damage or injury from the weather. If, in the opinion of the Engineer,any portion of the work or materials has been darnaged by reason of failure on the part of the Protect the work, such work and materials shall be removed and replaced with new materials and work to the satisfaction of the Engineer. Water Treatment Plant Pressure Contml Valves Summary City ot'Romid Rock 011000-9 C",2022 CDM Smith 8077-263948 All Rights Reserved February 2022 M. PAYMENT 1. The Work specified in this Section shall be considered incidental and payment will be included as part of the appropriate lump sum or unit prices specified in the Section 00 30 00, Sid Form. PART 2-PRODUCTS(NOT USED) PART 3-EXECUTION(NOT USED) END OF SECTION 011000 Water Treatment Plant Pressure Control Valves Summary City of Round Rock 011000 1 10 I 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 010250- MEASUREMENT AND PAYMENT PAR,r I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1,2 SUMMARY A, This Section includes specification for the measurement and payment of the various elements of the Work; with provisions applicable to lump sum prices, unit prices, and Owner-Directed Improvements, if applicable. B. In the case of conflict between this Section and the measurement methods specified in the individual technical Sections, the measurement methods in the technical specifications shall govern. C. The Total Amount Bid in the Bid Form shall cover all Work required by the Contract Documents. The lump sum and unit prices bid shall include all costs in connection with the proper and successful completion of the Work, including but not limited to: furnishing all materials, equipment, supplies, and appurtenances; providing all construction equipment and tools; and performing all necessary labor and supervision to fully complete the Work. All Work not specifically set forth as to the pay 'stern or items in the Proposal shall be considered subsidiary obligations of Contractor and all costs in connection therewith shall be included in the prices bid, D. Related Requirements: I. Section 00 30 00"Bid Form." 2. Section 00 70 00"General Conditions." 3. Section 01 13 00 "Submittals." 1.3 BID FORM A, The Bid Form is a part of these Contract Documents and lists each itern of work for which payment will be made. No payment will be made for items other than those listed in the Bid Form. Lump Sum measurement will be for the entire item, unit of work, structure, or combination thereof,as specified and as indicated in the Bid Form. B. Required items of work and incidentals necessary for the satisfactory completion of the Project which are not specifically listed in the Bid Form, and which are not specified in this Section to be measured or to be included in one of the items listed in the Bid Form shall be considered as incidental to the work required under this contract, and all costs thereof, including Contractor's overhead costs and profit, shall be considered as included in the prices bid for the various Bid Items. The Contractor shall prepare his bid accordingly. Water Treatment Plant Pressure Control Valves Measurement and Payment City of Round Rock 010250 1 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Work includes furnishing all plant, labor, equipment, tools and materials, and performing all operations required to complete the work satisfactorily, in place, as specified and as indicated on the Drawings. D. Measurement: I. Measurement shall be based on the estimated percent complete of each item of the Schedule of Values,as determined by the Engineer. E. Payment: 1. Payment will be made at the lump sum price proportional to the completion percentages approved by the Engineer. 1.4 LUMP SUM ITEMS A. Lump Sum measurement will be for the entire item, unit of work, structure, or combination thereof, as specified and as indicated in the Bid Form. Measurement and payment for all bid items indicated as Lump Sums shall include the cost of all labor, materials and equipment necessary to furnish, install, clean, test, and place each bid item into operation; including permitting,general conditions,overhead and profit. B. Progress payments will be based on schedule of values prepared by the Contractor and approved by the Engineer and Owner before acceptance of the first Application for Payment. C. In order for the Contractor to request progress payments against Lump Sum items, Contractor shall provide a disaggregation or breakdown in sufficient measurable detail that is acceptable to Engineer. D. Measurement: L Measurement shall be based on the estimated percent complete of each item of the Schedule of Values,as determined by the Engineer. E. Payment: I. Payment will be made at the lump sum price proportional to the completion percentages approved by the Engineer. 1.5 UNIT PRICE ITEMS A. Quantity and measurement estimates stated in the Bid Form are estimates for bidding purposes only. Actual payments shall be based on actual quantities installed,in-place, as measured and/or verified by the Engineer. B. Unless otherwise provided in the General Conditions, the bid unit prices shall be in effect throughout the contract duration, regardless of variances between the estimated quantities and the actual installed quantities. Water Treatment Plant Pressure Control Valves Measurement and Payment City of Round Rock 010250-2 Kl'2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. The Contractor shall make no claim, nor receive any compensation, for anticipated profits, loss of profit, damages, or any extra payment due to any difference between the amounts of work actually completed,or materials or equipment furnished,and the estimated quantities. D. Unless otherwise approved by the Owner, any unit quantities exceeded may not be invoiced until the estimated quantity is increased by contract change order, E, Contractor shall assist Engineer by providing necessary equipment, workers, and survey personnel as required to measure quantities. F. Measured quantities shall be rounded to the nearest whole integer, unless the value of the unit price exceeds$100, in which case measured quantities shall be rounded to the nearest half unit. Items with a unit price exceeding$1000 shall be rounded to the nearest tenth unit. G. Measurement: 1. Measurement for progress payment shall be made by,or approved by,the Engineer based on the estimated effective quantity installed. The effective quantity installed represents the actual units or quantities installed,adjusted for incomplete elements or components, 2. Unless otherwise provided for in the Bid Form unit price items are all-inclusive of all related work,direct and indirect,to provide a complete and functional item. For example, underground pipe installation would include trenching, shoring, dewatering, bedding, installation, backfill, testing, flushing, disinfection, and commissioning, including all labor, materials and equipment necessary to furnish, install, clean, test, and place into operation; including permitting,general conditions,overhead and profit. 3. The final measurement shall be based on actual quantities, jointly measured by Contractor and Engineer,complete,fully,tested and placed into service. K Payment: I. Progress payments shall be in accordance with the contract documents based on estimated effective quantities installed,paid at the bid unit price. 1 The final payment shall be based on actual quantities, fully installed, tested and placed into service,paid at the bid unit price. 1.6 OWNER-DIRECTED IMPROVEMENTS A. Owner-Directed Improvements,if any,specified in the Contract Documents and indicated in the Bid Form are considered provisional amounts to be used only if directed, Owner-Directed Improvements are exclusive of work indicated in the Contract Documents for which payment is included under other items in the Bid Form. No work may be performed under all Owner- Directed Improvement without prior written approval of the Owner. B, Any unused balance of the Owner-Directed Improvements shall revert to the Owner upon completion of the project. Prior to final payment, the original amount provided for Owner- Directed Improvements shall be adjusted to actual costs by deductive Change Order, adjusting the contract price,accordingly. Waia'Freatment Mant Pressure Control Valves Measurementmd Payment Cay of Round Rock 010250-3 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. The Contractor shall make no claim, nor receive any compensation, for anticipated profits, loss of profit,damages, or any extra payment due to any unexpended portion of the Owner-Directed Improvements. D. The Contractor is to include time for Owner-Directed Improvement work in the construction schedule. No adjustment of Contract Time shall be allowed for any work performed under Owner-Directed Improvement items. E. Owner-Directed Improvement items shall be included in the Schedule of Values. F. Unless otherwise indicated in the specific measurement and payment provisions under Owner- Directed Improvement items, the measurable and allowable costs for work performed under an Owner-Directed Improvement item shall be limited to the actual,demonstrable,and direct costs associated with that Owner-Directed Improvement item. Shipping and sales taxes are allowable costs. 1. No mark-up for overhead or profit shall be included for payment under an Owner- Directed Improvement account item. Overhead and profit shall be included in the contract base bid or allocated across other bid items. 2. Work authorized by the Owner under an Owner-Directed Improvement may be performed as a lump sum (negotiated before the fact), unit prices (when applicable), or time and material. For work performed under time and material, Contractor shall submit detailed verification (break-down)of all costs,subject to the approval of the Engineer or Owner. PART 2-PRODUCTS (NOT USED) PART 3-EXECUTION 3.1 BONDING, INSURANCE, MOBILIZATION,AND DEMOBILIZATION A. Measurement: I. Measurement for payment of this item shall be on a lump sum basis. 2. Work under this item includes all costs associated with providing any and all bonds and insurance for the project. It shall also include any related expenses for project mobilization and demobilization. 3. The costs shall not exceed five(5)percent of the subtotal of the sum of all other items out the Bid Form B. Payment: I. Payment of the lump sum price for this item shall be full compensation for all costs associated with initiating the Contract except cost of materials. 2. Payment shall include, but is not limited to, mobilization, demobilization, insurance, bonds, shop drawings, health and safety plan, environmental protection requirements, project meetings, project closeout, utility locations, acquisition of permits, control of work, clearing of horticulture, erosion controls, signs, scheduling, and preparation and Water Treatment Plant Pressure Control Valves Measurement and Payment City of Round Rock 010250-4 (A,"')2022 CT)M Smith 8077-263948 All Rights Reserved February 2022 submittal of contract required work plans and all else required to complete this Project not specifically included under another Bid Item. 12 TRENCH SAFETY SYSTEM A. Measurement: I. Work under this item includes furnishing all labor, materials and equipment, and performing all operations to plan,design, construct, install, maintain, monitor, modify as necessary, and remove upon completion, a Trench Safety System for pipe trenches more than five feet deep, as shown on the Drawings and as specified. This item also includes the preparation of a trench safety plan by a registered professional engineer. B. Payment: I. Payment for this item shall be on a lump sum basis for trench safety system, plan, and implementation. Tile Contractor shall be paid based on a percentage of completion of the total estimated amount of trench safety system required for pipe trenches greater than five feet deep, irrespective of the number of pipes in the trench. 3.3 PRESSURE CONTROL GLOBE VALVES,PIPING, AND STRUCTURES A. Measurement and Payment: I Measurement and payment for installing the pressure control globe valve assemblies and structures will be made at the lump sum price included in the Bid Form and shall be full compensation to the Contractor for furnishing all labor, materials, equipment and incidentals required to complete the Work as specified, and all else incidental thereto. Such price and payment shall be full compensation for furnishing all labor, site preparation, equipment, and materials for installation of two concrete vault structures with aluminum hatches as dimensioned on drawings, gate valves, blow off valves, tapping sleeves and valves, pipe, fittings, adapters, restraints, excavation, dewatering, bedding, backfill, trench surface restoration and clean up complete in place as detailed and specified; and all else in connection therewith and incidental thereto for which separate payment is not provided under other Items, 3.4 ELECTRICAL AND INSTRUMENTATION A. Measurement and Payment: L Measurement and payment for electrical and instrumentation work to furnish and install the pressure control globe valves will be made at the lump sum price included in the Bid Dorm and shall be full compensation to the Contractor for fumishing all labor, materials, equipment and incidentals required to complete the Work as specified, and all else incidental thereto. Such price and payment shall be full compensation to furnish, install, and connect the new pressure control globe valves to the existing electrical service, control panel, and SCADA including all excavation, conduit, wiring, and clean up; and Water Treatment Plant Pressure Control Valves Measurement mid Payrt'ient City of Round Rock 010250-5 U 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 all else in connection therewith and incidental thereto for which separate payment is not provided under other Items. 3.5 DRIVEWAY REPAIRS A. Measurement and Payment: 1. Payment for all driveway repairs, all types and materials, will be made at the lump sum price included in the Bid Form, and shall be full compensation to the Contractor for furnishing all labor, materials, equipment and incidentals required to restore all driveways and private property features (fences, mailboxes, etc.) disturbed during construction to their original condition as detailed and specified, and all else incidental thereto. Price and payment shall include including saw cut,backfill, subgrade prep,base and pavement surface to match existing driveway in material, thickness, reinforcing and surface quality, including dowels for concrete, replace under driveway drainage pipes where encountered,complete in place as detailed and specified. 3.6 PRESSURE AND LEAKAGE TESTING A. Measurement and Payment: 1. Payment for pipeline testing will be made at the lump sum price included in the Bid Form and shall be full compensation to the Contractor for furnishing all labor, materials, equipment and incidentals required to complete the Work as specified above,and all else incidental thereto. The lump sum price shall include testing all finished water pipe segments per AWWA C605 or C600 regardless of the number of individual tests that are required 3.7 PIPELINE DISINFECTION A. Measurement and Payment: 1. Payment for testing and disinfection will be made at the lump sum price included in the Bid Form and shall be full compensation to the Contractor for furnishing all labor, materials, equipment and incidentals required to complete the Work as specified above, and all else incidental thereto. The lump sum price shall include testing and disinfection for all pipe segments and ground storage tank per Section 331300 Disinfecting of Water Utility Distribution and AWWA C651 regardless of the number of individual tests that are required. 3.8 SURFACE RESTORATION A. Measurement and Payment: 1. Payment for surface restoration (revegetation) will be made at the unit price bid in the Bid Form. This price shall include costs incurred by the Contractor for usage of public supply water as specified and shall be full compensation for all labor, materials, equipment and incidentals required to complete the work specified in Section 329200 Water Treatment Plant Pressure Control Valves Measurement and Payment City of Round Rock 010250-6 %2022 CDM Smith 8077-263948 All Rights Reserved February 2022 including work not specifically included under other items but which are obviously necessary for the proper completion of the Contract, 3.9 OWNER-DIRECTED IMPROVEMENTS A. Owner-Directed Improvements: 1. Work shall be as directed by the Engineer for the Owner's purposes, The Owner-Directed Improvement amount shall be as indicated on the Bid Form. Payment will be made in accordance with the Contract provisions for this item and shall be full compensation to the Contractor for providing all labor, materials, equipment, and incidentals required as directed by the Engineer. 1 The use of any Owner-Directed Improvement by the Contractor shall be only by written authorization or instruction from the Engineer and/or Owner. 1 Any unexpended balance shall be returned to the Owner as a credit. If the Owner- Directed Improvement amount is exceeded, the excess will be paid to the Contractor via Change Order. 3.10 OTHER BID ITEMS A. Measurement and Payment: I. Measurement for all other items included in the Bid Form shall be at the unit cost indicated in the Bid Forni. The price shown shall be full compensation for furnishing all labor, equipment, design and materials to complete the work. Items not included in the Bid Form shall not be paid for separately but shall be considered incidental to items included in the Bid Form. END OF SECTION 010250 WaterTreamerit Plant PreSgUrc Control Valves Measurement and Paymoi� City of'Round Rock 010250-7 (K';2022 CDM Smith 8077-263948 All Rights Reserved February 2022. This page intentionally left blank. Water Treatment Plant Pressure Control Valves Measurement and Payment City of Round Rock 010250-8 2022 -nith ,C) CDM Si 8077-263948 All Rights Reserved February 2022 SECTION 012500 - SUBSTITUTION PROCEDURES PART I GENERAL LI RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for substitutions. B. Related Requirements: 1. Section 016000 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers. L3 DEFINITIONS A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents. 1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty ten-ns, 2. Substitutions for Conveniencc: Changes proposed by Contractor or Owner that are not required to meet other Project requirements but may offer advantage to Contractor or Owner. 1.4 ACTION SUBMITTALS A. Substitution Requests: Submit documentation identifying product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. I. Substitution Request Form: Use form acceptable to Engineer. 1 Documentation: Show compliance with requirements for substitutions and the following, as applicable: a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable, K Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction perfortned by Owner and separate contractors that will be necessary to accommodate proposed substitution. WaterTreatment Plaru Pressure 0)rw(,)1 VAves &Luisfitulion Procedures City orf Round Rock 012500- 1 t,',�20122 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties,and specific features and requirements indicated. Indicate deviations, if any, from the Work specified. d. Product Data, including drawings and descriptions of products and fabrication and installation procedures. e. Samples,where applicable or requested. f. Certificates and qualification data,where applicable or requested. g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of Engineers and owners. h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated. i. Research reports evidencing compliance with building code in effect for Project, from ICC-ES. j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery. k. Cost information,including a proposal of change,if any,in the Contract Sum. 1. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated. in. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results. 3. Engineer's Action: If necessary, Engineer will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. Engineer will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation,whichever is later. a. Forms of Acceptance: Change Order, Construction Change Directive, or Engineer's Supplemental Instructions for minor changes in the Work. b. Use product specified if Engineer does not issue a decision on use of a proposed substitution within time allocated. 1.5 QUALITY ASSURANCE A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers. `Nater Treatment Plant Pressure Control Valves Substitution Procedures City of Round Rock 012500-2 A'i 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.6 PROCEDURES A. Coordination- Revise or adjust affected work as necessary to integrate work of (fie approved substitutions. 1.7 SUBSTITUTIONS A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals. I Conditions: Engineer will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Engineer will return requests without action, except to record noncompliance with these requirements: a. Requested substitution is consistent with the Contract Documents and will produce indicated results. b. Substitution request is fully documented and properly submitted. C. Requested substitution will not adversely affect Contractor's construction schedule, & Requested substitution has received necessary approvals of authorities having jurisdiction, c. Requested substitution is compatible with other portions of the Work. f. Requested substitution has been coordinated with other portions of the Work, & Requested substitution provides specified warranty. It. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work,is uniform and consistent, is compatible with other products,and is acceptable to all contractors involved. B. Substitutions for Convenience: Not allowed unless otherwise indicated, C, Substitutions for Convenience: Engineer will consider requests for substitution if received within 60 days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of Engineer, I Conditions: Engineer will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Engineer will return requests without action, except to record noncompliance with these requirements: a. Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Owner must assume. Owner's additional responsibilities may include compensation to Engineer for redesign and evaluation services, increased cost of other construction by Owner, and similar considerations. b. Requested substitution (toes not require extensive revisions to the Contract Documents, c, Requested substitution is consistent with the Contract Documents and will produce indicated results, d, Substitution request is fully documented and properly submitted. water Treatment Plant Pressure Control Valves Substitufion Procedures Cay of Round Rock 012500-3 (0 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 e. Requested substitution will not adversely affect Contractor's construction schedule. f. Requested substitution has received necessary approvals of authorities having jurisdiction. g. Requested substitution is compatible with other portions of the Work. h. Requested substitution has been coordinated with other portions of the Work. i. Requested substitution provides specified warranty. j. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work,is uniform and consistent,is compatible with other products, and is acceptable to all contractors involved. PART 2- PRODUCTS(NOT USED) PART 3- EXECUTION(NOT USED) END OF SECTION 012500 Water Treatment Plant Pressure Control Valves Substitution Procedures City of Round Rock 012500-4 (,C�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 013 100- PROJECT MANAGEMENT AND COORDINATION PART I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A, Section includes administrative provisions for coordinating construction operations on Project, including,but not limited to,the following: I. General coordination procedures. 1 Coordination drawings. 1 R]Fls. 4, Digital project management procedures. 5, Web-based Project management software package. 6. Project meetings, B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor, C. Related Requirements: I Section 013150 "Progress Schedule and Reports" for preparing and submitting Contractor's construction schedule, 2. Section 017300 "Execution" for procedures for coordinating general installation and field-engineering services,including establishment of benchmarks and control points, 3. Section 017700"Closeout Procedures" for coordinating closeout of the Contract. 1.3 DEFINITIONS A. BIM: Building InIonnation Modeling. B. RFI: Request for Information. Request from Owner, Engineer, or Contractor seeking information required by or clarifications of the Contract Documents. 1.4 INFORMATIONAL SUBMITTALS A. Subcontract List: Prepare a written summary identifying individuals or finiis proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design, Include(lie following information in tabular form: Water Tremunent Mant Pressure Conlad Vapves Project Mmagenwnt and Coordinauon City of Round Rock N3100 1 t�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Name, address, telephone number, and email address of entity performing subcontract or supplying products. 2. Number and title of related Specification Section(s)covered by subcontract. 3. Drawing number and detail references,as appropriate,covered by subcontract. B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses, cellular telephone numbers,and e-mail addresses.Provide names,addresses,and telephone numbers of individuals assigned as alternates in the absence of individuals assigned to Project. 1. Post copies of list in Project meeting room, in temporary field office, and in prominent location in built facility. Keep list current at all times. 1.5 GENERAL COORDINATION PROCEDURES A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation,connection,and operation. 1. Schedule construction operations in sequence required to obtain the best results, where installation of one part of the Work depends on installation of other components, before or after its own installation. 2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance,service,and repair. 3. Make adequate provisions to accommodate items scheduled for later installation. B, Coordination of Multiple Contracts: Each contractor shall cooperate with Project coordinator, who shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work. Each contractor shall coordinate its own operations with operations included in different Sections that depend on each other for proper installation,connection,and operation. 1. Schedule construction operations in sequence required to obtain the best results, where installation of one part of the Work depends on installation of other components, before or after its own installation. 2. Coordinate installation of different components with other contractors to ensure maximum performance and accessibility for required maintenance,service,and repair. 3. Make adequate provisions to accommodate items scheduled for later installation. C. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices,reports,and list of attendees at meetings. 1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required. D. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and direction of Project coordinator to avoid Water Treatment Plant Pressure Control Valves Project Management and Coordination City of Round Rock 013100-2 rr. 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 conflicts and to ensure orderly progress of the Work. Stich administrative activities include, but are not limited to,the following: I. Preparation of Contractor's construction schedule. 2. Preparation of the schedule of values, 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Preinstallation conferences. T Project closeout activities, K Startup and adjustment of systems. 1.6 COORDINATION DRAWINGS A. Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, and additionally where installation is not completely indicated on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity. I Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information,as applicable: a. Use applicable Drawings as a basis for preparation of coordination drawings. Prepare sections, elevations, and details as needed to describe relationship of various systems and components, K Coordinate the addition of trade-specific information to coordination drawings in a sequence that best provides for coordination of the information and resolution of conflicts between installed components before submitting for review. C. Indicate functional and spatial relationships of' components of architectural, structural,civil,mechanical, and electrical systems. d. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation. e. Show location and size of access doors required for access to concealed dampers, valves,and other controls. f. Indicate required installation sequences. g. Indicate dimensions shown on Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and rnininiurn clearance requirements. Provide alternative sketches to Engineer indicating proposed resolution of such conflicts. Minor dimension changes, and difficult installations will not be considered changes to the Contract, B. Coordination Drawing Organization: Organize coordination drawings as follows: 1. Structural Penetrations: Indicate penetrations and openings required for all disciplines. 2. Slab Edge and Embedded Items: Indicate stab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts,bearing plates,angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items. Water Treatment Plant Pressure Control Valves llrc�ject Manageruent arid('oorchnation City of Round Rock 013 WO-3 X",,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. Electrical Work: Show the following: a. Runs of vertical and horizontal conduit 1-1/4 inches (32 nim) in diameter and larger. b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire- alarm locations. c. Panel board, switchboard, switchgear, transformer,busway, generator, and motor- control center locations. d. Location of pull boxes and junction boxes,dimensioned from column center lines. 4, Review: Engineer will review coordination drawings to confirm that, in general, the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If Engineer determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, Engineer will so inform Contractor,who shall make suitable modifications and resubmit. 5, Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 013300 "Submittal Procedures." C. Coordination Drawing Process: Prepare coordination drawings in the following manner: i. Schedule submittal and review of Electrical and Instrumentation Shop Drawings to make required changes prior to preparation of coordination drawings. 2. Electrical Installer will indicate service and feeder conduit runs and equipment in green color. Electrical Installer shall forward drawing files to Communications and Electronic Safety and Security Installer. 3. Communications and Electronic Safety and Security Installer will indicate cable trays and cabling runs and equipment in purple color. Communications and Electronic Safety and Security Installer shall forward completed drawing files to Contractor. 4. Contractor shall perform the final coordination review. As each coordination drawing is completed, Contractor will meet with Architect to review and resolve conflicts on the coordination drawings, D. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements: 1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings. 1 File Preparation Format: DWG or DGN, Version 2018, operating in Microsoft Windows operating system. 3. File Submittal Format: Submit or post coordination drawing files using format same as file preparation format. 4. Engineer will furnish Contractor one set of digital data files of Drawings for use in preparing coordination digital data files. a. Engineer makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings. Water Treatment Plant Pressure Control Valves Project Management and Coordination City of Round Rock 013100-4 f,r,,,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.7 REQUEST FOR INFORMATION(RFI) A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified, I, Engineer will return without response those RFIs submitted to Engineer by other entities controlled by Contractor. 2. Coordinate and submit RFls in a prompt manner to avoid delays in Contractor's work or work of subcontractors, B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following: I. Project name. 1 Owner narne. 1 Owner's Project number. 4. Narne of`Engineer. 5. Engineer's Project number. 6. Date. 7. Name of Contractor. 8. RFI number,numbered sequentially. 9. RFI subject. 10. Specification Section number and title and related paragraphs,as appropriate. 11. Drawing number and detail references,as appropriate. 12. Field dimensions and conditions,as appropriate, 13. Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract Time or the Contract Sum,Contractor shall state impact in the RFI, 14. Conti-actor's signature. 15. Attachmenw Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings,coordination drawings,and other information necessary to fully describe items needing interpretation. a. Include dimensions, thicknesses, structural grid references, and details of affected materials,assemblies,and attachments on attached sketches, C. RFI Forms: Form bound in Project Manual, I. Attachments shall be electronic files in PDF format. D. Engineer's Action: Engineer will review each RFI, determine action required, and respond. Allow seven days for Engineer's response for each RFI. Is received by Engineer after 1:00 p.m. will be considered as received the following working day. I. The following Contractor-generated RFls will be returned without action: a. Requests for approval of submittals. b. Requests for approval of substitutions. C. Requests for approval of Contractor's means and methods. d. Requests for coordination information already indicated in the Contract Documents. Water'Frcatnient Plant Pressure Covwol Valves Project Manageirientrand Coordnauon Cit)(of Round Rock 013100 5 +ta 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 e. Requests for adjustments in the Contract Time or the Contract Sum. f. Requests for interpretation of Engineer's actions on submittals. g. Incomplete RFIs or inaccurately prepared RFIs. 2. Engincer's action may include a request for additional information, in which case Engineer's time for response will date from time of receipt by Engineer of additional information. 3. Engineer's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal. a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Engineer in writing within 5 days of receipt of the RFI response. E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log weekly. Include the following: I. Project name. 2. Name and address of Contractor. 3. Name and address of Engineer. 4. RFI description. 5. Date the RFI was submitted. 6. Date Engineer's response was received. 7. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal Request,as appropriate. 8. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate. F. On receipt of Engineer's action,update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Engineer within seven days if Contractor disagrees with response. 1.8 DIGITAL PROJECT.MANAGEMENT PROCEDURES A. Engineer's Data Files Not Available: Engineer will not provide Engineer's CAD drawing digital data files for Contractor's use during construction. B. Use of Engineer's Digital Data Files: Digital data files of Engineer's CAD drawings will be provided by Engineer for Contractor's use during construction. 1. Digital data files may be used by Contractor in preparing coordination drawings, Shop Drawings,and Project Record Drawings. 2. Engineer makes no representations as to the accuracy or completeness of digital data files as they relate to Contract Drawings. 3. Digital Drawing Software Program: Contract Drawings are available in PDF Format. C. PDF Document Preparation: Where PDFs are required to be submitted to Engineer,prepare as follows: Water Treatment Plant Pressure Control Valves Project Management and Coordination City of Round Rock 013100-6 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item. 1 Name file with submittal number or other unique identifier,including revision identifier, 1 Certifications: Where digitally submitted certificates and certifications are required, provide a digital signature with digital certificate on where indicated. 11.9 PROJECT MEETINGS A. General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated. 1. Attendees: inform participants and others involved, and individuals whose presence is required, of date and time of each meeting, Notify Owner and Engineer of scheduled meeting dates and times a minimum of 10 working days prior to meeting, 2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees, 3, Minutes: Entity responsible for conducting meeting will record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Engineer,within three days of the meeting, B. Preconstruction Conference: Engineer will schedule and conduct a preconstruction conference before starting construction, at a time convenient to Owner and Engineer, but no later than 15 days after execution of the Agreement. I Attendees: Authorized representatives of Owner, Engineer, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work, 2. Agenda: Discuss items of'significance that could affect progress,including the following: a, Responsibilities and personnel assignments. b. Tentative construction schedule. c. Phasing. d. Critical work sequencing and long lead items. e. Designation ol'key personnel and their duties. f. Lines of coin municati ons. g. Use of web-based Project software. h. Procedures for processing field decisions and Change Orders. i, Procedures for R.F[s. j. Procedures for testing and inspecting, k. Procedures for processing Applications for Payment. 1. Distribution of the Contract Documents, Ill. Submittal procedures, IL Sustainable design requirements. 0, Preparation of Record Documents. p. Use of the premises. q. Work restrictions. r. Working hours. & Owner's occupancy requirements. L Responsibility for temporary facilities and controls. Water'Frcalrnevit Plant Pressure Controll Vallves Project Management and CoorduKition Cuter of'Round Rock 0131001-7 0w 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 U. Procedures for moisture and mold control. V. Procedures for disruptions and shutdowns. W. Construction waste management and recycling. X. Parking availability. y. Office,work,and storage areas. Z. Equipment deliveries and priorities. aa. First aid. bb. Security. CC. Progress cleaning. dd. List of major subcontractors and suppliers. 3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes. C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity when required by other Sections and when required for coordination with other construction. I. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow,shall attend the meeting. Advise Engineer, of scheduled meeting dates. 2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following; a. Contract Documents. b. Options. C. Related RFIs. d. Related Change Orders. e. Purchases. f. Deliveries. g. Submittals. h. Sustainable design requirements. i. Review of mockups. j. Possible conflicts. k. Compatibility requirements. L Time schedules. In. Weather limitations. n. Manufacturer's written instructions. o. Warranty requirements. p. Compatibility of materials. q. Acceptability of substrates. r. Temporary facilities and controls. S, Space and access limitations. t. Regulations of authorities having jurisdiction. U. Testing and inspecting requirements. V. Installation procedures. W. Coordination with other work. X. Required performance results. y. Protection of adjacent work. Z. Protection of construction and personnel. Nater Treatment Plant Pressure Control Valves Project Management and Coordination City of Round Rock 013100-8 V,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions. 4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring inforniation. 5. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date. D. Project Closeout Conference: Schedule and conduct a project closeout conference, at a time convenient to Owner and Engineer, but no later than 90 days prior to the scheduled date of Substantial Completion. I Conduct the conference to review requirements and responsibilities related to Project closeout. 1 Attendees: Authorized representatives of Owner and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the meeting, Participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work. 3, Agenda: Discuss items of significance that could affect or delay Project closeout, including the following: a. Preparation of Record Documents. b. Procedures required prior to inspection for Substantial Completion and for final inspection for acceptance, C. Procedures for completing and archiving web-based Project software site data files. d. Submittal of written warranties, e. Requirements for completing sustainable design documentation. f Requirements for preparing operations and maintenance data, 9. Requirements for delivery of material samples,attic stock,and spare parts. li. Requirements for demonstration and training. i. Preparation of Contractor's punch list. j. Procedures for processing Applications for Payment at Substantial Completion and for final payment including final change order, k. Submittal procedures. 1. Coordination of separate contracts. M. Owner's partial occupancy requirements including certificate of occupancy and closeout of permits. n. Installation of Owner's furniture, fixtures,and equipment, 0. Responsibility for removing temporary facilities and controls, p, Final cleaning. 4. Minutes: Entity conducting meeting will record and distribute meeting minutes. E. Progress Meetings: Conduct progress meetings at regular intervals, I. Coordinate dates of meetings with preparation of payment requests. 1 Attendees: In addition to representatives of' Owner and Engineer, each contractor, subcontractor•, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these Water Trea unent Nant Pressure Convol V,-&cs ProJeci Nlanaganent and Coordmanon Cay of Round Rock 013100-9 �f 2022 CDM Smith 8077-263941 All Rights Reserved February 2022 meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work. 3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time,ahead of schedule,or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. I) Review schedule for next period. b. Review present and future needs of each entity present,including the following: 1) Interface requirements. 2) Sequence of operations. 3) Resolution of BIM component conflicts. 4) Status of submittals. 5) Status of sustainable design documentation. 6) Deliveries. 7) Off--site fabrication. 8) Access. 9) Site use. 10) Temporary facilities and controls. 11) Progress cleaning. 12) Quality and work standards. 13) Status of correction of deficient items. 14) Field observations. 15) Status of RFIs. 16) Status of Proposal Requests. 17) Pending changes. 18) Status of Change Orders. 19) Pending claims and disputes. 20) Documentation of information for payment requests. 4. Minutes: Entity responsible for conducting the meeting will record and distribute the meeting minutes to each party present and to parties requiring information. a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting, where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting. F. Coordination Meetings: Conduct Project coordination meetings at regular intervals. Project coordination meetings are in addition to specific meetings held for other purposes, such as progress meetings and preinstallation conferences. 1. Attendees: In addition to representatives of Owner and Engineer, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in Water Treatment Plant Pressure Control Valves Project Management and Coordination City of Round flock 013100-10 �()2022 CDM Smith 8077-263948 All Rights Reserved February 2022 planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meetings shall be familiar with Project and authorized to conclude matters relating to the Work. 1 Agenda: Review and correct or approve minutes of the previous coordination meeting. Review other iterns of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. Combined Contractor's Construction Schedule: Review progress since the last coordination meeting. Determine whether each contract is on time, ahead of schedule, or behind schedule, in relation to combined Contractor's construction schedule. Detennine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. b. Schedule Updating: Revise combined Contractor's construction schedule after each coordination meeting, where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with report of each meeting, c. Review present and future needs of each contractor present, including the following: I) Interface requirements. 2) Sequence of operations, 3) Resolution of BIM component conflicts. 4) Status of submittals. 5) Deliveries. 6) Off-site fabrication. 7) Access. 8) Site use. 9) Temporary facilities and controls. 10) Work hours. tl) Hazards and risks. 12) Progress cleaning, 13) Quality and work standards, 14) Status of RIs. 15) Proposal Requests. 16) Change Orders. 17) Pending changes. 1 Reporting: Record meeting results and distribute copies to everyone in attendance and to others affected by decisions or actions resulting from each meeting. PART 2- PRODUCTS(NOT USED) PART 3- EXECUTION(NOT USED) END OF SECTION 013100 Water Treatnicia Plant Pressure Conlrot Valves Project Management and Coardination City of'Round Rock OM00- I I 2022 CDM Smith 5077-263948 All Rights Reserved February 2022 This page intentionally left blank, Water Treatment Plant Pressure Control Valves Project Management and Coordination City of Round Rock 013100- 12 I ,V/2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 013200-CONSTRUCTION PROGRESS DOCUMENTATION PARTI -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1.2 REFERENCED STANDARDS A. All references listed shall imply to mean the most recent revision. 1. American National Standards Institute(ANSI): ANSI/NSF 61,Drinking Water System Components—Health Effects. 1.3 SUMMARY A. Section includes administrative and procedural requirements for docurnenting the progress of construction during performance of the Work,including the following. I. Startup construction schedule, 1 Contractor's Construction Schedule, 3. Construction schedule updating reports. 4. Daily construction reports. 5. Material location reports, G. Site condition reports. 7. Unusual event reports, B. Related Requirernents: 1. Section 011400"Quality Requirements" for schedule of tests and inspections, IA DEFINITIONS A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction Project. Activities included in a construction schedule consurne time and resources. I. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times. 2. Predecessor Activity: An activity that precedes another activity in the network. 3. Successor Activity: An activity that follows another activity in the network. B. Cost Loading: The allocation of the schedule of values for completing an activity as scheduled. The Sum of costs for all activities must equal the total Contract Sum. 'Arater 1'reatment Phint Pressure,Control Vdlves Coustruc(lon Progre,%s Documenuifion City of'R.ound Rock 013200, 1 C,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine the critical path of Project and when activities can be performed. D. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float. E. Event:The starting or ending point of an activity. F. Float:The measure of leeway in starting and completing an activity. 1. Float time belongs to Owner. 2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity. 1 Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date. G. Resource Loading: The allocation of manpower and equipment necessary for completing an activity as scheduled. 1.5 PROJECT"MILESTONES,CONSTRAINTS AND PROJECT WORK EFFORTS A. Project Milestones 1. Substantial and Final Completion milestones,have been assigned to this Project to ensure that the flow of work is progressing in a timely manner. 2. The time of completion for all critical Project dates (i.e., Substantial and Final Completion). B. General Construction Activity Requirements 1. Sanitary Constraints. All work performed on Potable Water Piping, and related components shall be conducted using the highest standard of care and shall be cleaned, disinfected as specified in Paragraph 3.01 herein and as otherwise shown in the Drawings. 1 Daily Construction Activity Limitations. Contractor shall adhere to the daily construction activity limitations. Contractor shall submit a request to the Owner for extended work hours within the time period specified. 3. Weekly Construction Activity Limitations. Contractor shall adhere to the weekly construction activity limitations. Contractor shall submit a request to the Owner for work on Saturdays,Sundays and legal holidays within the time period specified. 4. Coordination Requirements. Contractor shall coordinate with Owner or Engineer all work executed by Contractor, Subcontractors, suppliers, and manufacturer's representatives, including, but not limited to site, civil, structural, process piping and equipment, landscaping, instrumentation, and electrical work. Contractor shall coordinate with the Engineer and Owner's personnel as specified prior to performing any work associated with tying into existing facilities or for any shutdown of and water line after achieving Substantial Completion. 5. Notification Requirements. Contractor shall submit notifications for extended daily work hours and/or for work on Saturdays, Sundays and legal holidays as specified herein. For Water Treatment Plant Pressure Contro I Valves Construction Progress Documentation City of Round Rock 013200.2 K")2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 all work that requires a temporary shutdown of Plant operations or tank operations, submit a proposed work plan as specified herein. 6, Security Requirements. Contractor shall execute and be responsible for site security as specific& 1.6 INFORMATIONAL SUBMI'T'TALS A. Format for Submittals: Submit required submittals in the following format: L Working electronic copy of schedule file, 2. PDF file. B. Startup construction schedule. L Submittal of cost-loaded, startup construction schedule will not constitute approval of schedule of values for cost-loaded activities. C. Startup Network Diagram: Of size required to display entire network for entire construction period. Show logic ties for activities. D. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period, 1. Submit a working digital copy of schedule, using software indicated, and labeled to comply with requirements for submittals. E CPM Reports: Concurrent with CPM schedule,submit each of the following reports, Format for each activity in reports shall contain activity number, activity description, cost and resource loading,original duration, remaining duration,early start date,early finish date, latest allowable start date, latest allowable finish date, status (where critical) and total float and free float in calendar days. I Activity Report: List of activities sorted by activity number and then early start date, or actual start date if known. 1 Logic Report.- List of preceding and succeeding activities for each activity, sorted in ascending order by activity number and then by early start date, or actual start date if known, 1 Total Float Report: List of activities sorted in ascending order of total float. 4. Earnings Report: Compilation of Contractor's total earnings from the Notice to Proceed until most recent Application for Payment. F. Construction Schedule Updating Reports- Submit with Applications for Payment. G. Daily Construction Reports: Submit at monthly intervals. H. Material Location Reports: Submit at monthly intervals. 1, Site Condition Reports: Submit at time of discovery of differing conditions. J. Unusual Event Reports: Submit at time of unusual event. Water Treaunent Plant Pressure Control Valves Construction Progress DocuroeuuwWl City of Round Rock 002001• 3 C")2022 CDM Smith 8077-263948 All Rights Reserved February 2022 K. Qualification data: For scheduling consultant. 1.7 QUALITY ASSURANCE A. Scheduling Consultant Qualifications: An experienced specialist in CPM scheduling and reporting,with capability of producing CPM reports and diagrams within 24 hours of Engineer's request. B. Prescheduling Conference: Conduct conference at Project site to comply with requirements in Section 013100 "Project Management and Coordination." Review methods and procedures related to the preliminary construction schedule and Contractor's Construction Schedule, including,but not limited to,the following: 1. Review software limitations and content and format for reports. 2. Verify availability of qualified personnel needed to develop and update schedule. 3. Discuss constraints,including interim milestones. 4. Review delivery dates for Owner-furnished products. 5. Review schedule for work of Owner's separate contracts. 6. Review submittal requirements and procedures. 7. Review time required for review of submittals and resubmittals. 8. Review requirements for tests and inspections by independent testing and inspecting agencies. 9. Review time required for Project closeout and Owner startup procedures including commissioning activities. 10. Review and finalize list of construction activities to be included in schedule. 11. Review procedures for updating schedule. 12. Submit at this conference a preliminary network defining the planned operation during the first 60 calendar days after the Notice to Proceed. 1.8 COORDINATION A. Coordinate Contractor's Construction Schedule with the schedule of values, submittal schedule, progress reports, payment requests,and other required schedules and reports. I. Secure time commitments for performing critical elements of the Work from entities involved. 2. Coordinate each construction activity in the network with outer activities, and schedule them in proper sequence. 1.9 CONTRACTOR'S CONSTRUCTION SCHEDULE A. Program Description: I. A Critical Path Method (CPM) construction schedule shall be used to control the Work and to provide a basis for determining job progress. The construction schedule shall be prepared and maintained by the Contractor. All work shall be done in accordance with the established CPM schedule. The Contractor and all subcontractors shall cooperate Water Treatment Plant Pressure Control Valves Construction Progress Documentation City of Found Rock 013200-4 A")2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 fully in developing the constniction schedule and in executing the work in accordance with the CPM schedule. 2. The construction schedule shall consist of a computerized C111M network (diagram of activities)presented in a time-scaled graphic(print-out)with reports, as specified herein. B. Computer Scheduling Software: Prepare schedules using current version of a program that has been developed specifically to manage construction schedules. 1, Use Primavera for current Windows operating system. C. Qualifications: I, Have the capability of preparing and utilizing the specified CPM schedule, or engage the services of a specialized scheduling professional to do so. Within seven days of the award of contract, provide a resume or qualifications statement for the individual within the Contractor's organization, or the outside consultant, who is being proposed as the responsible party for development and maintenance of the CPM schedule.The resume or qualifications statement shall demonstrate that the proposed responsible party has successfully developed and maintained CPM schedules for at least three construction projects of the same size or greater than this project. The proposed responsible party for the CPM schedule is subject to approval by the Engineer and Owner. If the proposed responsible party for the CPM schedule is not approved by the Engineer and/or Owner, Contractor shall resubmit a more-appropriate candidate for approval. D. Time Prarrie: Extend schedule from date established for the Notice to Proceed to date of Final Completion. I Contract completion date shall not be changed by submission of a schedule that shows an early completion date,unless specifically authorized by Change Order. E. Activities: Treat each floor or separate area as a separate numbered activity for each main element of(fie Work.Comply with the following: 1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by Engineer. 2. Activities to facilitate the Work: Indicate start and completion dates for the following as applicable: a, Securing of approvals and permits required for performance of the Work. b, Temporary facilities. C, Construction of mock-ups,prototypes and samples. d. Owner interfaces and furnishing of items, e. Interfaces with Separate Contracts. f. Regulatory agency approvals. g. Punch list, 3. Procurement Activities; Include procurement process activities for the following long lead-time items and major items, requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals,approvals, purchasing, fabrication, and delivery. Waterl'reatnioit Plant Pressure Conuol Valves, Consvucuon Progress Docunwmwon City of Round Rook Oil 3200-5 C,2022 CDM Smith 8077-263948 Al!Rights Reserved February 2022 a. Pressure Control Globe Valves. b. Valve Vaults(only if contractor prefers to use pre-cast vaults). 4. Submittal Review Time: Include review and resubmittal times indicated in Section 013300 "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with submittal schedule. 5. Startup and Testing Time: Include no fewer than 15 days for startup and testing. 6. Commissioning Time: Include no fewer than 15 days for commissioning, 7, Substantial Completion: Indicate completion in advance of date established for Substantial Completion, and allow time for Engineer's administrative procedures necessary for certification of Substantial Completion. 8. Punch List and Final Completion: Include not more than 30 days for completion of punch list items and Final Completion. F. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule,and show how the sequence of the Work is affected. 1. Phasing:Arrange list of activities on schedule by phase. 2. Work under More Than One Contract: Include a separate activity for each contract. 1 Work by Owner: Include a separate activity for each portion of the Work performed by Owner. 4. Products Ordered in Advance: Include a separate activity for each product. Include delivery date indicated in Section 01 10 00"Summary." Delivery dates indicated stipulate the earliest possible delivery date. 5. Owner-Furnished Products: Include a separate activity for each product. Include delivery date indicated in Section 01 10 00 "Summary," Delivery dates indicated stipulate the earliest possible delivery date. 6. Work Restrictions: Show the effect of the following items on the schedule: a. Coordination with existing construction. b. Limitations of continued occupancies. C. Uninterruptible services. d. Partial occupancy before Substantial Completion. e. Use-of-premises restrictions. f. Provisions for future construction. g. Seasonal variations. h. Environmental control. 7. Work Stages: Indicate important stages of construction for each major portion of the Work,including,but not limited to,the following: a. Subcontract awards. b. Submittals. C. Purchases. d. Mockups. e. Fabrication. f. Sample testing. g. Deliveries, h, Installation. i. Tests and inspections. Water Treatment Plant Pressure Control Valves Construction Progress Documentation City of Round Rock 013200-6 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 j. Adjusting. k. Curing. 1, Building flush-out. M. Startup and placement into final use and operation, n. Commissioning. 8. Construction Areas: Identify each major area of construction for each major portion of the Work. Indicate where each construction activity within a major area must be sequenced or integrated with other construction activities to provide for the following: a. Structural completion. b. Temporary enclosure and space conditioning. C. Permanent space enclosure. d. Completion of mechanical installation. e. Completion of electrical installation. f, Substantial Completion. G. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to,the Notice to Proceed,Substantial Completion,and Final Completion. 1. Notice to Proceed. 1 Review Valve and Vault Submittals, 1 Temporary enclosure and space conditioning, 4. Erosion and Sediment Controls. 5. Piping Installation. 6Electrical Installation. T Valve Vault Installation, & Valve Installation, 9. Instrumentation Installation. 10. Testing and Disinfection, IE Substantial Completion, 12. Startup and Commissioning. 11 Revegetation and Cleanup. 14. Final Completion, H. Cost Correlation: Superimpose a cost correlation timeline, indicating planned and actual costs. On the line, show planned and actual dollar volume of the Work performed as of planned and actual dates used for preparation of payment requests. 1. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update. Summarize the following issues: I. Unresolved issues. 2. Unanswered Requests for Information, 3. Rejected or unreturned submittals. 4. Notations on returned submittals. 5. Pending modifications affecting the Work and the Contract Time, J. Acceptability Water"I'reatment Plant Prcsure Conuol Valves Couistruoion Progress Doctmientation Cay of Round Rock 013200-7 (r,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Submit the CPM schedule submittals, as specified,and resubmit as needed, until they are in compliance with Contract requirements. 2. The Engineer's review of the Contractor's construction schedule submittals will only be for conformance with the Contract requirements -, including but not limited to contract time and work sequences specified in the contract documents. The Engineer's review of the schedule shall not include the Contractor's means and methods of construction or safety. The Engineer's concurrence,acceptance,or approval of the Contractor's schedule submittals will not relieve the Contractor from responsibility for complying with the Contract Scope, Contract Time or any other contract requirement. Any indication of concurrence, acceptance, or approval of the Contractor's schedule will only indicate a general conformance with the Contract Requirements. 3. Engineer's review of the Contractor's construction schedule submittals shall not relieve the Contractor from responsibility for any deviations from the Contract Documents unless the Contractor has in writing called Engineer's attention to such deviations at the time of submission and Engineer has given written concurrence to the specific deviations, nor shall any concurrence by the Engineer relieve Contractor from responsibility for errors and omissions in the submittals.Concurrence of the CPM Activity Network by the Engineer is advisory only and shall not relieve the Contractor of responsibility for accomplishing the Work within the Contract completion date(s). 4. Concurrence, acceptance,or approval of the Contractor's CPM schedule by the Engineer in no way makes the Engineer an insurer of the CPM schedule's success, nor liable for time or cost overruns resulting therefrom. 5. Failure to include any element of work required for the performance of this Contract will not excuse the Contractor from completing all Work required within the Contract completion date(s),notwithstanding the review of the network by the Engineer. 6. CPM schedules that contain activities with negative float, or which extend beyond the contract completion date,will not be acceptable. 7. Except where earlier completions are specified,CPM schedules which show completion of all work prior to the contract completion date may be indicated; however,in no event shall they constitute a basis for claim for delay by the Contractor. K. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting. I Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting. 2. Include a report with updated schedule that indicates every change, including, but not limited to,changes in logic,durations,actual starts and finishes,and activity durations, 1 As the Work progresses, indicate Final Completion percentage for each activity. Activities shall not be considered to be complete until they are in fact 100 percent complete. 4. Submit a narrative report based on the CPM schedule evaluation,in a format agreed upon by the Contractor and the Engineer. The report shall include a description of the progress during the previous period in terms of completed activities, an explanation of each activity which is showing a delay,a description of problem areas, current and anticipated delaying factors and their estimated impact on performance of other activities and completion dates and an explanation of corrective action taken or proposed. Water Treatment Plant Pressure Control Valves Construction Progress Documentation City of Round Rock 013200-8 lk,,)2022 CDM Smith 8077-263948 AU Rights Reserved February 2022 L. Recovery Schedule: When periodic update indicates the Work is 14 or more calendar days behind the current approved schedule, submit a separate recovery schedule indicating means by which Contractor intends to regain compliance with the schedule. Indicate changes to working hours, working days, crew sizes, equipment required to achieve compliance, and date by which recovery will be accomplished. M. The contract completion time will be adjusted only for causes specified in this Contract. If requesting an extension of any contract completion date, furnish such justification and supporting evidence as the Engineer may deem necessary to determine whether entitled to an extension of time tinder the provisions of this Contract. The Engineer will, after receipt of such justification and supporting evidence,make findings of fact and will advise in writing thereof. If the Engineer finds that the Contractor is entitled to any extension of any contract completion date, the Engineer's determination as to the total number of days extension shall be based upon the currently approved CPM schedule and on all data relevant to the extension. Such data shall be included in the next updating of the schedule. Actual delays in activities which,according to the CPM schedule, do not affect any contract completion date shown by the critical path in the network will not be the basis for a change therein. N. Distribution: Distribute copies of approved schedule to Engineer, Owner, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility, I. Post copies in Project meeting rooms and temporary field offices. 2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities. 1.10 STARTUP CONSTRUCTION SCHEDULE A. Gantt-Chart Schedule: Submit startup,horizontal, Gantt-chart-type construction schedule within seven days of date established for the Notice to Proceed. B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line. Outline significant construction activities for first 90 days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities. I'll GANTT-CHART SCHEDULE REQUIREMENTS A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal, Gantt-chart-type, Contractor's Construction Schedule within 30 days of date established for the Notice to Proceed. I Base schedule on the startup construction schedule and additional information received since the start of Project. B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line. Water Treatment Plant Pressure Conrrol VMve, Construcrion Progress Ductunenumon Cay of Round Rock 00200 9 C',2022 CDM Smith 9077-263948 All Rights Reserved February 2022 1 For construction activities that require three months or longer to complete, indicate an estimated completion percentage in 10 percent increments within time bar. 1.12 CPM SCHEDULE REQUIREMENTS A. Prepare network diagrams using AON(activity-on-node) fon-nat. B. Startup Network Diagram: Submit diagram within 14 days of date established for the Notice to Proceed. Outline significant construction activities for the first 90 days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities. C. CPM Schedule: Prepare Contractor's Construction Schedule using a time-scaled CPM network analysis diagram for the Work. I. Develop network diagram in sufficient time to submit CPM schedule, so it can be accepted for use no later than 60 days after date established for the Notice to Proceed. a. Failure to include any work item required for performance of this Contract shall not excuse Contractor from completing all work within applicable completion dates. 1 Conduct educational workshops to train and inform key Project personnel, including subcontractors'personnel, in proper methods of providing data and using CPM schedule information. 3. Establish procedures for monitoring and updating CPM schedule and for reporting progress.Coordinate procedures with progress meeting and payment request dates. 4, Use"one workday"as the unit of time for individual activities. Indicate nonworking days and holidays incorporated into the schedule to coordinate With the Contract Time. D. CPM Schedule Preparation: Prepare a list of all activities required to complete the Work. Using the startup network diagram,prepare a skeleton network to identify probable critical paths. 1. Activities: Indicate the estimated time duration, sequence requirements, and relationship of each activity in relation to other activities. Include estimated time frames for the following activities: a. Preparation and processing of submittals. b. Mobilization and demobilization. C. Purchase of materials. d. Delivery, e. Fabrication. f. Utility interruptions. g. Installation. h. Work by Owner that may affect or be affected by Contractor's activities. i. Testing and inspection. j. Commissioning. k. Punch list and Final Completion. 1. Activities occurring following Final Completion. In. Maintenance of existing facilities. Water Treatment Plant Pressure Control Valves Construction Progress Documentation City of Round Rock 013200- 10 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 M Contract milestones, 1 Critical path Activities: Identify critical path activities, including those for interim completion dates. Scheduled start and completion dates shall be consistent with Contract milestone dates. 3. Processing: Process data to produce output data on a computer-drawn, time-scaled network. Revise data, reorganize activity sequences, and reproduce as often as necessary to produce the CPM schedule within the limitations of the Contract Time. 4. Format: Mark the critical path. Locate the critical path near center of network; locate paths with most float near the edges. a. Subnetworks on separate sheets are permissible for activities clearly off the critical path. E. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a tine-impact analysis using a network fragment to demonstrate the effect of the proposed change on the overall Project schedule. I.. Initial Issue of Schedule: Prepare initial network diagram from a sorted activity list indicating straight"early start-total float." Identify critical activities. Prepare tabulated reports showing the following: I. Contractor or subcontractor and the Work or activity. 2. Description of activity. 3. Main events of activity. 4. Immediate preceding and succeeding activities, 5. Early and late start dates, 6. Early and late finish dates, 7. Activity duration in workdays. R. Total float or slack time. 9. Average size of workforce, 10. Dollar value of activity(coordinated with the schedule of values). G. Schedule Updating: Concurrent with making revisions to schedule, prepare tabulated reports showing the following: I. Identification of activities that have changed. 1 Changes in early and late start dates. 1 Changes in early and late finish dates. 4. Changes in activity durations in workdays. 5. Changes in the critical path. 6. Changes in total float or slack time. 7. Changes in the Contract Time. H. Value Summaries: Prepare two cumulative value lists,sorted by finish dates, 1. In first list,tabulate activity number,early finish date,dollar value,and cumulative dollar value, 2. In second list, tabulate activity number, late finish date, dollar value, and cumulative dollar value. Watcrl'reavnent Plant Pressure Control Valves Construc6on Progress Docuinentation City of`Round Rock 013200 If o 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. In subsequent issues of both lists,substitute actual finish dates for activities completed as of list date. 4. Prepare list for ease of comparison with payment requests; coordinate timing with progress meetings. a. In both value summary lists, tabulate "actual percent complete" and "cumulative value completed"with total at bottom. b. Submit value summary printouts one week before each regularly scheduled progress meeting. 1.13 REPORTS A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site: 1. List of subcontractors at Project site. 2. List of separate contractors at Project site. 3. Approximate count of personnel at Project site. 4. Equipment at Project site. 5. Material deliveries. 6. High and low temperatures and general weather conditions,including presence of rain or snow. 7. 'Testing and inspection. 8. Accidents. 9. Meetings and significant decisions. 10. Unusual events. 11. Stoppages,delays, shortages,and losses. 12. Meter readings and similar recordings. 13. Emergency procedures. 14. Orders and requests of authorities having jurisdiction. 15. Change Orders received and implemented. 16. Construction Change Directives received and implemented. 17. Services connected and disconnected. 18. Equipment or system tests and startups. 19. Partial completions and occupancies. 20. Substantial Completions authorized. B. Material Location Reports: At monthly intervals, prepare and submit a comprehensive list of materials delivered to and stored at Project site. List shall be cumulative, showing materials previously reported plus items recently delivered. Include with list a statement of progress on and delivery dates for materials or items of equipment fabricated or stored away from Project site. Indicate the following categories for stored materials: 1. Material stored prior to previous report and remaining in storage. 2. Material stored prior to previous report and since removed from storage and installed. 3. Material stored following previous report and remaining in storage. C. Site Condition Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report. Submit with a Request for Water Treatment Plant Pressure Control Valves Construction Progress Documentation City of Round Rock 013200- 12 %,;2022 CDM Suiith 8077-263948 All Rights Reserved February 2022 Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents. D. Unusual Event Reports: When an event of an unusual and significant nature occurs at Project site,whether or not related directly to the Work, prepare and submit a special report. List chain of events, persons participating, responses by Contractor's personnel, evaluation of results or effects, and similar pertinent inforination, Advise Owner in advance when these events are known or predictable. 1. Submit unusual event reports directly to Owner within one day(s) of an occurrence. Distribute copies of report to parties affected by the occuiTcnee. PARI'2-PRODUCTS (NOT USED) PART 3- EXECUTION 3.1 CONSTRUCTION SEQUENCE- SCOPE OF'WORK A. The intent of construction sequencing as specified herein and as shown on the Drawings is to facilitate coordination with the Owner and Landowner. All tasks of the phased construction schedule,whether described herein or not, are the responsibility of the Contractor. 13, Schedule and perforin piping and tie-iris at the existing Round Rock Water Treatment Plant during off-peak periods (January through March). The connection work shall be planned to limit the Plant downtime to a maximum of 10 continuous calendar days. C. Plan to work overtime if needed to complete construction of the various project improvements and shall make no claims for extra compensation for overtime work required to conform to these requirements, Coordinate with the Engineer and Owner's Plant personnel at least two weeks prior to performing any work associated with tying into existing facilities or for any shutdown of an existing system with an additional notification to the Engineer and Owner at least 72 hours prior to any shutdown, D. Upon achieving Substantial Completion, the Water Treatment Plant Pressure Control Valves will be part of an operational finished water pipeline that must remain in service under pressure and must comply at all times with the Texas Commission on Environmental Quality (TCEQ) Rules and Regulations, E. In the event that underground piping or utilities are encountered which are not shown on the Drawings, such piping or utilities shall not be disturbed without written prior approval of the Engineer. 12 SCHEDULE CONSIDERATIONS A. Develop the construction schedule to accommodate the Project Schedule and General Construc- tion Activity Requirements, as described in Paragraph 1.06 herein and shall accommodate the Watcr Treatment Mant Pressure Control Valves Comirumon Progress Docunienumon City of Rotand Rock 01 32010- l3 V 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 schedule considerations herein. The Project Schedule shall be updated on a monthly basis as needed. B. The following considerations shall be taken into consideration in development of the Construc- tion Schedule,This is not meant to be all inclusive,but to provide a general overview of some of the constraints involved with the proposed construction. 3.3 LIQUIDATED DAMAGES A. Understands and agrees that the time of completion is an essential consideration in the development of his proposal and that failure to complete the Work under this Contract, within the allotted time as specified or subsequently adjusted by Change Orders, will result in Damages being sustained by the Owner. Therefore, the Contractor and the Owner agree in applying Liquidated Damages for each and every Calendar Day the Work, or any portion thereof, remains uncompleted after the specified time-,or adjusted times if modified by Change Order,pay as agreed Liquidated Damages,but not as a penalty,the amounts specified in Section 005000,Agreement. These Liquidated Damages are for the following items: 1. Substantial Completion. 2. Final Completion. B. In the event the Project is not Substantially Complete prior to the Final Completion date, liquidated damages associated with both Substantial Completion and Final Completion shall be assessed concurrently. 3.4 SUBMITTALS A. Review and determine all materials and equipment needed to complete the Work during construction as described herein. Submit all Shop Drawings, Product Data and Samples for all materials and equipment needed for construction as specified in Section 013300, Submittal Procedures. B. Submit notifications for extended daily work hours and/or for work on Saturdays, Sundays and legal/Owner holidays as specified herein. C, Submit products and materials for all temporary plugs,dams,sealants,etc. D. Submit to the Owner for approval a detailed Construction Schedule prior to initiation of construction. The Schedule shall comply with all aspects of the work described herein. E. Update the schedule as required. 3.5 INSTALLATION A. Locate the Work and components of the Work accurately,in correct alignment and elevation,as indicated. 1. Make vertical work plumb and make horizontal work level. Water Treatment Plant Pressure Control Valves Construction Progress Documentation City of Round Rock 013200, 14 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement. 3. Conceal pipes,ducts,and wiring in finished areas unless otherwise indicated, B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated. C, Install products at the time and under conditions that will ensure satisfactory results as judged by Engineer. Maintain conditions required for product performance until Substantial Completion. D, Conduct construction operations so no part of the Work is subjected to darnaging operations or loading in excess of that expected during normal conditions of occupancy of type expected for Project. E. Sequence the Work and allow adequate clearances to accommodate movement of construction items onsite and placement in permanent locations. F. Tools and Equipment: Select tools or equipment that minimize production of excessive noise levels. G. Templates: Obtain and distribute to the parties involved templates for Work specified to be factory prepared and field installed. Check Shop Drawings of other portions of the Work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements. 11. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions with manufacturer, I Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Engineer. 2. Allow for building movement,including thermal expansion and contraction. 3. Coordinate installation of anchorages. Furnish setting drawings,templates,and directions for installing anchorages, including sleeves,concrete inserts,anchor bolts,and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation. 1. Joints: Make joints of uniform width, Where joint locations in exposed Work are not indicated, arrange joints for the best visual effect,as judged by Engineer, Fit exposed connections together to forms hairline joints. L Repair or remove and replace damaged,defective,or nonconforming Work. I Comply with Section 017700 "Contract Closeout" for repairing or removing and replacing defective Work. END OF SECTION 013200 Water Treatment Plant Pressure Control Valves Consvuetion Progress Docunientat 1011 0 y of Round Rock 013200 15 C,,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Construction Progress Documentation City of Round bock 013200 16 X12022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 013300 - SUBMITTAL PROCEDURES PARTI -GENERAL 1.1 DESCRIPTION OF REQUIREMENTS A. This Section specifies the general methods and requirements of submissions applicable to the following work-related submittals: Shop Drawings, Product Data, Samples, Mock Ups, Construction Photographs, and Construction or Submittal Schedules. Detailed submittal requirements will be specified in the technical specification sections, 13. All submittals shall be clearly identified by reference to Specification Section, Paragraph, Drawing No. or Detail as applicable. Submittals shall be clear and legible and of sufficient size for sufficient presentation of data. C. Each Specification Section, Paragraph, Drawing No, or Detail,as applicable, shall be submitted individually. D. Provide all submittal distribution to the Owner and shall coordinate with the Owner in regards to all submittal requirements and reviews. The Owner shall be responsible for all submittal reviews,and the Engineer shall only review submittals at Owner's request, 1.2 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1.3 SUMMARY A. Section Includes: L Submittal schedule requirements. 2. Administrative and procedural requirements for submittals. B. Related Requirements: I. Section 012200 "Measurement and Payment" for submitting Applications for Payment and the schedule of values. 2. Section 013100 "Project Management and Coordination" for submitting coordination drawings and subcontract list and for requirements for web-based Project software. 3. Section 013200 "Construction Progress Documentation" for submitting schedules and reports,including Contractors construction schedule, 4. Section 014000 "Quality Requirements" for submitting test and inspection reports, and schedule of tests and inspections. 5. Section 017700 "Closeout Procedures" for submitting closeout submittals and maintenance material submittals, WaterTirearment Plant rlressurc Control Valves Submittal Procedures Oty of Round Roick 0133001- 1 t'�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 6. Section 017823 "Operation and Maintenance Data" for submitting operation and maintenance manuals. 7. Section 017839 "Project Record Documents" for submitting record Drawings, record Specifications,and record Product Data. 1.4 DEFINITIONS A. Action Submittals: Written and graphic information and physical samples that require Engineer's responsive action. Action submittals are those submittals indicated in individual Specification Sections as"action submittals." B. Informational Submittals: Written and graphic information and physical samples that do not require Engineer's responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as"informational submittals." C. Mass Submittals: Six or more submittals or items in one day or 15 or more submittals or items in one week. 1.5 SHOP DRAWINGS,PRODUCT DATA, SAMPLES A. Shop Drawings 1. Shop drawings, as specified in individual work Sections include, but are not necessarily limited to, custom-prepared data such as fabrication and erection/installation (working) drawings, scheduled information, setting diagrams, actual shop work manufacturing instructions, custom templates, special wiring diagrams, coordination drawings, individual system or equipment inspection and test reports including performance curves and certifications,as applicable to the Work, 2. All shop drawings submitted by subcontractors for approval shall be sent directly to the Contractor for checking. The Contractor shall be responsible for their submission at the proper time so as to prevent delays in delivery of materials. 3. The Contractor shall check all subcontractor's shop drawings regarding measurements, size of members, materials, and details to satisfy himself that they conform to the intent of the Drawings and Specifications. Shop drawings found to be inaccurate or otherwise in error shall be returned to the subcontractors for correction before submission thereof. 4. All details on shop drawings submitted for approval shall show clearly the relation of the various parts to the main members and lines of the structure, and where correct fabrication of the work depends upon field measurements, such measurements shall be made and noted on the drawings before being submitted for approval. B. Product Data I. Product data as specified in individual Sections, include, but are not necessarily limited to, standard prepared data for manufactured products (sometimes referred to as catalog data), such as the manufacturer's product specification and installation instructions, Water Treatment Plant Pressure Control Valves Submittal Procedures City of Round Rock 013300-2 4�2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 availability of colors and patterns, manufacturer's printed statements of compliances and applicability, roughing-in diagrams and templates, catalog cuts, product photographs, standard wiring diagrams, printed performance curves and operational-range diagrams, production or quality control inspection and test reports and certifications, mill reports, product operating and maintenance instructions and recommended spare-parts listing and printed product warranties,as applicable to the Work, C. Samples I Samples specified in individual Sections, include, but are not necessarily limited to, physical examples of the work such as sections of manufactured or fabricated work,small cuts or containers of materials, complete units of repetitively-used products, cot or/tex(urc/pa trem swatches and range sets, specimens for coordination of visual effect, graphic symbols and units of work to be used by the Engineer or Owner for independent inspection and testing,as applicable to the Work, L6 CONTRACTOR'S RESPONSIBILITIES A. Action Submittals and Informational Submittals: Review each submittal and check for coordi- nation with other Work of the Contract and for compliance with the Contract Documents.Note corrections and field dimensions. Mark with approval stamp before submitting to Engineer. B. The Contractor shall review shop drawings,product data and samples, including those by sub- contractors,prior to submission to determine and verify the following: I. Field measurements 1 Field construction criteria,including construction means, techniques,sequences,proce- dures,and safety precautions 3. Catalog numbers and similar data 4. Conformance with the Specifications C. Each shop drawing,sample and product data submitted by the Contractor shall have affixed to it the following Certification Statement including the Contractor's Company name and signed by the Contractor: "Certification 5tatement: by this submittal, I hereby rej)resew that I havefid- filled all obligations regarding verifting and determiningfield measurements,field construction criteria, materials, dimensions, catalog numbers,and similar clata and other apl)licable ah- proved shop draivings."Shop drawings and product data sheets I I-inches by 17-inches and smaller shall be bound together in an orderly fashion and bear the above Certification Statement on the cover street. The cover sheet shall fully describe the packaged data and include a listing of all items within the package. Provide to the Resident Project Representative a copy of each submittal transmittal sheet for shop drawings,product data and samples at the time of submittal of said drawings,product data and samples to the Owner/Engineer. D. The Contractor shall utilize a 9-character submittal identification numbering system in the fol- lowing manner: 1. The first six digits shall be the applicable Specification Section Number, Water Treatment 11kirit Pressure Conlyot Valves Subniktal Procedures Oty ol'Round Rock 013300, 3 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. The next two digits shall be the numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. 3. The last character shall be a letter,A-Z, indicating the submission,or resubmission of the same Drawing(i.e. A,,Ist submission, B=2nd submission,C-3rd submission,etc.).A typi- cal submittal number would be as follows: 030110-08-B 030110 Specification Section for Concrete and Reinforcing Steel 08 The eighth initial submittal under this specification section B The second submission(first resubmission)of that particular shop drawing E. Notify the Owner/Engineer in writing,at the time of submittal,of any deviations in the submit- tals from the requirements of the Contract Documents. F. The review and approval of shop drawings,samples or product data by the Owner/Engineer shall not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. All risks of error and omission are assumed by the Contractor and the Owner`Engineer will have no responsibility therefor. G. No portion of the work requiring a shop drawing,sample,or product data shall be started nor shall any materials be fabricated or installed prior to the approval or qualified approval of such item. Fabrication performed,materials purchased or on-site construction accomplished which does not conform to approved shop drawings and data shall be at the Contractor's risk.The Owner will not be liable for any expense or delay due to corrections or remedies required to ac- complish conformity. H. Project work,materials,fabrication,and installation shall conform with approved shop draw- ings,applicable samples,and product data. 1.7 SUBMITTAL SCHEDULE A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Engineer and additional time for handling and reviewing submittals required by those corrections. 1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and Contractor's construction schedule. 2. Initial Submittal Schedule: Submit concurrently with startup construction schedule. Include submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication. 3. Final Submittal Schedule: Submit concurrently with the first complete submittal of Contractor's construction schedule. a. Submit revised submittal schedule as required to reflect changes in current status and timing for submittals. Water Treatment Plant Pressure Control Valves Submittal Procedures City of Round Rock 013300-4 (A,)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 4. Format:Arrange the following information in a tabular format: a. Scheduled date for first submittal. b. Specification Section number and title. c. Submittal Category: Action; informational. d. Name of subcontractor. e. Description of the Work covered. f. Scheduled date for Engineer's final release or approval. g. Scheduled dates for purchasing. 11. Scheduled date of fabrication. i. Scheduled dates for installation. j. Activity or event number. 1.8 SUBMITTAL FORMATS A. Submittal Information. Include the following information in each submittal: 1. Project name. 2. Date. 3. Name of Engineer. 4. Name of Contractor. 5, Name of firm or entity that prepared submittal. 6. Names of subcontractor,manufacturer,and supplier. 7. Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier and alphanumeric suffix for resubmittals. 8. Category and type of submittal. 9. Submittal purpose arid description. 10. Number and title of Specification Section, with paragraph number and generic name for each of multiple items, It. Drawing number and detail references,as appropriate. 12. Indication of full or partial submittal. 13. Location(s)where product is to be installed, as appropriate. 14. Other necessary identification. 15. Remarks. 16. Signature of transmitter. B. Options: Identify options requiring selection by Engineer. C. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional inforniation and revisions, other than those requested by Engineer on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet. D. Electronic Submittals: Prepare submittals as PDF package, incorporating complete information into each PDF file. Name PDF file with submittal number. waft er'Freatrnent 111am Prc.ssurc Contr(,d Valvas Submwal Proeedures Cay of'Roand Rock 0 133010-5 F2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.9 SUBMITTAL PROCEDURES A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections. L Email: Prepare submittals as PDF package and transmit to Engineer by sending via email. Include PDF transmittal form. Include information in email subject line as requested by Engineer. a. Engineer will return annotated file. Annotate and retain one copy of file as a digital Project Record Document file. B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals,and related activities that require sequential activity. 2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule. 3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals. C. Coordinate transmittal of submittals for related parts of the Work specified in different Sections, so processing will not be delayed because of need to review submittals concurrently for coordination. a. Engineer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. D. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Engineer's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to pen-nit processing,including resubmittals. I. Initial Review: Allow 30 days for initial review of each submittal (and 45 days for multi- discipline reviews). Allow additional time if coordination with subsequent submittals is required. Engineer will advise Contractor when a submittal being processed must be delayed for coordination. 2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal. 3. Resubmittal Review: Allow 15 days for review of each resubmittal. 4. Sequential Review: Where sequential review of submittals by Engineer's consultants, Owner,or other parties is indicated,allow 21 days for initial review of each submittal. 5. Concurrent Consultant Review: Where the Contract Documents indicate that submittals may be transmitted simultaneously to Engineer and to Engineer's consultants, allow 30 days for review of each submittal. Submittal will be returned to Engineer before being returned to Contractor. a. Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to Engineer. Water Treatment Plant Pressure Control Valves Submittal Procedures City of Round(tock 013300,6 x.2022 CDM Smith 8077-263948 All Rights Reserved February 2022 E. Resubmittals: Make resubmittals in same form and number of copies as initial submittal, I. Note date and content of previous submittal. 2. Note date and content of revision in label or title block and clearly indicate extent of revision, 3. Resubmit submittals until they are marked with approval notation from Engineer's action stamp. 4. Repetitive Reviews: Shop drawings, O&M manuals, and other submittals will be reviewed no more than twice at the Owner's expense. All subsequent reviews will be performed at the Contractor's expense. Reimburse the Owner for all costs invoiced by Engineer for the third and subsequent reviews, F. Distribution: Fumish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers,authorities having jurisdiction,and others as necessary for performance of construction activities. Show distribution on transmittal forms, & Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Engineer's action stamp. 1.10 SUBMITTAL REQUIREMENTS A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment, 1. If information must be specially prepared for submittal because standard published data are unsuitable for use,submit as Shop Drawings,not as Product Data. 1 Mark each copy of each submittal to show which products and options are applicable. 1 Include the following information,as applicable: a. Manufacturer's catalog cuts. b. Manufacturer's product specifications, c. Standard color charts. d. Statement of compliance with specified referenced standards, e. Testing by recognized testing agency. f. Application of testing agency labels and seals. 91 Notation of coordination requirements. 11. Availability and delivery time information. 4, For equipment,include the following in addition to the above, as applicable: a. Wiring diagrams that show factory-installed wiring. b. Printed performance curves. C. Operational range diagrams. d. Clearances required to other construction, if not indicated on accompanying Shop Drawings. 5. Submit Product Data before Shop Drawings,and before or concurrently with Samples. B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. WaterTreatment Plant Pressure Control VMves Submittal Procedures City of'Roand Rock 013300-7 ti 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information,as applicable: a. Identification of products. b. Schedules. C. Compliance with specified standards. d. Notation of coordination requirements. e. Notation of dimensions established by field measurement. f. Relationship and attachment to adjoining construction clearly indicated. g. Seal and signature of professional engineer if specified. C. Samples: Submit Samples for review of type, color, pattern, and texture for a check of these characteristics with other materials. 1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package. 2. Identification: Permanently attach label on unexposed side of Samples that includes the following: a. Project name and submittal number. b. Generic description of Sample. C. Product name and name of manufacturer. d. Sample source. e. Number and title of applicable Specification Section. f. Specification paragraph number and generic name of each item. 3. Email Transmittal: Provide PDF transmittal. Include digital image file illustrating Sample characteristics and identification information for record. 4. Disposition: Maintain sets of approved Samples at Project site, available for quality- control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set. a. Samples not incorporated into the Work, or otherwise designated as Owner's property,are the property of Contractor. 5. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units,showing the full range of colors,textures,and patterns available. a. Number of Samples: Submit 1 full set(s)of available choices where color,pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Engineer will return submittal with options selected. D. Product Schedule: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form: 1. Type of product. Include unique identifier for each product indicated in the Contract Documents or assigned by Contractor if none is indicated. 2. Manufacturer and product name,and model number if applicable. 3. Number and name of room or space. 4. Location within room or space. Water Treatment Plant Pressure Control Valves Submittal Procedures City of Round Rock 013300-8 ,'v 2022 CDM St-nith 8077-263948 All Rights Reserved February 2022 E. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of cornpleted projects with project names and addresses, contact information of architects and owners,and other information specified. R Design Data: Prepare and submit written and graphic information indicating compliance with indicated performance and design criteria in individual Specification Sections. Include list of assumptions and summary of loads. Include load diagrams if applicable. Provide narne and version of software,if any,used for calculations.Number each page of submittal. G, Certificates. I Certificates and Certifications Submittals: Submit a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. Provide a notarized signature where indicated. 2. If specifically required in other Sections of these Specifications, the Contractor shall submit a P.E. Certification for each item required, in the form attached to this Section, completely filled in and stamped. 3. Installer Certificates: Submit written statements on manufacturer's letterhead, certifying that Installer complies with requirements in the Contract Documents and,where required, is authorized by manufacturer for this specific Project. 4. Manufacturer Certificates: Submit written statements on manufacturer's letterhead, certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required, 5. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents. 6. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents, 7. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of AWS B2.1/132.1M on AWS forms. Include names of fin-ns and personnel certified. H. Test and Research Reports: I Compatibility "Fest Reports: Submit reports written by a qualified testing agency, oil testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for substrate preparation and primers required. 2. Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location,for compliance with requirements in the Contract Documents, 3. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents. 4. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents, 5. Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on Waler]reaunent Phant Pressure Control Valves Submatal Procedures City of'Round Rmk 013300 •9 tip 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 evaluation of tests performed by manufacturer and witnessed by a qualified testing agency,or on comprehensive tests performed by a qualified testing agency. 6. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include the following information: a. Name of evaluation organization. b. Date of evaluation. C, Time period when report is in effect. d. Product and manufacturers'names. e. Description of product. f. Test procedures and results. g. Limitations of use. 1.11 DELEGATED-DESIGN SERVICES A. Performance and Design Criteria: 'Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated. 1. If criteria indicated are insufficient to perform services or certification required,submit a written request for additional information to Engineer. B. Delegated-Design Services Certification: In addition to Shop Drawings,Product Data,and other required submittals, submit digitally signed PDF file of certificate, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional. 1. Indicate that products and systems comply with performance and design criteria in the Contract Documents. Include list of codes, loads, and other factors used in performing these services. 1.12 PROPOSED PRODUCT LIST A. Within 15 days after date of Notice to Proceed, submit list of major products proposed for use, with name of manufacturer,trade name,and model number of each product. B. For products specified only by reference standards,indicate manufacturer,trade name,model or catalog designation,and reference standards. 1.13 CONTRACTOR'S REVIEW A. Action Submittals and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Engineer. B. Contractor Responsible for: Water Treatment Plant Pressure Control Valves Submittal Procedures Cay of Round Rock 013300- 10 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 1. Deten-nination and verification of materials including manufacturer's catalog numbers, 2. Deten-nination and verification of field measurements and field construction criteria, 3. Checking and coordinating information in submittal with requirements of Work and of Contract Documents. 4. Determination of accuracy and completeness of dimensions and quantities. 5. Confirmation and coordination of dimensions and field conditions at Site. 6. Construction means,techniques,sequences,and procedures. 7. Safety precautions. 8. Coordination and performance of Work of all trades. 9. Other requirements enumerated in Contract Documents. C. Contractor's Approval: Indicate Contractor's approval for each submittal with a uniform approval stamp. Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents. I Engineer will not review submittals received from Contractor that do not have Contractor's review and approval. 1.14 ENGINEER'S REVIEW A. Do not make mass submittals to Engineer. If mass submittals are received, Engineer's review time stated above will be extended as necessary to perforin proper review. Engineer will review mass submittals based on priority determined by Engineer after consultation with Owner avid [Contractor] [Construction Manager]. B. Action Submittals: Engineer will review each submittal, indicate corrections or revisions required. I PDF Submittals: Engineer will indicate, via markup on each submittal, tile appropriate action, C. Informational Submittals: Engineer will review each submittal and will not return it, or will return it if it does not comply with requirements. Engineer will forward each submittal to appropriate party. D. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from Engineer. E. Incomplete Submittals are unacceptable, will be considered nonresponsive,and will be returned for resubmittal without review. F. Engineer will return without review submittals received from sources other than Contractor. G. Submittals not required by the Contract Documents will be returned by Engineer without action, H. Shop drawings will be returned to the Contractor with one of the following codes. I. "APPROVED" - This code is assigned when there are no notations or comments on the submittal. When returned under this code the Contractor may release the equipment and/or material for manufacture. WaterTreatinent Plant Pressure Control Valves Submittal Procedures pity of Round Rock 013300 11 ,k)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. "APPROVED AS NOTED" -This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor, The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. 3. "APPROVED AS NOTED/RESUBMIT" - This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product.The resubmittal is to address all comments, omissions and non-conforming items that were noted. An additional box is checked to indicate whether the resubmission is for the complete package, or for parts of the package. If no box is checked,a complete resubmittal shall be provided. Review code may designate if a partial or full submittal is required. If full submittal is required, a complete resubmittal package addressing all comments shall be provided. If a partial submittal is designated, resubmittal shall only include information pertaining to those items noted in review comments requiring clarification and any portions of submittal impacted as a result of the response. Resubmittal is to be received by the Engineer within 30 calendar days of the date of the Engineer's transmittal requiring the resubmittal. 4. "REJECTED" -This code is assigned when the submittal does not meet the intent of the Contract Documents. The Contractor must resubmit the entire package revised to bring the submittal into conformance. It may be necessary to resubmit using a different manufacturer/vendor to meet the requirements of the Contract Documents. 5. "RECEIPT ACKNOWLEDGED (Not subject to Engineer's Approval)" - This code is assigned to acknowledge receipt of a submittal that is not subject to the Engineer's approval. This code is generally used with submittals involving the Conti-actor's means and methods of construction work plans,and health and safety plans. 1.15 ELECTRONIC CAD FILES OF PROJECT DRAWINGS A. Electronic CAD Files of Project Drawings: May only be used to expedite production of Shop Drawings for the Project.Use for other Projects or purposes is not allowed. B. Electronic CAD Files of Project Drawings: Distributed only under the following conditions: I. Use of files is solely at receiver's risk. Engineer does not warrant accuracy of files. Receiving files in electronic form does not relieve receiver of responsibilities for measurements, dimensions, and quantities set forth in Contract Documents. In the event of ambiguity, discrepancy, or conflict between information on electronic media and that in Contract Documents,notify Engineer of discrepancy and use infort-nation in hard-copy Drawings and Specifications. 2. CAD files do not necessarily represent the latest Contract Documents, existing conditions, and as-built conditions. Receiver is responsible for determining and complying with these conditions and for incorporating addenda and modifications. 3. User is responsible for removing information not normally provided on Shop Drawings and removing references to Contract Documents. Shop Drawings submitted with information associated with other trades or with references to Contract Documents will not be reviewed and will be immediately returned. 4. Receiver shall not hold Engineer responsible for data or file clean-up required to make files usable, nor for error or malfunction in translation, interpretation, or use of this electronic information. Water Treatment Plant Pressure Control Valves Submittal Procedures City of Round Rock 013300. 12 R(`,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 5. Receiver shall understand that even though Engineer has computer virus scanning software to detect presence of computer viruses, there is no guarantee that computer viruses are not present in files or in electronic media, 6, Receiver shall not hold Engineer responsible for such viruses or their consequences, and shall hold Engineer harmless against costs, losses, or damage caused by presence of computer virus in files or media. 1,16 REQUEST FOR INFORMATION(RFI) A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the font specified, I. Engineer will return without response those RFIs submitted to Engineer by other entities controlled by Contractor. 2, Coordinate and submit RFIs in a prompt mariner to avoid delays in Contractor's work or work of subcontractors. B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following I. Project name. 2. Owner name, 1 Owner's project number. 4. Name of Engineer. 5. Engineer's project number. 6. Date. 7. Name of Contractor. 8, RFI number,numbered sequentially. 9. RFI subject. 10. Specification section number and title and related paragraphs,as appropriate. IL Drawing number and detail references,as appropriate. 11 Field dimensions and conditions,as appropriate. 11 Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract Time or the Contract Sum,Contractor shall state impact in the RFI. 14, Contractor's signature. 15, Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings,coordination drawings,and other information necessary to fully describe items needing interpretation. a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches. C. RFI I-orms: Font found in Section 018000 -"Forms". 1. Attachments shall be electronic files in PDF format. D, Engineer's Action: Engineer will review each RFI,determine action required,and respond. WaterTreatment Hant Pressure Control VaNes Submittal Procedures Oty of Round Rock W3300- 13 )2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. The following Contractor-generated RFIs will be returned without action: a. Requests for approval of submittals. b. Requests for approval of substitutions. C. Requests for approval of Contractor's means and methods. d. Requests for coordination information already indicated in the Contract Documents. e. Requests for adjustments in the Contract Time or the Contract Sum. E Requests for interpretation of Engineer's actions on submittals. g. Incomplete RFIs or inaccurately prepared RFIs. 2. Engineer's action may include a request for additional information. 3. Engineer's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit a Change Proposal. a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum,notify Engineer in a formal letter within 5 days of receipt of the RFI response. E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log weekly.Include the following: 1. Project name. 2. Name and address of Contractor. 3. Name and address of Engineer. 4. RFI number,including RFIs that were returned without action or withdrawn. 5. RFI description. 6. Date the RFI was submitted. 7. Date Engineer's response was received. 8. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal Request,as appropriate. 9. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate. F. On receipt of Engineer's action,update the RFI log and immediately distribute the RFl response to affected parties. Review response and notify Engineer within seven days if Contractor disagrees with response. 1.17 SCHEDULE OF VALUES A. Within 15 calendar days after award of Contract, the Contractor shall submit to the Owner a tentative schedule of values (a breakdown of the lump sum bid items) for the purpose of developing an approved schedule of values, which in turn shall be used to determine partial payment estimates. 1. The tentative schedule of values will be reviewed by the Owner''Engineer to determine whether, in the Owner's judgement, it is sufficiently detailed for the purpose intended. The Owner will also evaluate the tentative schedule of values to determine whether, in the Owner's judgement, the prices included are "unbalanced". Any unbalanced schedule or subsidiary items will be disallowed. 2. The Owner/Engineer will provide the Contractor with comments and/or may request additional information from the Contractor to justify certain item quantities and prices. Water Treatment Plant Pressure Control Valves Submittal Procedures City of Round Rock 013300- 14 f,;2022 CDM Smith 8077-263948 All Rights Reserved February 2022 On the basis of the Engineer's comments, the Contractor shall revise and resubmit the tentative schedule of values for further review and/or approval. 3, Once the tentative schedule of values is approved by the Owner/Engineer,it shall becorne the approved schedule of values to be used in detennining partial payment estimates. Ten (10) copies of this schedule shall be submitted to the Owner for distribution and the Owner's use, 4. No partial payment request (including the first) shall be made or approved until the schedule of values has been approved by the Owner. B, In so far as possible, total quantities and unit prices shall be shown for all items of work, separating for each item the materials and labor and such other sub items as the Conti-actor may desire. ""Lump sum", "miscellaneous", and other such general entries in the schedule of values shall be avoided whenever possible. Stich items as Bond premiums, temporary facilities, and equipment storage may be listed separately in the schedule of values,provided the costs can be substantiated. Overhead and profit shall not be listed as separate items. C, At a mininiurn,the breakdown within the schedule of values for each bid item shall separate out the following costs if applicable: Bond; Mobilization; Fencing; Road Material and Grading; Sidewalks; Excavation; Backfill; Waterstop; Concrete (by class); Reinforcing Steel; Miscellaneous Metals and Structural Steel; Grout; Sand; Yard Pipe, Valves, and Fittings; Manholes; Mechanical Pipe, Valves, and Fittings; Weirs, Gates, and Troughs; Mechanical Equipment; Structures (other than Concrete); Motor Control Centers; Electrical; Painting; Cleanup; Landscape; Site Work;Trench Safety;and/or any other items such as are applicable to the Work. D. The sum of the items listed on the schedule of values for each bid item shall equal the contract lump sum price for the bid item, and the total of all items included in the schedule of values shall equal the contract price. No additional payment will be allowed if the quantities shown on the schedule are less than those actually required to accomplish the work, unless the quantities are altered by a change order. The schedule of values shall not be interpreted as a means by which the contract price could be diminished. 1.18 PAYMENT APPLICATIONS A, Partial payments will be made for materials and equipment stored on site but not installed, in accordance with Article 14 of the General Conditions. The arnount paid for stored materials shall be for amount actually paid by Contractor and include any discounts received for early payment. In order to receive approval for partial payment of any materials and equipment stored on site,the Contractor must submit copies of the original invoice with the Application for Payment for all materials and equipment, in order to be approved for payment. Payment for all stored on-site items shall be subject to the retainage described in Article 14 of the General Conditions, B. For all lump sum work, payment will be made on the basis of percent complete of each task identified in Contractor's Schedule of Values. C. Payment for Insurance and Bonds WaterTreatment Mann Pressure ControQ VaNes Submittal Procedures City of Round Rock CSV 3300- 15 ............... C)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Contractor's Insurance and Bonds shall include costs for insurance plus Performance and Payment Bonds. 2. Payment for Insurance and Bonds will be made on the first approved monthly pay request with suitable evidence of the cost thereof. The amount should agree with the suitable ev- idence provided and the Schedule of Values. 3. The amount of the Insurance and Bonds on the Schedule of Values shall not exceed 2.5 percent of the total contract amount. The amount of the Insurance,Bonds,and Mobiliza- tion/Demobilization shall not exceed 5 percent of the total contract amount. D. Payment for Mobilization and Demobilization 1. Mobilization and Demobilization includes costs of personnel, equipment and supplies, construction offices and the utility costs associated therewith,etc. 2. Payments for Mobilization and Demobilization will be made as follows based upon the "adjusted contract amount" for construction items. The "adjusted contract amount" is defined as the total contract amount less the amount for Insurance and Bonds and less the amount for Mobilization and Demobilization. 3. When I percent of the adjusted contract amount for construction items is earned, 25 percent of the mobilization and demobilization amount shown in the Schedule of Values will be paid. 4. When 10 percent of the adjusted contract amount for construction items is earned, 50 percent of the mobilization and demobilization amount shown in the Schedule of Values will be paid. 5, When 25 percent of the adjusted contract amount for construction items is earned, 75 percent of the mobilization and demobilization amount shown in the Schedule of Values will be paid. 6. Upon Final Completion of all Work items,payment for the remainder of the mobilization and demobilization amount shown in the Schedule of Values will be made. 7. The amount for Insurance, Bonds, and Mobilization/Demobilization shall not exceed 5 percent of the total contract amount. PART -PRODUCTS (NOT USED) PART 3 -EXECUTION(NOT USED) END OF SECTION 013300 Water Treatment Plant Pressure Control Valves Submittal Procedures City of Round Rock 013300- 16 ,f,,)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 013544-ENVIRONMENTAL PROTECTION PROCEDURES PART GENERAL Lol RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1.02 SCOPE OF WORK A. The work covered by this Section consists of furnishing all labor,materials and equipment and performing all work required for the prevention of environmental pollution in conformance with applicable laws and regulations,during and as the result of construction operations under this Contract. For the purpose of this Specification,environmental pollution is defined as the presence of chemical,physical,or biological elements or agents which adversely affect human health or welfare;unfavorably alter ecological balances of importance to human life;affect other species of importance to man;or degrade the utility of the environment for aesthetic and/or recreational purposes. B. The control of environmental pollution requires consideration of air,water and land, and involves management of noise and solid waste,as well as other pollutants. C. Schedule and conduct all work in a manner that will minimize the erosion of soils in the area of the work. Provide erosion control measures such as sedimentation or filtration systems,berms, silt fences,seeding,mulching or other special surface treatments as are required to prevent silting and muddying of streams,rivers,impoundments, lakes,etc. All erosion control measures shall be in place in an area prior to any construction activity in that area. Specific requirements for Erosion and Sedimentation Controls are specified in Section 312500. D. These Specifications are intended to ensure that construction is achieved with a minimum of' disturbance to the existing ecological balance between a water resource and its surroundings. These are general guidelines. It is the Contractor's responsibility to determine the specific construction techniques to meet these guidelines. E. All phases of sedimentation and erosion control shall comply with and be subject to the approval of the Texas Commission on Environmental Quality(TCEQ)and the U.S. Environmental Protection Agency(U.S.EPA). 1.03 APPLICABLE REGULATIONS A, Comply with all applicable Federal, State and local laws and regulations concerning environmental pollution control and abatement. 1,04 NOTIFICATIONS A. The Owner or Engineer will notify the Contractor in writing of any non-compliance with the foregoing provisions or of any environmentally objectionable acts and corrective action to be taken. State or local agencies responsible for verification of certain aspects of the environmental protection requirements shall notify the Contractor in writing, through the Engineer,of any non-compliance with State or local requirements, The Contractor shall,after Water Treatment Plant Pressure Control Valves Environmental Protection Procedures City of Round Rock 013544 - I Q(`x 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 receipt of such notice from the Engineer or from the regulatory agency through the Engineer, irmnediately take corrective action. Such notice, when delivered to the Contractor or his authorized representative at the site of the work,shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly,the Owner may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor unless it is later determined that the Contractor was in compliance. 1.05 IMPLEMENTATION A. Prior to commencement of the work,meet with the Owner to develop mutual understandings relative to compliance with this provision and administration of the environmental pollution control program. B. Remove temporary environmental control features,when approved by the Engineer,and incorporate permanent control features into the project at the earliest practicable time. 1.06 PROTECTION OF WATERWAYS A. The Contractor shall observe the rules and regulations of the State of Texas and agencies of the U.S. Government prohibiting the pollution of any lake,stream,river,or wetland by the dumping of any refuse,rubbish,dredge material,or debris therein. B. Contractors are specifically cautioned that disposal of materials into any waters of the State must conform with the requirements of the Texas Commission on Environmental Quality (TCEQ),and an applicable permit from the U.S.Army Corps of Engineers. C. The Contractor shall be responsible for providing holding ponds or an approved method which will handle,carry through,or divert around his work all flows,including storm flows and flows created by construction activity,so as to prevent silting of waterways or flooding damage to the property or adjacent properties. D. If required,the Contractor shall prepare a Stormwater Pollution Prevention Plan and obtain a Texas Pollution Discharge Elimination System(TPDES)permit and monitor the site per the permit requirements until Final Completion. 1.07 DISPOSAL OF EXCESS EXCAVATION AND OTHER WASTE MATERIALS A. Excess excavated material not required or suitable for backfill and other waste material must be disposed of at sites approved by the Owner and Engineer. B. Unacceptable disposal sites include,but are not limited to,sites within a wetland or critical habitat and sites where disposal will have a detrimental effect on surface water or groundwater quality. C. The Contractor may make his own arrangements for disposal subject to submission of proof to the Engineer that the Owner(s)of the proposed site(s)has a valid fill permit issued by the appropriate governmental agency and submission of a haul route plan including a map of the proposed route(s). Water Treatment Plant Pressure Control Valves Environmental Protection Procedures City of Round Rock 013544- 2 k" 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 D. The Contractor shall provide watertight conveyance of any liquid,semi-liquid,or saturated solids which tend to bleed or leak during transport. No liquid loss from transported materials will be permitted whether being delivered to the construction site or being hauled away for disposal. Fluid materials hauled for disposal must be specifically acceptable at the selected disposal site. 1.08 USE OF CHEMICALS A. All chemicals used during project construction or furnished for project operation, whether herbicide,pesticide,disinfectant,polymer,reactant or of other classification, must show approval of either the U.S. Environmental Protection Agency or the U.S. Department of Agriculture or any other applicable regulatory agency. Use of all such chemicals and disposal of residues shall be in conformance with the manufacturer's instructions. B. Any oil or other hydrocarbon spilled or dumped on the Owner's site during construction must be excavated and completely removed from the site prior to final acceptance. Soil contaminated by the Contractor's operations shall become the property of the Contractor,who will bear all costs of testing and disposal, 1.09 PAYMENT A. The work specified in this Section shall be considered incidental and payment will be included as part of the appropriate lump sum or unit prices specified in the Bid Form. PART2 PRODUCTS(NOT USED) PART EXECUTION 3.01 EROSION CONTROL A. Provide positive means of erosion control such as shallow ditches or berms around construction to carry off surface water. Erosion control measures,such as siltation basins,mulching,jute netting and other equivalent techniques,shall be used as appropriate. Flow of surface water into excavated areas shall be prevented. Ditches around construction area shall also be used to carry away water resulting from dewatering of excavated areas. At the completion of the work, ditches shall be backfilled and the ground surface restored to original condition. 3.02 PROTECTION OF STREAMS A. Care shall be taken to prevent, or reduce to a minimum,any damage to any stream,water ways, or lakes from pollution by debris,sediment or other material,or from the manipulation of equipment and/or materials in or near such streams. Water that has been used for washing or processing,or that contains oils or sediments that will reduce the quality of the water in the stream, shall not be directly returned to the stream. Such waters shall be diverted through a settling basin or filter before being directed into the streams. B. The Contractor shall not discharge water from dewatering operations directly into any live or intermittent stream, channel,wetlands,surface water or any storm sewer. Water from dewatering operations shall be treated by filtration,settling basins,or other approved method to reduce the amount of sediment contained in the water. Water Treativent Plant Piressure Control Valves Environmental Protection Procedures City of Round Rock 013544-3 t° 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. All preventative measures shall be taken to avoid spillage of petroleum products and other pollutants. In the event of any spillage,prompt remedial action shall be taken in accordance with a contingency action plan approved by the Texas Commission on Environmental Quality (TCEQ). Contractor shall submit two copies of approved contingency plans to the Engineer. D. Water being flushed from structures or pipelines after disinfection,with a chlorine residue of 2 mg/l or greater,shall be treated with a dechlorination solution,in a method approved by the Engineer,prior to discharge. 3.03 PROTECTION OF LAND RESOURCES A. Land resources within the project boundaries and outside the limits of permanent work shall be restored to a condition,after completion of construction, that will appear to be natural and not detract from the appearance of the project. Confine all construction activities to areas shown on the Drawings. B. Outside of areas requiring earthwork for the construction of the new facilities,the Contractor shall not deface,injure„or destroy trees or shrubs,nor remove or cut them without prior approval. No ropes,cables,or guys shall be fastened to or attached to any existing nearby trees for anchorage unless specifically authorized by the Engineer. Where such special emergency use is permitted,first wrap the trunk with a sufficient thickness of burlap or rags over which softwood cleats shall be tied before any rope,cable,or wire is placed. The Contractor shall in any event be responsible for any damage resulting from such use. C. Any trees or other landscape feature scarred or damaged by the Contractor's equipment or operations shall be restored as nearly as possible to its original condition. The Engineer will decide what method of restoration shall be used and whether damaged trees shall be treated and healed or removed and disposed of. 1. All scars made on trees by equipment,construction operations,or by the removal of limbs larger than 1-inch in diameter shall be coated as soon as possible with an approved tree wound dressing. All trimming or pruning shall be performed in an approved manner by experienced workmen with saws or pruning shears. Tree trimming with axes will not be permitted. 2. Climbing ropes shall be used where necessary for safety. Trees that are to remain,either within or outside established clearing limits,but are subsequently damaged by the Contractor and are beyond saving in the opinion of the Engineer,shall be immediately removed and replaced at the Contractor's expense. D. The locations of the Contractor's storage,and other construction buildings,required temporarily in the performance of the work,shall be cleared portions of the job site or areas to be cleared as shown on the Drawings and shall require written approval of the Owner and Engineer and shall not be within wetlands or floodplains. The preservation of the landscape shall be an imperative consideration in the selection of all sites and in the construction of buildings. Drawings showing storage facilities shall be submitted for approval of the Engineer. E. If the Contractor proposes to construct temporary roads or embankments and excavations for work areas,he/she shall submit the following for approval at least ten days prior to scheduled start of such temporary work. Water Treatment Plant Pressure Control Valves Environmental Protection Procedures City of Round Rock 013544-4 4'z')2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. A layout of all temporary roads,excavations and embankments to be constructed within the work area. 2. Details of temporary road construction. 3. Drawings and cross sections of proposed embankments and their foundations,including a description of proposed materials. F. Remove all signs of temporary construction facilities such as haul roads,work areas,structures, foundations of temporary structures,stockpiles of excess or waste materials,or any other vestiges of construction as directed by the Owner or Engineer. It is anticipated that excavation, filling and plowing of roadways will be required to restore the area to near natural conditions which will permit the growth of vegetation thereon. The disturbed areas shall be prepared and seeded as described in Section 329200—Turf and Grasses,or as approved by the Owner or Engineer. G. All debris and excess material shall be disposed of outside wetland or floodplain areas in an environmentally sound manner, 3.04 PROTECTION OF AIR QUALITY A. Burning. The use of burning at the project site for the disposal of refuse and debris will not be permitted. B. Dust Control. The Contractor will be required to maintain all excavations,embankment, stockpiles,access roads,plant sites,waste areas,borrow areas,and all other work areas within or without the project boundaries free from dust which could cause the standards for air pollution to be exceeded,and which would cause a hazard or nuisance to others. C, An approved method of stabilization consisting of sprinkling or other similar methods will be permitted to control dust. The use of petroleum products is prohibited. The use of chlorides may be permitted with approval from the Engineer. D. Sprinkling,to be approved,must be repeated at such intervals as to keep all parts of the disturbed area at least damp at all times, and the Contractor must have sufficient Suitable equipment oil the job to accomplish this if sprinkling is used. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs,as determined by the Engineer. 3.05 MAINTENANCE OF POLLUTION CONTROL FACILITIES DURING CONSTRUCTION A. During the life of this Contract, maintain all facilities constructed for pollution control as long as the operations creating the particular pollutant are being carried out or until the material concerned has become stabilized to the extent that pollution is no longer being created. 3.06 NOISE CONTROL A. During construction,the Contractor shall make every effort to minimize noises caused by his operations. Equipment shall be equipped with silencers or mufflers designed to operate with the least possible noise in compliance with State and Federal regulations. END OF SECTION 011100 Water'Freatment Plant Pressure Controt Valves Environmental Protection Procedures Cay of'Round Rock 013544 5 r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Environmental Protection Procedures City of Round Rock 013544-6 e>2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 414000 -QUALITY REQU IREMENTS PART I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for quality assurance and quality control. B. Testing and inspection services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements. 1. Specific quality-assurance and quality-control requirements for individual work results are specified in their respective Specification Sections, Requirements in individual Sections may also cover production of standard products. 2. Specified tests, inspections, and related actions do not limit Contractor's other quality- assurance and quality-control procedures that facilitate compliance with the Contract Document requirements, 3. Requirements for Contractor to provide quality-assurance and quality-control services required by Engineer, Owner, or authorities having jurisdiction are not limited by provisions of this Section. 13 DEFINITIONS A. Experienced: When used with an entity or individual, "experienced," unless otherwise further described, means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction. B. Field Quality-Control Tests and Inspections: Tests and inspections that are performed on-site for installation of the Work and for completed Work, C. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, subcontractor, or sub-subcontractor, to perform a particular construction operation, including installation,erection,application,assembly,and similar operations. 1. Use of trade-specific terminology in ref'erring to a Work result does not require that certain construction activities specified apply exclusively to specific trade(s). D. Preconstruction Testing: Tests and inspections performed specifically for Project before products and materials are incorporated into the Work, to verify performance or compliance Water Treatment Plant Pressure Control Valves Quality Requirements City of Round Rock 014000 1 r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 with specified criteria. Unless otherwise indicated, copies of reports of tests or inspections performed for other than the Project do not meet this definition. E. Product Tests: Tests and inspections that are performed by a nationally recognized testing laboratory (NRTL) according to 29 CFR 1910.7, by a testing agency accredited according to MST's National Voluntary Laboratory Accreditation Program(NVLAP),or by a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements. F. Source Quality-Control Tests and Inspections: Tests and inspections that are performed at the source(e,g.,plant,mill,factory,or shop). G, Testing Agency: An entity engaged to perform specific tests, inspections, or both. The terin "testing laboratory"shall have the same meaning as the term"testing agency." H. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work, to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements. 1. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work, to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Contractor's quality-control services do not include contract administration activities performed by Engineer. 1.4 DELEGATED-DESIGN SERVICES A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated. 1. If criteria indicated are not sufficient to perform services or certification required,submit a written request for additional information to Engineer. B. Delegated-Design Services Statement: Submit a statement signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional, indicating that the products and systems are in compliance with performance and design criteria indicated. Include list of codes, loads, and other factors used in performing these services. 1.5 CONFLICTING REQUIREMENTS A. Conflicting Standards and Other Requirements: If compliance with two or more standards or requirements is specified and the standards or requirements establish different or conflicting requirements for minimum quantities or quality levels, inform the Engineer regarding the conflict and obtain clarification prior to proceeding with the Work. Refer conflicting requirements that are different, but apparently equal, to Engineer for clarification before proceeding. Water Treatment Plant Pressure Control Valves Quality Requirements City of Round Rock 014000-2 (t)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 13. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or perfonned. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are nunit-num or maximum, as appropriate, for the context of requirements. Refer uncertainties to Engineer for a decision before proceeding. L6 INFORMATIONAL SUBMITTALS A, Contractor's Quality-Control Plan: For quality-assurance and quality-control activities and responsibilities. B. Qualification Data: For Contractor's quality-control personnel [and Delegated-Designer]. C. Contractor's Statement of Responsibility: When required by authorities having jurisdiction, submit copy of written statement of responsibility submitted to authorities having jurisdiction before starting work on the following systems: 1. Seismic-force-resisting system, designated seismic system, or component listed ill the Statement of Special Inspections. 2. Primary wind-force-resisting system or a wind-resisting component listed in the Statement of Special Inspections, D. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience, Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority, E. Schedule of Tests and Inspections: Prepare in tabular form and include the following- 1. Specification Section number and title. 2. Entity responsible for performing tests and inspections. 3. Description of test and inspection. 4. Identification of applicable standards. 5. Identification of test and inspection methods. 6, Number of tests and inspections required. T Time schedule or time span for tests and inspections. & Requirements for obtaining samples. 9. Unique characteristics of each quality-control service, F. Reports: Prepare and submit certified written reports and documents as specified, G. Permits, Licenses, and Certificates: For Owners record, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents established for compliance with standards and regulations bearing on performance of the Work. Waterl"reatrnent Plant Pressure ContrM VaNes Qualifty Requirements Oty of Round Rock 014000 3 14,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.7 CONTRACTOR'S QUALITY-CONTROL PLAN A. Quality-Control Plan,General: Submit quality-control plan within 10 days of Notice to Proceed, and not less than five days prior to preconstruction conference. Submit in format acceptable to Engineer. Identify personnel, procedures, controls, instructions, tests, records, and forms to be used to carry out Contractor's quality-assurance and quality-control responsibilities and to coordinate Owner's quality-assurance and quality-control activities. Coordinate with Contractor's Construction Schedule. B. Quality-Control Personnel Qualifications: Engage qualified personnel trained and experienced in managing and executing quality-assurance and quality-control procedures similar in nature and extent to those required for Project. 1. Project quality-control manager may also serve as Project superintendent. C. Submittal Procedure: Describe procedures for ensuring compliance with requirements through review and management of submittal process. Indicate qualifications of personnel responsible for submittal review. D. Testing and Inspection: In quality-control plan, include a comprehensive schedule of Work requiring testing or inspection,including the following: I. Contractor-performed tests and inspections, including subcontractor-performed tests and inspections. Include required tests and inspections and Contractor-elected tests and inspections. Distinguish source quality-control tests and inspections from field quality- control tests and inspections. 2. Special inspections required by authorities having jurisdiction and indicated on the Statement of Special Inspections. 3. Owner-performed tests and inspections indicated in the Contract Documents. E. Continuous Inspection of Workmanship: Describe process for continuous inspection during construction to identify and correct deficiencies in workmanship in addition to testing and inspection specified. Indicate types of corrective actions to be required to bring the Work into compliance with standards of workmanship established by Contract requirements and approved mockups. F. Monitoring and Documentation: Maintain testing and inspection reports including log of approved and rejected results. Include Work Engineer has indicated as nonconforming or defective. Indicate corrective actions taken to bring nonconforming Work into compliance with requirements.Comply with requirements of authorities having jurisdiction. 1.8 REPORTS AND DOCUMENTS A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following: 1. Date of issue. 2. Project title and number. 3. Name,address,telephone number,and email address of testing agency. 4. Dates and locations of samples and tests or inspections. Water Treatment Plant Pressure Control Valves Quality Requirements City of Round Rock 014000 .4 .......... 4,')2022 CDM Smith 8077-263948 All Rights Reserved February 2022 5, Narnes of individuals making tests and inspections. 6, Description of the Work and test and inspection method, 7, Identification of product and Specification Section, 8, Complete test or inspection data, 9, Test and inspection results and an interpretation of test results, M Record of temperature and weather conditions at time of sample-taking and testing and inspection. I I. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements. 11 Name and signature of laboratory inspector. 13, Recommendations on retesting and reinspecting. B. Manufacturer's Technical Representative's Field Reports: Prepare written infonnation documenting manufacturer's technical representative's tests and inspections specified in other Sections. Include the following: I Name, address, telephone number, and email address of technical representative making report. 2. Statement on condition of substrates and their acceptability for installation of product. 3. Statement that products at Project site comply with requirements. 4. Summary of installation procedures being followed, whether they comply with requirements and,if not,what corrective action was taken. 5. Results of operational and other tests and a statement of whether observed performance complies with requirements. 6. Statement of whether conditions,products,and installation will affect warranty, 7. Other required items indicated in individual Specification Sections. Pactory-Authorized Service Representative's Reports: Prepare written information documenting manufacturer's factory-authorized service representative's tests and inspections specified in other Sections, Include the following: I. Name, address, telephone number, and email address of factory-authorized service representative making report. 2. Statement that equipment complies with requirements, 3. Results of operational and other tests and a statement of whether observed performance complies with requirements, 4. Statement of whether conditions,products,and installation will affect warranty. 5, Other required iterns,indicated in individual Specification Sections. 1.9 QUALITY ASSURANCE A. Qualifications paragraphs in this article establish the minimum qualification levels required; individual Specification Sections specify additional requirements. 13. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of'successful in-service performance, as well as sufficient production capacity to produce required units. As applicable, procure products from manufacturers able to meet qualification requirements, warranty requirements, and technical or factory-authorizcd service representative requirements. Water Tyeaunent Plant Pressure ControVMves Quality Requirements Cay of'Round Rock 014000-5 cif 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units. D. Installer Qualifications: A firm or individual experienced in installing, erecting, applying, or assembling work similar in material,design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance. E. Design Professional Qualifications: A professional engineer/registered architect who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Design 1 engineering services are defined as those performed for installations of the system, assembly, or product that is similar in material, design,and extent to those indicated for this Project. F. Specialists: Certain Specification Sections require that specific construction activities shall be perforrned by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged in the activities indicated. I. Requirements of authorities having jurisdiction shall supersede requirements for specialists. G. Testing and Inspecting Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspection indicated, as documented in accordance with ASTM E329, and with additional qualifications specified in individual Sections; and, where required by authorities having jurisdiction, that is acceptable to authorities. Ff. Manufacturer's Technical Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to observe and inspect,demonstrate, repair and perform service on installations of manufacturer's products that are similar in material,design,and extent to those indicated for this Project. 1. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material,design,and extent to those indicated for this Project. J. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing for compliance with specified requirements for performance and test methods. Contractor responsibilities include the following: I. Provide test specimens representative of proposed products and construction. 2. Submit specimens in a timely manner with sufficient time for testing and analyzing results to prevent delaying the Work. 3, Testing Agency Responsibilities: Submit a certified written report of each test, inspection, and similar quality-assurance service to Engineer with copy to Contractor. Interpret tests and inspections and state in each report whether tested and inspected Work complies with or deviates from the Contract Documents. Water Treatment Plant Pressure Control Valves Quality Requirements City of Round Rock 014000-6 ��2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1,10 QUALITY CONTROL A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services, I Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspection they are engaged to perform. 2. Payment for these services will be made from testing and inspection allowances specified in the Bid Form as authorized by Change Orders, 3. Costs for retesting and reinspecting construction that replaces or is necessitated by Work that failed to comply with the Contract Documents will be charged to Contractor. B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are Contractor's responsibility, Perform additional quality-control activities, whether specified or not,to verify and docurnent that the Work complies with requirements, 1. Unless otherwise indicated,provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction,whether specified or riot. 2. Engage a qualified testing agency to perform quality-control services. a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner. 3. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspection will be performed. 4. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report,in duplicate,of each quality-control service, 5. Testing and inspection requested by Contractor and not required by the Contract Documents are Contractor's responsibility. 6. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct, C. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Conti-act Documents. D. Testing Agency Responsibilities: Cooperate with Engineer and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections. I. Notify Engineer and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services. 2. Determine the locations from which test samples will be taken and in which in-situ tests are conducted. 3. Conduct and interpret tests and inspections and state in each report whether tested and inspected Work complies with or deviates from requirements. 4. Submit a certified written report, in duplicate, of each test, inspection, and Similar quality-control service through Contractor. 5. Do not release, revoke,alter,or increase(lie Contract Document requirements or approve or accept any portion of the Work. Water Treatment Plant Pressure Control Valves Qualay Reqwrements City of Round Rock 01400-.7 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 6. Do not perform duties of Contractor. E. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Section 013300 "Submittal Procedures." F. Manufacturer's Technical Services: Where indicated, engage a manufacturer's technical representative to observe and inspect the Work. Manufacturer's technical representative's services include participation in preinstallation conferences, examination of substrates and conditions, verification of materials, observation of Installer activities, inspection of completed portions of the Work,and submittal of written reports. G. Contractor's Associated Requirements and Services: Cooperate with agencies and representatives performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following: 1. Access to the Work. 2. Incidental labor and facilities necessary to facilitate tests and inspections. 3. Adequate quantities of representative samples of materials that require testing and inspection. Assist agency in obtaining samples. 4. Facilities for storage and field curing of test samples. 5. Delivery of samples to testing agencies. 6. Preliminary design mix proposed for use for material mixes that require control by testing agency. 7. Security and protection for samples and for testing and inspection equipment at Project site. H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspection. I. Schedule times for tests,inspections,obtaining samples,and similar activities. 1. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality- control services required by the Contract Documents. Coordinate and submit concurrently with Contractor's Construction Schedule. Update and submit with each Application for Payments. 1. Schedule Contents. Include tests, inspections, and quality-control services, including Contractor- and Owner-retained services, commissioning activities, and other Project- required services paid for by other entities. 2. Distribution: Distribute schedule to Owner, Engineer, testing agencies, and each party involved in performance of portions of the Work where tests and inspections are required. Water Treatment Plant Pressure Control Valves Quality Requirements City of Round Rock 014000, 8 I`12022 CDM Smith 8077-263948 All Rights Reserved February 2022 PART 2- PRODUCTS (NOT USED) PART 3- EXECUTION 3.1 TEST AND INSPECTION LOG A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following: I. Date test or inspection was conducted, 2. Description of the Work tested or inspected. 3. Date test or inspection results were transmitted to Engineer, 4. Identification of testing agency or special inspector conducting test or inspection, BMaintain log at Project site. Post changes and revisions as they occur. Provide access to test and inspection log for Engineer's reference during normal working hours. L Submit log at Project closeout as part of Project Record Documents. 3.2 REPAIR AND PROTECTION A. General: On completion of testing, inspection, sample taking, and similar services, repair damaged construction and restore substrates and finishes. I. Provide materials and comply with installation requirements specified in other Specification Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. Comply with the Contract Document requirements for cutting and patching in Section 017300"Execution." B. Protect construction exposed by or for quality-control service activities. C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services. END OF SECTION 014000 WaterTrearment Nana PresstacControl VaNes Quality Reqwrcments City of Round Rock 0 14001) 9 4 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water'Creatonent Plant Pressure Control Valves Quality Requirements City of Round Rack 014000- 10 0 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 0142010 -REFERENCES PART I GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 DEFINITIONS A. General: Basic Contract definitions are included in the Conditions of the Contract. B. "Approved` When used to convey Engineer's action on Contractor's submittals, applications, and requests, "approved" is limited to Engineer's duties and responsibilities as stated in the Conditions of the Contract. C. "Directed": A command or instruction by Engineer. Other terms including "requested," "authorized," "selected," "required,"and""permitted'"have the same meaning as "directed." D. "Indicated": Requirements expressed by graphic representations or in written form oil Drawings, in Specifications, and in other Contract Documents, Other terms including "shown," "noted," "scheduled,"and"specified"have the same meaning as"indicated." E. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction,and rules,conventions,and agreements within the construction industry that control perfortliance of the Work, F. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation,and similar operations. G. "Install": Unload, temporarily store, unpack, asserrible, erect, place, anchor, apply, work to dimension, finish,cure,protect, clean, and similar operations at Project site, K "Provide": Furnish and install,complete and ready for the intended use. 1. "Project Site": Space available for performing construction activities. The extent of ProJect site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built. 13 INDUSTRY STANDARDS A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference. Water Treaftnent Ph.ml Pressure Comrol VaNes References 01),of Round Rock 0 1 420�O- I T)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated. C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents. 1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source. 1.4 ABBREVIATIONS AND ACRONYMS A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities indicated in Gale's "Encyclopedia of Associations: National Organizations of the U.S." or in Columbia Books' "National Trade&Professional Associations of the United States." B. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. The information in this list is subject to change and is believed to be accurate as of the date of the Contract Documents. i. AABC-Associated Air Balance Council; mM_ ,.waabc.cs" . 2. AAMA-American Architectural Manufacturers Association; w.aamanet.or . 3. AAPFCO-Association of American Plant Food Control Officials; w.aa fco.or . 4. AASHTO-American Association of State Highway and Transportation Officials; www t1A sportat crn".or,. S. AATCC-American Association of Textile Chemists and Colorists; .aatcc.or&, 6. ABMA- American Bearing Manufacturers Association; .ameripcatlb lair 7. ABMA-American Boiler Manufacturers Association;www,abraia ggrpt 8. ACI-American Concrete Institute;(Formerly: ACI International); 9. ACPA-American Concrete Pipe Association; weuW_g ncrete Ittp .c rg. 10. AE1C-Association of Edison Illuminating Companies, Inc.(The); ,,, w aecracg. 11. AF&PA-American Forest&Paper Association, www-A . 12. AGA-American Gas Association; w .,.ala.Qr . 1.3. AHAM -Association of Home Appliance Manufacturers; Avv, .alaxx,.Urg. 14. AI-IRI -Air-Conditioning,Heating,and Refrigeration Institute(The); www.ahrinet.or 15. Al-Asphalt Institute; .as lialtinstitute.or . 16. AIA-American Institute of Architects(The);www.aia.org. 17. AISC-American Institute of Steel Construction; www.aiscmg. LS. AISI-American Iron and Steel Institute;35yHsteel.org. 19. AITC-American Institute of Timber Construction; ..... site t11t1aMrtl,.or'. 20. AMCA-Air Movement and Control Association International, Inc.; _ amca.or . 21. ANSI -American National Standards Institute; .ansi.org. 22. AOSA-Association of Official Seed Analysts, Inc.; ,,,,....... ,.......aosaseed c 23. APA-APA-The Engineered Wood Association, www apawood.crg. 24. APA-Architectural Precast Association;www,archprec ,l.xr 25. API -American Petroleum Institute;ww,,,,w api�Qmr 26. ARI-Air-Conditioning&Refrigeration Institute;(See AHRI). 27. ARI-American Refrigeration Institute; (See AHRI). Water Treatment Plant Pressure Control Valves References City of Round mock 014200-2 4_ CDM Smith 8077-263948 All Rights Reserved February 2022 28. ARMA-Asphalt Roofing Manufacturers Association, WW;w.asplialtroofinori. 29. ASCE-American Society of Civil Engineers;wwyvr asce,�grg. 30. ASCE/SEI-American Society of Civil Engineers/Structural Engineering Institute;(See ASCE). 31. ASH AE -American Society of Heating, Refrigerating and Air-Conditioning Engineers; www,asl"ra"e..org. 32, ASME-AS E International;(American Society of Mechanical Engineers); w a�ww�.,a,sgrte.,.QM. 33. ASSE_American Society of Safety Engineers(The); www.asse.t2rgp. 34, ASSE_American Society of Sanitary Engineering; wwyA,gas c, aiutru,ting agrg. 35. ASTM -ASTM International; ry tggrg,crr,g. 36. ATIS-Alliance for Telecommunications Industry Solutions; wwy 4�4eso 37. AWEA-American Wind Energy Association;yaww.awea.ort. 38. AWI-Architectural Woodwork Institute; www.awinet.or . 39, AWMAC-Architectural Woodwork Manufacturers Association of Canada; www_.awmac.coni. 40. AWPA-American Wood Protection Association; fir.. wwp4wyuft4.,ggM. 41. AWS -American Welding Society; wvwvw.aws.org,, 42. AWWA-American Water Works Association; wvww a___wa..tgrg. ttlders, 43. BHMA-Builders Hardware Manufacturers Assoctakion•,www,_ wrwwy bg.W,µ,,,_�.liardware,cotrt._ 44, EIA-Brick Industry Association(The); ,..w w ptartck�crnx. 45. BICSI -BICSI, Inc.; wwvr, wt ws�prg. 46. BIFMA-BIFMA International; (Business and Institutional Furniture Manufacturer's Association), btfma,org. 47. BISSC- Baking Industry Sanitation Standards Committee; w ww ,b ssc,org, 48. BWF-Badminton World Federation;(Formerly: International Badminton Federation); 49. CDA-Copper Development Association;WWvv,cgpp carg. 50. CE-Conformite Europeenne;jrtt 2: /ec reaart>to gg grogw tl/s rxgle-t qt/,c -gr<gkirt 51. CEA-Canadian Electricity Association; ri gleetncity.ca, 52. CEA-Consumer Electronics Association; wwwece.or . 53. UFA-Chemical Fabrics and Film Association„ Inc.; W.chemicalfabric.sand,f,Ilm�conn 54, CFSEI -Cold-Formed Steel Engineers Institute; www.cfsei.org. 55. CGA-Compressed Gas Association,Nyww cg anel,cgm. 56, LIMA-Cellulose Insulation Manufacturers Association; My)yxetltal rse,pr . 57. CISCA-Ceilings& Interior Systerns Construction Association;W,W,w,w,c 11ca org. 58. CISPI -Cast Iron Soil Pipe Institute, ?y„c7s4rqpa,„ . 59. CLFMI-Chain Link Fence.Manufacturers Institute,4y ..t hairmlgt�cinfc2wcgrg. 60. CPA-Composite Panel Association; ., pbtndf carp. 61. CRI-Carpet and Rug Institute(The); wvw cars t-rteg..cggg , 62. CRRC-Cool. Roof Rating Council; www,caataltcgtgf's.pr,g, 63. CRSI-Concrete Reinforcing Steel Institute; w�, 64. CSA-CSA Group; www&§g,4 ggp.com. 65. CSA-CSA International; ,, w,csa interr%a,c,rrgnal,org. 66. CSI -Construction Specifications Institute(The');ay csinet.ors, . 67. CSSB -Cedar Shake& Shingle Bureau; wywvw,cedarbureau,orgg. fib. CTI -Cooling Technology Institute; (Formerly: Cooling Tower Institute);www&jijorg 69. CWC -Composite Wood Council; (See CPA), 70. DA SMA-Door and Access Systems Manufacturers Association;, w. a ma.cpgrr, 71. DSII - Door and Hardware Institute; __O1e wall i or Y. 72. ECA- Electronic Components Association;(See ECIA), Water Treaataiwaa Maw Pressure Control Valves References Oty of Round Rock 014200-3 <2022 CDM Smith 8077-263948 All Rights Reserved February 2022 73. ECAMA-Electronic Components Assemblies&Materials Association;(See ECIA). 74. ECIA-Electronic Components Industry Association;www, ctagn)ine.grg. 75. EIA- Electronic Industries Alliance;(See TIA). 76. EIMA- EIFS Industry Members Association;.m.,ww,eirna coo. p w.e,,�rna., r . 77. EJMA- Expansion Joint Manufacturers Association, Inc.;wwmm„_ 78. ESD -ESD Association;(Electrostatic Discharge Association);, ,,..&"�&Q . 79. ESTA- Entertainment Services and Technology Association;(See PLASA). 80, ETL-Intertek(See Intertek);yKE intertek.com. 81. EVO -Efficiency Valuation Organization; w.evo-world.or 82. FCI -Fluid Controls Institute; _... w.fN,&gtjy i�li.lu r 83. FIBA- Federation Internationale de Basketball;(The International Basketball Federation); .fiba.com. 84. FIVB-Federation Internationale de Volleyball;(The International Volleyball Federation);AAW, y qrg. 85. FM Approvals-FM Approvals LLC; .KfrgjLgbat.qom. 86. FM Global - PM Global;(Formerly: FMG -FM 6Tobal), lira abal corn. 87. FRSA-Florida Roofing,Sheet Metal &Air Conditioning Contractors Association, Inc.; www.floridaroofcom. 88. FSA- Fluid Scaling Association, __._w uidsea i ,IJ,can;t. 89. FSC-Forest Stewardship Council U.S.;www.fscus.org. 90. GA-Gypsum Association; w.t ssum or)-. 91. GANA-Glass Association of North America; �l ss ebslte cdrra. 92. GS -Green Seal; www.grreenseal.o% 93. HI -Hydraulic Institute, "Wr ,pumps rr„g. 94. HFGAMA-Hydronics InstituWGas Appliance Manufacturers Association;(See AHRI). 95, EIMMA-Hollow Metal Manufacturers Association;(See NAAMM). 96, HPVA-Hardwood Plywood& Veneer Association; _..._..,......hpva"rr 97. HPW -H. P. White Laboratory, Inc.; y www.,iapsc o 98. IAPSC- International Association of Professional Security Consultants„ .,-_,,,w,. - 99. IAS- International Accreditation Service;,X)y rasgnhne,or . 100. ICBG)-International Conference of Building Officials;(See ICC). 101. ICC- International Code Council; www tcc+sffeµcar ,. 102, ILEA- Insulated Cable Engineers Association,Inc.;www,icea.net, 103. ICPA- International Cast Polymer Alliance;__ v,.$wcJaa h_q QrS. 104. ICRI - International Concrete Repair Institute, Inc.;ww .i„01gar , 105. IEC- International.Electrotechnical Commission; w.iec.ch. 106. IEEE- Institute of Electrical and Electronics Engineers, Inc. (The); www,ip�crr . 107. IES-Illuminating Engineering Society;(Fontuerly: Illuminating Engineering Society of North America); w.ies.or,g. 108. IESNA- Illuminating Engineering Society of North America;(See IES). 109. IEST- Institute of Environmental Sciences and Technology; www.iestaog. 110. IGMA- Insulating Glass Manufacturers Alliance;W...:.wyj n onliine,,r�rg. 1 l 1. IGSHPA-International Ground Source Heat Pump Association; w yyLigs is ckstate,e u. ��.. 112. ILI -Indiana Limestone Institute of America, Inc.; .iliai.com. 113. Intertek- Intertek Group;(Formerly: ETL SEMCO; Intertek Testing Service NA); intertek.com. 114. IS�;��-.-,,,.,a �.,,,,,,,-�'„�'�.,,,� -International Society of Automation(The); (Formerly: Instrumentation, Systems, and Automation Society);MyAjsa.orL. 115. ISAS - Instrumentation,Systems,and Automation Society("Che); (See ISA). Water Treatment Plant.Pressure Control.Valves References City of Round Rock 014200-4 a" 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 116. ISFA-International Surface Fabricators Association;(Fonnerly: Inter-national Solid Surface Fabricators Association); W 'i'5,,fi gw,q%. 11T ISO- International Organization for Standardization;��Jso�.or Y, H& LSSA-International Solid Surface Fabricators Association;(See ISFA). 119. ITU-International Telecommunication Union; www.itu.intfhotne. 120. KCMA- Kitchen Cabinet Manufacturers Association; AwwAAw.kciriaorg. 121. LMA-Laminating Materials Association;(See CPA). 122. LPI-Lightning Protection Institute; WWW,ji itnin .or'g. 123. MDMA- Metal Building Manufacturers Association;w"w"w,rnbrna,corn. 124MCA-Metal Construction Association; KWNy, e'i:'a'I'c'o'n's'tructi'op,o%, 125. MFMA-Maple Flooring Manufacturers Association,Inc.; 126. MFMA-Metal Framing Manufacturers Association, Inc,; 127. MHIA-Material Handling Industry of America;MnyM,rrrttia.org, 128, MIA-Marble Institute of Arnerica; w-vy\Y,..rna.i.-b.lc-.in.s.t.i.tute. .o .c .in., 129. MMPA- Moulding& Millwork Producers Association; yywwwyi-QL_p Pto ccawst,. 130. MPI -Master Painters Institute; AMMpAiRtiln-fo.c.o.p.i. 131. MSS -Manufacturers Standardization Society of The Valve and Fittings Industry Inc.; www.mss-j%.pr2. 131 NAAMM -National Association of Architectural Metal Manufacturers; wwwmaarrim,org. 131 MACE-NACE International;(National Association of Corrosion Engineers International); www,nace,org. 134. NADCA -National Air Duct Cleaners Association;:!6ruev„nadca com, 135. NAIMA-North American.Insulation Manufacturers Association; Www,,na1i1m1a,.org' 136. NBGQA-National Building Granite Quarries Association, Inc.; 137, NBI-New Buildings Institute; WW 138, NCAA-National Collegiate Athletic Association(The); 139. NCMA-National Concrete Masonry Association;Ah2y.ncrnaorL. 140. NEBB -National Environmental Balancing Bureau; KwE nebborg, 141. NECA-National Electrical Contractors Association;�wyww,neeanet.or�,,, 142. NeLMA-Northeastern Lumber Manufacturers Association; ww 141 NEMA-National Electrical Manufacturers Association; wyr.ncrna erg. 144. META- InterNational Electrical Testing Association; 145. NFHS-National Federation of State High School Associations-, 146. NFPA-National Fire Protection Association; 147. NFPA-NFPA International;(See NFPA), 148. NFC-National Fenestration Rating Council;3nyy.nfrc.org. 149. NHI-A-National Hardwood Lumber Association; www.rilila.com, 150. NLGA-National Lumber Grades Authority;KWKnlg, ,oLg, 151. NOFMA-National Oak Flooring Manufacturers Association;(See NWFA). 152, NOMMA-National Ornamental &Miscellaneous Metals Association; My ymonirna.or- g 151 NBCA-National Roofing Contractors Association; www.nrca.net, 154. NRMCA-National Ready Mixed Concrete Association; AAAnrmca.org. 155. NSF-NSF International,A3yH.nqf.or& 156. NSPE-National Society of Professional Engineers; www.nsL.)e.org. 157, NSSGA-National Stone,Sand& Gravel Association;AML%�.nssga.,®r,,. 158. NTMA -National Terrazzo&Mosaic Association, Inc.(The); www.ntma.corn. 159, NWFA -National Wood Flooring Association; )yw 160. PC[ -Precast/Prestressed Concrete Institute,AE)y.Licjorg, 161. PDI - Plumbing& Drainage Institute;)ny3K.jLcfionlme org, Water"i featrnoii Mani Presstac ControVapves flee fierences Cory of Round Rock W4200-5 t)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 162. PLASA- PLASA;(Formerly: ESTA- Entertainment Services and Technology Association);www,.p 163. RCSC-Research Council on Structural Connections; 164. RFCI-Resilient Floor Covering Institute; w!ww rfcisotn. 165. RIS-Redwood Inspection Service; www.redwoodi 166. SAE-SAE International;yam�.sae.or . 167. SCTE-Society of Cable Telecommunications Engineers; www,s tg,pr . 168. SDI -Steel Deck Institute;KiLW,sd: 169. SDI - Steel Door Institute;Www,steeldQqr,QrZ. 170. SEFA-Scientific Equipment and Furniture Association(The);www,,sefalabs.coni, 171, SEI/ASCE-Structural Engineering Institute/American Society of Civil Engineers;(See ASCE). 172. SIA-Security Industry Association; www.sjaon1_ineorz. 173. SJI-Steel Joist institute;��.ste�eroisto�r . 174. SMA-Screen Manufacturers Association;yvurwjjniktnt 175. SMACNA- Sheet Metal and Air Conditioning Contractors'National Association; WWw_,sm4qq4�QT&. 176. SMPTE-Society of Motion Picture and Television Engineers;W:W)Kmple.org, 177. SPFA-Spray Polyurethane Foam Alliance; 178. SPIB-Southern Pine Inspection Bureau; 179. SPRI-Single Ply Roofing Industry;WWwsp4o% 180. SRCC -Solar Rating&Certification Corporation; www.solar- i Fatmg,9rg, 181. SSINA- Specialty Steel Industry of North America; 182. SSPC-SSPC: The Society for Protective Coatings;3nDL.sspcorg. 183. STI-Steel Tank Institute;www,steeltank.coin. 184. SWI-Steel Window Institute;WWW,steelwindows,com. 185. SWPA- Submersible Wastewater Pump Association; 186. TCA-Tilt-Up Concrete Association;!yw)yji'it'-` ,p jilc gpr,&. 187, TCNA-Tile Council of North America, Inc.�,wwwu.sa..com. 188, TEMA-Tubular I,:xchanger Manufacturers Association,Inc.; Www.t,cP1Mrx. IK TIA-Telecommunications Industry Association(The);(Formerly:TIA/EIA- Telecommunications Industry AssociatiotVElectronic Industries Alliance); www.tiaontine.. ,org. 190. -."Te'lecommuni cations Industry Association/Electronic Industries Alliance;(See ........ TIA). 191. TMS-The Masonry Society;.. K,M4spqrysqqjeA"-or- 192, TPI -Truss Plate Institute;ww�yj Tir 191 TPI-Turfgrass Producers International„ wwjurf�,rassso�dor,. 194. TRI -Tile Roofing Institute; www,,jj fip PKPQ _&,grg, 195, UL- Underwriters Laboratories Inc.;htt,p://www.ut.cgm. 196. UNI-Uni-Bell PVC Pipe Association; www.uni-bellmg. 197, USAV-USA Volleyball;www,tisavol,leyball.org. 198, USGBC-U.S. Green Building Council;www.usp-bc.org. 199, USITT-United States Institute for Theatre Technology, Inc.; 200. WA-Wallcoverings Association;www.wallcove 201. WASTEC-Waste Equipment Technology Association;www.wastee.org, 202. WCLIB-West Coast Lumber Inspection Bureau; .wclib.org. 203. WCMA-Window Covering Manufacturers Association; 204. WDMA-Window&Door Manufacturers Association;WWWw4jrq uo , 205. WI-Woodwork Institute;www,,, icililet,19rS. 206. WSRCA-Western States Roofing Contractors Association; Water Treatment Plant Pressure Control Valves References City ol'Rouod Rock 014200-6 ,C',,2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 207, WWPA- West Wood Products Association; www.wwpa.org. C. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Conti-act Documents, they shall mean the recognized name of the entities in the following list. This information is believed to be accurate as of the date of the Contract Documents. I DIN- Deutsches Institut fur Normung c.V.; Www,din,de. 2. IAPMO- International Association of Plumbing and Mechanical Officials; WWwJ4Pmo,o g. 1 ICC- International Code Council-, ww .... wiccsqfe.orZ- 4. ICC-ES- ICC Evaluation Service,LLC; D. Federal Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents,they shall mean the recognized name of the entities in the following list. Information is subject to change and is up to date as of the date of the Contract Documents. 1. COE-Army Corps of Engineers; )y M��pgq . , ,pffl1ytm, 1 CPSC-Consumer Product Safety Commission;M&Wcpsc.rove. 1 DOC- Department of Commerce; National Institute of Standards and Technology; www,rt i SL . 4. DOD- Department of Defense; .vwW,q icksearchAla,mil. 5. DOE-Department of Energy; 6. EPA-Environmental protection Agency; 7. FAA,�, Federal Aviation Administration;www.faa,,gpv. S. FG -Federal Government Publications; wwyMo.,&py/fdsYs, 9. GSA-General Services Administration;W",gs4.,gov, 10HUD -Department of Housing and Urban Development; )y hud,gqv. 11. LBL-Lawrence Berkeley National Laboratory; Environmental Energy Technologies Division; Wywqwqt,lbl,.,,gpv. 12. OSHA-Occupational Safety& Health Administration;mMMLosha,&()v, 13. SD-Department of State',ww%vnstatcZpv. 14. TRB-Transportation Research Board; National Cooperative Highway Research Program- The National Academies; nyy.trb.org. 15. USDA-Department of Agriculture; Agriculture Research Service; U.S. Salinity Laboratory; N 4rs,usdA,,gpy, 16. USDA - Department of Agriculture; Rural Utilities Service; wWw,usda,goy. 17, US DOJ - Department of Justice;Office of Justice Programs;National Institute of Justice; wwwy L - 9k_.MdQi.WV,_ 18. USP- U.S. Pharmacopeial Convention;WAAusp.or6, _ 19. USPS -United States Postal Service; wvwus g�com. E. Standards and Regulations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall rrican the recognized name of the standards and regulations in the following list. This information is subject to change and is believed to be accurate as of the date of the Contract Documents. I CFR-Code of Federal Regulations,Available from Government Printing Office; W 1NK,&,7q-,tpv/fds s, 2, DOD - Department of Defense; Military Specifications and Standards; Available from DLA Document Services; 1 DSCC- Defense Supply Center Columbus;(See FS). Water Treatment Plant Pressure Covirrol Valves Rell!rences City of Round Rock 014200-7 C)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 4. FED-STD-Federal Standard;(See FS). 5. FS- Federal Specification;Available from DLA Document Services; w ,,, uicksearclt, .14,txtit. a, Available from Defense Standardization Program;www.& „.cl,1,a,md.. b. Available from General Services Administration;)nyW.gsa.&v. C. Available from National Institute of Building Sciences/Whole Building Design Guide;www.v✓bdg ctrg, 6, MILSPEC -Military Specification and Standards;(See DOD). 7. USAB-United States Access Board; ,access-board.pov. 8. USATBCB-U.S. Architectural&Transportation Barriers Compliance Board;(See USAB), F. State Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents,they shall mean the recognized name of the entities in the following list. This information is subject to change and is believed to be accurate as of the date of t17e Contract Documents. 1. CBHF; State of California;Department of Consumer Affairs;Bureau of Electronic and Appliance Repair, Home Furnishings and Thermal Insulation;mya,a,a bga tfiqt civ. 2. CCR;California Code of Regulations; Office of Administrative Law;California Title 24 Energy Code; w.calregs,, ptil. 3. CDHS;California Department of Health Services; (See CDPH). 4. CDPH; California Department of Public Health; Indoor Air Quality Program;w:... ...ca.l.- io . 5. . CPUC;California Public Utilities Commission; w cfruc,c ,gq•y• 6. SCAQMD; South Coast Air Quality Management District;WW 0_& 7. TFS;Texas A&M Forest Service; Sustainable Forestry and Economic Development; wAxkor slK i1pP t4z th0k PART 2-PRODUCTS(NOT USED) PART 3-EXECUTION(NOT USED) END OF SECTION 014200 Water Treatment Plant Pressure Control Valves References City of Round Rock 014200-8 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 015000 -TEMPORARY FACILITIES AND CONTROLS PART I GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities, B. Related Requirements: 1. Section 011000"Summary" for work restrictions and limitations on utility interruptions, 1.3 USE CHARGES A. Installation, removal, and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities engaged in the Project to use temporary services and facilities without cost, including, but not limited to,Owner's construction forces, Engineer,occupants of Project, testing agencies,and authorities having jurisdiction. 13, Sewer Service: Owner will pay sewer-service use charges for sewer usage by all entities for construction operations, C. Water Service: Owner will pay water-service use charges for water used by all entities for construction operations. D. Electric Power Service: Pay electric-power-service use charges for electricity used by all entities for construction operations. E. Water and Sewer Service from Existing System: Water from Owner's existing water system is available for use without metering and without payment of use charges, Provide connections and extensions of services as required for construction operations. Electric Power Service from Existing System: Electric power from Owner's existing system is available for use. Provide connections and extensions of services and metering as required for construction operations. WateirTreatinerit Mant PressureConvol Valves Temporary Facdaiesand Controk 015,of Round rWelk 0 l 50,00- I h 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.4 INFORMATIONAL SUBMITTALS A. Site Utilization Plan: Show temporary facilities,temporary utility lines and connections,staging areas, construction site entrances, vehicle circulation, and parking areas for construction personnel. B. Implementation and Tennination Schedule: Within 15 days of date established for commencement of the Work, submit schedule indicating implementation and termination dates of each temporary utility. C. Fire-Safety Program: Show compliance with requirements of NFPA 241 and authorities having jurisdiction. Indicate Contractor personnel responsible for management of fire-prevention program. D. Moisture- and Mold-Protection Plan: Describe procedures and controls for protecting materials and construction from water absorption and damage and mold. Describe delivery, handling, storage,installation, and protection provisions for materials subject to water absorption or water damage. 1. Indicate procedures for discarding water-damaged materials, protocols for mitigating water intrusion into completed Work, and requirements for replacing water-damaged Work. 2. Indicate sequencing of work that requires water, such as sprayed fire-resistive materials, plastering, and terrazzo grinding, and describe pians for dealing with water from these operations. Show procedures for verifying that wet construction has dried sufficiently to permit installation of finish materials. 3. Indicate methods to be used to avoid trapping water in finished work. E. Dust- and HVAC-Control Plan: Submit coordination drawing and narrative that indicates the dust- and HVAC-control measures proposed for use, proposed locations, and proposed time frame for their operation. Include the following: 1. Locations of dust-control partitions at each phase of work. 2. IJVAC system isolation schematic drawing. 3. Location of proposed air-filtration system discharge. 4. Waste-handling procedures. 5. Other dust-control measures. F. Noise and Vibration Control Plan: Identify construction activities that may impact the occupancy and use of existing spaces within the building or adjacent existing buildings,whether occupied by others,or occupied by the Owner. Include the following: I. Methods used to meet the goals and requirements of the Owner. 2. Concrete cutting method(s)to be used. 3. Location of construction devices on the site. 4. Show compliance with the use and maintenance of quieted construction devices for the duration of the Project. S. Indicate activities that may disturb building occupants and that are planned to be performed during non-standard working hours as coordinated with the Owner. 6. Indicate locations of sensitive equipment areas or other areas requiring special attention as identified by Owner. Indicate means for complying with Owner's requirements. Water Treatment Plant Pressure Control Valves Temporary Facilities and Controls City of Round.Flock 015000, 2 %'2022 CDM Strii(li 8077-263948 All Rights Reserved February 2022 1.5 QUALITY ASSURANCE A. Temporary facilities shall comply with all applicable state and local ordinances, codes and regulations. 13. Electric Service: Comply with NECA,NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA X C. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits. D. Accessible 'temporary Egress: Comply with applicable provisions in the United States Access Board's ADA-ABA Accessibility Guidelines, L6 PROJECT'CONDITIONS A. Temporary Use of Permanent Facilities: Engage Installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, regardless of previously assigned responsibilities. PART 2-PRODUCTS 11 MATERIALS A. Chain-Link Fencing: Minimum 2-inch (50-i-nm), 0,148-inch- (3.8-rnrn-) thick, galvanized-steel, chain-link fabric fencing; minimum 6 feet (1.8 in) high with galvanized-steel pipe posts; minimum 2-3/8-inch- (60-rnm-) OD line posts and 2-7/8-inch- (73-111m-) OD corner and pull posts with 1-5,18-inch-(42-mm-)OD top rails. B. Portable Chain-Link Fencing: Minimum 2-inch (50-mm), 0,148-inch- (3.8-111m-) thick, galvanized-steel, chain-link fabric fencing; minimum 6 feet (1.8 in) high with galvanized-steel pipe posts; minimum 2-3i8-inch- (60-mm-) OD line posts and 2-7/8-inch-(73-mm-) OD comer and pull posts, with 1-5/8-inch- (42-mm-)OD top and bottom rails. Provide concrete bases for supporting posts. C. Fencing Windscreen Privacy Screen: Polyester fabne scrim with grommets for attachment to chain-link fence, sized to height of'fence, in color selected by Engineer from manufacturer's standard colors. D. Wood Enclosure Fence: Plywood, 6 feet (1.8 in) high, framed with four 2-by-4-inch (50-by- 100-min)rails,with preservative treated wood posts spaced not more than 8 feet (2.4 m)apart. E. Polyethylene Sheet: Reinforced, fire-resistive sheet, 10-mil (0.25-mm) minimum thickness, with flame-spread rating of 15 or less in accordance with ASTM E84 and passing NFPA 701 Test Method 2, F. Dust-Control Adhesive-Surface Walk-Off Mats: Provide mats, minimum 36 by 60 inches (914 by 1524 nun). Wafer Treatment Plant Pressure Control Val%,cs Temporary Facilities avid Controls City of Round Rock 015000 3 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 G. Insulation: Unfaced mineral-fiber blanket, manufactured from glass, slag wool, or rock wool; with maximum flame-spread and smoke-developed indexes of 25 and 50,respectively. 2.2 TEMPORARY FACILITIES A. Field Offices: Prefabricated or mobile units with serviceable finishes,temperature controls, and foundations adequate for non-nal loading. B. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment for construction operations. 1. Store combustible materials apart from building. 2.3 EQUIPMENT A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures. B. HVAC! Equipment: Unless Owner authorizes use of permanent HVAC system, provide vented, self-contained,liquid-propane-gas or fuel-oil heaters with individual space thermostatic control. 1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited. 2. Heating, Cooling, and Dehumidifying Units: Listed and labeled for type of fuel being consumed, by a qualified testing agency acceptable to authorities having jurisdiction and marked for intended location and application, 3. Permanent HVAC System: If Owner authorizes use of permanent HVAC system for temporary use during construction,provide filter with MERV of 8 at each return-air grille in system and remove at end of construction, and clean HVAC system as required in Section 017700"Closeout Procedures." C. Air-Filtration Units: Primary and secondary HEPA-filter-equipped portable units with four- stage filtration. Provide single switch for emergency shutoff.Configure to run continuously. PART 3-EXECUTION 3.1 TEMPORARY FACILITIES,GENERAL A. Conservation: Coordinate construction and use of temporary facilities with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste, I Salvage materials and equipment involved in performance of, but not actually incorporated into,the Work. See other Sections for disposition of salvaged materials that are designated as Owner's property. Water Treatment Plant Pressure Control Valves Temporary Facilities and Controls City of Round Rock 015000-4 2022 CDM S in ith 8077-263948 All Rights Reserved February 2022 3.2 INSTALLATION,GENERAL A. Locate facilities where shown on the Drawings or where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work. Engineer's trailer shall be set up and ready for occupancy within 30 days of the Notice to Proceed. 1. Locate facilities to limit site disturbance as specified in Section 011000 "Summary," B. Provide each facility ready for use within 30 days of the Notice to Proceed and prior to Commencement of Work at the site. Do not remove until approved by Engineer or are replaced by authorized use of completed permanent facilities. 33 CONTRACTOR'S FIELD OFFICE A. Provide a temporary field office(s) for the Contractor's use for the duration of the project. An authorized representative of the Contractor shall be present at all times while the Work is in progress. Instructions received at the Contractors field office from the Engineer shall be considered delivered to the Contractor. & Locate field office(s)in accordance with approved shop drawings and as directed by the Owner, C. Establish and occupy field office within 30 days of the Notice to Proceed, unless otherwise approved by the Engineer or Owner. 3A TEMPORARY UTILITY INSTALLATION A. General: Install temporary service or connect to existing service,if approved by Owner. I Arrange with utility company, Owner, and existing users for time when service can be interrupted,if necessary, to make connections for ternporary services, B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully. I Connect temporary sewers to municipal system as directed by authorities having jurisdiction, C. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction, D. Water Service: If approved, connect to Owner's existing water service facilities. Clean and maintain water service facilities in a condition acceptable to Owner, At Final Completion, restore these facilities to condition existing before initial use. E. Sanitary Facilities: Provide temporary toilets, wash facilities, safety shower and eyewash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type,number, location,operation,and maintenance of fixtures and facilities. Water Treatment Plant Pressure Control VaGves Tegvporary Facilities and Controls City of Round Rock 015000 5 C�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Use of Permanent Toilets: Use of Owner's existing or new toilet facilities is not permitted. F. Temporary Heating and Cooling: Provide temporary heating and cooling required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed. I Provide temporary dehumidification systems when required to reduce ambient and substrate moisture levels to level required to allow installation or application of finishes and their proper curing or drying. G. Isolation of Work Areas in Occupied Facilities: Prevent dust, fumes, and odors from entering occupied areas. I. Prior to commencing work, isolate the HVAC system in area where work is to be performed according to coordination drawings. a. Disconnect supply and return ductwork in work area from HVAC systems servicing occupied areas. b. Maintain negative air pressure within work area, using HEPA-equipped air- filtration units, starting with commencement of temporary partition construction, and continuing until removal of temporary partitions is complete. 2. Maintain dust partitions during the Work. Use vacuum collection attachments on dust- producing equipment. Isolate limited work within occupied areas using portable dust- containment devices. 3. Perform daily construction cleanup and final cleanup using approved, HEPA-filter- equipped vacuum equipment. H. Temporary Light and Power: Provide by Contractor, including 220 Volt service for welding, complete with wiring, lamps and similar equipment as required to adequately light all work areas and with sufficient power capacity to meet the project needs. Make all necessary arrangements with the local electric company for temporary electric service and pay all expenses in connection therewith. I. Electric Power Service:Connect to Owner's existing electric power service. Maintain equipment in a condition acceptable to Owner. J. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity,and power characteristics required for construction operations. 1. Install electric power service overhead unless otherwise indicated. 2. Connect temporary service to Owner's existing power source,as directed by Owner. K. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations,observations,inspections,and traffic conditions. I. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system. Water Treatment Plant Pressure Control Valves Temporary Facilities and Controls City of Round Rock 015000 6 ................... ................ KI)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 L. Telephone Service: Provide temporary telephone service in common-use facilities for use by all construction personnel, Install WiFi cell phone access equipment for each field office. I Provide additional telephone lines for the following: a, Provide one telephone line(s)for Owner's use, 2, At each telephone,post a list of important telephone numbers. a. Police and fire departments, lb, Ambulance service, C. Contractor's home office. d. Contractor's emergency after-hours telephone number, e, Engineer's office, f. Engineers'offices, g. Owner's office. h. Principal subcontractors' field and home offices. M, Electronic Communication Service: Provide secure Wild wireless connection to internet with provisions for access by Engineer and Owner, N, Project Computer: Provide a desktop computer in the primary field office adequate for use by Engineer and Owner to access Project electronic documents and maintain electronic corrununications. Equip computer with not less than the following: I. Processor.- Intel Core i5 or i7. 2. Memory: 164 gigabyte. 3. Disk Storage: I -terabyte hard-disk drive and combination DVD-RWiCD-RW drive. 4. Display:24 inch (6 10 nim)LCD monitor with 256-Mb dedicated video RAM. 5. Full-size keyboard and mouse, 6. Network Connectivity: 1010013aseT Ethernet, 7. Operating System: Microsoft Windows 10 Professional. 8, Productivity Software: a. Microsoft Office Professional, 2013 or higher, including Word, Excel, and Outlook. b. Adobe Reader DC, C. WitiZip 10 or higher. 9. Printer: "All-in-one" unit equipped with printer server, combining color printing, photocopying,scanning,and faxing,or separate units for each of these three functions. 10. Internet Service: Broadband modern, router and ISP, equipped with hardware firewall, providing rninitnum 10 Mbps upload and t 5 Mbps download speeds at each computer, 11. Internet Security: Integrated software, providing software firewall, virus, spyware, phishing,and spam protection in a combined application. 12. Backup: External hard drive, minimum 2 terrabytes, with automated backup software providing daily backups. WaterTreawwm Plant Pressure Control VaNcs Temporary F=htws and Controls City ol'Round Rock 0151 0t O-7 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3.5 SUPPORT FACILITIES INSTALLATION A. Comply with the following: 1. Provide construction for temporary field offices, shops, and sheds located within construction area or within 30 feet (9 in) of building lines that is noncombustible in accordance with ASTM E136.Comply with NFPA 241. 2. Utilize designated area within existing building for temporary field offices. 3, Maintain support facilities until Engineer schedules Final Completion inspection. Remove just before Final Completion. B. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas adequate for construction operations. Locate temporary roads and paved areas within construction limits indicated on Drawings. I. Provide dust-control treatment that is nonpolluting and nontracking. Reapply treatment as required to minimize dust. C. Temporary Use of Planned Permanent Roads and Paved Areas: Locate temporary roads and paved areas in same location as permanent roads and paved areas. Construct and maintain temporary roads and paved areas adequate for construction operations. Extend temporary roads and paved areas,within construction limits indicated,as necessary for construction operations. I. Coordinate elevations of temporary roads and paved areas with permanent roads and paved areas, 2. Prepare subgrade and install subbase and base for temporary roads and paved areas accordance with Section 312000"Earthwork." 3. Recondition base after temporary use, including removing contaminated material, regrading,proofrolling,compacting,and testing. 4. Delay installation of final course of permanent hot-mix asphalt pavement until immediately before Substantial Completion. Repair hot-mix asphalt base-course pavement before installation of final course in accordance with Section 300 "Street Surface Courses". D. Traffic Controls:Comply with requirements of authorities having jurisdiction. 1. Protect existing site improvements to remain including curbs,pavement,and utilities. 2. Maintain access for fire-fighting equipment and access to fire hydrants. E. Parking: Use designated areas of Owner's existing parking areas for construction personnel. F. Storage and Staging: Use designated areas of Project site for storage and staging needs. G. Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction. Maintain Project site,excavations,and construction free of water. 1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining properties or endanger permanent Work or temporary facilities. 2. Remove snow and ice as required to minimize accumulations. H. Project Signs: Provide Project signs as indicated. Unauthorized signs are not permitted. Water Treatment Plant Pressure Control Valves Temporary Facilities and Controls City of Round Rock 015000 8 8077-263948 A,` 2022 CDM Sinith All Rights Reserved February 2022 1 Identification Signs: Provide Project identification signs as indicated on Drawings. Signs shall be constructed of A-A Ext—APA grade plywood, I-in thick. Posts and braces shall be of pressure treated lumber. 2. Temporary Signs: Provide other signs as indicated and as required to mfon-n public and individuals seeking entrance to Project. a. Provide temporary,directional signs for construction personnel and visitors. 3. Maintain and touch up signs, so they are legible at all times. 1. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Comply with progress cleaning requirements in Section 017300"Execution." J. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel. I. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment"and not temporary facilities, K. Temporary Elevator Use: Use of elevators is not permitted. L. Existing Elevator Use: Use of Owner's existing elevators will be pennitted, provided elevators are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore elevators to condition existing before initial use, including replacing wom cables, guide shoes,and similar items of limited life. L Do not load elevators beyond their rated weight capacity. 1 Provide protective coverings, barriers, devices, signs, or other procedures to protect elevator car and entrance doors and frame. If, despite such protection, elevators became damaged, engage elevator Installer to restore darnaged work, so no evidence remains of correction work. Return iterns that cannot be refinished in field to the shop, make required repairs and refinish entire unit,or provide new units as required. lvl. Temporary Stairs: Until permanent stairs are available, provide temporary stairs where ladders are not adequate. M Existing Stair Usage: Use of Owner's existing stairs will be permitted, provided stairs are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore stairs to condition existing before initial use. L Provide protective coverings, barriers, devices, signs,or other procedures to protect stairs and to maintain means of egress. If stairs become damaged, restore damaged areas, so no evidence remains of correction work. O. Temporary Use of Permanent Stairs: Use of new stairs for construction traffic will be permitted, provided stairs are protected and finishes restored to new condition at time of Substantial Completion. WaterTrealmew Plant Pressure Control Valves Temporary Facilifles and Controls City of Round Rock 019 5000-9 ((�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3.6 SECURITY AND PROTECTION FACILITIES INSTALLATION A. Protection of Existing Facilities: Protect existing vegetation,equipment, structures,utilities,and other improvements at Project site and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities. I Where access to adjacent properties is required in order to affect protection of existing facilities, obtain written permission from adjacent property owner to access property for that purpose. B. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air,waterway,and subsoil contamination or pollution or other undesirable effects. 1. Comply with work restrictions specified in Section 011000"Summary." C. Temporary Erosion and Sedimentation Control: Comply with requirements of EPA Construction General Permit or authorities having jurisdiction, whichever is more stringent and requirements specified in Section 102"Clearing and Grubbing". D. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and discharge of soil-bearing water runoff and airborne dust to undisturbed areas and to adjacent properties and walkways,according to erosion-and sedimentation-control Drawings. 1. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross tree-or plant-protection zones. 2. Inspect, repair, and maintain erosion- and sedimentation-control measures during construction until permanent vegetation has been established. 3. Clean, repair, and restore adjoining properties and roads affected by erosion and sedimentation from Project site during the course of Project. 4. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal. E. Storinwater Control: Comply with requirements of authorities having jurisdiction. Provide barriers in and around excavations and subgrade construction to prevent flooding by runoff of stormwater from heavy rains. F. Tree and Plant Protection: Comply with requirements specified in Section 610"Preservation of Trees And Other Vegetation". G. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line of trees to protect vegetation from damage from construction operations. Protect tree root systems from damage,flooding,and erosion. H. Pest Control: Engage pest-control service to recommend practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals, so Project will be free of pests and their residues at Substantial Completion. Perform control operations lawfully, using materials approved by authorities having jurisdiction. Water Treatment Plant Pressure Control Valves Temporary Facilities and Controls City of Round Rock 015000, 10 )2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Site Enclosure Fence: Before construction operations begin furnish and install site enclosure fence in a manner that will prevent people from easily entering site except by entrance gates. I. Extent of Fence: As required to enclose entire Project site or portion determined sufficient to accommodate construction operations. 2, Maintain security by limiting number of keys and restricting distribution to authorized personnel. Furnish one set of keys to Owner. J. Security Enclosure and Lockup: Install temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance,vandalism,theft,and similar violations of security. Lock entrances at end of each workday. KBarricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting. L. Temporary Egress: Provide temporary egress from existing occupied facilities as indicated and as required by authorities having jurisdiction, Provide, install and maintain signage directing occupants to temporary egress. M. Covered Walkway: Erect protective, covered walkway for passage of individuals through or adjacent to Project site. Coordinate with entrance gates, other facilities, and obstructions. Comply with regulations of authorities having jurisdiction and requirements indicated on Drawings, I Provide overhead decking, protective enclosure walls, handrails, barricades, warning signs, exit signs, lights, safe and well-drained walkways, and similar provisions for protection and safe passage, I Paint and maintain appearance of walkway for duration of the Work. N. Temporary Enclosures. Provide temporary enclosures for protection of construction,in progress avid completed, from exposure, foul weather, other construction operations, and similar activities, Provide temporary weathertight enclosure for building exterior. I Where heating or cooling is needed and permanent enclosure is incomplete, insulate temporary enclosures. 0, Temporary Partitions: Provide floor-to-ceiling dustproof partitions to limit dust and dirt migration and to separate areas occupied by Owner and tenants from fumes and noise. I. Construct dustproof partitions with gypsum wallboard, with joints taped on occupied side,and fire-retardant-treated plywood on construction operations side. 2. Construct dustproof partitions with two layers of 6 mil (0.14 turn) polyethylene sheet on each side. Cover floor with two layers of 6 mil (0,14 mm) polyethylene sheet, extending sheets 18 inches (460 mm) up the sidewalls. Overlap and tape full length of joints, Cover floor with fire-retardant-treated plywood. a. Construct vestibule and airlock at each entrance through temporary partition with not less than 48 inches (1219 mm) between doors. Maintain water-dampened foot mats in vestibule. Water Treatment Plant Pressure Control Valves Temporary Faedifies and Controls City of Round Rock 0l 50700- I I ta"a 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. Where fire-resistance-rated temporary partitions are 'indicated or are required by authorities having jurisdiction,construct partitions according to the rated assemblies. 4. Insulate partitions to control noise transmission to occupied areas. 5. Seal joints and perimeter. Equip partitions with gasketed dustproof doors and security locks where openings are required. 6. Protect air-handling equipment. 7. Provide walk-off mats at each entrance through temporary partition. P. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with NFPA 241; manage fire-prevention program. I. Prohibit smoking in construction areas. Comply with additional limits on smoking specified in other Sections. 2. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition in accordance with requirements of authorities having jurisdiction. 3. Develop and supervise an overall fire-prevention and -protection program for personnel at Project site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information. 4. Provide temporary standpipes and hoses for fire protection. Hang hoses with a warning sign, stating that hoses are for fire-protection purposes only and are not to be removed. Match hose size with outlet size and equip with suitable nozzles. Q. Weather protection shall comply with M.G.L. Chapter 149 Section 44G. 3.7 MOISTURE AND MOLD CONTROL A. Moisture and Mold Protection: Protect stored materials and installed Work in accordance with Moisture and Mold Protection Plan. B. Exposed Construction Period: Before installation of weather barriers, when materials are subject to wetting and exposure and to airborne mold spores,protect as follows: L Protect porous materials from water damage. 2. Protect stored and installed material from flowing or standing water. 3. Keep porous and organic materials from coming into prolonged contact with concrete. 4. Remove standing water from decks. 5. Keep deck openings covered or dammed. C. Partially Enclosed Construction Period: After installation of weather barriers but before full enclosure and conditioning of building, when installed materials are still subject to infiltration of moisture and ambient mold spores,protect as follows: I. Do not load or install drywall or other porous materials or components, or items with high organic content,into partially enclosed building. 2. Keep interior spaces reasonably clean and protected from water damage. 3. Periodically collect and remove waste containing cellulose or other organic matter. 4. Discard or replace water-damaged material. 5. Do not install material that is wet. 6. Discard and replace stored or installed material that begins to grow mold. Water Treatment Plant Pressure Control Valves Temporary Facilities and Controls City of Round Rock 015000-12 rC,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 7. Perform work in a sequence that allows wet materials adequate time to dry before enclosing the material in gypsum board or other interior finishes. D. Controlled Construction Period: After completing and sealing of the building enclosure but prior to the full operation of permanent I-IVAC systems, maintain as follows: L Control moisture and humidity inside building by maintaining effective dry-in conditions. I Use temporary or permanent HVAC system to control humidity within ranges specified for installed and stored materials. I Comply with manufacturer's written instructions for temperature, relative humidity, and exposure to water limits. a. Hygroscopic materials that may support mold growth, including wood and gypsum-based products, that become wet during the course of construction and remain wet for 48 hours are considered defective and require replacing. b. Measure moisture content of materials that have been exposed to moisture during construction operations or after installation. Record readings beginning at time of exposure and continuing daily for 48 hours. Identify materials containing moisture levels higher than allowed.Report findings in writing to Engineer. C. Remove and replace materials that cannot be completely restored to their manufactured moisture level within 48 hours. 3.8 OPERATION,TERMINATION,AND REMOVAL A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse,limit availability of temporary facilities to essential and intended uses, B. Maintenance: Maintain facilities in good operating condition until removal, I Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage. I Clear snow and ice from all drives, walks and stairs to maintain safe vehicle and pedestrian access to the site and facilities as directed by the Engineer, C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Final Completion. D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Final Completion, Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces,and replace construction that cannot be satisfactorily repaired. I Materials and facilities that constitute temporary facilities are property of Contractor. f Owner reserves right to take possession oProject identification signs.gns. 2. Remove temporary roads and paved areas not intended for or acceptable for integration into permanent construction. Where area is intended for landscape development, remove soil and aggregate fill that do not comply with requirements for fill or subsoil. Remove materials contaminated with road oil, asphalt and other petrochemical compounds, and Water'FreMmetit Nam Pressure Control Valves Temporary Facflaies dnd Controls Cay of'Round Rock W5000 B 2022 CDM Stnith 8077-263948 All Rights Reserved February 2022 other substances that might impair growth of plant materials or lawns. Repair or replace street paving, curbs, and sidewalks at temporary entrances, as required by authorities having jurisdiction. 3. Just prior to Final Completion, repair, renovate, and clean permanent facilities used during construction period. Comply with final cleaning requirements specified in Section 017700"Closeout Procedures." END OF SECTION 015000 Water Treatment Plant.Pressure.Control Valves Temporary facilities and Controls City of Round Rock 015000- 14 k,'>2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 016000- PRODUCT REQUIRE MENTS PART I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products;special warranties; and comparable products. K Related Requirements: I Section 011000 "Summary" for Contractor requirements related to Owner-furnished products. 2. Section 012500"Substitution Procedures"for requests for substitutions. 3. Section 014200"References" for applicable industry standards for products specified. 4. Section 017700"Closeout Procedures"for submitting warranties, 1.3 DEFINITIONS A. Products: Items obtained for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," '"equipment,""system,"and terms of similar intent, 1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents. 2. New Products: Items that have not previously been incorporated into another project or facility. Salvaged items or items reused front other projects are not considered new products, Items that are manufactured or fabricated to include recycle contract materials are considered new products,unless indicated otherwise. 3. Comparable Product: Product by named manufacturer that is demonstrated and approved through the comparable product submittal process described in Part 2 "Comparable Products" Article, to have the indicated qualities related to type, function,dimension, in- service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product. B. Basis-of-Design Product Specification: A specification in which a single manufacturer's product is named and accompanied by the words "basis-of-design product," including make or model number or other designation. Published attributes and characteristics of basis-of-design product establish salient characteristics of products, Water f'reaunent Mant Pressure Control Valves Product Requirements Gly of Round Rock 016000- 1 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Evaluation of Comparable Products: In addition to the basis-of-design product description,product attributes and characteristics may be listed to establish the significant qualities related to type, function,in-service perfortnance and physical properties,weight, dimension, durability, visual characteristics, and other special features and requirements for purposes of evaluating comparable products of additional manufacturers named in the specification. Manufacturer's published attributes and characteristics of basis-of-design product also establish salient characteristics of products for purposes of evaluating comparable products. C. Subject to Compliance with Requirements: Where the phrase "Subject to compliance with requirements" introduces a product selection procedure in an individual Specification Section, provide products qualified under the specified product procedure. In the event that a named product or product by a named manufacturer does not meet the other requirements of the specifications, select another named product or product from another named manufacturer that does meet the requirements of the specifications; submit a comparable product request or substitution request,if applicable. D. Comparable Product Request Submittal: An action submittal requesting consideration of a comparable product,including the following information: I. Identification of basis-of-design product or fabrication or installation method to be replaced, including Specification Section number and title and Drawing numbers and titles. 2. Data indicating compliance with the requirements specified in Part 2 "Comparable Products"Article. E. Basis-of-Design Product Specification Submittal: An action submittal complying with requirements in Section 013300 "Submittal Procedures." F. Substitution: Refer to Section 012500 "Substitution Procedures" for definition and limitations on substitutions. 1.4 QUALITY ASSURANCE A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project,select product compatible with products previously selected,even if previously selected products were also options. 1. Resolution of Compatibility Disputes between Multiple Contractors: a. Contractors are responsible for providing products and construction methods compatible with products and construction methods of other contractors. b. If a dispute arises between the multiple contractors over concurrently selectable but incompatible products,Engineer will determine which products shall be used. B. Identification of Products: Except for required labels and operating data, do not attach or imprint manufacturer or product names or trademarks on exposed surfaces of products or equipment that will be exposed to view in occupied spaces or on the exterior. Water Treatment Plant Pressure Control Valves Product Requirements City of Round Rock 016000..2 4`)2022 CDM Smith 8077-263948 Ail Rights Reserved February 2022 1 Labels: Locate required product labels and stamps on a concealed surface, or, where required for observation following installation,on a visually accessible surface that is not conspicuous, 2. Equipment Nameplates: Provide a permanent nameplate on each itern of service- or power-operated equipment. Locate on a visually accessible but inconspicuous surface. Include infonnation essential for operation,including the following: a. Name of product and manufacturer. b. Model and serial number. c. Capacity. & Speed. C. Ratings. 3, See individual identification Sections in Divisions 21, 22, 23, and 26 for additional equipment identification requirements, 1.5 COORDINATION X Modify or adjust affected work as necessary to integrate work of approved comparable products and approved substitutions, 1.6 PRODUCT DELIVER`',STORAGE,AND HANDLING A. Deliver, store, and handle products, using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions. & Delivery and Handling: 1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces. 2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses. 3. Deliver products to Project site in an undamaged condition in manufacturer's original seated container or other packaging system, complete with labels and instructions for handling,storing,unpacking,protecting,and installing, 4. Inspect products on delivery to determine compliance with the Contract Documents and that products are undamaged and properly protected, C. Storage: t. Provide a secure location and enclosure at Project site for storage of materials and equipment, 2. Store products to allow for inspection and measurement of quantity or counting of units. 1 Store materials in a manner that will not endanger Project structure. 4. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation and with adequate protection for wind. WaterTreatinient Plant Pressure Convol Valves Product Requireraents City of Round Rock 016000 3 C)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 S. Protect foam plastic from exposure to sunlight, except to extent necessary for period of installation and concealment. 6. Comply with product manufacturer's written instructions for temperature, humidity, ventilation,and weather-protection requirements for storage. 7. Protect stored products from damage and liquids from freezing. 8. Provide a secure location and enclosure at Project site for storage of materials and equipment by Owner's construction forces.Coordinate location with Owner. 1.7 PRODUCT WARRANTIES A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents. 1, Manufacturer's Warranty: Written standard warranty form furnished by individual manufacturer for a particular product and issued in the name of the Owner or endorsed by manufacturer to Owner. 2. Special Warranty: Written warranty required by the Contract Documents to provide specific rights for Owner and issued in the name of the Owner or endorsed by manufacturer to Owner. B. Special Warranties: Prepare a written document that contains appropriate terns and identification,ready for execution. I. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed. 2. Specified Form: When specified forms are included in the Project Manual, prepare a written document,using indicated form properly executed. 3. See other Sections for specific content requirements and particular requirements for submitting special warranties. C. Submittal Time:Comply with requirements in Section 017700"Closeout Procedures." PART 2-PRODUCTS 2.1 PRODUCT SELECTION PROCEDURES A. General Product Requirements: Provide products that comply with the Contract Documents,are undamaged and,unless otherwise indicated, are new at time of installation. I. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect. 2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects. 3. Owner reserves the right to limit selection to products with warranties meeting requirements of the Contract Documents. Water Treatment Plant Pressure Control Valves Product Requirements City of Round flock 016000-4 lx2022 CDM Smith 8077-263948 All Rights Reserved February 2.022 4. Where products are accompanied by the term "as selected," Engineer will make selection. 5. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products. 6. Or Equal: For products specified by name and accompanied by the term "or equal," "or approved equal," or "or approved," comply with requirements in "Comparable Products" Article to obtain approval for use of an unnamed product, a. Submit additional documentation required by Engineer in order to establish equivalency of proposed products. Unless otherwise indicated, evaluation of "or equal" product status is by the Engineer,whose determination is final. B. Product Selection Procedures: I Sole Product: Where Specifications name a single manufacturer and product,provide the named product that complies with requirements.Comparable products or substitutions for Contractor's convenience will not be considered. a. Sole product may be indicated by the phrase "Subject to compliance with requirements,provide the following." 2, Sole Manufacturer/Source: Where Specifications narne a single manufacturer or source, provide a product by the named manufacturer or source that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered. a. Sole manufacturer/source may be indicated by the phrase "Subject to compliance with requirements,provide products by the following." 3. Limited List of Products: Where Specifications include a list of names of both manufacturers and products, provide one of the products listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will not he considered unless otherwise indicated. a. Limited list of products may be indicated by the phrase "Subject to compliance with requirements, provide one of the following." 4. Non-Limited List of Products: Where Specifications include a list of names of both available manufacturers and products, provide one ofthe products listed, or an unnamed product that complies with requirements. a. Non-limited list of products is indicated by the phrase"Subject to compliance with requirements,available products that may be incorporated in the Work include, but are not limited to,the following." b. Provision of an unnamed product is not considered a substitution, if the product complies with requirements. 5. Limited List of' Manufacturers: Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements, Comparable products or substitutions for Contractor's convenience will not be considered unless otherwise indicated, Water Treatment Nartr Pressure Control Valves Product Requirements City of Round Rock 016000-5 t 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 a. Limited list of manufacturers is indicated by the phrase "Subject to compliance with requirements,provide products by one of the following." 6. Non-Limited List of Manufacturers: Where Specifications include a list of available manufacturers, provide a product by one of the manufacturers listed, or a product by an unnamed manufacturer that complies with requirements. a. Non-limited list of manufacturers is indicated by the phrase"Subject to compliance with requirements,available manufacturers whose products may be incorporated in the Work include,but are not limited to,the following." b. Provision of products of an unnamed manufacturer is not considered a substitution, if the product complies with requirements. 7. Basis-of-Design Product: Where Specifications name a product, or refer to a product indicated on Drawings, and include a list of manufacturers, provide the specified or indicated product or a comparable product by one of the other named manufacturers. Drawings and Specifications may additionally indicate sizes, profiles, dimensions, and other characteristics that are based on the product named. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product by one of the other named manufacturers. a. For approval of products by unnamed manufacturers,comply with requirements in Section 012500"Substitution Procedures"for substitutions for convenience. C. Visual Matching Specification: Where Specifications require the phrase "match Engineer's sample," provide a product that complies with requirements and matches Engineer's sample. Engineer's decision will be final on whether a proposed product matches. I. If no product available within specified category matches and complies with other specified requirements, comply with requirements in Section 012500 "Substitution Procedures"for proposal of product. D. Visual Selection Specification: Where Specifications include the phrase "as selected by Engineer from manufacturer's full range"or a similar phrase,select a product that complies with requirements. Engineer will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items. E. Sustainable Product Selection: Where Specifications require product to meet sustainable product characteristics, select products complying with indicated requirements. Comply with requirements in Division 01 sustainability requirements Section and individual Specification Sections. 1. Select products for which sustainable design documentation submittals are available from manufacturer. 2.2 COMPARABLE PRODUCTS A. Conditions for Consideration of Comparable Products: Engineer will consider Contractor's request for comparable product when the following conditions are satisfied. If the following Water Treatment Platit Pressure Control Valves Product Renuircrnents City of Round Rock 016000 .6 � j 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 conditions are not satisfied, Engineer may return requests without action, except to record noncompliance the following requirements: I Evidence that proposed product does not require revisions to the Contract Documents, is consistent with the Contract Documents, will produce the indicated results, and is compatible with other portions of the Work. 2. Detailed comparison of significant qualities of proposed product with those of the named basis-of-design product. Significant product qualities include attributes, such as type, function, in-service performance and physical properties, weight, dimension, durability, visual characteristics,and other specific features and requirements. 3. Evidence that proposed product provides specified warranty, 4. List of similar installations for completed projects,with project narnes and addresses and names and addresses of'Engineers and owners,if requested. 5. Samples,if requested. B, Frigincer's Action on Comparable Products Submittal: If necessary, Engineer will request additional information or documentation for evaluation, as specified in Section 013300 "Submittal Procedures," 1. Form of Approval of Submittal: As specified in Section 013300"Submittal Procedures." 1 Use product specified if Engineer does not issue a decision on use of a comparable product request within time allocated. C. Submittal Requirements, Two-Step Process- Approval by the Engineer of Contractor's request for use of comparable product is not intended to satisfy other submittal requirements. Comply with specified submittal requireirients, D. Submittal Requirements, Single-Step Process: When acceptable to Engineer, incorporate specified submittal requirements of individual Specification Section in combined submittal for comparable products. Approval by the Engineer of Contractor' request for use of comparable product and of individual submittal requirements will also satisfy other submittal requirements. PART 3 - EXECUTION(NOT USED) END OF SECTION 016000 Water Treatment Plant Pressue Controt Valves Product Requironents City of'Round Rock 016000.7 xC'u 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank, Water Treatment Plant Pressure Control Valves Product Requirements City of Round Rack 016000..8 0 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 017300-EXECUTION PART I -GENERAL LI RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. t.2 SUMMARY A. Section includes general administrative and procedural requirements governing execution of the Work,including,but not limited to,the following: 1. Construction layout, 2. Field engineering and surveying, 3. Installation of the Work, 4. Cutting and patching. S. Coordination of Owner's portion of the Work. 6. Coordination of Owner-installed products. T Progress cleaning. S. Starting and adjusting. 9. Protection of installed construction. B. Related Requirements: I. Section 011000 "Summary" for coordination and limits on use of Protect site, 1 Section 013300 "Submittal Procedures" for submitting surveys, 3. Section 017700 "Closeout Procedures" for submitting final property survey with Project Record Documents, recording of Owner-accepted deviations from indicated lines and levels,replacing defective work, and final cleaning. 1.3 DEFINITIONS A. Cutting: Removal of in-place construction necessary to permit installation or performance of subsequent work, BPatching: Fitting and repair work required to restore construction to original conditions after installation of subsequent work. 1.4 PREINSTALLATION MEETINGS A. Cutting and Patching Conference: Conduct conference at Project site. 1. Prior to commencing work requiring cutting and patching, review extent Of Cutting and patching anticipated and examine procedures for ensuring satisfactory result from cutting WaterTreaurwm Plant Pressurc Control Valves Execution Cq of Round Rock 017300 1 2022 CDM Smith 8077,263948 All Rights Reserved February 2022 and patching work. Inform Engineer of scheduled meeting. Require representatives of each entity directly concerned with cutting and patching to attend, including the following: a. Contractor's superintendent. b. Trade supervisor responsible for cutting operations. C. Trade supervisor(s)responsible for patching of each type of substrate. d. Mechanical, electrical, and utilities subcontractors' supervisors, to the extent each trade is affected by cutting and patching operations. 2. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding. B. Layout Conference:Conduct conference at Project site. I. Prior to establishing layout of new and existing perimeter and structural column grids), review building location requirements. Review benchmark, control point,and layout and dimension requirements. Inform Engineer of scheduled meeting. Require representatives of each entity directly concerned with Project layout to attend,including the following: a. Contractor's superintendent. b. Professional surveyor responsible for performing Project surveying and layout. C. Professional surveyor responsible for performing site survey serving as basis for Project design. 2. Review meanings and intent of dimensions, notes, terms, graphic symbols, and other layout information indicated on the Drawings. 3. Review requirements for including layouts on Shop Drawings and other submittals. 4. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding. 1.5 fNFORMATIONAL SUBMITTALS A. Qualification Data: For land surveyor or professional engineer. B. Certified Surveys: Submit two copies signed by land surveyor or professional engineer. C. Certificates: Submit certificate signed by land surveyor or professional engineer,certifying that location and elevation of improvements comply with requirements. D. Cutting and Patching Plan: Submit plan describing procedures at least 10 days prior to the time cutting and patching will be perfonned. Include the following information: L Extent: Describe reason for and extent of each occurrence of cutting and patching. 2. Changes to In-Place Construction: Describe anticipated results. Include changes to structural elements and operating components as well as changes in building appearance and other significant visual elements. 3. Products: List products to be used for patching and fines or entities that will perform patching work. 4. Dates: Indicate when cutting and patching will be performed. WaterTreatrnent Plant Pressure Control Valves Execution City of Round Rock 017300-2 t')2022 CDM Smith 9077-263948 All Rights Reserved February 2022 5. Utilities and Mechanical and Electrical Systems: List services and systems that cutting and patching procedures will disturb or affect. List services and systems that will be relocated and those that will be temporarily out of service. Indicate length of time permanent services and systems will be disrupted. a. Include description of provisions for temporary services and systems during interruption of permanent services and systems. E. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous materials, for hazardous waste disposal. L6CLOSEOUT SUBMI'l-PALS A. Final Property Survey: Submit 10 copies showing the Work perfonned and record survey data. 1.7 QUALITY ASSURANCE A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated. B. Professional Engineer Qualifications: Refer to Section 014000"Quality Requirements." C. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements. 1. Structural Elements: When cutting and patching structural elements, or when encountering the need for cutting and patching of elements, whose structural function is not known, notify Engineer of locations and details of cutting and await directions from Engineer before proceeding. Shore, brace, and support structural elements during cutting and patching. Do not cut and patch structural elements in a manner that could change their load-carrying capacity or increase deflection. 2. Operational ElerrrenW Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety. Operational elements include the following: a. Primary operational systems and equipment, b. Fire separation assemblies. c. Air or smoke barriers. & Fire-suppression systems. e. Plumbing piping systems. f. Mechanical systems piping and ducts. g. Control systems. Ir, Communication systems. i. Fire-detection and-alarm systems, j. Conveying systems, k. Electrical wiring systems, 1. Operating systems of special construction. Water Treatnwnt Mant Preswre Controt Valves Execution Cay rat'Round Rock 017300-3 .'r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended,or that results in increased maintenance or decreased operational life or safety. Other construction elements include but are not limited to the following: a. Water,moisture,or vapor barriers. b. Membranes and flashings. C. Exterior curtain-wall construction. d. Sprayed fire-resistive material. C. Equipment supports. f Piping,ductwork,vessels,and equipment. g. Noise-and vibration-control elements and systems. 4. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in Engineer's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner. D. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of specified products and equipment. PART2-PRODUCTS 2.1 MATERIALS A. Comply with requirements specified in other Sections. 1. For projects requiring compliance with sustainable design and construction practices and procedures,use products for patching that comply with sustainable design requirements. B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible. 1. If identical materials are unavailable or cannot be used,use materials that,when installed, will provide a match acceptable to Engineer for the visual and functional performance of in-place materials. Use materials that are not considered hazardous. C. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces. 1. Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels. Water Treatment Plant Pressure Control Valves Execution City of Round Rock 017300-4 OA,")2022 CDM Smith 8077-263948 All Rights Reserved February 2022 PART -EXECUTION 11 EXAMINATION A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities,mechanical and electrical systems,and other construction affecting the Work. I Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, gas service piping, and water-service piping; underground electrical services;and other utilities. 2. Furnish location data for work related to Project that must be performed by public utilities serving Project site, B. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance, Record observations. I. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation. 2. Examine walls, floors, and roof-, for suitable conditions where products and systems are to be installed. 1 Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers, C. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections,include the following: I. Description of the Work, including Specification Section number and paragraphs, and Drawing sheet number and detail,where applicable, 2. List of detrimental conditions,including substrates. 3. List of unacceptable installation tolerances. 4. Recommended corrections, D, Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions. 3.2 PREPARATION A. Existing Utility Information: furnish information to local utility that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction. B. Field Measurements: Take field measurements as required to fit the Work properly, Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of' other construction by field measurements before Water Treatment Plant Pressure Cern uo� Valves Execution Oly ofRound 1�ock 017300-5 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work. C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings. D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Engineer in accordance to requirements in Section 0 13 100"Project Management and Coordination." 3.3 CONSTRUCTION LAYOUT A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks and existing conditions. If discrepancies are discovered,notify Engineer promptly. B. Engage a land surveyor or professional engineer experienced in laying out the Work, using the following accepted surveying practices. 1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project. 2. Establish limits on use of Project site. 3. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain. required dimensions. 4. Inform installers of lines and levels to which they must comply. S. Check the location, level and plumb,of every major element as the Work progresses. 6. Notify Engineer when deviations from required lines and levels exceed allowable tolerances. 7. Close site surveys with an error of closure equal to or less than the standard established by authorities having jurisdiction. C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement,utility slopes,and rim and invert elevations. D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels. I,.evel foundations and piers from two or more locations. E. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by Engineer. 3.4 FIELD ENGINEERING A. Identification: Owner will identify existing benchmarks,control points,and property corners. Water Treatment Plant Pressure Control Valves Execution Ctty of Round Rock 017300 6 4:1 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations, I. Do not change or relocate existing benchmarks or control points without prior written approval of Engineer. Report lost or destroyed permanent benchmarks or control points promptly. Report the need to relocate permanent benchmarks or control points to Engineer before proceeding. 2. Replace lost or destroyed permanent benchmarks and control points promptly. Base replacements on the original survey control points. C. Benchmarks: Establish and maintain a minimum of two permanent benchmarks on Project site, referenced to data established by survey control points. Comply with authorities having jurisdiction for type and size of benchmark. I Record benclunark locations, with horizontal and vertical data, on Project Record Documents. 1 Where the actual location or elevation of layout points cannot be marked, provide temporary reference points sufficient to locate the Work. 1 Remove temporary reference points when no longer needed. Restore marked construction to its original condition, D. Certified Survey: On completion of foundation walls, major site improvements, and other work requiring field-engineering services, prepare a certified survey showing dimensions, locations, angles,and elevations of construction and sitework. E. Final Property Survey: Engage a land surveyor or professional engineer to prepare a final property survey showing significant features (real property) for Project. Include on the survey a certification, signed by land surveyor or professional engineer, that principal metes, bounds, lines, and levels of Project are accurately positioned as shown on the survey. I. Show boundary lines, monuments, streets, site improvements and utilities, existing improvements and significant vegetation, adjoining properties, acreage, grade contours, and the distance and hearing from a site comer to a legal point. 2. Recording: At Substantial Completion,have the final property survey recorded by or with authorities having jurisdiction as the official "property survey." 15 INSTALLATION A. Locate the Work and components of the Work accurately,in correct alignment and elevation,as indicated. I. Make vertical work plumb and make horizontal work level, 2. Where space is limited, install components to maxii-nize space available for maintenance and ease of removal for replacement. 1 Conceal pipes,ducts,and wiring in finished areas unless otherwise indicated. 4. Maintain minimum headroom clearance ot'96 inches in occupied spaces and 90 inches in unoccupied spaces,unless otherwise indicated on Drawings, WaterTreatment Plant Pressure Control Valves Executwn City of'Round Rock 0 t 7300..7 tF" 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated. C. Install products at the time and under conditions that will ensure satisfactory results as judged by Engineer. Maintain conditions required for product performance until Substantial Completion. D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy of type expected for Project. E. Sequence the Work and allow adequate clearances to accommodate movement of construction items onsite and placement in permanent locations. F. Tools and Equipment: Select tools or equipment that minimize production of excessive noise levels. G. Templates: Obtain and distribute to the parties involved templates for Work specified to be factory prepared and field installed. Check Shop Drawings of other portions of the Work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements. H. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions with manufacturer. 1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Engineer. 2. Allow for building movement,including thermal expansion and contraction. 3. Coordinate installation of anchorages. Furnish setting drawings,templates, and directions for installing anchorages,including sleeves,concrete inserts,anchor bolts,and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation. 1. Joints: Make joints of uniform width. Where joint locations in exposed Work are not indicated, arrange joints for the best visual effect, as judged by Engineer. Fit exposed connections together to form hairline joints. J. Repair or remove and replace damaged,defective,or nonconforming Work. I. Comply with Section 017700 "Closeout Procedures" for repairing or removing and replacing defective Work. 3.6 CU TING AND PATCHING A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time,and complete without delay. Water Treatment Plant Pressure Control Valves Execution City of Round Rock 017300-8 X,)2022 CDM Smith 8077 263948 All Rights Reserved February 2022 1 Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition. B. Existing Warranties: Remove, replace, patch,and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties. C. Temporary Support: Provide temporary support of Work to be cut, D. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations. E. Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of free passage to adjoining areas is unavoidable, coordinate cutting and patching in accordance with requirements in Section 011000 "Summary." R Existing Utility Services and Mecliani cal/Electrical Systems: Where existing services,'systerns are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas. G. Cutting: Cut in-place construction by sawing,drilling,breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations, 1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces.Temporarily cover openings when not ill use, 2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces. 3. Concrete and Masonry.- Cut using a cutting machine, such as all abrasive saw or a diamond-core drill, 4. Excavating and Backfilling: Comply with requirements in applicable Sections where required by cutting and patching operations, 5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and sea] remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting. & Proceed with patching after construction operations requiting cutting are complete, I-f. Patching: Patch construction by filling,repairing,refinishing,closing up,and similar operations following performance of other Work. Patch with durable seams that are as invisible as practicable,as judged by Engineer. Provide materials and comply with installation requirements specified in other Sections,where applicable. I. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate physical integrity of installation. 2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing. Water Treaftnent Maw Pressure Coniml Valves ExtXUfiffll Coy of Round Rock 017300-9 k`,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 a. Clean piping, conduit,and similar features before applying paint or other finishing, materials. b. Restore damaged pipe covering to its original condition. 3. Floors and Walls: Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish,color,texture,and appearance. Remove in-place floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance. a. Where patching occurs in a painted surface,prepare substrate and apply primer and intermediate paint coats appropriate for substrate over the patch, and apply final paint coat over entire unbroken surface containing the patch, corner to corner of wall and edge to edge of ceiling. Provide additional coats until patch blends with adjacent surfaces. 4. Ceilings: Patch, repair,or rehang in-place ceilings as necessary to provide an even-plane surface of uniform appearance. 5. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition and ensures thermal and moisture integrity of building enclosure. 1. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar,oils,putty,and similar materials from adjacent finished surfaces. 3.7 COORDINATION OF OWNER'S PORTION OF THE WORK A. Site Access: Provide access to Project site for Owner's construction personnel. I. Provide temporary facilities required for Owner-furnished,Contractor-installed products. 2. Refer to Section 0 i 1000 "Summary" for other requirements for Owner-furnished, Contactor-installed products. B. Coordination: Coordinate construction and operations of the Work with work performed by Owner's construction personnel. 1. Construction Schedule: Inform Owner of Contractor's preferred construction schedule for Owner's portion of the Work.Adjust construction schedule based on a mutually agreeable timetable, Notify Owner if changes to schedule are required due to differences in actual construction progress. 2. Preinstallation Conferences: Include Owner's construction personnel at preinstallation conferences, covering portions of the Work that are to receive Owner's work. Attend preinstallation conferences conducted by Owner's construction personnel if portions of the Work depend on Owner's construction, 3.8 PROGRESS CLEANING A, Clean Project site and work areas daily,including common areas. Enforce requirements strictly. Dispose of materials lawfully. Water Treatment Plant Pressure Control Valves Execution City of Round Ruck 017300- 10 C,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Comply with requirements in NFPA 241 for removal of combustible waste materials and debris. 2. Do not hold waste materials more than seven days during normal weather or three days if the temperature is expected to rise above 80 deg F(27 deg Q. 1 Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally,according to regulations. a. Use containers intended for holding waste materials of type to be stored. 4. Coordinate progress cleaning for joint-use areas where Contractor and other contractors are working concurrently, B. Site: Maintain Project site free of waste materials and debris. C. Work Areas: Clean areas where Work is in progress to the level of cleanliness necessary for proper execution of the Work, 1. Remove liquid spills promptly. 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area,as appropriate. D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces. E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space. F. Exposed Surfaces: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion. C. Waste Disposal: Do not bury or bum waste materials on-site. Do not wash waste materials down sewers or into waterways. Comply with waste disposal requirements in Section 01 50 00 "Temporary Facilities and Controls." H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion, 1. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects. J. Limiting Exposures: Supervise construction operations to ensure that no part of the construction,completed or in progress, is subject to harmful,dangerous, damaging,or otherwise deleterious exposure during the construction period. Water Treaunent Pkint Pressure Control'Valves ExCCUtion Cay of Round Rock 017300 11 °a 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3.9 STARTING AND ADJUSTING A. Coordinate startup and adjusting of equipment and operating components with requirements in Section 019113"General Commissioning Requirements." B. Start equipment and operating components to confirm proper operation. Remove malfunctioning units,replace with new units, and retest. C. Adjust equipment for proper operation. Adjust operating components for proper operation without binding. D. Test each piece of equipment to verify proper operation. "rest and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. E. Manufacturer's Field Service: Comply with qualification requirements in Section 014000 "Quality Requirements." 3.10 PROTECTION AND REPAIR OF INSTALLED CONSTRUCTION A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion. B. Repair Work previously completed and subsequently damaged during construction period Repair to like-new condition. C. Protection of Existing Items: Provide protection and ensure that existing items to remain undisturbed by construction are maintained in condition that existed at commencement of the Work. D. Comply with manufacturer's written instructions for temperature and relative humidity. 3.11 CONTROL OF WORK A. EQUIPMENT 1. Furnish equipment which will be efficient, appropriate and large enough to secure a satisfactory quality of work and a rate of progress which will insure the completion of the work within the Contract Time. If at any time such equipment appears to the Engineer to be inefficient, inappropriate or insufficient for securing the quality of work required or for producing the rate of progress aforesaid, he may order the Contractor to increase the efficiency, change the character or increase the equipment and the Contractor shall conform to such order. Failure of the Engineer to give such order shall in no way relieve the Contractor of his obligations to secure the quality of the work and rate of progress required. B. PRIVATE LAND 1. The Contractor shall not enter or occupy private land outside of easements, except by permission of the land owner. The Contractor shall keep land owners fully appraised of the project schedule while operating on private property. The contractor shall install and Water Treatment Plant Pressure Control Valves Execution City of Round Rock 017300-12 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 maintain temporary fencing is any location where a permanent fence is temporarily removed. Temporary fencing shall be sufficient to prevent the escape of livestock. C. PIPE LOCATIONS 1, Pipelines shall be located substantially as indicated on the Drawings, but the Engineer reserves the right to make such modifications in locations as may be found desirable to avoid interference with existing structures or for other reasons. Where fittings are noted on the Drawings, such notation is for the Contractor's convenience and does not relieve him from laying and jointing different or additional items where required, D. OPEN EXCAVATIONS L All open excavations shall be adequately safeguarded by providing temporary barricades, caution signs, lights and other means to prevent accidents to persons and damage to property. The Contractor shall,at his own expense,provide suitable and safe bridges and other crossings for accommodating travel by pedestrians and workmen. Bridges provided for access during construction shall be removed when no longer required. The length or size of excavation will be controlled by the particular surrounding conditions, but shall always be confined to the limits prescribed by the Engineer. If the excavation becomes a hazard, or if it excessively restricts traffic at any point, the Engineer may require special construction procedures such as limiting the length of the open trench, prohibiting stacking excavated material in the street and requiring that the trench shall not remain open overnight, 1 The Contractor shall take precautions to prevent injury to the public due to open trenches. All trenches,excavated material,equipment, or other obstacles which could be dangerous to the public shall be well lighted at night. E. TEST PITS 1. Test pits for the purpose of locating underground pipelines or structures in advance of the construction shall be excavated and backfilled by the Contractor at the direction of the Engineer. Test pits shall be backfilled irriniediately after their purpose has been satisfied and the surface restored and maintained in a manner satisfactory to the Engineer. 1". MAINTENANCE OF TRAFFIC 1. Unless permission to close a street is received in writing from the proper authority, all excavated material shall be placed so that vehicular and pedestrian traffic is maintained at all times. If the Contractor's operations cause traffic hazards, he shall repair the road surface,provide temporary ways,erect wheel guards or fences,or take other measures for safety satisfactory to the Owner and Engineer, a. Contractor shall maintain access into and out of private property at all times. 2. Detours around construction will be subject to the approval of the Owner and the Engineer. Where detours are permitted the Contractor shall provide all necessary barricades and signs as required to divert the flow of traffic. While traffic is detoured the Contractor shall expedite construction operations and periods when traffic is being detoured will be strictly controlled by the Owner. 3. The Contractor shall take precautions to prevent injury to the public due to open trenches. Night watchmen may be required where special hazards exist, or police protection WaterTreatment Plant Pressure ControV Valves Execution Oty of Round Rock 017300 , 13 )2022 CDM Smith 8077-263948 All Rights Reserved February 2022 provided for traffic while work is in progress. The Contractor shall be fully responsible for damage or injuries whether or not police protection has been provided. G. CARE AND PROTECTION OF PROPERTY I. The Contractor shall be responsible for the preservation of all public and private property and shall use every precaution necessary to prevent damage thereto. If any direct or indirect damage is done to public or private property by or on account of any act, omission, neglect, or misconduct in the execution of the work on the part of the Contractor, such property shall be restored by the Contractor, at his expense, to a condition similar or equal to that existing before the damage was done, or lie shall make good the damage in other manner acceptable to the Engineer, H. PROTECTION AND RELOCATION OF EXISTING STRUCTURES AND UTILITIES I. The Contractor shall assume full responsibility for the protection of all buildings, structures, and utilities, public or private, including poles, signs, fences, mailboxes, services to buildings'utilities in the street,gas pipes,water pipes,hydrants,sewers,drains and electric and telephone cables, whether or not they are shown on the Drawings. The Contractor shall carefully support and protect all such structures and utilities from injury of any kind. Any damage resulting from the Contractor's operations shall be repaired by him at his expense. 2. Assistance will be given the Contractor in determining the location of existing services. The Contractor, however, shall bear full responsibility for obtaining all locations of underground structures and utilities (including existing water services, drain lines and sewers). Services to buildings shall be maintained,and all costs or charges resulting from damage thereto shall be paid by the Contractor. 3. Protection and temporary removal and replacement of existing utilities and structures as described in this Section shall be a part of the work under the Contract and all costs in connection therewith shall be included in the Total Price Bid in the Bid Form. 4. If, in the opinion of the Engineer, permanent relocation of a utility owned by the Owner is required, he may direct the Contractor, in writing, to perforin the work. Work so ordered will be paid for as extra work. The Contractor shall fully cooperate with the Owner and shall have no claim for delay due to such relocation. The Contractor shall notify the Owner in writing at least 72 hours (excluding Saturdays, Sundays and Legal holidays)before excavating in any public way. I. MAINTENANCE OF FLOW 1. The Contractor shall at his own cost,provide for the flow of water mains, sewers, drains and water courses interrupted during the progress of the work,and shall immediately cart away and remove all offensive matter. The entire procedure of maintaining existing flow shall be fully discussed with the Engineer well in advance of the interruption of any flow. 2. Contractor shall provide means to control any excessive leaking through existing valves to maintain a safe work area through the use of pumps, bypass piping, blind flanges or other approved methods. J. COOPERATION WITHIN THIS CONTRACT Water Treatment Plant Pressure Control Valves Execution, City of Round Rock 017300- 14 ,an 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 All firms or persons authorized to perform any work under this Contract shall cooperate with General Contractor and his Subcontractors or trades and shall assist in incorporating the work of other trades where necessary or required. 2. Cutting and patching, drilling and fitting shall be conducted where required by the trade or subcontractor having jurisdiction, unless otherwise indicated herein or directed by the Engineer K. CLEANUP AND DISPOSAL OF EXCESS MATERIAL 1. During the course of the work, the Contractor shall keep the site of his operations ill as clean and neat a condition as is possible. He shall dispose of all residue resulting from the construction work and, at the conclusion of the work, he shall remove and haul away any surplus excavation, broken pavement, lumber, equipment, temporary structures and any other refuse remaining from the construction operations and shall leave the entire site of the work in a neat and orderly condition. 2. In order to prevent environmental pollution arising from the construction activities related to the performance of this Contract, the Contractor and his subcontractors shall comply with all applicable Federal, State and local laws and regulations concerning waste material disposal,as well as the specific requirements stated in this Section and elsewhere in the Specifications. 1 The Contractor is advised that the disposal of excess excavated material in wetlands, stream corridors and plains is strictly prohibited even if the permission of the property owner is obtained. Any violation of this restriction by the Contractor or any person employed by him, will be brought to the immediate attention of the responsible regulatory agencies, with a request that appropriate action be taken against the offending parties. Therefore, the Contractor will be required to remove the fill at his own expense and restore the area impacted. L. BLASTING L Blasting will not be allowed oil this job, M, PAYMENT 1. Payment for the Work in this section will not be made separately but will be included as part of the appropriate unit prices stated in Section 003000,Bid Form. N. COMPLEMENTARY CONTRACT DOCUMENTS I. The Contract Documents are complementary. What is required by one is as binding as if required by all, END OF SECTION 017300 WaterTreatment Plant Pressure U)ntrol Valves Execuhon City of Round R(wk 017300 • 15 V 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Execution City of Round Rock 017300 16 (V 2022 CDM Sniiin 8077-263948 All Rights Reserved February 2022 SECTION 017700-CLOSEOUT PROCEDURES PARTI -GENERAL 1.1 RELATED DOCUMENTS X Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1,2 SCOPE OF WORK A. This Section outlines the procedures to be followed in closing-out the Contract. 13. All inspections shall be performed by the Owner unless the Owner requests the Engineer's as- sistance.Contractor shall coordinate all inspections and notice of completions with the Owner, 1.3 SUMMARY A, Section includes administrative and procedural requirements for Contract closeout, including, but not limited to,the following: 1. Substantial Completion procedures. 2. Final completion procedures. 3. Warranties, 4. Final cleaning. 1.4 DEFINITIONS A. List of Incomplete Items: Contractor-prepared list of items to be completed or corrected, prepared for the Engineer's use prior to Engineers inspection, to determine if the Work is substantially complete, 1.5 AC71ON SUBMITTALS A, Contractor's List of Incomplete Items: Initial submittal at Substantial Completion. B. Certified List of Incomplete Items: Final submittal at Final Completion, 1.6 CLOSEOUT SUBMITTALS A. Certificates of Release: From authorities having jurisdiction. B. Certificate of Insurance: For continuing coverage. WaterTreaunent Plain Pressure Control Vaives Closeout Proce4ures City of'Round Rock W7700 I C;2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Field Report: For pest-control inspection, 1.7 MAINTENANCE MATERIAL SUBMITTALS A. Schedule of Maintenance Material Items: For maintenance material submittal items required by other Sections. 1.8 PREREQUISITES TO SUBSTANTIAL COMPLETION A. Submittals Prior to Substantial Completion. Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request. I. Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and corrected(Contractor's"punch list"),indicating the value of each item on the list and reasons why the Work is incomplete. 2. Certificates of Release: Obtain and submit releases from authorities having jurisdiction, permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits,operating certificates,and similar releases. 3. Submit closeout submittals specified in other Division 01 Sections, including Project Record Documents, operation and maintenance manuals, damage or settlement surveys, property surveys,and similar final record information. 4. Submit closeout submittals specified in individual Sections,including specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents. 5. Submit maintenance material submittals specified in individual Sections, including tools, spare parts, extra materials, and similar items, and deliver to location designated by Engineer. Label with manufacturer's name and model number. I. Schedule of Maintenance Material Items: Prepare and submit schedule of maintenance material submittal items, including name and quantity of each item and name and number of related Specification Section.Obtain Engineer's signature for receipt of submittals. 6. Submit testing,adjusting,and balancing records. ". Submit sustainable design submittals not previously submitted. 8. Submit changeover information related to Owner's occupancy, use, operation, and maintenance. B. Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request. 1. Advise Owner of pending insurance changeover requirements. 2. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions. 3. Complete startup and testing of systems and equipment. 4. Perforin preventive maintenance on equipment used prior to Substantial Completion. 5, Advise Owner of changeover in utility services. Water Treatment Plant Pressure Control Valves Closeout Procedures City of Round bock 017700-2 C',2022 CDM Smith 8077-263948 All Rights Reserved February 2022 6. Participate with Owner in conducting inspection and walkthrough with local emergency responders. 7. Terminate and remove temporary facilities from Project site, along with mockups, construction tools,and similar elements. 8. Complete final cleaning requirements, 9. Touch up paint and otherwise repair and restore marred exposed finishes to eliminate visual defects. C. Inspection: Submit a written request for inspection to determine Substantial Completion a minimum of 10 days prior to date the Work will be completed and ready for final inspection and tests, On receipt of request, Engineer will either proceed with inspection or notify Contractor of unfulfilled requirements, Engineer will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Engineer,that must be completed or corrected before certificate will be issued, 1. Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected. 2. Results of completed inspection will form the basis of requirements for Final Completion. C. All bid form and punch-list items must be complete except Clean Up,Finish touch-up painting, Landscape repairs,and Final documentation. D. Contractor shall provide all equipment training and manufacturer certifications,all spare parts and all final O&M Manuals and Data prior to Substantial Completion. E9 PREREQUISITES TO FFNAL COMPLETION A. Contractor shall complete the following prior to requesting Owner to inspect for Final Completion: I. Provide all support documentation for completion as indicated in these Documents, including,but not limited to: I. Final Shop Drawings, 2. Project Record Documents and Drawings. 3. Indexes and Schedules. 4, Construction Photographs. 5. Provide a statement showing accounting of changes to the Contract amount. 6. Advise owner of pending insurance change-over requirements, 7. Provide Warranties, Bonds,Agreements and similar documents. 8. Provide a release to Owner enabling full, unrestricted use of the Work, including certificates and related documents. 9. Perform touch-up and otherwise restore marred/damaged surfaces. B. Following tire Final Inspection, the Owner will advise the Contractor of work which must be finished/corrected. Contractor shall finish/correct all items. If necessary, the Owner will repeat the inspection when requested to ensure Final Completion. Water Freatinent Matu Pressure Control Vatves Ctoscouk Procedures City of Round Rock 017700-3 0,'r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Should the Owner/Engineer be required to perform a second reinspection because of Contractor's failure to adequately finish/correct the Work, the Owner will compensate themselves and the Engineer for Additional Services and deduct such amount from the Final Payment to Contractor. 1.10 SUBMITTAL OF PROJECT WARRANTIES A. Time of Submittal: Submit written warranties on request of Engineer for designated portions of the Work where warranties are indicated to continence on dates other than date of Substantial Completion, or when delay in submittal of warranties might limit Owner's rights under warranty. B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated portions of the Work that are completed and occupied or used by Owner during construction period by separate agreement with Contractor. C. Organize warranty documents into an orderly sequence based on the table of contents of Project Manual. D. Warranty Electronic File: Provide warranties and bonds in PDF format. Assemble complete warranty and bond submittal package into a single electronic PDF file with bookmarks enabling navigation to each item. Provide bookmarked table of contents at beginning of document. I. Submit by email to Engineer. E. Warranties in Paper Forth: 1. Bind warranties and bonds in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch (215-by-280-mm)paper. 2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer. 3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name,and name of Contractor. F. Provide additional copies of each warranty to include in operation and maintenance manuals. 1.11 PREREQUISITES TO FINAL ACCEPTANCE AND PAYMENT A. Submittals Prior to Final Completion: Before requesting final inspection for determining Final Completion,complete the following: 1. Submit Final Payment request in accordance with Section 012200 "Measurement and Payment"with releases of Liens from subcontractors. 2. Submit Contractor's Certification of Payment of all debts and claims. 3. Submit an updated Final Statement,accounting for additional charges to Contract Sutn. 4. Submit Consent of Surety. Water Treatment Plant Pressure Control Valves Closeout Procedures City of Round Rock 017700-4 k""2022 CDM Smith 8077-263948 All Rights Reserved February 2022 S. Submit Final Liquidated Damages and Settlement Statement,acceptable to Owner. 6, Submit evidence of final, continuing insurance coverage complying with insurance requirements. 7. Revise subparagraphs below to match the Supplementary Conditions. 8. Submit a final Application for Payment in accordance with Section 012200 "Measurement and Payment". 9. Certified List of Incomplete Iterns: Submit certified copy of' Engineer's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Engineer. Certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance, M Certificate of Insurance: Submit evidence of final, continuing insurance coverage complying with insurance requirements, It. Submit pest-control final inspection report, 12. Submit Final Completion photographic documentation. B. Inspection: Submit a written request for final inspection to determine acceptance a minimum of 10 days prior to date the Work will be completed and ready for final inspection and tests. On receipt of request, Engineer will either proceed with inspection or notify Contractor of unfulfilled requirements, Engineer will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued, I. Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected. 1 Should the Owner/Engineer be required to perform a second reinspection because of failure to adequately finish/correct the Work, the Owner will compensate themselves and the Engineer for Additional Services and deduct such arnount from the Final Payment to Contractor. PAR'I'2- PRODUCTS 2.1 MATERIALS A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned, Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces. I Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels. PART 3-EXECUTION 3.1 CLEANINGY A. DURING CONSTRUCTION M,mrTreatrnent Mant Pressure Control Vahv,cs Closeout PrtwC%lures City of Round Rock 017700-5 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Execute daily cleaning to keep the Work, the site and adjacent properties free from accumulations of waste materials, rubbish and windblown debris resulting from construction operations. 2. Provide on-site containers for the collection of waste materials, debris and rubbish. All waste materials,including containers,food debris and other miscellaneous materials must be disposed of daily in on-site containers. 3. Remove waste materials, debris and rubbish from the site periodically and dispose of at legal disposal areas away from the site. B. DUST CONTROL 1. Clean interior spaces prior to the start of finish painting and continue cleaning on an as-needed basis until painting is finished. 2. Schedule operations so that dust and other contaminants resulting from cleaning process will not fall on wet or newly-coated surfaces. C. FINAL CLEANING 1. Cleaning provisions in the General Conditions are limited to rubbish removal and similar activities. 2. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. 3. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions. 4. If final cleaning is delayed until final acceptance,revise subparagraph below. S. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a designated portion of Project: a. Clean Project site of rubbish, waste material, litter, and other foreign substances. b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits. C. Rake grounds that are not planted, mulched, or paved to a smooth, even- textured surface. d. Remove tools, construction equipment, machinery, and surplus material from Project site. e. Remove snow and ice to provide safe access to building. f. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition. g. Remove debris and surface dust from limited access spaces,including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces. h, Clean flooring, removing debris, dirt, and staining: clean according to manufacturer's recommendations. i. Vacuum and mop concrete. Water Treatment Plant Pressure Control Valves Closeout Procedures City of Round Rock 017700-6 K 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 j. Vacuum carpet and similar soft surfaces, removing debris and excess nap; clean according to manufacturer's recommendations if visible soil or stains remain, k. Clean transparent materials, including mirrors and glass in doors and windows. Remove glazing compounds and other noticeable, vision- obscuring materials. Polish mirrors and glass, taking care not to scratch surfaces. 1. Remove labels that are not permanent, rn. Revise subparagraphs below to suit Project. Check for conflict or duplication with provisions in other Sections. M Wipe surfaces of mechanical and electrical equipment and similar equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances, 0. Clean Plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure. p. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers,registers,and grills. % First subparagraph below describes a major work item that requires coordination with other closeout procedures, 1'. Clean ducts,blowers,and coils. S. Retain first subparagraph below in environments with demanding FIVAC system cleaning standards or for special contamination issues, Coordinate with the requirements of sustainable design requirements specified in Section Series 018113 "Sustainable Design Requirements," Below adds significantly to cleaning cost, t. Clean luminaires, lamps, globes, and reflectors to function with full efficiency, U. Clean strainers. V, Leave Project clean and ready for occupancy. & "Pest Control"and"Construction Waste Disposal" paragraphs below represent end of the Work specified in Section 015000 "Temporary Facilities and Controls." Most projects require these actions at completion of construction. Ten-nite inspection where required by authorities having jurisdiction or applicable for Project. 7. Construction Waste Disposal: Comply with waste disposal requirements in Section 015000"Temporary Facilities and Controls," 12 REPAIR OF THE WORK A. Complete repair and restoration operations required by Section 017300 "Execution" before requesting inspection for determination of Substantial Completion. 3.3 SUBSTANTIAL COMPLETION A. Procedures: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion, List items below that are incomplete at time of request. WaierTreimnent Mari,Pressure Couto-ot Vaives Closeout Procedtircs City of Round Rock 017700-7 a 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Advise(,Owner of pending insurance changeover requirements. 2. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions. 3. Complete startup and testing of systems and equipment. 4. Perform preventive maintenance on equipment used prior to Substantial Completion. 5. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment,and systems. b. Advise Owner of changeover in utility services. 7. Participate with Owner in conducting inspection and walkthrough with local emergency responders. 8. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements. 9. Complete final cleaning requirements. 10. Touch up paint and otherwise repair and restore marred exposed finishes to eliminate visual defects. 11. Where materials of value remain after completion,store as directed by Owner,or dispose of as directed by Owner. B. Inspection: Submit a written request for inspection to determine Substantial Completion a minimum of 10 days prior to date the Work will be completed and ready for final inspection and tests. On receipt of request,Engineer will either proceed with inspection or notify Contractor of unfulfilled requirements. Engineer will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Engineer,that must be completed or corrected before certificate will be issued. C. Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected. D. Results of completed inspection will form the basis of requirements for Final Completion, 3.4 FINAL COMPLETION A. Procedures: Before requesting final inspection for detennining Final Completion, complete the following: 1. Submit a final Application for Payment in accordance with Section 010250 "Measurement and Payment". Form for Contractor's Certification for Final Payment found in Section 018000"Forms" 2. Certified List of Incomplete Items: Submit certified copy of Engineer's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Engineer. Certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance. 3. Certificate of Insurance: Submit evidence of final, continuing insurance coverage complying with insurance requirements. 4. Submit pest-control final inspection report. 5. Submit Final Completion photographic documentation. B. Inspection: Submit a written request for final inspection to determine acceptance a minimum of 10 days prior to date the Work will be completed and ready for final inspection and tests. On receipt of request, Engineer will either proceed with inspection or notify Contractor of Water Treatment Plant Pressure Control Valves Closeout Procedures City of Round Rock 017700-9 V 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 unfulfilled requirements, Engineer will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued. I Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected. 15 LIST OF INCOMPLETE ITEMS A. Organization of List-. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary,areas disturbed by Contractor that are outside the limits of construction. I. Organize list of spaces in sequential order, listed by room or space number. 2. Organize items applying to each space by major element, including categories for ceilings, individual walls, floors,equipment,and building systems, 3. Include the following information at the top of each page: I. Project name. 2. Date. 3. Dame of Engineer. 4. Name of Contractor. 5. Page number. 4. Submit list of incomplete items in the following format: I. MS Excel Electronic File, Engineer will return annotated file. 2. PDF Electronic File. Engineer will return annotated file. 3. Web-Based Project Management Software Upload: Utilize software feature for creating and updating list of incomplete items(punch list). 4. Three Paper Copies. Engineer will return two copies. 3,6 WARRANTY PERIOD A. Two years following the Final Acceptance of the Work, Contractor shall perform a walk- through of the Project with the Engineer and Owner. B. The Contractor shall correct, at his own expense, all defects that may have occurred or become known and have not been remedied during the Warranty Period, C. Upon completion of Work,and Certification by the Owner that all Work is complete, the Owner will notify the Contractor of the release of the Performance and Labor and Materials Bonds, D. Contractor shall organize and submit warranty documents with the operation and maintenance manuals. END OF SECTION 017700 Water'Freatinevit Mant Pressure Controt V'Mves Ooseout Procedures City of Round Rock Olt 7700-9 x'12022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Closeout Procedures City of Round Rock 017700- 10 wt")2022 CDM Smith 8077-263948 Ah Rights Reserved February 2022 SECTION 017823 -OPERATION AND MAINTENANCE DATA PARTI -GENERAL LI RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. L2 SUMMARY A. Section includes administrative and procedural requirements for preparing operation and maintenance manuals,including the following: 1. Systems and equipment operation manuals. 1 Systems and equipment maintenance manuals. 1 Product maintenance manuals. B. Related Requirements: L Section 013300 "Submittal Procedures" for submitting copies of submittals for operation and maintenance manuals, 1.3 DEFINITIONS A. System: An organized collection of parts, equipment, or subsystems united by regular interaction. B, Subsystem: A portion of a system with characteristics similar to a system. 1.4 CLOSEOUT SUBMITTALS A. Submit operation and maintenance manuals indicated. Provide content for each manual as specified in individual Specification Sections, and as reviewed and approved at the time of Section submittals. Submit reviewed manual content formatted and organized as required by this Section. 1. Engineer will comment on whether content of operation and maintenance submittals is acceptable. 1 Where applicable, clarify and update reviewed manual content to correspond to revisions and field conditions, B, Format. Submit operation and maintenance manuals in the following format: I. Submit on digital media acceptable to Engineer. Enable reviewer comments on draft submittals, Water Treatinoit Plant Pressure CowwA Valves Operation and Mamienance Data City of Rolund Rock 017823- I ,2022 CDM Smith 8077-263948 All Rights Deserved February 2022 2. Submit three paper copies.Engineer will return two copies. C. Initial Manual Submittal: Submit draft copy of each manual at least 30 days before commencing demonstration and training. Engineer will comment on whether general scope and content of manual are acceptable. D. Final Manual Submittal: Submit each manual in final form prior to requesting inspection for Substantial Completion and at least 15 days before commencing demonstration and training. Engineer will return copy with comments. I. Correct or revise each manual to comply with Engineer's comments. Submit copies of each corrected manual within 1.5 days of receipt of Engineer's comments and prior to commencing demonstration and training. E. Comply with Section 017700 "Closeout Procedures" for schedule for submitting operation and maintenance documentation. 1.5 FORMAT OF OPERATION AND MAINTENANCE MANUALS A. Manuals, Electronic Files: Submit manuals in the form of a multiple file composite electronic PDF file for each manual type required. 1. Electronic Files: Use electronic files prepared by manufacturer where available. Where scanning of paper documents is required, configure scanned file for minimum readable file size. 2. File Names and Bookmarks: Bookmark individual documents based on file names. Name document files to correspond to system,subsystem, and equipment names used in manual directory and table of contents. Group documents for each system and subsystem into individual composite bookmarked files, then create composite manual, so that resulting bookmarks reflect the system, subsystem, and equipment names in a readily navigated file tree.Configure electronic manual to display bookmark panel on opening file. B. Manuals,Paper Copy: Submit manuals in the farm of hard-copy,bound and labeled volumes. 1. Binders: Heavy-duty, three-ring, vinyl-covered, binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-Il-inch (215-by-280-mm) paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets. a. If two or more binders are necessary to accommodate data of a system, organize data in each binder into groupings by subsystem and related components. Cross- reference other binders if necessary to provide essential information for proper operation or maintenance of equipment or system. b. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents,and indicate Specification Section number on bottom of spine. Indicate volume number for multiple-volume sets. 2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section of the manual. Mark each tab to indicate contents. Include typed list of products and major components Water Treatment Plant Pressure Control Valves Operation arra Maintenance Data City of Round Rock 017823-2 ,k)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 of equipment included in the section on each divider, crass-referenced to Specification Section number and title of Project Manual, 3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software storage media for computerized electronic equipment, Enclose title pages and directories in clear plastic sleeves. 4, Supplementary Text: Prepared on 8-1/2-by-I I-inch(215-by-280-min)white bond paper. 5. Drawings: Attach reinforced,punched binder tabs on drawings and bind with text. a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts. K If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles,descriptions of contents, and drawing locations. 1.6 SYSTEMS AND EQUIPMENT OPERATION MANUALS A. Systems and Equipment Operation Manual: Assemble a complete set of data indicating operation of each system, subsystem, and piece of equipment not part of a system. Include information required for daily operation and managernent, operating standards, and routine and special operating procedures, I. Engage a factory-authorized service representative to assemble and prepare information for each system,subsystem,and piece of equipment not part of a system. 1 Prepare a separate manual for each system and subsystem, in the fonn of an instructional manual for use by Owner's operating personnel. B. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information: I System, subsystem, and equipment descriptions. Use designations for systems and equipment indicated on Contract Documents. 2. Performance and design criteria if Contractor has delegated design responsibility. 1 Operating standards, 4. Operating procedures, 5, Operating logs, 6. Wiring diagrams. 7. Control diagrams. 8, Piped system diagrams, 9. Precautions against improper use. 10, License requirements including inspection and renewal dates, C. Descriptions: Include the following: I Product name and model number. Use designations for products indicated oil Contract Documents, 2, Manufacturer's name. 3. Equipment identification with serial number of each component. 4. Equipment function, 5. Operating characteristics. Water Treatnient Plant Pressure Control Valves Operation and Maintenance Data Cay of'Round Rock 017823-3 c�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 6. Limiting conditions. 7. Performance curves. 8. Engineering data and tests. 9. Complete nomenclature and number of replacement parts. D. Operating Procedures: Include the following,as applicable: 1. Startup procedures. 2. Equipment or system break-in procedures. 3. Routine and normal operating instructions. 4. Regulation and control procedures. 5. Instructions on stopping. 6. Normal shutdown instructions. 7. Seasonal and weekend operating instructions. 8. Required sequences for electric or electronic systems. 9. Special operating instructions and procedures. E. Systems and Equipment Controls: Describe the sequence of operation,and diagram controls as installed. F. Piped Systems: Diagram piping as installed, and identify color coding where required for identification. 1.7 SYSTEMS AND EQUIPMENT MAINTENANCE MANUALS A. Systems and Equipment Maintenance Manuals: Assemble a complete set of data indicating maintenance of each system, subsystem, and piece of equipment not part of a system. Include manufacturers' maintenance documentation, preventive maintenance procedures and frequency, repair procedures,wiring and systems diagrams,lists of spare parts,and warranty information. I, Engage a factory-authorized service representative to assemble and prepare information for each system,subsystem,and piece of equipment not part of a system. 2. Prepare a separate manual for each system and subsystem, in the form of an instructional manual for use by Owner's operating personnel. B. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules,spare parts list and source information,maintenance service contracts,and warranties and bonds as described below. C. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name,address,and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual and drawing or schedule designation or identifier where applicable. D. Manufacturers' Maintenance Documentation: Include the following information for each component part or piece of equipment: Water Treatment Plant Pressure Control Valves Operation and Maintenance Data City of Round Rock 017823 .,4 �o 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 1 Standard maintenance instructions and bulletins; include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable. a. Prepare supplementary text if manufacturers' standard printed data are not available and where the infort-nation is necessary for proper operation and maintenance of equipment or systems. 2. Drawings, diagrams, and instructions required for maintenance, including disassembly and component removal,replacement,and assembly. 3. Identification and nomenclature of parts and components, 4. List of items recommended to be stocked as spare parts, E. Maintenance Procedures: Include the following information and items that detail essential maintenance procedures: I. Test and inspection instructions. 1 Troubleshooting guide, 3. Precautions against improper maintenance. 4. Disassembly;component removal,repair, and replacement; and reassembly instructions. S. Aligning,adjusting,and checking instructions. 6. Demonstration and training video recording,if available. J, Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment, I. Scheduled Maintenance and Service: Tabulate actions for daily, weekly, monthly, quarterly, semiannual,and annual frequencies, 2. Maintenance and Service Record: Include manufacturers' forms for recording maintenance. G. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services, H. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent. 1. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. 1. Include procedures to follow and required notifications for warranty claims, J. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in record Drawings to ensure correct illustration of completed installation, Water'Y'reannent Plant Pressure Control Valves Operation wid Maintenance Data Cay of lZound Rock 017823-5 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Do not use original project record documents as part of maintenance manuals. 1.8 PRODUCT MAINTENANCE MANUALS A. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product,material,and finish incorporated into the Work. B. Content: Organize manual into a separate section for each product,material, and finish. Include source information,product information, maintenance procedures,repair materials and sources, and warranties and bonds,as described below. C. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual and drawing or schedule designation or identifier where applicable. D. Product Information: Include the following,as applicable: 1. Product name and model number. 2. Manufacturer's name. 3. Color,pattern,and texture. 4. Material and chemical composition. 5. Reordering information for specially manufactured products. E. Maintenance Procedures: Include manufacturer's written recommendations and the following: L Inspection procedures. 2. Types of cleaning agents to be used and methods of cleaning. 3. List of cleaning agents and methods of cleaning detrimental to product. 4. Schedule for routine cleaning and maintenance. 5. Repair instructions. F. Repair Materials and Sources: Include lists of materials and local sources of materials and related services. G, Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. I. Include procedures to follow and required notifications for warranty claims. PART 2-PRODUCTS(NOT USED) PART 3-EXECUTION(NOT USED) END OF SECTION 017823 Water Treatment Plant Pressure Control Valves Operation and Maintenance Data City of Round Rock 017823-6 %, 2022 CDM Snuth 8077-263948 All Rights Reserved February 2022 SECTION 017439 -PROJECTR :CD RD DOCUMENTS PART I - GENERAL, I.l RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for Project Record Documents, including the following: 1. Record Drawings, 1 Record Specifications. 3. Record Product Data. 4. Miscellaneous record submittals. B. Related Requirements: I. Section 017300 "Execution" for final property survey. 2. Section 017700 "Closeout Procedures" for general closeout procedures. 3. Section 017823 "Operation and Maintenance Data" for operation and maintenance manual requirements. 13 CLOSEOUT SUBMITTALS A. Record Drawings: Comply with the following-, I. Number of Copies: Submit one set(s) of marked-up record prints, 2. Number of Copies: Submit copies of Record Drawings as follows: a. Initial Submittal: 1) Submit one paper-copy sel(s)of marked-up record prints, 2) Subinit PDF electronic files of scanned record prints and one set(s) of file prints, 3) Submit Record Digital Data Files and one set(s) of plots, 4) Engineer will indicate whether general scope of changes, additional information recorded, and quality of drafting are acceptable, K Final Submittal: 1) Submit three paper-copy set(s)of marked-up record prints. 2) Submit PDF electronic files of scanned Record Prints and three set(s)of file prints. WmerTreauiient If tant Presswe Control'Valves Project Record Docunwnts Oty of Round Rock 017839- 1 t')2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3) Print each drawing, whether or not changes and additional information were recorded. C. Final Submittal: 1) Submit one paper-copy set(s)of marked-up record prints. 2) Submit Record Digital Data Files and three set(s) of Record Digital Data File plots. 3) Plot each drawing file, whether or not changes and additional information were recorded. B. Record Specifications: Submit annotated PDF electronic files of Project's Specifications, including addenda and Contract modifications. C. Record Product Data: Submit annotated PDF electronic files and directories of each submittal. I Where record Product Data are required as part of operation and maintenance manuals, submit duplicate marked-up Product Data as a component of manual. D. Miscellaneous Record Submittals: See other Specification Sections for miscellaneous record- keeping requirements and submittals in connection with various construction activities. Submit annotated PDF electronic files and directories of each submittal. E. Reports: Submit written report weekly indicating items incorporated into Project Record Documents concurrent with progress of the Work, including revisions, concealed conditions, field changes,product selections,and other notations incorporated. 1.4 RECORD DRAWINGS A. Record Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop Drawings,incorporating new and revised drawings as modifications are issued. 1. Preparation: Mark record prints to show the actual installation, where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to provide information for preparation of corresponding marked-up record prints. a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later. b. Accurately record information in an acceptable drawing technique. C. Record data as soon as possible after obtaining it. d. Record and check the markup before enclosing concealed installations, e. Cross-reference record prints to corresponding photographic documentation. 2. Content:Types of items requiring marking include,but are not limited to,the following: a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. C. Depths of foundations. d. Locations and depths of underground utilities. Water Treatment Plant Pressure Control Valves Project Record Documents City of Round Rock 017839-2 x v2022 CDM Smith 8077-263948 ) All Rights Reserved February 2022 C. Revisions to routing of piping and conduits, f. Revisions to electrical circuitry. g. Actual equipment locations. h. Duct size and routing. i. Locations of concealed internal utilities. j. Changes made by Change Order or Work Change Directive. k, Changes made following Engineer's written orders, 1. Details not on the original Contract Drawings. M. Field records for variable and concealed conditions, n. Record inforrilation on the Work that is shown only schematically. 1 Mark the Contract Drawings and Shop Drawings completely and accurately. Use personnel proficient at recording graphic information in production of marked-up record prints. 4. Mark record prints with erasable, red-colored pencil, Use other colors to distinguish between changes for different categories of the Work at same location, 5. Mark important additional information that was either shown schematically or omitted from original Drawings. 6, Note Construction Change Directive numbers, alternate numbers, Change Order numbers,and similar identification,where applicable. 11 Record Digital Data Files; Immediately before inspection for Certificate of Substantial Completion,review marked-tip record prints with Engineer. When authorized,prepare a full set of corrected digital data Files of the Contract Drawings,as follows: I Format: Same digital data software program, version, and operating system as for the original Contract Drawings. 2, Format: DWG,Version 2021, Microsoft Windows operating system. 3, Format: Annotated PDF electronic file with comment function enabled. 4. Incorporate changes and additional information previously marked on record prints. Delete,redraw,and add details and notations where applicable. 5. Refer instances of uncertainty to Engineer for resolution. 6. Engineer will furnish Contractor with one set of digital data files of the Contract Drawings for use in recording information. a. See Section 013100 "Project Management and Coordination" for requirements related to use of Engineer's digital data files. b. Engineer will provide data file layer information. Record markups in separate layers. C, Format: Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. I. Record Prints: Organize record prints into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets, 2. Format: Annotated PDF electronic file with comment function enabled. 3. Record Digital Data Files: Organize digital data inforniation into separate electronic files that correspond to each sheet of the Contract Drawings, Name each file with the sheet identification. Include identification in each digital data file. 4. Identification: As follows: Water Tivaoucru Plant Vresmnv Cowrol Valves Project Record Documents City tARoiund Rock 017839-3 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 a. Project name. b. Date. C. Designation"PROJECT RECORD DRAWINGS." d. Name of Engineer. e. Name of Contractor. 1.5 RECORD SPECIFICATIONS A. Preparation: Mark Specifications to indicate the actual product installation, where installation varies from that indicated in Specifications,addenda,and Contract modifications. 1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. 2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished,including substitutions and product options selected. 3. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made. 4. For each principal product, indicate whether Record Product Data has been submitted in operation and maintenance manuals instead of submitted as Record Product Data. 5. Note related Change Orders and Record Drawings where applicable. B. Format: Submit Record Specifications as annotated PDF electronic file. L6 RECORD PRODUCT DATA A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document purposes. Post changes and revisions to Project Record Documents as they occur;do not wait until end of Project. B. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal. L Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. 2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation. 1 Note related Change Orders,and Record Drawings where applicable. C. Format: Submit Record Product Data as annotated PDF electronic file. 1. Include Record Product Data directory organized by Specification Section number and title,electronically linked to each item of Record Product Data. 1.7 MISCELLANEOUS RECORD SUBMITTALS A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each,ready for continued use and reference. Water Treatment Plant Pressure Control Valves Project Record Documents City of Round Rock 017839 4 ( 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Format: Submit miscellaneous record submittals as PDF electronic file, I Include miscellaneous record submittals directory organized by Specification Section number and title,electronically linked to each item of miscellaneous record submittals. 1.8 MAINTENANCE OF RECORD DOCUMENTS A. Maintenance of Record Documents: Store Record Documents in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes, Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss, Provide access to Project Record Documents for Engineer's reference during normal working hours, As a prerequisite for monthly progress payments, exhibit the updated record documents for review by Owner and Engineer for accuracy and completeness. PART 2-PRODUCTS (NOT USED) PART 3 -EXECUTION (NOT USED) END OF SECTION 017839 Water Treatment Mara Pressure ControVaives Froject Record Documents Coy of'Romd Rock 017839 5 2022 CLAM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Project Record Documents City of Round Rack 017839-6 t�(`)2022 CDM Srnith 8077-263948 All Rights Reserved February 2022 SECTION 018000-FORMS FART GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,including General and Supplementary Conditions and other Division 01 Specification Sections,apply to this Section. 1.02 SUMMARY A. This Section covers the various forms that the Contractor shall use for administering and managing the Project, B. Contractor shall prepare and Submit for review and approval by Owrier/Engi ricer the"O&M Data, Startup,Testing and Warranty Matrices". Contractor shall be responsible for completing all data(e.g.,equipment identification,serial numbers,equipment model numbers,etc., included in the form. Upon Ownerl/Engineer approval of said document,Contractor shall maintain the matrix and update it throughout the course of the Project and submit the matrix to the Owner for review and approval. 1.03 FORMS INCLUDED A. Use the forms following this Section for contract administration,such as preparing submittals, Requests for Information,documentation of test results,etc. A single copy of these forms will be provided to the Contractor, The Contractor may make additional copies of the fonds as required. The Contractor may substitute computer generated forms with the approval of the Engineer if these forms include the same information,statements and certifications and the same general format as the forms included in this section. Forms included are listed below: I. Submittal Transmittal, 2. Request for Information. 3. Request for Deviation. 4, Payment Request. 5, Consent of Surety Company to Final Payment. 6, Contractor's Certification of Final Payment. 7. Contractor's Release of Owner. S. Professional Engineer Certification. 9. Pressure Pipe Test Report. 10. Protective Coating Test Report. It. Contractor Acknowledgement, 12. rwo-Week Schedule, 13. O&M Data,Startup,Testing and Warranty Matrices 14. Field Order, 15. Spare Paris Transfer Form. Water'Freatunent Plant Pressure Control Valves Forms City of Round Rock 0118000-I 4 2022 CDM Smith 8077-263948 All Rights Reserved. February 2022 PART 2 PRODUCTS(NOT USED) PART 3 EXECUTION (NOT USED) END OF SECTION 018000 Water Treatment Plant Pressure Control Valves Forms City of Round Rock 018000-2 V 2022 CDM Smith 8077-263948 All Rights Reserved February 2.022 SECTION 019113 -GENERAL COMMISSIONING REQUIREMENTS PART I GENERAL I'l RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. K Owner's Project Requirements and Basis-of-Design Document are included by reference for information only. L2 SUMMARY A. Section Includes: I. General requirements for coordinating and scheduling commissioning activities. 2. Commissioning meetings. 3. Commissioning reports. 4, Use of commissioning process test equipment,instrumentation,and tools. 5, Construction checklists, including, but not limited to, installation checks, startup, performance tests, and performance test demonstration. 6. Commissioning tests and commissioning test demonstration. 7. Adjusting,verifying,and documenting identified systems and assemblies. BRelated Requirements: L Section 011000 '"Summary"" for Commissioning Authority responsibilities. 2. Section 013300 "Submittal Procedures" for submittal procedure requirements for commissioning process. 1 Section 017700 "Closeout Procedures" for Certificate of Construction-Phase Commissioning Process Completion submittal requirements. 4. Section 017823 "Operation and Maintenance Data" for preliminary operation and maintenance data submittal requirements. 13 ALLOWANCES A. Labor and management costs for the performance of commissioning process. B. The following are excluded from the commissioning allowance: I Equipment and systems installation, startup, and field quality-control testing indicated in the Contract Documents, 2. Test equipment, instrumentation,and tools (including, but not limited to, proprietary test equipment, instrumentation,and tools)required to perfonii tests. 3. Work to correct commissioning issues. 4. Work to repeat tests when equipment and systems fail acceptance criteria. Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rock 019113 1 t:a 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.4 UNIT PRICES A. The following are excluded from the computation for the adjustment of the commissioning allowance for technician labor hours: 1. Work to correct commissioning issues. 2. Work to repeat tests when equipment and systems fail acceptance criteria. 1.5 DEFINITIONS A. Acceptance Criteria: Threshold of acceptable work quality or performance specified for a commissioning activity,including,but not limited to,construction checklists,performance tests, perfortnance test demonstrations,commissioning tests,and commissioning test demonstrations. B. Basis-of-Design Document: A document prepared by Engineer that records concepts, calculations, decisions, and product selections used to comply with Owner's Project Requirements and to suit applicable regulatory requirements,standards,and guidelines. C. Commissioning Authority: An entity engaged by Owner, and identified in Section 011000 "Summary," to evaluate Commissioning-Process Work. D. Commissioning Plan: A document, prepared by Commissioning Authority, that outlines the organization, schedule, allocation of resources, and documentation of commissioning requirements. E. Commissioning: A quality-focused process for verifying and documenting that the facility and all of its systems and assemblies are planned, designed, installed, and tested to comply with Owner's Project Requirements. The requirements specified here are limited to the construction phase commissioning activities. The scope of the commissioning process is defined in Section 011000"Summary." F. Construction-Phase Commissioning-Process Completion: The stage of completion and acceptance of commissioning process when resolution of deficient conditions and issues discovered during commissioning process and retesting until acceptable results are obtained has been accomplished. Owner will establish in writing the date construction-phase commissioning- process completion is achieved. See Section 017700 "Closeout Procedures" for Certificate of Construction-Phase Commissioning Process Completion submittal requirements. 1. Commissioning process is complete when the Work specified of this Section and related Sections has been completed and accepted,including,but not limited to,the following: a. Completion of tests and acceptance of test results. b. Resolution of issues, as verified by retests performed and documented with acceptance of retest results. C. Completion and acceptance of submittals and reports. G. Owner's Project Requirements: A document that details the functional requirements of a project and the expectations of how it will be used and operated, including Project goals, measurable performance criteria, cost considerations, benchmarks, success criteria, and supporting Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rock 019113 2 rr:2022 CDM Smith 8077-263948 All Rights Reserved February 2022 information. This document is prepared either by the Owner or for the Owner by the Engineer or Commissioning Authority, 11 Owner's Witness: Commissioning Authority, Owner's Project Manager, or Engineer-designated witness authorized to authenticate test demonstration data and to sign completed test data forms. L "Systems," "Assemblies," "Subsystems," "Equipment," and "Components": Where these terms are used together or separately, they shall mean "as-built" systems, assemblies, subsystems, equipment,and components. J. Test: Performance tests, performance test demonstrations, commissioning tests, and commissioning test demonstrations. K. Sampling Procedures and Tables for Inspection by Attributes: As defined in ASQ ZIA. 1.6 COMPENSATION A. If Engineer, Commissioning Authority, other Owner's witness, or Owner's staff perform additional services or incur additional expenses due to actions of Contractor listed below, compensate Owner for such additional services and expenses. 1. Failure to provide timely notice of commissioning activities schedule changes. 2. Failure to meet acceptance criteria for test demonstrations. L7 COMMISSIONING"IMAM A. Members Appointed by Contractor(s): I Commissioning Coordinator: A person or entity employed by Contractor to manage, schedule,and coordinate commissioning process. 1 Project superintendent and other employees that Contractor may deem appropriate for a particular portion of the commissioning process. 1 Subcontractors,installers,suppliers,and specialists that Contractor may(teem appropriate for a particular portion of the commissioning process. 4. Appointed team members shall have the authority to act on behalf of the entity they represent. & Members Appointed by Owner: I Commissioning Authority, plus consultants that Commissioning Authority may deem appropriate for a particular portion of the commissioning process. 1 Owner representative(s), facility operations and maintenance personnel, plus other employees, separate contractors, and consultants that Owner may deem appropriate for a particular portion of the commissioning process. 3. Engineer, plus employees and consultants that Engineer may deem appropriate for a particular portion of the commissioning process. Water Treatrimt Plant Pressure Control Valves General Comirmssvxong Requarements City of Round Rock 019113-3 0 2022 CDM Stnith 8077-263948 All Rights Reserved February 2022 1.8 [NFORMATIONAL SUBMITTALS A. Comply with requirements in Section 013300 "Submittal Procedures" for submittal procedure general requirements for commissioning process. B. Commissioning Pian Information: 1. List of Contractor-appointed commissioning team members to include specific personnel and subcontractors performing the various commissioning requirements. 2. Contractor personnel and subcontractors participating in each test. 3. List of instrumentation required for each test to include identification of parties that will provide instrumentation for each test. C. Commissioning schedule. D. Two-week look-altcad schedules. E. Commissioning Coordinator Letter of Authority: 1. Within 10 days after approval of Commissioning Coordinator qualifications, submit a letter of authority for Commissioning Coordinator, signed by a principal of Contractor's firm. Letter shall authorize Commissioning Coordinator to do the following: a. Make inspections required for commissioning process. b. Coordinate, schedule, and manage commissioning process of Contractor, subcontractors,and suppliers. C. Obtain documentation required for commissioning process from Contractor, subcontractors,and suppliers. d. Report issues, delayed resolution of issues, schedule conflicts, and lack of cooperation or expertise on the part of members of the commissioning team. F. Commissioning Coordinator Qualification Data: For entity coordinating Contractor's commissioning activities to demonstrate their capabilities and experience. 1. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction. G. List test instrumentation, equipment, and monitoring devices. Include the following information: I. Make, model, serial number, and application for each instrument, equipment, and monitoring device. 2. Brief description of intended use. 3. Calibration record showing the following: a. Calibration agency,including name and contact information. b. Last date of calibration. C. Range of values for which calibration is valid. d. Certification of accuracy. Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rack 01911.3 4 J()2022 CDM Smith 8077-263948 All Rights Reserved February 2022 e. Certification for calibration equipment traceable to NIST. f. Due date of the next calibration. 14. Test Reports: 1, Pre-Startup Report: Prior to startup of equipment or a system, submit signed, completed construction checklists. 2. Test Data Reports: At the end of each day in which tests are conducted, submit test data for tests performed. 3. Commissioning Issue Reports: Daily,at the end of each day in which tests are conducted, submit commissioning issue reports for tests for which acceptable results were not achieved. 4, Weekly Progress Report: Weekly, at the end of each week in which tests are conducted, submit a progress report, 5. Data Trend Logs: Submit data trend logs at the end of the trend log period. 6. System Alarm Logs: Daily, at the start of days following a day in which tests were performed,submit printout of log of alarms that occurred since the last log was printed. 1. Construction Checklists: 1. Material checks, 2. Installation checks. 3. Startup procedures,where required. 1.9 CLOSEOUT SUBMITTALS A. Commissioning Report: I At Construction-Phase Commissioning Completion,include the following: a. Pre-startup reports. b. Approved test procedures. c. Test data forms,completed and signed. & Progress reports. e. Commissioning issue report log. f. Commissioning issue reports showing resolution of issues. g. Correspondence or other documents related to resolution of issues. h. Other reports required by commissioning process. i. List unresolved issues and reasons they remain unresolved and should be exempted from the requirements for Construction-Phase Commissioning Completion. j. Report shall include commissioning work of Contractor. B. Request for Certificate of Construction-Phase Commissioning Process Completion, C. Operation and Maintenance Data: For proprietary test equipment, instrumentation, and tools to include in operation and maintenance manuals, Water Treatment Plant Pressure Control valves General Commissioning Requircrywrds City of Round Rock 0191 B-5 k"I 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.10 QUALITY ASSURANCE A. Commissioning Coordinator Qualifications: I. Documented experience commissioning systems of similar complexity to those contained in these documents on at least three projects of similar scope and complexity. 2. Certification of commissioning-process expertise. The following certifications are acceptable. Owner reserves the right to accept or reject certifications as evidence of qualification. a. Certified Commissioning Authority,by AABC Commissioning Group(ACG). b. Commissioning-Process Management Professional, by American Society of Heating,Refrigerating and Air-Conditioning Engineers. C. Certified Commissioning Professional,by Building Commissioning Association. d. Accredited Commissioning-Process Authority Professional, by University of Wisconsin. e. Accredited Commissioning-Process Manager,by University of Wisconsin. f. Accredited Green Commissioning-Process Provider,by University of Wisconsin. B. Calibration Agency Qualifications: Certified by The American Association for Laboratory Accreditation that the calibration agency complies with minimum requirements of ISO/IEC 17025. PART2-PRODUCTS 2.1 TEST EQUIPMENT, INSTR.UMENTKrION,AND TOOLS A. Test equipment and instrumentation required to perform the commissioning process shall remain the property of Contractor unless otherwise indicated. B. Test equipment and instrumentation required to perform commissioning process shall comply with the following criteria: 1. Be manufactured for the purpose of testing and measuring tests for which they are being used and have an accuracy to test and measure system performance within the tolerances required to determine acceptable performance. 2. Calibrated and certified. a. Calibration performed and documented by a qualified calibration agency according to national standards applicable to the tools and instrumentation being calibrated. Calibration shall be current according to national standards or within test equipment and instrumentation manufacturer's recommended intervals, whichever is more frequent, but not less than within six months of initial use on Project. Calibration tags shall be permanently affixed. b. Repair and recalibrate test equipment and instrumentation if dismantled, dropped, or damaged since last calibrated. 3. Maintain test equipment and instrumentation. Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rock 019113-6 K")2022 CDM Smith 8077-263948 All Rights Reserved February 2022 4. Use test equipment and instrumentation only for testing or monitoring Work for which they are designed. 2.2 PROPRIETARY TESTEQUIPMENT, INSTRUMENTATION,AND TOOLS A. Proprietary test equipment, instrumentation, and tools are those manufactured or prescribed by tested equipment manufacturer and required for work on its equipment as a condition of equipment warranty, or as otherwise required to set-vice, repair, adjust, calibrate, or perform work on its equipment. I Identify proprietary test equipment, instrumentation, and tools required in the test equipment identification list submittal. 1 Proprietary test equipment, instrumentation, and tools shall become the property of Owner at Substantial Completion, 2.3 REPORT FORMAT AND ORGANIZATION A, General Format and Organization: I, Bind report in three-ring binders, 2. Label the front cover and spine of each binder with the report title, volume number, project name,Contractor's narne,and date of report, 3. Record report on compact disk. 4, Electronic Data: Portable document format (PDF); a single file with outline-organized bookmarks for major and minor tabs and tab contents itemized for specific reports. B. Commissioning Report: 1. Include a table of contents and an index to each test. 2. Include major tabs for each Specification Section. 3. Include minor tabs for each test. 4, Within each minor tab,include the following: a. Test specification, b. Pre-startup reports. C. Approved test procedures. d. Test data forms,completed and signed, e. Commissioning issue reports, showing resolution of issues, and documentation related to resolution of issues pertaining to a single test. Group data forms, commissioning issue reports showing resolution of issues, and documentation related to resolution of issues for each test repetition together within the minor tab, in reverse chronological order(most recent on top). PART 3-EXECUTION 3,1 PREPARATION A. Review preliminary construction checklists and preliminary test procedures and data forms. Water Treatm ent Plant Pressure Control Valves General Conimissionaig Requirements City of Round Rock 019113 7 io 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3.2 CONSTRUCTION CHECKLISTS A. Construction checklists cannot modify or conflict with the Contract Documents. B. Create construction checklists based on actual systems and equipment to be included in Project. C. Material Checks: Compare specified characteristics and approved submittals with materials as received. Include factory tests and other evaluations, adjustments, and tests performed prior to shipment if applicable. I. Service connection requirements, including configuration, size, location, and other pertinent characteristics. 2. Included optional features. 3. Delivery Receipt Check: Inspect and record physical condition of materials and equipment on delivery to Project site, including agreement with approved submittals, cleanliness,and lack of damage. 4. Installation Checks: a. Location according to Drawings and approved Shop Drawings. b. Configuration. C. Compliance with manufacturers' written installation instructions. d. Attachment to structure. e. Access clearance to allow for maintenance, service, repair, removal, and replacement without the need to disassemble or remove other equipment or building elements. Access coordinated with other building elements and equipment, including, but not limited to, ceiling and wall access panels, in a manner consistent with OSHA fall-protection regulations and safe work practices. f. Utility connections are of the correct characteristics,as applicable. g. Correct labeling and identification. h, Startup Checks: Verify readiness of equipment to be energized. Include manufacturer's standard startup procedures and forms. D. Startup: Perform and document initial operation of equipment to prove that it is installed properly and operates as intended according to manufacturer's standard startup procedures, at minimum. E. Performance Tests: I. Static Tests: As specified elsewhere, including, but not limited to,duct and pipe leakage tests,insulation-resistance tests,and water-penetration tests. 2. Component Performance Tests: Tests evaluate the performance of an input or output of components under a full range of operating conditions. 3. Equipment and Assembly Performance Tests: Test and evaluate perfort-nance of equipment and assemblies under a full range of operating conditions and loads. 4. System Performance Tests: Test and evaluate performance of systems under a full range of operating conditions and loads. 5. Intersystem Performance Tests:Test and evaluate the interface of different systems under a full range of operating conditions and loads. F. Deferred Construction Checklists: Obtain Owner approval of proposed deferral of construction checklists, including proposed schedule of completion of each deferred construction checklist, Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rock 019113-8 ................ 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 before submitting request for Certificate of Construction-Phase Commissioning Process Completion. When approved, deferred construction checklists may be completed after date of Construction-Phase Commissioning Completion. Include the following in a request for Certificate of Construction-Phase Commissioning Process Completion: I. Identify deferred construction checklists by[lumber and title. 1 Provide a target schedule for completion of deferred construction checklists. 3. Written approval of proposed deferred construction checklists, including approved schedule of completion of each deferred construction checklist, G. Delayed Construction Checklists: Obtain Owner approval of proposed delayed construction checklists, including proposed schedule of completion of each delayed construction checklist, before submitting request for Certificate of Construction-Phase Commissioning Process Completion. When approved, delayed construction checklists may be completed after date of Constivction-Phase Commissioning Completion. Include the following in a request for Certificate of Construction-Phase Commissioning Process Completion: I. Identify delayed construction checklist by construction checklist number and title. 1 Provide a target schedule for completion of delayed construction checklists. 3. Written approval of proposed delayed construction checklists, including approved schedule of completion of each delayed constniction checklist. 3.3 GENERAL EXECUTION REQUIREMENTS A. Schedule and coordinate commissioning process with the Construction Schedule. B. Perform activities identified in construction checklists, including tests, and document results of actions as construction proceeds. C. Perform test demonstrations for Owner's witness. Unless otherwise indicated,demonstrate tests for 100 percent of work to which the test applies. In some instances,demonstration of a random sample of other than 100 percent of the results of a test is specified. I. Where sampling is specified, the sampling plan and procedure for (lie test demonstration shall be determined using ASC)ZIA. 1 The "lot size" in ASQ ZIA is the sum of the number of items to which the test demonstration applies,as described in the scope subparagraph of each test, 1 On determination of the sample size, the samples shall be selected randomly by Owner's witness at the time of the test demonstration. 4. Include in the Commissioning Plan a detailed list of the test demonstrations with lot and sample quantities for each test. D. Report test data and commissioning issue resolutions. E. Schedule personnel to participate in and perform Commissioning-Process Work. R Installing contractors' commissioning responsibilities include, but are not limited to, the following: I. Operating the equipment and systems they install during tests. WalerTireatinent Mant Pressure Corstrol Valves GenerM Commissmning RequirenientS City or Round Rock 019113 9 k',f 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. In addition, installing contractors may be required to assist in tests of equipment and systems with which their work interfaces. 3.4 COMMISSIONING COORDINATOR RESPONSIBILITIES A. Management and Coordination: Manage, schedule, and coordinate commissioning process, including,but not limited to, the following: 1. Coordinate with subcontractors on their commissioning responsibilities and activities. 1 Obtain,assemble,and submit commissioning documentation. 1 Conduct periodic on-site commissioning meetings. Comply with requirements in Section 013 100"Project Management and Coordination." 4. Develop and maintain the commissioning schedule. Integrate commissioning schedule into the Construction Schedule. Update Construction Schedule at specified intervals. 5. Review and comment on preliminary test procedures and data forms. 6. Report inconsistencies and issues in system operations. 7. Verify that tests have been completed and results comply with acceptance criteria, and that equipment and systems are ready before scheduling test demonstrations. 8. Direct and coordinate test demonstrations. 9. Coordinate witnessing of test demonstrations by Owner's witness. 10. Coordinate and manage training. Be present during training sessions to direct video recording, present training, and direct the training presentations of others. Comply with requirements in Section 017900"Demonstration and Training." 11. Prepare and submit specified commissioning reports. 12. Track commissioning issues until resolution and retesting is successfully completed. 13. Retain original records of Commissioning-Process Work, organized as required for the commissioning report. Provide Owner's representative access to these records on request. 14. Assemble and submit commissioning report. 3.5 COMMISSIONING TESTING A. Quality Control: Construction checklists, including tests, are quality-control tools designed to improve the functional quality of Project. Test demonstrations evaluate the effectiveness of Contractor's quality-control process. B. Owner's witness will be present to witness commissioning work requiring the signature of an owner's witness,including,but not limited to,test demonstrations.Owner's project manager will coordinate attendance by Owner's witness with Contractor's published Commissioning Schedule, Owner's witness will provide no labor or materials in the commissioning work. The only function of Owner's witness will be to observe and comment on the progress and results of commissioning process. C. Construction Checklists: 1. Complete construction checklists as Work is completed. 2. Distribute construction checklists to installing contractors before they start work. 3. Installers: a. Verify installation using approved construction checklists as Work proceeds. Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rock 019113- 10 i,'12022 CDM Smith 8077-263948 All Rights Reserved February 2022 b. Complete and sign construction checklists regularly for work performed during the preceding week(s), 4. Provide Commissioning Authority access to construction checklists, D. Installation Compliance Issues: Record as an installation compliance issue Work found to be incomplete, inaccessible, at variance with the Contract Documents, nonfunctional, or that does not comply with construction checklists, Record installation compliance issues on the construction checklist at the time they are identified. Record corrective action and flow future Work should be modified before signing off the construction checklist. E. Pre-Startup Audit: Prior to executing startup procedures, review completed installation check,,, to determine readiness for startup and operation. Report conditions, which, if left uncorrected, adversely impact the ability of systems or equipment to operate satisfactorily or to comply with acceptance criteria. Prepare pre-startup report for each system. F 'rest Procedures and Test Data Forms: I 'rest procedures shall define the step-by-step procedures to be used to execute tests and test demonstrations. 1 Test procedures shall be specific to the make, model, and application of the equipment and systems being tested, 3. Completed test data forms are the official records of the test results. 4. Commissioning Authority will provide to Contractor preliminary test procedures and test data forms for performance tests and commissioning tests after approval of Product Data, Shop Drawings,and preliminary operation and maintenance manual, 5. Review preliminary test procedures and test data forms,and provide comments within 14 days of receipt front Commissioning Authority. Review shall address the following: a, Equipment protection and warranty issues, including, but not limited to, manufacturers' installation and startup recommendations, and operation and maintenance instructions. b, Applicability of the procedure to the specific software, equipment, and systems approved for installation. 6, After Contractor has reviewed and commented on the preliminary test procedures and test data forms, Commissioning Authority will revise and reissue the approved revised test procedures and test data forms marked"Approved for Testing." 7. Use only approved test procedures and test data forms marked "Approved for Testing" to perform and document tests and test demonstrations. G Performance of Tests: I The sampling rate for tests is 100 percent. The sampling rate for test demonstrations is 100 percent unless otherwise indicated, 1 Perform and complete each step o1µthe approved test procedures in the order listed. 1 Record data observed during performance of tests on approved data forms at the time of test performance and when the results are observed, 4. Record test results that are not within the range of acceptable results on commissioning issue report fornis in addition to recording the results on approved test procedures and Wam-Treattuent Plant Pressure Convol Valves Gpmenfl Coaunssoontng Requiremeln", Cay of Round Rack OM 13 - l I r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 data forms according to the "Commissioning Compliance Issues" Paragraph in this Article. 5. On completion of a test,sign the completed test procedure and data form.Tests for which test procedures and data forms are incomplete,not signed,or which indicate performance that does not comply with acceptance criteria will be rejected. Tests for which test procedures and data forms are rejected shall be repeated and results resubmitted. H. Performance of Test Demonstration: I. Perforin test demonstrations on a sample of tests after test data submittals are approved. The sampling rate for test demonstrations shall be 100 percent unless otherwise indicated in the individual test specification. 2. Notify Owner's witness at least three days in advance of each test demonstration. 3. Perfonn and complete each step of the approved test procedures in the order listed. 4. Record data observed during performance of test demonstrations on approved data forms at the time of demonstration and when the results are observed. 5. Provide full access to Owner's witness to directly observe the performance of all aspects of system response during the test demonstration. On completion of a test demonstration, sign the completed data form and obtain signature of Owner's witness at the time of the test to authenticate the reported results. 6. "Cest demonstration data forints not signed by Contractor and Owner's witness at the time of the completion of the procedure will be rejected. Test demonstrations for which data forms are rejected shall be repeated and results shall be resubmitted. a. Exception for Failure of Owner's Witness to Attend: Failure of Owner's witness to be present for agreed-on schedule of test demonstration shall not delay Contractor. If Owner's witness fails to attend a scheduled test, Contractor shall proceed with the scheduled test. On completion, Contractor shall sign the data form for Contractor and for Owner's witness, and shall note the absence of Owner's witness at the scheduled time and place. 7. False load test requirements are specified in related sections. a. Where false load testing is specified, provide temporary equipment, power, controls, wiring, piping, valves, and other necessary equipment and connections required to apply the specified load to the system. False load system shall be capable of steady-state operation and modulation at the level of load specified. Equipment and systems pennanently installed in this work shall not be used to create the false load without Engineer's written approval. I. Deferred Tests: I. Deferred Test List: Identify, in the request for Certificate of Construction-Phase Commissioning Process Completion, proposed deferred tests or other tests approved for deferral until specified seasonal or other conditions are available. When approved, deferred tests may be completed after the date of Construction-Phase Commissioning Completion. identify proposed deferred tests in the request for Certificate of Construction-Phase Commissioning Process Completion as follows: a. Identify deferred tests by number and title. b. Provide a target schedule for completion of deferred tests. Water Treatment Plant Pressure Control valves General Commissioning Requirements City or Round Rock b 19113- l2 2022 CDM Stnith 8077-263948 All Rights Reserved February 2022 2. Schedule and coordinate deferred tests. Schedule deferred tests when specified conditions are available. Notify Engineer and Commissioning Authority at least three working days (minimum)in advance of tests. 3. Where deferred tests are specified,coordinate participation of necessary personnel and of Engineer, Commissioning Authority, and Owner's witness. Schedule deferred tests to minimize occupant and facility impact. Obtain Engineer's approval of the proposed schedule. J. Delayed Tests. 1, Delayed Test List: Identify, in the request for Certificate of Construction-Phase Commissioning Process Completion, proposed delayed tests. Obtain Owner approval of proposed delayed tests, including proposed schedule of completion of each delayed test, before submitting request for Certificate of Construction-Phase Commissioning Process Completion. Include the following in the request for Certificate of Construction-Phase Commissioning Process Completion: a. Identify delayed tests by test number and title. b. Written approval of proposed delayed tests, including approved schedule of completion of delayed tests. 2. Schedule and coordinate delayed tests. Schedule delayed tests when conditions that caused the delay have been rectified. Notify Engineer and Commissioning Authority at least three working days(minimum)in advance of tests. 3. Where delayed tests are approved, coordinate participation of necessary personnel and of Engineer, Commissioning Authority, and Owner's witness. Schedule delayed tests to minimize occupant and facility impact. Obtain Engineer's approval of the proposed schedule, K. Commissioning Compliance Issues: I. Test results that are not within the range of acceptable results are commissioning compliance issues. 2. Track and report commissioning compliance issues until resolution and retesting are successfully completed, 3. If a test demonstration fails, determine the cause of failure. Direct timely resolution of issue and then repeat the demonstration. If a test demonstration must be repeated due to failure caused by Contractor work or materials, reimburse Owner for billed costs for the participation in the repeated demonstration. 4. Test Results: It' a test demonstration fails to meet the acceptance criteria, perform the following: a. Complete a commissioning compliance issue report form promptly on discovery of test results that do not comply with acceptance criteria. b. Submit commissioning compliance issue report form within 24 hours of the test. c. Determine the cause of the failure. d. Establish responsibility for corrective action if the failure is due to conditions found to be Contractor's responsibility. Water Treahnent Plant Pressure Control V'alves 4ncral Comniissuomng Requirenwnts CAty of Round Rock 019113- 13 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 5. Commissioning Compliance Issue Report: Provide a commissioning compliance issue report for each issue. Do not report multiple issues on the same commissioning compliance issue report. a. Exception: If an entire class of devices is determined to exhibit the identical issue, they may be reported on a single commissioning compliance issue report. (For example, if all return-air damper actuators that are specified to fail to the open position are found to fail to the closed position, they may be reported on a single commissioning issue report. If a single commissioning issue report is used for multiple commissioning compliance issues, each device shall be identified in the report,and the total number of devices at issue shall be identified. b. Complete and submit Part I of the commissioning compliance issue report immediately when the condition is observed. C. Record the commissioning compliance issue report number and describe the deficient condition on the data form. d. Resolve commissioning compliance issues promptly. Complete and submit Part 2 of the commissioning compliance issue report when issues are resolved. 6. Diagnose and correct failed test demonstrations as follows: a. Perform diagnostic tests and activities required to determine the fundamental cause of issues observed. b. Record each step of the diagnostic procedure prior to performing the procedure. Update written procedure as changes become necessary. C. Record the results of each step of the diagnostic procedure. & Record the conclusion of the diagnostic procedure on the fundamental cause of the issue. e. Determine and record corrective measures. f. Include diagnosis of fundamental cause of issues in commissioning compliance issue report. 7. Retest: a. Schedule and repeat the complete test procedure for each test demonstration for which acceptable results are not achieved. Obtain signature of Owner's witness on retest data forms. Repeat test demonstration until acceptable results are achieved. Except for issues that are determined to result from design errors or omissions, or other conditions beyond Contractor's responsibility, compensate Owner for direct costs incurred as the result of repeated test demonstrations to achieve acceptable results. b. For each repeated test demonstration, submit a new test data form, marked "Retest." 8. Do not correct commissioning compliance issues during test demonstrations. a. Exceptions will be allowed if the cause of the issue is obvious and resolution can be completed in less than five minutes. If corrections are made under this exception, note the deficient conditions on the test data form and issue a commissioning compliance issue report. A new test data fon-n, marked "Retest," shall be initiated after the resolution has been completed. Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rock 019113-14 ............. ......... (*i 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 16 COMMISSIONING MEErINGS A. Schedule and conduct commissioning meetings. Comply with requirements in Section 013100 "Project Management and Coordination." 3.7 SEQUENCING A. Sequencing of Commissioning Verification Activities: For a particular material, item of equipment, assembly, or system, perform the following in the order listed unless otherwise indicated: I Construction Checklists: a. Material checks. b. Installation checks. C. Startup, as appropriate. Some startup may depend on component performance. Such startup may follow component performance tests on which the startup depends. & Perforrnante Tests: I) Static tests,as appropriate. 2) Component perfon-nance tests. Some component performance tests may depend on completion of startup. Such component perfon-nance tests may follow startup. 3) Equipment and assembly performance tests. 4) System performance tests. 5) Intersystem performance tests. 2. Commissioning tests. B. Before performing commissioning tests, verify that materials, equipment, assemblies, and systems are delivered, installed, started, and adjusted to perform according to construction checklists. C. Verify readiness of materials, equipment, assemblies, and systems by perfonning tests prior to performing test demonstrations. Notify Engineer if acceptable results cannot be achieved due to conditions beyond Contractor's control or responsibility. U Commence tests as soon as installation checks for materials,equipment,assemblies, or systems are satisfactorily completed. Tests of a particular system may proceed prior to completion of other systems, provided the incomplete work does not interfere with successful execution of test. 18 SCHEDULING A. Commence commissioning process as early in the construction period as possible, B. Commissioning Schedule: Integrate commissioning activities into Construction Schedule. See Section 0 13200"Construction Progress Documentation." water Treannent Plant Pressure Control Valves General Commissioning Reqturements, City of Round Rock 00113- 15 4,`>2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Include detailed commissioning activities in monthly updated Construction Schedule and short-interval schedule submittals. 2. Schedule the start date and duration for the following commissioning activities: a. Submittals. b. Preliminary operation and maintenance manual submittals. c. Installation checks. d. Startup,where required. e. Performance tests. f. Performance test demonstrations. & Commissioning tests. h. Commissioning test demonstrations. 3. Schedule shall include a line item for each installation check, startup, and test activity specific to the equipment or systems involved. 4. Determine milestones and prerequisites for commissioning process. Show commissioning milestones, prerequisites, and dependencies in monthly updated critical-path-method construction schedule and short-interval schedule submittals. C. Two-Week Look-Ahead Commissioning Schedule: I Two weeks prior to the beginning of tests, submit a detailed two-week look-ahead schedule. Thereafter, submit updated two-week look-ahead schedules weekly for the duration of commissioning process. 2. Two-week look-ahead schedules shall identify the date, time, beginning location, Contractor personnel required,and anticipated duration for each startup or test activity. 3. Use two-week took-ahead schedules to notify and coordinate participation of Owner's witnesses. D. Owner's Witness Coordination: 1. Coordinate Owner's witness participation via Engineer. 2. Notify Engineer of commissioning schedule changes at least two work days in advance for activities requiring the participation of Owner's witness. 3,9 COMMISSIONING REPORTS A. Test Reports: 1. Pre-startup reports include observations of the conditions of installation, organized into the following sections: a. Equipment Model Verification: Compare contract requirements, approved submittals,and provided equipment.Note inconsistencies. b. Preinstallation Physical Condition Checks: Observe physical condition of equipment prior to installation. Note conditions including, but not limited to, physical damage,corrosion,water damage,or other contamination or dill. C. Preinstallation Component Verification Checks: Verify components supplied with the equipment,preinstalled or field installed, are correctly installed and functional. Verify external components required for proper operation of equipment correctly Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rock 0191[3- 16 ......... ......... ,1,)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 installed and functional. Note missing, improperly configured, improperly installed,or nonfunctional components. & Summary of Installation Compliance Issues and Corrective Actions: Identify installation compliance issues and the corrective actions for each. Verify that issues noted have been corrected. C. Evaluation of System Readiness for Startup: For each item of equipment for each system for which startup is anticipated, document in summary form acceptable to Owner completion of equipment model verification, preinstallation physical condition checks, preinstallation component verification checks,and completion of corrective actions for installation compliance issues. 1 Test data reports include the following: a. "As-tested" system configuration. Complete record of conditions under which the test was performed,including, but not limited to, the status of equipment,systems, and assemblies;temporary adjustments and settings;and ambient conditions. b. Data and observations, including, but not limited to, data trend logs, recorded during the tests. C, Signatures of individuals performing and witnessing tests. d. Data trend logs accumulated overnight from the previous day of testing. 1 Commissioning Compliance Issue Reports: Report as commissioning compliance issues results of tests and test demonstrations that do not comply with acceptance criteria. Report only one issue per commissioning compliance issue report. Use sequentially numbered facsimiles of commissioning compliance issue report form included in this Section, or other form approved by Owner, Distribute commissioning compliance issue reports to parties responsible for taking corrective action, Identify the following: a. Commissioning compliance issue report number. Assign unique, sequential numbers to individual commissioning compliance issue reports when they are created,to be used for tracking. b. Action distribution list. C. Report date, d. Test number and description. e. Equipment identification and location. f. Briefly describe observations about the performance associated with failure to achieve acceptable results. Identify the cause of failure if apparent. g. Diagnostic procedure or plan to determine the cause(include in initial submittal) h. Diagnosis of fundamental cause of issues as specified below (include in resubmittal), i. Fundamental cause of unacceptable perfortuance as determined by diagnostic tests and activities. j. When issues have been resolved, update and resubmit the commissioning issue report forms by completing Part 2. Identify resolution taken and the dates and initials of the persons making the entries. k. Schedule for retesting. 4. Weekly progress reports include information for tests conducted since the preceding report and the following: a. Completed data forms. \Vaier'Freaitnent Plant Pressure Control VaNes General Cornrniissi=ng Requirements Cay of Round Ro�ck 01910 - 17 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 b. Equipment or system tested, including test number, system or equipment tag number and location,and notation about the apparent acceptability of results. C. Activities scheduled but not conducted per schedule. d. Commissioning compliance issue report log. C. Schedule changes for remaining Commissioning-Process Work,if any. S. Data trend logs shall be initiated and running prior to the time scheduled for the test demonstration. a. Trend log data format shall be multiple data series graphs. Where multiple data series are trend logged concurrently,present the data on a common horizontal time axis. Individual data series may be presented on a segmented vertical axis to avoid interference of one data series with another, and to accommodate different axis scale values.Graphs shall be sufficiently clear to interpret data within the accuracy required by the acceptance criteria. b. Attach to the data form printed trend log data collected during the test or test demonstration. C. Record, print out, and attach to the data form operator activity during the time the trend log is running. During the time the trend log is running,operator intervention not directed by the test procedure invalidates the test results. 6. System Alarm Logs: Record and print out a log of alarms that occurred since the last log was printed. Evaluate alarms to determine if the previous day's work resulted in any conditions that are not considered"normal operation." a. Conditions that are not considered "normal operation" shall be reported on a commissioning issue report attached to the alarm log. Resolve as necessary. The intent of this requirement is to discover control system points or sequences left in manual or disabled conditions, equipment left disconnected, set points left with abnormal values, or similar conditions that may have resulted from failure to fully restore systems to non-nal,automatic control after test completion. 3.10 CERTIFICATE OF CONSTRUCTION-PHASE COMMISSIONING PROCESS COMPLETION A. When Contractor considers that construction-phase commissioning process,or a portion thereof which Owner agrees to accept separately, is complete, Contractor shall prepare and submit to Owner and Commissioning Authority through Engineer a comprehensive list of items to be completed or corrected. Failure to include an item on such list does not alter Contractor's responsibility to compete cornmissioning process. B. On receipt of Contractor's list, Commissioning Authority will make an inspection to determine whether the construction-phase commissioning process or designated portion thereof is complete. If Commissioning Authority's inspection discloses items, whether included on Contractor's list, which is not sufficiently complete as defined in "Construction-Phase Commissioning Process Completion" Paragraph in the "'Definitions" Article, Contractor shall, before issuance of the Certificate of Construction-Phase Commissioning Process Completion, complete or correct such items on notification by Commissioning Authority. In such case, Contractor shall then submit a request for another inspection by Commissioning Authority to determine construction-phase commissioning process completion. Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rock 010113 18 cO 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Contractor shall promptly correct deficient conditions and issues discovered during commissioning process. Costs of correcting such deficient conditions and issues, including additional testing and inspections, the cost of uncovering and replacement, and compensation for Engineer's and Commissioning Authority's services and expenses made necessary thereby, shall be at Contractor's expense. D. When construction-phase commissioning process or designated portion is complete, Commissioning Authority will prepare a Certificate of Construction-Phase Commissioning Process Completion that shall establish the date of completion of construction-phase commissioning process. Certificate of Construction-Phase Commissioning Process Completion shall be submitted prior to requesting inspection for determining date of Substantial Completion. END OF SECTION 019113 WaterTireaunent Marit Pressure Contml Valves General Commssioning Requtremerits City of'Round Rook 019113. 19 C;2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank, Water Treatment Plant Pressure Control Valves General Commissioning Requirements City of Round Rock 010113.20 ,402022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 030110 -CONCRETE AND REINFORCING STEEL PART I -GENERAL Ll RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division I Specification Sections apply to this Section. 1.2 SUMMARY A. Section includes: Cast-in-place steel reinforced concrete. B. Related Requirements: I. Section 030130.71 "Modifications to Existing Concrete." 13 ACTION SUBMITTALS A. Submit,in accordance with Section 013000,shop drawings and product data for: L Placing drawings and bar bending details in conformity with the recommendations of ACI 315. 1 Technical data on all materials and components. 3. Material Safety Data Sheets(MSDS) for all concrete admiXtUrcs,and curing agents. B. Test Reports: I. Sieve analysis, mechanical properties and deleterious substance content for fine and coarse aggregates. 2. Concrete mixes: For each formulation of concrete proposed for use, submit constituent quantities per cubic yard, water cementitious ratio, concrete slurnp, type and manufacturer of cement. Provide either a. or b.,below, for each mix proposed. a. Standard deviation data for concrete mixes based on statistical records. b. Water cementitious ratio curve for concrete mixes based on laboratory tests. Provide average cylinder strength test results at 7 and 28 days for laboratory concrete mix designs. Provide results of 14 day tests if available. 1.4 INFORMATIONAL,SUBMITTALS A. Certifications: 1, Certify that admixtures used in the same concrete mix are compatible with each other and the aggregates. 2. Certificate of conformance for concrete production facilities from NRMCA. WaterTreannent Plant Pressure ContrDl Waives Concrete and Reinforcing Steel City of Round Rock 3111 N-1 C,,)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. Certify admixtures are made for use in concrete in contact with potable water after 30 days of concrete curing. 1.5 QUALITY ASSURANCE A. Comply with ACI 318,ACI 350, and other stated specifications,codes and standards. Apply the most stringent requirements of stated specifications, codes, standards, and this Section when conflicts exist. B. If, during the progress of the work, it is impossible to secure concrete of the specified workability and strength with the materials being furnished, the Engineer may order such changes in proportions or materials, or both, as may be necessary to secure the specified properties.Make all changes so ordered at the no additional cost to the Owner. C. All field testing and inspection services and related laboratory tests required will be provided by the Owner. The cost of such work will be paid for by the Owner. Methods of testing will comply with the latest applicable ASTM methods. D. Develop concrete mixes and their testing by an independent testing laboratory engaged by and at the expense of the Contractor. Methods of testing shall comply with the latest applicable ASTM methods. 1.6 DELIVERY,STORAGE AND HANDLING A. Ship and store reinforcing steel with bars of the same size and shape fastened in bundles with durable tags, marked in a legible manner with waterproof markings showing the same designations as those shown on the submitted placement drawings. Provide reinforcing steel free from mill scale, loose rust, mud, dirt, grease, oil, ice or other foreign matter. Store off the ground, protect from moisture and keep free from rust, mud, dirt, grease, oil, ice or other injurious contaminants. B. Store products in conformity with the manufacturer's recommendations. C. Store or stockpile sand,aggregates,and cement in conformity with ACI 301. PART 2- PRODUCTS 2.1 GENERAL A. The use of manufacturer's name and model or catalog number is for the purpose of establishing the standard of quality and general configuration desired. B. Like items of materials shall be the end products of one manufacturer in order to provide standardization for appearance,maintenance and manufacturer's service. C. Materials shall comply with this Section and any applicable State or local requirements. Water Treatment Plant Pressure Control Valves Concrete and Reinforcing Steel City of Round Rock 30110-2 ,J2022 CDM Smith 8077-263949 All Rights Reserved February 2022 12 MATERIALS A, Cement: Domestic portland cement conforming to ASTM 0150. Do not use air entraining cements. The allowable types of cement for each class of concrete are shown in Table 1. B. Fine Aggregate: Washed inert natural sand conforming to ASTM C33. C. Coarse Aggregate: Well-graded crushed stone or washed gravel conforming to ASTM C33,size 5T Limits of deleterious substances and physical property requirements as listed in ASTM C33, Table 4 for severe weathering regions, D. Water: Potable water free of oil, acid, alkali, salts, chlorides, (except those attributable to drinking water)organic matter,or other deleterious substances. E. Admixtures: Use admixtures free of chlorides and alkalis (except for those attributable to drinking water). The admixtures shall be from the same manufacturer when it is required to use more than one admixture in the same concrete mix. Use admixtures compatible with the concrete mix including other admixtures and made for use in contact with potable water after 30 days of concrete curing. I Air Entraining Admixture: Conforming to ASTM 0260. Proportion and mix in accordance with manufacturer's recommendations. 1 Water Reducing Admixture: Conforming to ASTM 0494, Type A. Proportion and mix in accordance with manufacturer's recommendations, 3. Do not use admixtures causing retarded or accelerated setting of concrete without written approval frorn the Engineer. Use retarding or accelerating water reducing admixtures when so approved. F. Fly Ash: Class F fly ash complying with ASTM 0618, including the requirements of Table I but with the Loss of Ignition (1,01) limited to 3 percent maximum and the optional physical requirements of Table 3. G. Deformed Concrete Reinforcing Bars: ASTM A615,Grade 60 deformed bars, H. Welded Steel Wire Fabric.- Conforming to ASTM A1064, 1. Reinforcing Steel Accessories: I, Plastic Protected Wire Bar Supports: CRSI Bar Supports,Class I -Maximum Protection, 1 Stainless Steel Protected Wire Bar Supports: CRSI Bar Supports, Class 2 - Moderate Protection with legs made wholly from stainless steel wire. 1 Precast Concrete Bar Supports: CRSI Bar Supports, Precast Concrete Bar Supports. Precast concrete blocks that have equal or greater strength than the surrounding concrete. J. Tie Wires for reinforcement: 16 gauge or heavier black annealed wire. 2.3 MIXES A. Select proportions of ingredients to meet the design strength and materials limits specified in Table I and to produce placeable, durable concrete conforming to these Specifications, Water,rrcatment Nant Pressure Control Valves- Co�nerete auid Remfomng Stccl Cay of Rs m)d Rock 300 M3 4)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 Proportion ingredients to produce a homogenous mixture which will readily work into corners and angles of forms and around reinforcement without permitting materials to segregate or allowing free water to collect on the surface, B. Base concrete mixes on standard deviation data of prior mixes with essentially the same proportions of the same constituents or, if not available, develop concrete mixes by laboratory tests using the materials proposed for the work. C. Compression Tests: Provide testing of the proposed concrete mix or mixes to demonstrate compliance with the compression strength requirements in conformity with the provisions of ACI 318. D. Entrained air,as measured by ASTM C231,shall be as shown in Table 1, E. Slump of the concrete as measured by ASTM C 143,shall be as shown in Table 1. F. Proportion admixtures according to the manufacturer's recommendations. Two or more admixtures specified may be used in the same mix provided that the admixtures in combination retain full efficiency and have no deleterious effect on the concrete or on the properties of the other admixture(s). TABLE I Class Design Cement Cementitious W/C WR Slump Strength ASTM Content (3) (4) Range ....................................................................................................................................Inches.... B 31000 Typ1/e 111 480 0,54 max Yes 1-4 or 1 D 4000 or Type l11 560 0.44 max Yes 3-5 Illi TABLE I NOTES: (1) Minimum compressive strength in psi at 28 days. (2) Minimum cementitious content in lbs,per cubic yard(where fly ash is used,cententitious content is defined as cement content plus fly ash content) (3) W/C is Maximum Water Cementitious ratio by weight. (4) WR is water reducing admixture. (5) Fly ash content in the range of 20-25 percent of the total cement content plus fly ash content,by weight. (6) All concrete classes shall have 3.5 to 5 percent air entrainment. 2.4 MEASURING, BATCHING,MIXING AND TRANSPORTING CONCRETE A. Measure, batch, mix and transport concrete in conformance with ASTM C94 and the requirements herein or as otherwise approved in writing by the Engineer. B. Ready-mixed concrete, whether produced by a concrete supplier or the Contractor shall conform to the requirements above. Do not hand mix. Water Treatment Plant Pressure Control Valves Concrete and Reinforcing Steel City of Round Rock 30110-4 tC,,2022 CDM SrTlith 8077-263948 All Rights Reserved February 2022 C. Dispense admixtures into the batch in confonnity with the recommendations of`the admixture manufacturer. D. Mix concrete until there is uniform distribution of the materials and discharge completely before the mixer is recharged. The mixer shall be rotated at a speed recommended by the mixer manufacturer and mixing shall be continued for at least 1-1,12 minutes after all the materials are in the mixer. Place concrete within 1-1/2 hours of the time at which water was first added, otherwise it will be rejected. Concrete which has been remixed or retempered, or to which an excess amount of water has been added,will also be rejected. 15 FORMS A. Provide forms free from roughness and imperfections,watertight and braced and tied to prevent motion when concrete is placed. Wooden spreaders will not be allowed in the concrete, B. Wire ties will not be allowed. Metal ties or anchorages which are necessary within the forms shall be so constructed that the metal work can be removed for a depth of at least I-F2-inch from the concrete surface without damage by spalling. Clean forms before using and treat with form release agent,or other approved material. C. All exposed edges of the finished concrete shall be chamfered 3/4-inch. PART 3- EXECUTION 3.1 CONSTRUCTION JOINTS A. Locate construction joints where indicated or where approved by the Engineer. B, Continue all reinforcing steel through the joint. C. At construction joints and at concrete joints indicated to be "roughened",unifon-nly roughen the surface of the concrete to a full amplitude (distance between high and low points and side to side)of 114-inch with chipping tools to expose a fresh face. Thoroughly clean joint surfaces of loose or weakened materials by waterblasting or sandblasting and prepare for bonding. At least two hours before and again shortly before the new concrete is deposited, saturate the joints with water. After glistening water disappears, coat joints with neat cement slurry mixed to the consistency of very heavy paste. The surfaces shall receive a coating at least 1/8-inch thick, scrubbed-in by means of stiff' bristle brushes. Deposit new concrete before the neat cernent dries. 3.2 REINFORCING STEEL, A. Fabricate reinforcing steel accurately to the dimensions shown. Bend bars around a revolving collar having a diameter of not less than that recommended in ACI 318. All bars shall be bent cold. fl. Provide tension lap splices in compliance with ACI 318. Stagger splices in adjacent bars where possible. Provide Class B tension lap splices at all locations unless otherwise indicated. Water Treatment I'lant Pressure Control Valves Concrete and Reuiforcirit;Steel Cay of Round Rock 30110 5 02022 CDM Srnith 8077-263948 All Rights Reserved February 2022 C. Lap splices in welded wire fabric in accordance with the requirements of ACI 318 but not less than 12-inch. Tie the spliced fabrics together with wire ties spaced not more than 24-inch on center and lace with wire of the same diameter as the welded wire fabric. Offset splices in adjacent widths to prevent continuous splices. D. Use precast concrete blocks where the reinforcing steel is to be supported over soil. Use plastic protected bar supports or steel supports with plastic tips where the reinforcing steel is to be supported on forms for a concrete surface that will be exposed to weather, high humidity, or liquid. Use stainless steel supports or plastic tipped metal supports in all other locations unless otherwise noted on the Drawings or specified herein. E. Before placing in position, clean reinforcement of loose mill scale and rust, mud, dirt, grease, oil and other coatings, including ice that reduce or destroy bond. When there is a delay in depositing concrete after the reinforcement is in place, bars shall be reinspected and cleaned again when necessary, F. Coat reinforcement which is to be exposed for a considerable length of time after being placed with a heavy coat of cement grout, G. Do not cover any reinforcing steel with concrete until the amount and position of the reinforcement has been checked and the Engineer has given permission to proceed. 3.3 INSPECTION AND COORDINATION A. Batching,mixing, transporting,placing and curing of concrete shall be subject to the inspection of the Engineer at all times. Advise the Engineer of readiness to proceed at least six working hours prior to each concrete placement. The Engineer will inspect the preparations for concreting including the preparation of previously placed concrete, the reinforcing and the alignment,cleanliness and tightness of formwork. Do not place concrete without the inspection and acceptance of the Engineer. 3.4 CONCRETE APPEARANCE A. Remix concrete showing either poor cohesion or poor coating of the coarse aggregate with paste. If this does not correct the condition, the concrete shall be rejected. B, Provide concrete having a homogeneous structure which, when hardened, will have the specified strength, durability and appearance. Provide mixtures and workmanship such that concrete surfaces,when exposed,will require no finishing except as specified herein. 3.5 PLACING AND COMPACTING A. Do not place concrete until forms, condition of subgrade and method of placement have been approved by the Engineer. Remove all debris, foreign matter, dirt, ice and standing water from the forms before depositing concrete. Do not place concrete on frozen subgrade, snow or ice. The contact surface between concrete previously placed and new concrete shall be cleaned and brushed with cement paste. Concrete, except as indicated on the Drawings, shall not be placed Water Treatment Plant Pressure Control Valves Concrete and Reinforcing Steel City of Round Rock 30110-6 v,,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 in water or submerged within 24 hours after placing, nor shall running water be permitted to flow over the surface of fresh concrete within 4 days after its placing. B. Deposit concrete as near its final position as possible to prevent segregation due to rehandling or flowing. Pumping of concrete will be permitted when an approved design mix and aggregate sizes suitable for pumping are used. Do not deposit concrete which has partially hardened or which has been contaminated by foreign materials. If the section cannot be placed continuously, place construction joints as specified or as approved. Place concrete for walls using tremic tubes in 12-inch to 24-inch lifts,keeping the surface horizontal.Do not drop concrete more than 4-ft. C. Use high frequency mechanical vibrators to obtain proper consolidation of the concrete. Do not use vibrators to move or transport concrete in the Forms. Do not over-vibrate so as to segregate, Continue vibration until the frequency returns to normal, trapped air ceases to rise and the surface appears liquefied, flattened and glistening. Use spades, rods or forks so that concrete is completely worked around reinforcement, embedded items, pipe stubs, and openings and into comers of forms. D, Slabs: I. After bulkheads, screeds and jointing materials have been positioned, place concrete continuously between joints beginning at a bulkhead, edgeform, or comer. Place each batch into the edge of the previously placed concrete to avoid stone pockets and segregation. 2. Avoid delays in placement. If there is a delay in placement, spade and consolidate the concrete placed after the delay at the edge of the previously placed concrete to avoid cold joints. Bring concrete to correct level and strike off with a straightedge. Use bullfloats or darbies to smooth the surface, leaving it free of trumps or hollows. 3. Where slabs are to be placed integrally with the walls below them, place the walls and compact as specified. Allow one hour to pass between placement of the wall and the overlying slab to permit consolidation of the wall concrete. Keep the top surface of the wall moist to prevent cold joints 3.6 CURING AND PROTECTION A. Protect all concrete work against injury from the elements and defacements of any nature during construction operations. B. Cure all concrete in conformance with ACI 301. Concrete that is to be used for the containment of water shall be water cured. Water curing shall be by ponding, by continuous sprinkling or by covering with continuously saturated burlap. Other concrete shall be cured by either water curing,sheet material curing or liquid membrane curing compound except that liquid membrane curing compound shall not be used on any concrete surface where additional concrete is to be placed or where the concrete surface is to be coated or painted. C. Protect finished surfaces and slabs from the direct rays of the sun to prevent checking and crazing. D. During cold weather concrete shall be hatched, delivered, placed, cured and protected in compliance with the recommendations of ACI 3068. Do not use salt,manure or other chemicals for cold weather protection. Water Treatrnem 1111am Pressure CoritrfA VaKes Concrete and Rcmforcmg Steel City of Round Rock 300 l0-7 „2022 CDM Smith 8077-263948 All Rights Reserved February 2022 E, During hot weather concrete shall be batched, delivered, placed, cured and protected in compliance with the recommendations of ACI 3058. The temperature of the concrete shall be such that it will cause no difficulties from loss of slump, flash set or cold joints. Immediately cover plastic concrete with sheet curing material during hot weather. 3.7 FIELD TESTS A. Sets of field control cylinder specimens will be taken by the Engineer during the progress of the work, in compliance with ASTM C31. The number of sets of concrete test cylinders taken of each class of concrete placed each day will not be less than one set per day,nor less than one set for each 150 cu yds of concrete nor less than one set for each 5,000 sq ft of surface area for slabs or walls. Specimens will be formed in 6-inch diameter by 12-inch long non-absorbent cylindrical molds. I. A "set” of test cylinders shall consist of five cylinders: one to be tested at seven days and two to be tested and their strengths averaged at 28 days. The fourth and fifth may be used for a special test at 3 days or to verify strength after 28 days if 28 day test results are low. 2. When the average 28 day compressive strength of the cylinders in any set falls below the required compressive strength or below proportional minimum seven-day strengths (where proper relation between seven and 28 day strengths have been established by tests),change proportions,cementitious content,or temperature conditions to achieve the required strengths at no additional cost to the Owner. B. Cooperate in the making of tests by allowing free access to the work for the selection of samples. Provide an insulated closed curing box for the specimens and protect the specimens against injury or loss through construction operations. Furnish material and labor required for the purpose of taking concrete cylinder samples. All shipping of specimens will be paid for by the Owner, C. Slump tests will be made in the field by the Engineer in conformity with ASTM 0143. D. Tests for air content will be made in the field by the Engineer in compliance with either the pressure method(ASTM C23 1)or by the volumetric method(ASTM C 173). 3.8 STRIPPING AND FINISHING CONCRETE A. Do not remove forms before the concrete has attained a strength of at least 70 percent of the specified design strength nor before reaching approximately "500 day-degrees" of moist curing (whichever is the longer). Degree-days are defined as the total number of 24 hour periods multiplied by the weighted average daily air temperature at the surface of the concrete(e.g., 7 days at an average 50 degrees F=-350 degree-days). B. Exercise care to prevent damaging edges or obliterating the lines of chamfers, rustications or comers when removing the forms or doing any other work adjacent thereto. C. Clean all exposed concrete surfaces and adjoining work stained by leakage of concrete, to the satisfaction of the Engineer. Water Treau-nent Plant Pressure Control Valves Concrete and Reinforcing Steel City of Round Rock 301 10-8 (e,)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 D. Immediately after removal of forms remove tie cones and metal portions of ties. Fill holes promptly upon stripping as follows: Moisten the hole with water, followed by a 1,116-inch brush coat of neat cernent slurry mixed to the consistency of a heavy paste. Immediately plug the hole with a I to 1.5 mixture of cement and concrete sand mixed slightly darnp to the touch Oust short of"balling"). Hammer the grout into the hole until dense, and an excess of paste appears on the surface in the form of a spider web. Trowel smooth with heavy pressure. Avoid burnishing. E. Defective concrete and honeycombed areas: Chip down square and at least I-inch deep to sound concrete with hand chisels or pneumatic chipping harnmers. Irregular voids or surface stones need not be removed it' they are sound, free of laitance, and firmly embedded in the parent concrete. If honeycomb exists around reinforcement, chip to provide a clear space at least 3/8- inch wide all around the steel. For areas less than 1-1/2-inch deep, the patch may be made in the same manner as described above for filling form tie holes, care being exercised to use adequately dry (non-trowelable) mixtures and to avoid sagging. Thicker repairs will require build-up in successive 1-1/2-inch layers on successive days, each layer being applied (with shiny,etc,)as described above. R Concrete to receive danipproofing and concrete not exposed in the finished work shall have off- tonn finish with fins and other projections removed and tie cones and defects filled as specified above. G. Screed top surface of slabs to the established grades and to a true plane with a tolerance of US- inch when checked with a 10-ft straightedge. Pitch surface to drain unless otherwise noted oil the Drawings. Finish the surface to give a smooth, hard, even surface free from high or low spots or other defects. Concrete subject to pedestrian traffic shall be given a broom finish. Failure to meet these conditions shall be cause for removal, grinding, or other correction as directed by the Engineer. 19 SCHEDULE A. The following TABLE 2 are the general applications for the various concrete design strengths to be used: TABLE 2 Design Strength Class (psi) Description B 3,000 Concrete overlay slabs,side walks,and pavements. D 4,000 Walls,slabs on grade,grade beams,and all other structural concrete. END OF SECTION 030110 Water Treahnent Plant Presstire Control Valves Concrete and Rurnfiorcung Steel Cay of'Rwmd lZock 30110-9 (x;2022 CDM Smith 8077-263948 All Rights Reserved February 2022 THIS PAGE INTENTIONALLY LEFT BLANK Water Treatment Plant Pressure Control Valves Concrete and Reinforcing Steel City of Round Rock 30110-10 u02022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 030130.71 - MODIFICATIONS TO EXISTING CONCRETE PART I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. L2 SUMMARY A. Section Includes: 1, Cutting,removing,or modifying parts of existing concrete structures or appurtenances. 2. Addressing existing steel reinforcing bars encountered. 3. Bonding new concrete or grout to existing concrete. K Related Requirements: I Section 030110 "Concrete and Reinforcing Steel" for concrete materials, and related work, 2. Section 036000"Grouting"for grout and related accessories. 3. Section 050519"Post-Installed Anchors" for anchors and related accessories. 4. Section 055000"Metal Fabrications" for various metals and related fabrications. L3 ACTION SUBMITTALS A. Product Data: For each type of product. 1. Submit manufacturer's technical literature and installation instructions that include: a. Current printed recommendations and product data sheets for products including performance criteria, product life, working time after mixing, surface preparation and application requirements and procedures, curing, volatile organic compound data,and safety requirements. b. Storage requirements including temperature,humidity,and ventilation. 1.4 INFORMA'T'IONAL SUBMITTALS A. Qualification Data: Documentation of the qualifications for Contractor qualifications, Manufacturer's qualifications,and Contractor's supervisor as specified in Paragraph 1.8. 13. Material Certificates: For each material provided. Watler'Treatiincnt Naw Pressure Control Valves Moddicauons to Eats ung Concrete Cay of Round Rock 0301303H C9 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.5 QUALITY ASSURANCE A. Manufacturer's Qualifications: Have a minimum of ten years' experience within last 10 years in manufacture and use of specified products and have an ongoing program of training,certifying, and technically supporting Contractor's personnel. B. Contractor Qualifications: Complete a program of instruction in application of approved manufacturer's material and provide certification from manufacturer attesting to their training and status as an approved applicator. C. Contractor's Supervisor: Have attended a training program sponsored by manufacturer supplying materials approved for this project. D. Manufacturer's Representative: A representative of product manufacturer who will visit the site for first three days of installation to give instructions to installation crew. Make periodic site visits to ensure products being installed are in accordance with published instructions. E. Do not shift, cut, remove,or otherwise altered existing structure or concrete until authorization is given by the Engineer. F. When removing materials from or making openings in existing structures,take precautions and erect necessary barriers, shoring and bracing, and other protective devices. Prevent damage to structures beyond limits necessary for new work,protect personnel,control dust,and to prevent damage to structures or contents by falling or flying debris. G. Unless otherwise permitted,shown,or specified,cut existing concrete by line drilling. H. Construction Tolerances: Comply with requirements specified elsewhere in Division 03, except as modified herein,and elsewhere in Contract Documents. 1. Make locations and phases of the work available for access by the Engineer or other personnel designated by the Engineer. Provide ventilation and safe access to the work. J. Be solely responsible for workmanship and quality of modification work. Inspections by the manufacturer,the Engineer,or others do not limit Contractor's responsibility for work quality. 1.6 DELIVERY,STORAGE,AND HANDLING A. Delivery: Deliver materials in original, new, and unopened packages and containers clearly labeled with the following information: 1. Manufacturer's name. 2. Name or title of material,and other product identification. 3. Manufacturer's stock number and batch number. 4. Date of manufacture. 5. Instructions, 6. Expiration date. Water Treatment Plant Pressure Control Valves Modifications to Existing Concrete City of Round Rock 030130,71-2 2022 CDM Smith9077-263948 All Rights Reserved February 2022 B. Storage: Store products in accordance with manufacturers' published recornmendat ions and the following supplementary requirements: I. Store only approved materials on site and in locations as directed. 2. Keep area clean and accessible. 3. Comply with health and fire regulations including those of the Occupational Safety and Health Administration(OSHA). CHandling: Handle products carefully and in accordance with manufacturers' published recommendations and the following supplementary requirements: I. Prevent inclusion of foreign materials. 2. Do not open containers or mix components until necessary preparatory work has been completed and application work will start immediately. PART 2- PRODUCTS 2.1 MATERIALS A. General: Comply with this Section and applicable state and local regulations. B. Epoxy Bonding Agent: I Product:Two-component,solvent-free,asbestos-free moisture insensitive epoxy resin material used to bind plastic concrete to hardened concrete and complying with requirements of ASTM 0881,Type V,Grade 2,Class C. 2. Approved manufacturers and products include following or equal: a. Sika Corporation, Lyndhurst,NJ: Sikadur 32, Hi Mod. b. Euclid Chemical Company,Cleveland, OH: Dural 452 MV. C. Simpson Strong-Tie Company Inc.,Pleasanton,CA: FX-762. C. Epoxy Paste Adhesive: I Product: Two-component, solvent-free, Moisture insensitive epoxy resin material used as an adhesive for mating surfaces where the glue line is 1,18 inchor less and to bond fresh, plastic concrete to clean, sound hardened concrete and complying with requirements of ASTM 0881,Type IV,Grade 3,Class C. 2. Approved manufacturers and products include following or equal: a. Sika Corporation, Lyndhurst,NJ: Sikadur 31 Ili-Mod Gel. b. Euclid Chemical Company,Cleveland,Off: Dural 452 G& C. BASF Corporation, Shakopee, MN: MasterEmaco ADH 1420. D. Repair Mortar(Polymer,Modified Portland Cement Mortar): I. Flofizonlal Surfaces: a, Product: Two-component polymer-modified, pordand cement based mortar used to repair horizontal surfaces with a migrating corrosion inhibitor and having a Water Treatment Plant Pressure Control Val%cs Modifications lo Existing Concrete City of Round Rock 030130.71 3 C,',2022 CDM Smith 8077-263948 All Rights Reserved February 2022 minimum compressive strength of 7,000 psiat 28 days tested in accordance with ASTM 0881 or ASTM C 109. b, Approved manufacturers and products include following or equal: l) Sika Corporation,Lyndhurst,NJ: SikaTop 122 Plus. 2) Euclid Chemical Company,Cleveland,OFI: DuralTop Flowable Mortar. 3) BASF Corporation,Shakopee,MN: MasterEmacol'310CI. 2. Vertical and Overhead Surfaces: a. Product: Two-component polymer-modified, portland cement based, fast setting, non-sag mortar used to repair vertical and overhead surfaces with a migrating corrosion inhibitor and having a minimum compressive strength of 5,000 psiat 28 days tested in accordance with ASTM C 881 or ASTM C 109. b. Approved manufacturers and products include following or equal: I) Sika Corporation: SikaToP 123 Plus. 2) Euclid Chemical Company: DuralTop Gel. 3) US MIX Co.: US SPEC 142. PART 3 • EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions,with Installer present, for compliance with requirements for maximum moisture content, installation tolerances and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION-GENERAL, A. Cut, remove, or otherwise modify parts of existing structures or appurtenances as indicated, specified, or as necessary to complete the work. Finishes,joints, reinforcements, sealants, and similar materials are specified in their respective Sections. Install work complying with requirements of this Section and as indicated. B. Locations, details, and limits of modifications are indicated on Drawings. Comply with requirements of this Section and as indicated on Drawings. C. Examine areas and conditions under which modification work is to be installed, and notify Engineer in writing of conditions detrimental to proper and timely completion of work. Do not proceed with work until unsatisfactory conditions have been corrected in a manner acceptable to Engineer. D. Store,mix,apply,and cure materials in strict compliance with manufacturer's instructions. Water Treatment Plant Pressure Control Valves Modifications to Existing Concrete City of Round Rock 030130,71-4 �s,n 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 E. Where concrete is to be modified near an expansion joint or control joint, preserve isolation between components on either side of the joint. F. When drilling holes for dowels and bolts, stop drilling if reinforcing is encountered. Do not cut reinforcing without prior approval by the Engineer. Relocate hole to avoid reinforcing as approved by the Engineer. I. Identify reinforcing locations prior to drilling using reinforcing bar locators so that drill hole locations may be adjusted to avoid reinforcing interference. G Saw-cut edges for modification areas vertically and horizontally straight. Make intersecting cuts perpendicular to each other. K Stop saw cutting if reinforcing is encountered. Do not cut reinforcing without prior approval by the Engineer. Identify reinforcing locations within I footof saw cut locations in any direction prior to saw cutting using reinforcing bar locators. I. Clean concrete surfaces of efflorescence, deteriorated concrete,dirt, laitance, and existing repair materials such as liners,adhesives,and epoxies. Remove foreign matter and deleterious films by sandblasting, oil-free air-blasting, scarifying, or other mechanical means to sound original concrete. J. Consolidate modification materials,completely filling portions of the area to be filled. K. hiring finished surfaces into alignment with adjacent existing surfaces to provide a unifonri, flush, and even surface. Match repair surfaces to adjacent existing surfaces in texture including any coatings or surface treatments that had been provided for the existing structure. L. Repair or replace concrete indicated or specified to be left in place that is damaged because of the work by approved rneans without additional compensation. 3.3 CONCRETE REMOVAL A. Concrete designated to be removed to specific limits indicated or directed by the Engineer, perforin saw cutting I inch deep at limits of removal followed by line drilling and chipping, sandblasting, or oil-free air blasting, as appropriate in the areas where concrete is to be taken out. Remove concrete such that surrounding concrete and existing reinforcing to be left in place and existing in place equipment are not damaged. L Perforin full thickness saw-cutting at limits of concrete to be removed only if indicated, herein specified,or after obtaining written approval from the Engineer. B. Where existing reinforcing is exposed due to saw cutting or line drilling and no new material is to be placed on cut surface,apply a 1,14 inchthick surface treatment of epoxy paste to entire cut surface. C. Where joint between new concrete or grout and existing concrete will be exposed in finished work, remove concrete edge by making a I inchdeep saw cut on each exposed surface of existing concrete or as indicated. Water Treatntent Rmt,flr"surc Control Valves Modifica%tons to Exisung Concrete Ctty of Round Rock 030130,71-5 C',2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3.4 CONNECTION SURFACE PREPARATION A, Concrete areas requiring patching, repairs, or modifications, prepare connection surfaces as specified,as indicated,or as directed by the Engineer. B. Remove loose and deteriorated materials, efflorescence, existing repair materials, dirt, oil, grease,and other bond inhibiting materials from concrete surface by dry mechanical means such as sandblasting, chipping, wire brushing, or other mechanical means as approved by the Engineer. I Uniformly roughen concrete surface to approximately 1/4 inchamplitude with pointed chipping tools. Thoroughly clean surface of loose or weakened material by sandblasting or air-blasting. 1 Irregular voids or surface stones need not be removed if they are sound, free of laitance, and firmly embedded into parent concrete. C. If reinforcing steel is exposed, mechanically clean to remove loose material, contaminants, and rust as approved by the Engineer. If half of reinforcing steel diameter is exposed, chip out behind the steel. Chip distance behind the steel to a minimum of I inch.Do not damage reinforcing to be incorporated in new concrete or repair mortar during removal operation. D. Clean reinforcing from existing removed or deteriorated concrete that is shown to be incorporated in new concrete or repair mortar by mechanical means to remove loose material and products of corrosion before proceeding. Cut, bend, or lap to new reinforcing as indicated and provide with I inchminimum clear cover. E. Use following specific concrete surface preparation Methods where indicated, specified, or as directed by the Engineer: I. Method A: a. Roughen and clean existing concrete surface at connection. b. Thoroughly saturate surfaces with water;prevent standing water during application. C. Scrub repair mortar into substrate filling concrete pores and voids. d. While scrub coat is still plastic, force repair material against surface. Use epoxy bonding agent if area is too large. e. Place new repair mortar as detailed. 2, Method B: a. Roughen and clean existing concrete surface at connection. b. Apply epoxy bonding agent at connection surfaces. c. Place new concrete or grout mixture to limits indicated within time constraints recommended by manufacturer to ensure bond. 3. Method C: a. Use adhesive anchoring system, as specified in Section 050519 "Post-Installed Anchors",for installation of reinforcing steel dowels into existing concrete where indicated. Water Treatment Plant Pressure Control Valves Modifications to Existing Concrete City of Round Rock 030130,71-6 C" —2022 CDM Smith 8077-263948 All Rights Reserved February 2022 b. Perforrn installation complying strictly with ma nu fact urer's recommendations, including drill bit diameter, surface preparation, injection, and installation of dowels. C. Drill concrete to embedded deformed bars to indicated depths. d. Use oil-free compressed air to blast out loose particles and dust frorn drilled holes. Clean dowels to be free of dirt, oil, grease, ice, or other deleterious material that would reduce bond. e. Concrete in existing structures is considered to have a strength of 3,000 psi, 4. Method D: a. Combination of Method B and Method C. 15 GROUTING A. Grout: As specified in Section 036000"Grouting." 3.6 FIELD QUALITY CONTROL A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect completed installations, I. Perform inspection with Contractor, material installer, and the Engineer present. Give minimum of 72 hours' notice prior to time of inspection. 2. Repair modifications not in conformance with Contract Documents in accordance with manufacturer's instructions at no additional cost to Owner. 3. At completion of non-conforming repairs, Contractor,material installer, and the Engineer shall reinspect the repaired problem areas. 4. Prepare inspection reports, identifying acceptable work, type and locations of unacceptable work,and actions taken to correct unacceptable work. 5. Complete field quality control work without additional compensation. FND OF SECTION 030130,71 WaterTreatmoit lllann Pressure Control Valves Mocfificatmns to Emwng Conacre C�ly of Round Rock 030130,71-7 x:)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 THIS PAGE INTENTIONALLY LEFT BLANK Water Treatment Plant Pressure Control Valves Modifications to Existing Concrete City of Round Rock 030130.71-8 ,r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 036000 -GROUTING PARTI -GENERAL LI RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. I. SUMMARY A, Section Includes: 1. Portland cement grout. 2. Cement grout. 3. Rapid-curing epoxy grout. 4. Nonshrink epoxy grout. 5. Nonshrink cementitious grout. B, Related Requirements: I. Section 030110"Concrete and Reinforcing Steel." 2. Section 055000"Metal Fabrications": Grout related to miscellaneous metals. 1.3 ACTION SUBMITTALS A. Product Data: Submit manufacturer information regarding grout and surface preparation, mixing and installation, 1. Commercially manufactured nonshrink cementitious grout. Include catalog cuts, technical data,storage requirements,product life, working time after mixing,temperature considerations,and conformity to the specified ASTM standards, 2. Commercially manufactured nonshrink epoxy grout. Include catalog cuts, technical data, storage requirements, product life, working time after mixing, temperature considerations,and conformity to the specified ASTM standards. 1 Cement grout. Include the type and brand of cement, the gradation of fine aggregate, product data on any proposed admixtures and the proposed grout mix. 4. Concrete grout. Include data as required for concrete and for fiber reinforcement as delineated in Section 030110"Concrete and Reinforcing Steel." L4 INFORMATIONAL SUBMITTALS A. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. B. Manufacturer Instructions: Submit instructions for mixing, handling, surface preparation, and placing epoxy-type and nonshrink grouts. Water Treaunent Plant Pre:�6sure Control Valves Grouting City of Round Rock 036000-1 C�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections. D. Qualifications Statement: 1. Submit qualifications for manufacturer. 1.5 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum ten years'experience in production and use of provided grouts. K Independent testing laboratory shall meet the requirements of ASTM E329 and ASTM 01077 and be acceptable to the Engineer. Laboratories affiliated with the Contractor or in which the Contractor or officers of the Contractor's organization have beneficial interest are not acceptable, C. Pre-installation Meeting: At least ten working days before grouting, hold a pre-installation meeting to review the requirements for surface preparation, mixing, placing, and curing procedures for each product proposed for use. Notify all parties involved with grouting, including the Engineer,of the meeting at least ten working days prior to its scheduled date. D. Services of Manufacturer's Representative: Provide services of a field technician of the nonshrink grout manufacturer epoxy grout manufacturer who has performed at least five projects of similar size and complexity during the last five years, to attend the pre-installation meeting, to be present for the initial installation of each type of nonshfirik grout, and to correct installation problems. E. Field Testing: I. All field testing and inspection services will be provided by the Owner, Assist in the sampling of materials and cooperate by allowing free access to the work and pernlitting the use of ladders, scaffolding, and such incidental equipment as may be required. Methods of testing will comply with the applicable ASTM Standards. F. Field testing of concrete grout will be as specified for concrete in Section 030110"Concrete and Reinforcing Steel." 1.6 DELIVERY,STORAGE,AND HANDLING A. Product Requirements: Requirements for Delivery, Storage,and Handling. & Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage. C. Store materials according to manufacturer instructions. Limit total storage time from date of manufacture to date of installation to six months or the manufacturer's recommended storage time,whichever is less. D. Remove immediately from the site material which becomes damp, contains lumps, or is hardened and replace with acceptable material. Water Treatment Plant Pressure Control Valves Grouting City of Round Rock 036000-2 % 2022 CDM Srnith 8077-263948 All Rights Reserved February 2022 E. Protection: 1. Protect materials from moisture and dust by storing in clean,dry location. 2. Provide additional protection according to manufacturer instructions. 1,7 AMBIENT CONDITIONS IN. Maximurn Conditions: Do not perform grouting if temperatures exceed 90 degrees F. 13, Minimum Conditions: Do not perform grouting if the minimum temperature of base plates, supporting concrete and grout are less than 40 degrees F. Maintain minimurn temperature of 40 degrees F before,during,and after grouting, until gout has set. PART 2- PRODUCTS 2.1 PORTLAND CEMENT GROUT A. Portland Cement: Comply with ASTM C I 50/C 150M,Type I and Il. B. Water: I. Potable. 2. No impurities, suspended particles, algae, or dissolved natural salts in quantities capable of causing: a. Corrosion of steel. b. Volume change increasing shrinkage cracking, c. Efflorescence. d. Excess air entraining. C. Fine Aggregate: I, Washed natural sand. 2, Gradation: a. Comply with ASTM C33/03m' b. Represented by smooth granulometric curve within required lit-nits. 3. Free from injurious amounts of organic impurities according to ASTM C40/C40M. D, Mix: I, Portland cement, sand,and water. 2. Do not use ferrous aggregate or staining ingredients in grout mixes. 2.2 NONSFIRINK EPDXY GROUT A, Description: WaterTreatinent Plant Pressure Control Valves Grouting City of Round Rock 036000 3 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Pre-proportioned, prepackaged, three-component, nonshrink epoxy grout, 100 percent solids system consisting of epoxy resin,hardener,and blended aggregate. B. Performance and Design Criteria: I Minimum Compressive Strength: a. 10,000 psi at seven days. b. Comply with ASTM D695, 2. Coefficient of Expansion: a. 30x 10-6 inch per degree F. b, Comply with ASTM C531. 3. Minimum"Tensile Strength: a. 1,800 psi. b. Comply with ASTM 0307. C. Product: Provide one of the following or equal: I. Masterflow 648 CP;by BASF Building Systems. 2. Five Star HP Epoxy Grout;by Five Stars Products, Inc. 3. Sikadur 42 Grout-Pak;by Sika Corp. 4. E3-G Epoxy Grout;by Euclid Chemical Co. 2.3 NONSHRINK CEMENTITIOUS GROUT A. Description: L Pre-mixed and ready-for-use formulation requiring only addition of water. 2. Nonshrink, non-corrosive, nonmetallic, non-gas forming, not containing expansive cement and no chlorides, 3. No shrinkage when tested in conformity with ASTM C827/C827M. B. Performance and Design Criteria: 1. Certified to maintain initial placement volume or expand after set, and to meet following minimum properties when tested according to ASTM C I 107/C I 107M for Grades B, C, D,and CRD-C621 nonshrink grout: a. Setting Time: I) Initial: Approximately two hours. 2) Final:Approximately three hours. 3) Comply with ASTM 0191. b. Maximum Expansion: 0.10 to 0.40 percent. C, Minimum Compressive Strength: Water Treatment Plant Pressure Control Valves Grouting City of Round Rock 036000-4 �)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1) One-Day:4,000 psi. 2) Seven-Day: 7,000 psi. 3) 28-Day: 10,000 to 10,800 psi. 4) Comply with CRD-0621. C. Manufacturers: I General purpose nonshrink cementitious grout products: Provide one of the following or equal: a. SikaGrout 212 by Sika Corp. b, Set Grout by BASF Building Systems C, NS Grout by The Euclid Chemical Co. d. Five Star Grout by Five Star Products, Inc. 1 Flowable (Precision) nonshrink cementitious grout products: Provide olle of the following or equal: a. Masterflow 928 by BASF Building Systems. 1). Hi-Flow Grout by The Euclid Chemical Co. C. SikaGrout 212 by Sika Corp. d. Five Star Grout by Five Star Products, Inc. 2.4 CONCRETE GROUT A. Description: Conform to the requirements of Section 030110"Concrete and Reinforcing Steel", except as follows. Proportion with Type 11 cement, coarse and fine aggregates, water, water reducing admixture,and air entraining agent to produce specified mix performance: 1. Average Strength(ASTM C 579): 3500 psi. 2. Maximum Coarse Aggregate Size: 3/8-inch. 3. Minimum Cement Content: 540 lbs per cubic yard. 4. Maximum Water to Cement Ratio: 0.45. 5. Maximum Slump: 5 inches, B. Add synthetic rLinforcing fibers as specified in Section 030110 "Concrete and Reinforcing Steel" to the concrete grout mix at the rate of 1.5 lbs of fibers per cubic yard of gout. Add fibers from manufacturer's pre-measured bags and according to manufacturer's recommendations to ensure complete dispersion of fiber bundles as single illonofilaments within the concrete grout. 2,5 FO WORD A, As specified in this Section 030110"Concrete and Reinforcing Steel." WaterTremment Plant Pres,,iure Control Valves Grouting City of Round Rock 036000-5 '��2022 CDM Smith 8077-263948 All Rights Reserved February 2022 PART 3 - EXECUTION 3.1 EXAMINATION A. Verify areas to receive grout. 3.2 PREPARATION A. Place grout where indicated or specified over existing concrete and cured concrete which has attained its specified design strength unless otherwise approved by the Engineer. B. Remove defective concrete, ice, laitance,dirt,oil, grease, form release agents,paints,and other foreign material from concrete surfaces, which may affect the bond or performance of the grout by brushing, hammering, chipping, sand blasting or other similar dry mechanical means until sound and clean concrete surface is achieved. Irregular voids or projecting coarse aggregate need not be removed if they are sound, free of laitance and firmly embedded into the parent concrete. 1. Air compressors used to clean surfaces in contact with grout shall be the oil-less type or equipped with an oil trap in the airline to prevent oil from being blown onto the surface. C. Roughen concrete lightly,but not to interfere with placement of grout. D. Remove foreign materials from metal surfaces in contact with grout. E. Align, level,and maintain final positioning of components to be grouted. R Wash concrete surfaces clean and then keep moist for at least 24 hours prior to the placement of nonshrink cementitious or cement grout. Saturation may be achieved by coveting the concrete with saturated burlap bags, use of a soaker hose, or flooding the surface or other method acceptable to the Engineer. Upon completion of the 24-hour period, remove visible water from the surface prior to grouting. G. Nonshrink epoxy grouts do not require saturation of concrete substrate. Do not wet concrete surfaces to receive nonshrink epoxy grout. Completely dry surfaces in contact with epoxy grout before grouting. H. Support equipment during alignment and installation of grout by shims,wedges,blocks or other approved means. Prevent bond of shims, wedges and blocking devices by bond breaking coatings and remove after grouting unless otherwise approved by the Engineer. Grout voids created by the removal of shims,wedges,and blocks. 3.3 INSTALLATION-GENERAL A. Formwork: 1. Construct leakproof forms anchored and shored to withstand grout pressures. 2. Install formwork with clearances to permit proper placement of grout. 3. As specified in Section 030110"Concrete and Reinforcing Steel." Water Treatment Plant Pressure Control Valves Grouting City of Round Rock 036000-6 c�2022 CDM Srnith 8077,263948 All Rights Reserved February 2022 B. Mixing-Portland Cement Grout: 1. Use proportions of two parts sand and one part cement,measured by volume. 2. Prepare grout with water to obtain consistency to permit placing and packing, 3. Mix water and grout in two steps: 4. Premix using approximately 2/3 of water, 5. After partial mixing, add remaining water to bring mix to desired placement consistency and continue mixing two to three minutes. & Mix only quantities of grout capable of being placed within 30 minutes after mixing. 7. Do not add additional water after grout has been mixed. & Minimum Compressive Strength per ASTM 0579: a. In 48 hours: 2,400. b. In 28 days 7,000, C. Placing of Grout: I. Place grout material quickly and continuously, 1 Do not use pneumatic-pressure or dry-packing methods. 3. Apply grout from one side only to avoid entrapping air, 4. Do not vibrate placed grout mixture or peitplacement if area is being vibrated by nearby equipment. 5. Thoroughly compact final installation and eliminate air pockets. 6. Do not remove leveling shims for at least 48 hours after grout has been placed. D. Curing: I. Prevent rapid loss of water from grout during first 48 hours by using wet burlap bags, soaker hoses or ponding, 1 Immediately after placement, protect grout from premature drying, excessively hot or cold temperatures,and mechanical injury, 3. After grout has attained its initial set,keep damp for minimum three days. L Reflect all existing underlying expansion joints, partial contraction joints, and construction joints through the grout. 3.4 INSTALLATION -CONCRETE GROUT A. Inspect slabs finished tinder Section 030110"Concrete and Reinforcing Steel"and scheduled to receive concrete grout. Protect and keep the surface clean until placement of concrete grout. B, Remove debris and clean the surface by sweeping and vacuuming of dirt and other foreign materials. Pressure wash the surface. Do not flush debris into tank drain lines. C. Saturate (fie concrete surface for at least 24 hours prior to placement of the concrete grout by use of saturated burlap bags, soaker hoses or ponding. Remove excess water just prior to placement of the concrete grout. Place a cement slurry immediately ahead of the concrete grout so that the slurry is moist when the grout is placed. Work the slurry over the surface with a broom until it is coated with approximately 1/16 to 1/8-in thick cement paste. Water Treatinent Plant Pressure Control Vavcs Grotiung City of Round Rock 030000 7 v 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 D. Place concrete grout to final grade using the scrapers of the installed mechanical equipment as a guide for surface elevation and to eliminate high and low spots. Unless specifically approved by the equipment manufacturer, do not use mechanical scraper mechanisms powered by their motors as a finishing machine or screed to push grout. E. Provide grout control joints as indicated on Drawings. F. Provide steel trowel finish. 3.5 INSTALLATION -NONSHRrNK EPDXY GROUTS A. Mix in accordance with manufacturer's recommendations. Mix full batches only, to maintain proper proportions of resin,hardener and aggregate. Do not vary the ratio of components or add solvent to change the consistency of the grout mix. Do not overmix. Do not entrain air bubbles by mixing too quickly. B. Monitor ambient weather conditions and contact the grout manufacturer for special placement procedures to be used for temperatures below 60 degrees F or above 90 degrees F. This is very important for thick placements(>4-inches plus/minus). C. Place grout rapidly and continuously to avoid cold joints. Place grout in lifts in accordance with manufacturer's recommendations. D. Provide forms as specified in Paragraph 33A. Place grout into the designated areas and prevent entrapment of air. Fill all spaces and provide full contact between the grout and adjoining surfaces. Provide grout holes and vent holes as necessary. E. Minimize 'shoulder' length(extension of grout horizontally beyond base plate). In no case shall the shoulder length of the grout be greater than the grout thickness. F. Finish grout by puddling to cover all aggregate and provide a smooth finish. Break bubbles and smooth the top surface of the grout in conformity with the manufacturer's recommendations. G. Epoxy grouts are self-curing and do not require the application of water. Maintain the formed grout within its recommended placement temperature range for at least 24 hours after placement, until grout compressive strength reaches 1,000 psi or as recommended by the manufacturer,whichever is longer. H. Provide grout control joints as indicated on Drawings. 3.6 SCHEDULE A. Use particular types of grout as follows: I General Purpose Nonshrink Cementitious Grout(CRD-C621 Grade D): a. Use at locations where nonshrink grout is indicated, except for base plates greater in area than 3-feet wide by 3-feet long. Water Treatment Plant Pressure Control Valves Grouting City of Round Rock 036000-8 t)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2, Flowable(precision)Nonshrink Cernentitious Grout(CRD-C621 Grade B or Q: a. Use under base plates greater in area than 3-feet wide by 3-feet long, Use at locations indicated to receive flowable (precision) nonshrink grout. Flowable (precision), nonshrink, cernentitious grout may be substituted for general purpose nonshrink cernentitious grout, 3, Nonshrink Epoxy Grout: a, Use at all locations specifically indicated to receive notishrink epoxy grout. 4. Cement Grout: a. Use where indicated. 5. Concrete Grout: a. Use for overlaying the base concrete as indicated. b. Use for concrete grout fill within liquid retaining structures and other locations where specifically indicated. END OF SECTION 036000 Water Treaunent Plant Pressure Control valves Groufing Cay of'Roand Rock 036000-9 ° 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 THIS PAGE INTENTIONALLY LEFT BLANK. Water Treatment Plant Pressure Control Valves Grouting City of Round Rock 036000-10 4,,',�2022 CI)M Smith 8077-263948 All Rights Reserved February 2022 SECTION 050519- POST-INSTALLED ANCHORS AND REINFORCING BARS PART I GENERAL I'l RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. L2 SUMMARY A. Section Includes: L Post-installed adhesive and expansion anchors for concrete and concrete masonry unit substrates. 2. Post-installed reinforcing bar dowels using adhesive anchoring system. 1 Performance and proof testing of post-installed adhesive anchoring system for anchor,,; and reinforcing bar dowels. B. Related Requirements: I Section 030110 "Concrete and Reinforcing Steel" and related Sections for concrete, reinforcement,and accessories. 1 Various Sections in Division 05 related to metals. 1 Various Sections in Divisions 23 and 26 related to facility utilities, 4. Various Sections in Divisions 40,43,and 46 related to process mechanical equipment. 1.3 ACTION SUBMITTALS A. Post-Installed Expansion Anchors: 1. Design Data: Submit manufacturer's specifications and data including recommended design values and physical characteristics for expansion anchors. 2, Product Data: Include construction details, material descriptions, dimensions of individual components and profiles, materials and finishes for post-installed expansion anchors installed into cracked concrete masonry. 3. Installation Procedures: Submit procedures stating product proposed for use, and complete installation method. B. Post-Installed Adhesive Anchoring System: L Design Data: Submit manufacturer's specifications and data including recommended design values and physical characteristics, including temperature,humidity, and moisture limitations for adhesive anchoring system. 2, Product Data: Include construction details, material descriptions, dimensions of individual components and profiles, materials and finishes for post-installed adhesive anchoring system installed into cracked concrete masonry. Water Treatment Mant Pressure Control Valves Post-tinstallcx.l Anchors and Reiuforcing Bars City of Round Rock 050519 1 C,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. Installation Procedures: Submit procedures stating method of drilling, product proposed for use,and complete installation method. C. Post-Installed Adhesive Anchoring System Testing: 1. Equipment Data: Manufacturer's information for equipment to be used to conduct performance and proof tests on adhesive anchoring system. Submit diagrams showing geometry of performance and proof test equipment relative to the anchors and reinforcing bar dowels to be tested and calibration data for system of jacks and gauges,including: a. Calibration: Conducted by a certified testing laboratory, of the complete performance and proof test assembly, together as a unit. Conduct assembly calibration within one month prior to conducting first test and present in the form of a plot of gauge pressure versus actual jack force. b. Project Specific Diagram: Laboratory's proposed test equipment setups for monitoring elongation of anchors reinforcing bar dowels during performance and proof tests. Meet the requirements of ASTM E488. [lave proposed test equipment completely independent of the jack and include a micrometer dial gauge capable of measuring anchor extension to nearest 0.001 inch having 3 inches of travel and be mounted on an adjustable tripod or other device with flexible extension arms or a goose neck to permit rapid alignment of the dial gauge axis with the axis of the anchor. 1.4 INFORMATIONAL SUBmirl-ALs A. Installation procedure: Submit installation procedure for post-installed adhesive anchoring system;including method of drilling. B. Certificates: L Installer Qualifications for Adhesive Anchoring System: Submit installer and testing agency qualifications as stated in following Paragraph of this Article. 2. Submit current International Code Council (ICC) Evaluation Service Reports (ESR) for expansion anchors and adhesive anchoring system, for installation into cracked concrete or masonry, as applicable, indicating conformance with current ICC Evaluation Service (ICC-ES) Acceptance Criteria. C. Qualification Data: 1. Installer: Indicate manufacturer's training date and a list of personnel trained on installation of adhesive anchoring system. 2. Testing Agency: a. Laboratory: Meet requirements of ASTM E329. Prior to testing, submit qualifications of proposed testing laboratory for approval that includes: 1) Name and address. 2) Names and positions of principal officers and name, position, and qualifications of responsible registered professional engineer in charge. Water Treatment Plant Pressure Control Valves Post-Installed Anchors and Reinforcing Bars City of Round Rock 050519-2 i,"s2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3) List technical services provided, indicating external technical services to be provided by other organizations. 4) Names and qualifications of the supervising laboratory technicians. 5) Provide report prepared by laboratory evaluations authority when requested by The Engineer. 6) Submit as required above for other organizations that will provide external technical services. b. Include in submittal a list of five projects in which the laboratory has perfornied testing in accordance with ASTM E488. Include following information for each project: 1) Project name and location. 2) Project Owner. 3) Owner's representative including address and phone number. 4) Brief description of work. 1 Submit qualifications of other laboratory or laboratories until approved. D. Perfon-nance and Proof Test Reports of Adhesive Anchoring System Each Procedure: For each diameter of post-installed anchors and reinforcing bar dowels, for tests performed by manufacturer and witnessed by a qualified testing agency or a qualified testing agency. Submit a report stamped and sealed by a Professional Engineer registered in State of Texas for each test procedure, including whether additional tests or design modifications are required. Based on the results of the reports,The Engineer will determine if any additional tests or modifications to the design are required, Prepare each inspection report complying with ASTM F488 and ASTM E575 that includes: L Date of issue. 1 Project title and number, 3. Name,address,and telephone number of testing laboratory. 4, Dates and locations of samples and tests or inspections. 5. Names of individuals making the inspection or test. 6. Designation of the work and test method. 7. Complete inspection or test data, 8. 'rest results and an interpretation of test results. 9, Ambient conditions at time of testing. M Comments or professional opinion on whether inspected or tested work complies with Contract Document requirements. 11. Name and signature of laboratory inspector. 11 Recommendations on retesting. 11 Design data. 14. 'rest reports. 15. Field reports. E. Evaluation Reports: From ICC-ES for expansion anchors and adhesive anchoring system, for installation of post-installed anchors into cracked [concrete or concrete masonry unit, as applicable, indicating conformance with current ICC ES Acceptance Criteria. W,,uer Treaunent Plant Pressure Control Valves 11(m-Installexi Anchors and Reinforcing Bars Cay of Round Rock 050519-3 1,x,�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.5 QUALITY ASSURANCE A. General: Coordinate with the work of other Sections, field verifying dimensions and work of other trades adjoining items of work before installing items specified in this Section. B. Representatives of post-installed anchor system manufacturer: 1. Performance Testing: Be on site for installation of [anchor] [reinforcing bars] and performance testing of adhesive anchoring system of their respective products system, subsystem, or component. Observe, guide, and provide instruction on Contractor's assembly, erection, installation or application procedures during the drilling, placement, injection and testing. Inspect, check,and make adjustments as required for the product to function as warranted by the manufacturer and as necessary to furnish the Manufacturer's Certification of Proper Installation. 2. Proof Testing: Be on site periodically for assistance during installation and testing/inspection of their respective products system, subsystem, or component. Observe, guide, and provide instruction on Contractor's assembly, erection, installation or application procedures during the drilling, placement, injection and testing. Inspect, check,and snake adjustments as required for the product to function as warranted by the manufacturer and as necessary to furnish the Manufacturer's Certification of Proper Installation. C. Adhesive Anchoring System: 1. Installer Training: Conduct thorough training by the manufacturer or the manufacturer's representative. Training shall consist of the complete installation process for post- installed anchors and reinforcing bar dowels,including but not limited to: a. Tool selection. b. Hole drilling procedure. C. Hole preparation and cleaning techniques. d. Adhesive injection technique and dispenser training and maintenance. e. Anchor preparation and installation. f Reinforcing bar dowels preparation and installation. g. Proof loading and torqueing. h. Temperature,humidity, and moisture limitations. i. Working time limitations. j. Setting time. 2. Include training for anchors and reinforcing bar dowels installed horizontally or upwardly inclined to support sustained tension loads. Install horizontally or upwardly inclined anchors and reinforcing bar dowels by personnel certified by an applicable certification program. Certification shall include written and performance tests in accordance with the ACI/CRSI Adhesive Anchor Installer Certification program,or equivalent. 3. Manufacturer's Certificate of Proper Installation: Submit upon completion of work, for the post-installed anchors and reinforcing bar dowels, including tion-production and production anchors and reinforcing bar dowels. Water Treatment Plant Pressure Control Valves Post Installed Anchors and Reinforcing Bars City of Round Rock 0505194 ,v:2022 CDM Smith 8077.263948 All Rights Reserved February 2022 L6 DELIVERY, STORAGE AND HANDLING A. Deliver items to be incorporated into the work of other trades in sufficient time to be checked prior to installation. B. Handle materials with cranes or derricks. Do not durnp material off transportation vehicles or handle in ways that will cause damage. C. Store materials elevated above grade and block up so they will not become bent or otherwise damaged. D. Repair items that have become damage or corroded to satisfaction of the Engineer prior to incorporating them into the work. PART 2- PRODUCTS 2,1 EXPANSION ANCHORS A. Fastening to Concrete Substrate: Zinc plated carbon steel wedge type anchors, complete with zinc plated nuts and washers,unless otherwise noted. B. Submerged or Weather Exposed Substrates: ASTM A276 Type 316 stainless steel wedge type anchors, complete with Type 316 stainless steel nuts and washers,unless otherwise noted. C. Meet ICC ES ACO I or ICC ES AC 193, D. Length: W"hen length or anchor embedment is not indicated, provide length sufficient to place the wedge and expansion cone portion of the anchor at least I inch behind concrete reinforcing steel. E. Basis-of-Design: E Anchorage designs indicated are based on Hilti,Kwik-Bolt TZ,unless otherwise noted. 2. Acceptable Anchors: Hilti Kwik-Bolt TZ-1 Simpson Strong-Tic Strong Bolt 2 Wedge Anchor; DeWalt Power-Stud+ SDI DeWalt Power-Stud+ SD6 for stainless steel; or equal, 2.2 ADHESIVE ANCHORING SYSTEM A. Fastening to Concrete Substrate- Manufactured system consisting of post installed threaded rods, nuts, washers, other anchoring hardware, and chemical dispenser for installation in hammer drilled holes. L Anchors: Meet [CC ES AC308. 2. Injection Adhesive: Two-component epoxy system consisting of a hardener and a resin, furnished in pre-measured side-by-side cartridges which keep both components separate. 3. Adhesive Cartridge: Side-by-side design to accept a static mixing nozzle which thoroughly blends both components and allows injection directly into a drilled hole. Water'n-calment Plant Pressure Controt Valves Pom-histalled Anchors and Remforcing Bars 0 5,of'Round Rock 050519-5 it°2022 CDM Smith 8077-263948 All Rights Reserved February 2022 4. Anchor: Type 316 stainless steel as indicated consisting of an all-thread anchor rod with nut and washer,of matching material to anchor rod. a. Basis-of-Design: 1) Anchorage designs indicated are based on Hilti HIT- RE 500 V3, unless otherwise noted. 2) Acceptable Manufacturers: Hilti HIT- RE 500 V3; Simpson Strong Tie SET-XP; ITW Ramset Red Head Epeon G5;or equal. 5. Reinforcing Bar Dowels: Reinforcing bar,per Section 030110. a. Basis-of-Design: 1) Anchorage designs indicated are based on Hilti HIT- RE 500 V3, unless otherwise noted. 2) Acceptable Manufacturers: Hilti HIT- RE 500 V3; Simpson Strong Tie SET-XP;ITW Ramset Red Head Epcon G5;or equal. B. Fastening to Hollow Concrete Block, Brick, or Hollow-Core Precast Concrete Planks: Three- part threaded rod,screen tube,and chemical dispenser anchoring system, I. Anchors: Meet ICC ES AC58. 2. Adhesive Cartridges: Contain pre-measured amounts of resin and hardener which are mixed and deposited in a screen tube by a dispenser. 3. Anchor: Type 316 stainless steel as indicated consisting of an all-thread anchor rod with. nut and washer,of matching material to anchor rod. 4. Reinforcing Bar Dowel: Reinforcing bar,per Section 030110. 5. Basis-of-Design: a. Anchorage designs indicated are based on Hilti HIT HY-70 System, unless otherwise noted;or equal. PART 3-EXECUTION 3.1 INSTALLATION A. General: 1. Install anchoring system in strict compliance with manufacturer's published installation instructions and approved Shop Drawings. Comply with recommended surface preparation,temperature,and moisture of substrate and ambient conditions. 2. Coordinate installation with Special Inspector, 3. Use drill bit of correct diameter and drill to required depth using rotary impact type hammer drills with carbide-tipped bits. 4. Drill holes perpendicular to concrete surface,unless otherwise indicated. 5. Use oil free compressed air to blast out loose particles and dust from drilled holes, Water Treatment Plant Pressure Control Valves Post-Installed Anchors and Reinforcing Bars City of Round Rock 050519.6 (ir"2022 CDM Srnith 8077263948 All Rights Reserved February 2022 13Expansion anchors: I. Check expansion anchors for tightness a minimum of 24 hours after initial installation. C. Adhesive anchoring system: I. Perforin installation only by personnel trained in anchor installation and having certification required in PART I -GENERAL. 1 Inject adhesive and install anchors reinforcing bar dowels that are clean and free of dirt, oil,grease,ice or other deleterious material which would reduce bond. 3.2 TESTING OF ADHESIVE ANCHORING SYSTEM A. Performance Testing: 1. At locations of concrete to be removed, conduct perfori-nance testing of approved adhesive anchoring system at locations indicated. 1 Locate existing reinforcing bars with the use of a reinforcing bar locator prior to installation of post-installed anchors and reinforcing bar dowels to be used for performance testing. Mark existing reinforcing bars on concrete indicating spacing and direction within test area. Do not cut existing reinforcing bars without prior approval by the Engineer. 3. Use post installed anchors and reinforcing bar dowels matching those of the approved adhesive anchoring system with the embedment length indicated. In the event an alternate adhesive anchoring system is approved, the embedment length will be determined by the Engineer. 4. Design Strength of Existing Concrete: 4,000 psi at 28 days. 5. Install and test post-installed anchors and reinforcing bar dowels, as indicated. For each diameter of post-installed anchors install and test one anchors. lb. For each diameter of post-installed reinforcing bar dowels install and test one dowels. c. Perform static tensile test in accordance with ASTM E488 using defined incremental load application and failure criteria, Test to failure. & Test Results: For each of the one group of five anchors and reinforcing bar dowels, test three and average the results. If the result of any one test in a group varies by more than 15 percent from the group average, perform two additional tests at locations determined by the Engineer. Average the five test results. 6. Advise(lie Engineer at least 14 working days prior to Performance Testing. 7, Do not use post-installed anchors and reinforcing bar dowels installed for performance testing as part of production anchors and bars. 8. Do not demolish existing construction or perform new work until Performance Testing is complete and approved by the Engineer. B, Proof Testing: L Perform proof tests in accordance with ASTM E488. 2. During the progress of the work perform periodic proof test of post-installed anchors. Water Treatment Plant Preswre Control VMves Post lnstaHcd Anchors and Reinfiorcing BBs City of Round Rock 050519-7 Oi'�2022 CDM Smith 8077-263945 All Rights Deserved February 2022 a. Threaded rod sizes: 3A inch diameter. b. Post-installed Anchors: During progress of the work, randomly chose for Proof Testing 5 percent of each anchor diameter, embedment length, and adhesive bonding material system. Select test anchors at random. 'fest the anchors for the static tension test only, to the allowable test load of insert load in pounds for each diameter,embedment,and adhesive 10,000 pounds for 3/4"diameter. 3. During progress of the work, perform periodic proof test of post-installed reinforcing bar dowels. a. Bar Sizes:#4,#5,#6,#7,#8,and#9, b. Initial Reinforcing Bar Dowel Test Group: During progress of the work,randomly select five post-installcd reinforcing bar dowels,for Proof Testing. Select from first 50 post-installed reinforcing bar dowels installed. C. Subsequent Reinforcing Bar Dowel Test Groups: In addition, randomly select and test one post-installed reinforcing bar dowel from every 20 post-installed bars installed of remaining post4nstalled bars. 4. Post-installed Reinforcing Bar Dowels: Test for static tension only to Allowable Test Load indicated in Table 1. TABLE l Post-installed Reinforcing Bar Dowels Test Loads Rebar Size Yield Strength Allowable Test Load #4 12,000 lbs 4,800 lbs 95 18,600 lbs 7,440 lbs #6 26,400 lbs 10,560 lbs #7 36,000 lbs 14,400 lbs #8 47,400 lbs 18,980 lbs #7 36,000 lbs 14,400 lbs #8 47,400 lbs 18,980 lbs NOTE: "Test loads are based on Hilti. Engineer may modify Table values based on approved adhesive anchoring system. 3.3 TEST FAILURE-ADHESIVE ANCHORING SYSTEM A. Failure Defined: Observance of any one or any combination of failure modes in ASTM E488. B. Perforrnance Testing: If results show a failure of the adhesive system, not yielding of anchor or reinforcing bar dowel, the Engineer will require greater embedment, changes in installation technique, or require the use of another adhesive anchoring system, at no additional cost to Owner. C. Proof"Testing of Anchors: If any of the tested anchors failed, perform two additional tests on adjacent untested anchors,one each side.Continue additional tests until no more tests fail,or all anchors installed that day are tested. The Engineer may require greater embedment, changes in Water Treatment Plant Pressure Control valves Post-installed Anchors and Reinforcing Bars City of Round Rock 050519-8 4,')2022 CDM Snaith 8077-263948 All Rights Reserved February 2022 installation technique, or require the use of another adhesive anchoring system, at no additional cost to Owner. D. Proof'resting of Reinforcing Bar Dowels: If the bond strength of a post-installed reinforcing bar dowel falls below the Allowable Test Load indicated in Table 1, the Engineer may require greater embedment, changes in installation technique, or require the use of another adhesive anchoring system,at no additional cost to Owner. E. If installations fail to produce the required strength performance, the Engineer will require additional post-installed anchors and require modified or enlarged base plates or additional metal connecting pieces or reinforcing bar dowels and additional reinforced concrete to meet the required design strength. Perform this additional work and additional tests to correct deficient installations,at no additional cost to Owner. 14 REPAIRS A. At testing completion, repair damaged concrete, post-installed anchors, reinforcing bar dowels and other damaged construction as required to match conditions prior to testing. B. Repair in accordance with provisions of Section 030130.71 "Modifications to Existing Concrete",including but not limited to: I. Saw cutting and removal of damaged, loose,or unsound concrete. 2. Removal of damaged anchors reinforcing bar dowels. 3. Cleaning and preparing concrete surface and reinforcing bar dowels. 4, Place new repair material. S. Install new anchors and reinforcing bar dowels to replace anchors and reinforcing bar dowels that are found to be unacceptable or deficient. 6. Perform repairs at no additional cost to Owner. END OF SECTION 050519 Warer Treaunent Plara Pressure Control Valves Post•InstaHed Andiors and Reuiforciuig lBars Cay of Round Rmk 0505 97 9 ,K,'2022 CDM Smith 8077-263948 All Rights Reserved February 2022 THIS PAGE INTENTIONALLY LEFT BLANK Water Treatment Plant Pressure Control Valves Post�Installed Anchors and Reinforcing Bars City of Round Rock 050519-10 2022 CDM Smith 8077 263948 All Rights Reserved February 2022 SECTION 055000-METAL FABRICATIONS PART I -GENERAL Ll, RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Steel framing and supports for mechanical and electrical equipment. 1 Steel framing and supports for applications where framing and supports are riot specified in other Sections. 1 Steel angles, 4. Steel lintels. 5. Steel support brackets. 6. Steel base plates for other than structural steel or equipment. 7. Steel holddown straps and lugs. 8. Steel door frames 9. Steel splice plates. 10. Steel subframing at roof openings. IL Shelf angles, 12. Miscellaneous items fabricated from steel aluminum or stainless steel. 11 Aluminum beams. 14, Aluminum angles. 15. Aluminum closure angles, 16. Aluminum grates. 17. Aluminurn diamond plate and floor plate. 18. Aluminum nosing. 19. Aluminum bar racks. 20. Stainless steel beams. 21. Stainless steel angles. 21 Stainless steel bar racks. 23. Structural-steel door frames. 24. Miscellaneous steel trim. 25. Metal bollards. 26. Loose bearing and leveling plates for applications where they are riot specified in other Sections, B. Products furnished,but not installed, under this Section include the following: I. Loose steel lintels, Waerl'rcatnient Plant Pressure Comrol Valves Metal Fabrications Cay of Round Rock 055000.1 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. Anchor bolts, steel pipe sleeves, slotted-channel inserts,and wedge-type inserts indicated to be cast into concrete or built into unit masonry. 3. Steel weld plates and angles for casting into concrete for applications where they are not specified in other Sections. C. Related Requirements: 1. Section 030110 "Concrete and Reinforcing Steel" for installing anchor bolts, steel pipe sleeves,slotted-channel inserts,wedge-type inserts,and other items cast into concrete. 2. Section 036000"Grouting"for non-shrink grout. 3. Various Sections in divisions 40-46 for process mechanical work scopes. 1.3 COORDINATION A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' written recommendations to ensure that shop primers and topcoats are compatible with one another. B. Coordinate installation of metal fabrications that are anchored to or that receive other work. Furnish setting drawings, templates,and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation. 1.4 ACTION SUBMITTALS A. Product Data: For the following: 1. Prefabricated building columns. 2. Paint products. B. Samples: I. Submit samples as requested by the Engineer during construction. C. Shop Drawings: Show fabrication and installation details. Include plans, elevations, sections, and details of metal fabrications and their connections. Show anchorage and accessory items. Provide Shop Drawings for the following: 1. Steel framing and supports for mechanical and electrical equipment. 2. Steel framing and supports for applications where framing and supports are not specified in other Sections. 3. Prefabricated building columns. 4. Shelf angles. 5. Metal floor plate. Water Treatment Plant Pressure Control Valves Metal Fabrications City of Round Rock 055000-2 R;�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 6Structural-steel door frames, T Miscellaneous steel trim. K Metal bollards. 9. Abrasive metal, 10, Loose steel lintels. I I, Miscellaneous steel items. 12, Miscellaneous aluminum items. 13. Miscellaneous stainless-steel items, 1.5 rNFORMATIONAL SUBM117ALS A. Qualification Data: For professional engineer. B, Mill Certificates: Signed by aluminum, steel and stainless-steel manufacturers, certifying that products furnished comply with requirements. C. Welding certificates. I. Certify that welders have been qualified under AWS, within previous 12 months, to perform welds required under this Section. D. Paint Compatibility Certificates: From manufacturers of topcoats applied over shop primers, certifying that shop primers are compatible with topcoats. 1.6 QUALITY ASSURANCE A. Welding Qualifications: Qualify procedures and personnel according to AWS DIA/DLI M, "Structural Welding Code-Steel." B. Welding Qualifications: Qualify procedures and personnel according to the following: I. AWS D 1.1/D 1.1 M, "Structural Welding Code-Steel." I AWS DI 2/1311 2M, "Structural Welding Code-Aluminum." I AWS DI.6/DI.6M, "Structural Welding Code-Stainless steel." C. Evaluation Reports: Post-installed concrete anchors, from ICC-ES for adhesive anchor system, for installation into cracked concrete or unit masonry, as applicable, indicating conformance with current ICC ES Acceptance Criteria, 1.7 FIELD CONDITIONS A� Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication. Water Treauneni Plaw Pressure Control Valves Metal Fabri4ations Crty of Routid Rock 059)00-3 c 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 PART 2-PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes acting on exterior metal fabrications by preventing buckling, opening of joints, overstressing of components,failure of connections,and other detrimental effects, I. Temperature Change: 120 deg F,ambient; 180 deg F,material surfaces. 2.2 METALS A. Metal Surfaces, General: Provide materials with smooth, flat surfaces unless otherwise indicated. For metal fabrications exposed to view in the completed Work, provide materials without seam marks,roller marks,rolled trade names,or blemishes. B. Steel Wide Flange Shapes:ASTM A992. C. Steel Other Shapes, Plates,Shapes,and Bars: ASTM A36/A36M. D. Stainless steel Sheet, Strip, and Plate: ASTM A240/A240M or ASTM A666, Type 316, Type 316L for welded components. E Stainless steel Bars and Shapes: ASTM A276,Type 316,Type 3161.,for welded components. F. Rolled-Steel Floor Plate: ASTM A786/A786M, rolled from plate complying with ASTM A36/A36M or ASTM A283/A283M,Grade C or D. G. Rolled-Stainless Steel Floor Plate: ASTM A793. H. Abrasive-Surface Floor Plate: Steel plate with abrasive granules rolled into surface. I. Steel Tubing: ASTM A500/A500M,Grade B cold-formed steel tubing. J. Steel Pipe: ASTM A53/A53M, Type S Grade B Standard Weight (Schedule 40) unless otherwise indicated, K. Zinc-Coated Steel Wire Rope: ASTM A741. 1. Wire-Rope Fittings: Hot-dip galvanized-steel connectors with capability to sustain, without failure, a load equal to minimum breaking strength of wire rope with which they are used. L Slotted Channel Framing:Cold-formed metal box channels(struts)complying with MFMA-4, I. Size of Channels: 1-5/8 by 1-5/8 inches. 2. Material: Galvanized steel, ASTM A653/A653M, commercial steel, Type B structural steel,Grade 33,with G90 coating;0.108-inch nominal thickness. 3. Material: Cold-rolled steel, ASTM A1008/A1008M, commercial steel, Type B structural steel,Grade 33,0.0966-inch minimum thickness. Water Treatment Plant Pressure Control Valves Metal Fabrtcations City of Round Rock 055000-4 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 M. Cast Iron: Either gray iron, ASTM A48/A48M, or malleable iron, ASTM A47/A47M, unless otherwise indicated. N. Aluminum Extruded Pipe: ASTM B429,Alloy 6063 T6 and Alloy 6061 T6 as indicated. 0. Aluminum Plate and Sheet: ASTM B209, Alloy 6061-T6, P. Aluminum Extrusions: ASTM B221,Alloy 6061 T6. Q. Aluminum-Alloy Rolled Tread Plate: ASTM B632/B 632M,Alloy 6061-T6. R. Aluminum Castings: ASTM B26/13 26M, Alloy 443.0-F. S. Bronze Extrusions: ASTM B455,Alloy U No. 038500(extruded architectural bronze). T. Bronze Castings: ASTM B584, Alloy LYNS No. 083600 (leaded red brass) or No. 084400 (leaded semi-red brass). U. Nickel Silver Extrusions. ASTM B 15 I/B 15 1 M, Alloy UNS No. 074500. V� Nickel Silver Castings: ASTM B584, Alloy UNS No.097600 (20 percent leaded nickel bronze). W. Gray Iron Castings: ASTM A48,Class 35. X. Ductile Iron Castings: ASTM A536,Grade 65-45-12. Y. Stainless steel Bolts: ASTM F593,Type 316. Z. Stainless steel Nuts: ASTM F594,Type 316. AA. Carbon Steel Bolts and Studs: ASTM A307, Grade A (hot dip galvanized nuts and washers where noted) BB, High Strength Steel Bolts, Nuts, and washers: ASTM F3125, Grade A325 (mechanically galvanized per ASTM B695,Class 50,where noted). I. Elevated Temperature Exposure: Type 1. 2. General Application: Type I or Type 11. CC. Galvanizing: ASTM A123,Zn w/0,05 percent minimum Ni. DD, Galvanizing,hardware: ASTM A153, Zn w/0,05 percent minimum Ni. EE. Galvanizing,anchor bolts: ASTM F2329,Zn w./0.05 percent minimum Ni. FF. Welding electrodes,steel: AWS A5.1 E70xx, WaucrTreatrnent Plam Pressure Control Valves Metal Fabneations Coy of Round Rock 055000 5 t".2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2.3 FASTENERS A. Unless otherwise noted, provide steel machine bolts for the connection of carbon steel or iron; galvanized steel or stainless-steel machine bolts for the connection of galvanized steel or iron; and stainless-steel machine bolts for the connection of aluminum or stainless-steel. B. General: Unless otherwise indicated, provide Type 316 stainless steel fasteners for exterior use and zinc-plated fasteners with coating complying with ASTM B633 or ASTM F1941, Class FcrZn 5,at exterior walls. Select fasteners for type,grade,and class required. 1. Provide stainless-steel fasteners for fastening aluminum. 2. Provide stainless-steel fasteners for fastening stainless steel. 3. Provide stainless-steel fasteners for fastening nickel silver. 4. Provide bronze fasteners for fastening bronze. C. Steel Bolts and Nuts: Regular hexagon-head bolts, ASTM A3O7, Grade A; with hex nuts, ASTM A 563;and,where indicated, flat washers. D. Mechanically Galvanized Steel Bolts and Nuts: Regular hexagon-head bolts, ASTM F3125, Grade A325, Type 3; with hex nuts, ASTM A563, Grade C3; and, where indicated, flat washers. F. Anchor Bolts: ASTM F1554, Grade 36, of dimensions indicated; with nuts, ASTM A563; and, where indicated,flat washers. 1. Provide standard headed bolts with heavy hex nuts and Grade A washers. 2. Where galvanized anchor bolts are indicated or specified, provide standard headed bolts with heavy hex nuts and Grade A washers,galvanize in accordance with.ASTM F2329. F. Automatic End Welded Headed Anchor Studs and Flux Ended Studs: Cold drawn steel, ASTM 108,. 1. Basis-of-Design - Headed Anchor Studs as Manufactured by Nelson or equal: H4L Headed Concrete Anchors. G. Machine bolts and nuts conforming to Federal.Specification FF-B-5750. Bolts and nuts shall be hexagon type. Bolts, nuts, screws, washers, and related appurtenances shall be Type 316 stainless steel. H. Toggle Bolts: shall be Hilti,Toggler Bolt or equal. 1. Slotted-Channel Inserts: Cold-formed,hot-dip galvanized-steel box channels (struts)complying with MFMA-4, 1-5/8 by 7/8 inches by length indicated with anchor straps or studs not less than 3 inches long at not more than 8 inches o.c. Provide with temporary filler and tee-head bolts, complete with washers and nuts,all zinc-plated to comply with ASTM B633, Class Fe"Zn 5, as needed for fastening to inserts Water Treatment Plant Pressure Control Valves Metal Fabrications City of Round Rock 055000-6 Oc 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2.4 MISCELLANEOUS ALUMINUM A, Miscellaneous Aluminum: Formed true to detail, with clean, straight, sharply defined profiles and smooth surfaces of uniform color and texture and free from defects impairing strength or durability, Drill or punch holes. Smooth edges without burrs. Fabricate supplementary pieces necessary to complete each item though such pieces are not definitely shown or specified. B. Connections and Accessories: Sufficient strength to safely withstand the stresses and strains to which they will be subjected. Close fitting exposed joints and jointed where least conspicuous. Conceal threads on threaded connections where practical. Provide continuous welds or intermittent welds on welded connections as specified or shown. Dress face of welds flush and smooth, Weld on unexposed side as much as possible in order to prevent pitting or discoloration of the aluminum exposed surface. Grind smooth continuous welds that will be exposed. Provide holes for temporary field connections and for attachment ofthe work of other trades. C. Miscellaneous Aluminum Items: Beams, angles,closure angles, grates, floor plates, stop plates, stair nosings,and other miscellaneous aluminum indicated and not otherwise specified. D. Angle Frames for Roof Hatches, Beams,Grates,and Similar Items: Complete with welded strap anchors attached, E. Stair Treads for Aluminum Stairs: As specified for grating and having cast abrasive non-slip nosing as approved. R Aluminum Nosing at Concrete Stairs. Furnish with wing type anchors and flat head stainless steel machine screws, 12 inches on center. Provide nosing at concrete ladder openings. Single piece nosing for each step extending to within 3 inches full ladder width. Set nosing flush with stair tread finish at concrete stairs. Furnish treads with heavy duty protective tape cover, 1, Basis-of-Design: Wooster Products, Inc.; Alurnogrit Treads, Type 116; similar by Barry Pattern and Foundry Co.,Andco;or equal. G. Aluminum Finishes. I. Anodized Finish:Give an anodic oxide treatment in accordance with AA M3 IC22A41 2. Mill Finish: Have a cleaned and degreased mill finish on other aluminum items. 2.5 MISCELLANEOUS STEEL A. Miscellaneous Steel Work: Donned true to detail, with clean, straight, sharply defined profiles and smooth surfaces of uniform color and texture and free from defects impairing strength or durability. Drill or punch holes. Smooth edges without burrs. Fabricate supplementary pieces necessary to complete each item though such pieces are not definitely shown or specified. B. Connections and Accessories: Sufficient strength to safely withstand the stresses and strains to which they will be subjected, Close fitting exposed joints and jointed where least conspicuous. Conceal thread on threaded connections where practical. Provide continuous welds or intermittent welds on welded connections as specified or shown. Dress face of welds flush and smooth. Grind smooth continuous welds that will be exposed. Provide holes for temporary field connections and for attachment of the work of other trades. Water Treatment Plant Pressure Control Valves Metal Fabrications City of Round Rock 055000-7 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Miscellaneous Steel Items: Beams,angles,lintels,metal stairs detailed on the Drawings,support brackets, base plates for other than structural steel or equipment, closure angles, bridge crane rails,monorail hoist beams,hold-down straps and lugs,door frames,splice plates,subframing at roof openings and any other miscellaneous steel indicated and not otherwise specified. D. Structural steel angle and channel door frames: Galvanized or Shop coated with primer. Fabricated with not less than three anchors on each jamb. E. Steel pipe pieces for sleeves, lifting attachments and other functions: Schedule 40 pipe unless otherwise indicated. Wall and floor sleeves, of steel pipe: Provide welded circumferential steel waterstops at mid-length, F. Lintels,relief angles or other steel supporting masonry or embedded in masonry: Galvanized or Shop coated with primer. G. Steel Finish Work: Thoroughly cleaned,by effective means,of loose mill scale,rust and foreign matter. Provide one shop coat of primer compatible with finish coat after fabrication but before shipment. Omit paint within 3 inches of proposed field welds. Apply paint to dry surfaces and be thoroughly and evenly spread and well worked into joints and other open spaces. 11 Galvanizing, where required: Use hot-dip zinc process after fabrication,coating not less than 2 oz)1sq.ft. of surface. 2.6 MISCELLANEOUS STAINLESS-STEEL A. Miscellaneous Stainless-Steel Work: Forrited true to detail, with clean, straight, sharply defined profiles and smooth surfaces of uniform color and texture and free from defects impairing strength or durability. Drill or punch holes. Smooth edges without burrs. Fabricate supplementary pieces necessary to complete each item though such pieces are not definitely shown or specified. B. Connections and accessories: Sufficient strength to safely withstand the stresses and strains to which they will be subjected. Close fitting exposed joints, jointed where least conspicuous. Conceal threads on threaded connections where practical. Provide continuous welds or intermittent welds on welded connections as specified or shown. Dress face of welds flush and smooth.Grind smooth continuous welds that will be exposed. Provide holes for temporary field connections and for attachment of the work of other trades. C. Beams,angles,bar racks,and other miscellaneous stainless steel. 2.7 MISCELLANEOUS MATERIALS A. Shop Primers: Provide primers that comply with Section 099010 "Shop Priming" and Section 099 100"Paintiug." B. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer complying with MPI#79 and compatible with topcoat. 1. Use primer containing pigments that make it easily distinguishable from zinc-rich primer, Water Treatment Plant Pressure Control Valves Metal Fabrications City of Round Rock 055000-8 0 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Water-Based Primer: Emulsion type, anticorrosive primer for mildly corrosive environments that is resistant to flash rusting when applied to cleaned steel, complying with MPI#107 and compatible with topcoat. D. Epoxy Zinc-Rich Primer: Complying with MPI#20 and compatible with topcoat. L Shop Primer for Galvanized Steel: Primer formulated for exterior use over zinc-coated metal and compatible with finish paint systems indicated. F. Galvanizing Repair Paint: Fligh-zinc-dust-content paint complying with SSPC-Paint 20 ASTM A780 and compatible with paints specified to be used over it. G. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D1.187. 2.8 CASTINGS: A. General: Good quality, strong, tough, even-gained, smooth, free from scale, lumps, blisters, sand holes, and other defects. Thoroughly clean castings to remove foreign matter, and deleterious films. Castings will be subjected to a hammer inspection in the field by the Engineer. Damaged castings may be rejected and replaced at no cost to the Owner. B. Matching Surfaces: Machine to a true plane surface allowing contact surfaces to seat without rocking. Provide allowances in patterns so specified thickness is not reduced to obtain finished surfaces. Castings will not be acceptable if actual weight is less than 95 percent of theoretical weight computed from dimensions. Provide facilities for weighing castings in the presence of the Engineer. 2.9 FABRICATION,GENERAL A. Shop Assembly: Preassemble items in the shop to greatest extent possible. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces.Clearly mark units for reassembly and coordinated installation. B. Cut,drill,and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1,132 inch unless otherwise indicated. Remove sharp or rough areas on exposed surfaces, C. Form bent-metal comers to smallest radius possible without causing grain separation or otherwise impairing work, D. Form exposed work with accurate angles and surfaces and straight edges. E. Weld corners and scams continuously to comply with the following: I Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 2. Obtain fusion without undercut or overlap. 3, Remove welding flux immediately. Water Treaunent Plarit Pressure Cootrol Valves Metal Fabricattons City of Round Rock 055000,9 Wt 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface. F. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners or welds where possible. Where exposed fasteners are required, use Phillips flat-head (countersunk) fasteners unless otherwise indicated. Locate joints where least conspicuous. G. Fabricate seams and other connections that are exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate. H. Cut, reinforce, drill, and tap metal fabrications as indicated to receive finish hardware, screws, and similar items. I. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring devices to secure metal fabrications rigidly in place and to support indicated loads. J. Where units are indicated to be cast into concrete or built into masonry, equip with integrally welded steel strap anchors, 1/4 by l inch, with a minimum 6 inch embedment and 1 1,F2-inch hook, not less than S inches from ends and corners of units and 24 inches o.c.,unless otherwise indicated. 2.10 MISCELLANEOUS FRAMING AND SUPPORTS A. General: Provide steel framing and supports not specified in other Sections as needed to complete the Work. B. Fabricate units from steel shapes, plates, and bars of welded construction unless otherwise indicated. Fabricate to sizes, shapes,and profiles indicated and as necessary to receive adjacent construction. 1. Fabricate units from slotted channel framing where indicated. 2. Furnish inserts for units installed after concrete is placed. C. Fabricate supports for operable partitions from continuous steel beams of sizes recommended by partition manufacturer with attached bearing plates, anchors, and braces as recommended by partition manufacturer. Drill or punch bottom flanges of beams to receive partition track hanger rods;locate holes where indicated on operable partition Shop Drawings. D. Fabricate steel girders for wood frame construction from continuous steel shapes of sizes indicated. 1. Provide bearing plates welded to beams where indicated. 2. Drill or punch girders and plates for field-bolted connections where indicated. 3. Where wood nailers are attached to girders with bolts or lag screws, drill, or punch holes at 24 inches o.c. E. Fabricate steel pipe columns for supporting wood frame construction from steel pipe with steel baseplates and top plates as indicated. Brill or punch baseplates and top plates for anchor and Water Treatment Plant Pressure Control Valves Metal Fabrications City of Round Rock 0550W 10 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 connection bolts and weld to pipe with fillet welds all around. Make welds the same size as pipe wall thickness unless otherwise indicated. I. Unless otherwise indicated,fabricate frorn Schedule 40 steel pipe. 2. Unless otherwise indicated, provide 1/2-inch baseplates with four 5/8-inch anchor bolts and 1/4-inch top plates. R Galvanize miscellaneous framing and supports where indicated. G. Prime miscellaneous framing and supports with zinc-rich primer or where indicated. 2.11 SHELF ANGLES A, Fabricate shelf angles from steel angles of sizes indicated and for attachment to concrete framing. Provide horizontally slotted holes to receive 3,14-inch bolts, spaced not more than 6 inches from ends and 24 inches o.c.,unless otherwise indicated. I. Provide mitered and welded units at comers. 2. Provide open joints in shelf angles at expansion and control joints. Make open joint approximately 2 inches larger than expansion or control joint. B. Galvanize shelf angles located in exterior walls. C Fumish wedge-type concrete inserts, complete with fasteners, to attach shelf angles to cast-in- place concrete. 2.12 COVER PLATE A. Fabricate aluminum diamond plate and floor plate having a minimum thickness of 3/8 inch. Fabricate frames and supports of aluminum construction. Fastening devices and hardware shall be'rype 316 stainless-steel, Plates shall have a mill finish. B, Provide aluminum angle supports as indicated. C Include aluminum angle stiffeners, and fixed and removable sections as indicated. D. Provide flush stainless-steel bar drop handles for lifting removable sections, one at each end of each section, 2.13 STRUCTURAL-STEEL DOOR FRAMES A. Fabricate structural-steel door frames from steel shapes, plates, and bars of' size and to dimensions indicated, fully welded together, with 5/8-by-1-1/2-inch steel channel stops, unless otherwise indicated. Plug-weld built-up members and continuously weld exposed joints. Secure removable stops to frame with countersunk machine screws, unifonrily spaced at not more than 10 inches o.c. Reinforce frames and drill and tap as necessary to accept finish hardware, 1. Provide with integrally welded steel strap anchors for securing door frames into adjoining concrete or masonry. Water Treatment Plant Pressure Control Valves Metal Fabrications City of Round Rock 055f 00D 11 ;2022 CDM Smith 80177-263948 All Rights Reserved February 2022 B. Extend bottom of frames to floor elevation indicated with steel angle clips welded to frames for anchoring frame to floor with expansion anchors. C. Galvanize and prime exterior steel frames. 2.14 MISCELLANEOUS STEEL TRIM A. Unless otherwise indicated, fabricate units from steel shapes, plates, and bars of profiles shown with continuously welded,joints and smooth exposed edges. Miter corners and use concealed field splices where possible. B. Provide cutouts, fittings,and anchorages as needed to coordinate assembly and installation with other work. I. Provide with integrally welded steel strap anchors for embedding in concrete or masonry construction. C. Galvanize and prime exterior miscellaneous steel trim. 2.15 METAL BOLLARDS A. Fabricate metal bollards from steel shapes,as indicated. 1. Cap bollards with 1d4-inch-thick steel plate round off top. 2. Where bollards are indicated to receive controls for door operators, provide cutouts for controls and holes for wire. 3. Where bollards are indicated to receive light fixtures, provide cutouts for fixtures and holes for wire, B. Fabricate bollards with I-inch thick steel baseplates for bolting to concrete slab. Drill baseplates at all four corners for 7/8-inch anchor bolts. 1. Provide 1-inch minimum of nonshrink grout beneath bollard base plate to allow for plumb alignment of bollards. C. Fabricate sleeves for bollard anchorage from steel pipe with 1/4-inch-thick steel plate welded to bottom of sleeve. Make sleeves not less than 8 inches deep and 3/4 inch larger than OD of bollard. 2.16 ALUMINUM METAL NOSINGS AND THRESHOLDS A. Cast-Metal Units: Cast aluminum, with an integral-abrasive, as-cast finish consisting of aluminum oxide, silicon carbide, or a combination of both. Fabricate units in lengths necessary to accurately fit openings or conditions. 1. Nosings: Cross-hatched units, I-1 2 by 1-1/2 inches,for casting into concrete. 2. Thresholds:Fluted-saddle-type units, 5 inches wide by 1/2 inch high,with tapered edges. water'freatunent Plant Pressure Control Valves Metal Fabrications City of Round Rock 055000­12 i 2022 CDM Surith 8077-263948 All Rights Reserved February 2022 B. Extruded Units: Aluminum or Bronze,with abrasive filler consisting of aluminum oxide,silicon carbide,or a combination of both, in an epoxy-resin binder, Fabricate units in lengths necessary to accurately fit openings or conditions. I Provide fibbed units, with abrasive filler strips projecting 1,116 inch above aluminum extrusion. 2. Provide solid-abrasive type units without ribs. C Provide anchors for embedding units in concrete,either integral or applied to units, as standard with manufacturer. D. Drill for mechanical anchors and countersink. Locate holes not more than 4 inches from ends and not more than 12 inches o.c,, evenly spaced between ends, unless otherwise indicated. Provide closer spacing if recommended by manufacturer. 1. Provide two rows of holes for units more than 5 inches wide, with two holes aligned at ends and intermediate holes staggered, 117 LOOSE BEARING AND LEVELING PLATES A. Provide loose bearing and leveling plates for steel items bearing on masonry or concrete construction. Drill plates to receive anchor bolts and for grouting. 2.18 LOOSE STEEL LINTELS A. Fabricate loose steel lintels from steel angles and or shapes and plates of size indicated for openings and recesses in masonry walls and partitions at locations indicated. Fabricate in single lengths for each opening unless otherwise indicated. Weld adjoining members together to form a single unit where indicated, B. Size loose lintels to provide bearing length at each side of openings of 8 inches unless otherwise indicated. C Galvanize and prime loose steel lintels located in exterior walls, D. Prime loose steel lintels located in exterior walls with zinc-rich primer. 2.19 STEEL WELD PLATES AND ANGLES A. Provide steel weld plates and angles not specified in other Sections, for items supported from concrete construction as needed to complete the Work. Provide each unit with no fewer than two integrally welded steel strap anchors for embedding in concrete. 2.20 HNISHES,GENERAL A. Finish metal fabrications after assembly. B, Finish exposed surfaces to remove tool and die marks and stretch lines, and to blend into surrounding surface. Water Treatment Plant Pressure Control Valves Metal Fabrications City of Round Rock 055000.13 C)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2.21 STEEL AND IRON FINISHES A. Galvanizing: Hot-dip galvanize items as indicated to comply with ASTM A153/AI53M for steel and iron hardware and with ASTM A I 23/A I 23M for other steel and iron products. Limit maximum nickel(Ni)content of galvanizing zinc to 0.05 percent. B. Preparation for Shop Priming: Prepare surfaces to comply with requirements indicated below: 1. Exterior Items: SSPC-SP 6/NACE No. 3,"Commercial Blast Cleaning." 2. Items Indicated to Receive Zinc-Rich Primer: SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning." 1 Items Indicated to Receive Primers "High-Performance Coatings": SSPC-SP 6/NACE No. 3,"Commercial Blast Cleaning." 4. Other Items: SSPC-SP 3, "Power Tool Cleaning." C. Shop Priming: Apply shop primer to comply with SSPC-PA 1, "Paint Application Specification No. 1: Shop,Field,and Maintenance Painting of Steel,"for shop painting. 1. Stripe paint comers,crevices, bolts,welds,and sharp edges. 2.22 ALUMfNUM FINISHES A. As-Fabricated Finish: AA-M 12. B. Clear Anodic Finish: AAMA 611,Class 1,AA-M 12C22A4 1. 2.23 SPECIAL PREFABRICATED DOORS A. Pit,Floor and Sidewalk Hatches: 1. Acceptable Manufacturers: Provide products from one of the following or equal: a. Bilco Company Type"J." b. Babcock-Davis Assoc. 2. Materials and Fabrication: a. Prefabricated access hatches shall be single or double leaf type depending on sizes shown on Drawings and specified herein. b. Door Leaf(s): 1/4-inch aluminum diamond pattern plant with sufficient stiffening to withstand a live load of 300 lbs/sq ft. c. Torsion Bars: Unless otherwise noted on Drawings, use pivot torsion bars for counterbalance or spring operators for easy operation along with automatic door hold open. & Channel Frame: 1/4-inch aluminum equipped with embedded strap anchors or perimeter anchor flange as required. e. Hardware: Durable and corrosion resistant with Type 316 stainless steel hardware used throughout. Provide removable lock handle. f. Finish: Provide factory mill finish and bituminous coating to the exterior of the frames. Water Treatment Plant Pressure Control Valves Metal Fabrications City of'Round Rock 055000-14 ,t')2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 g. Hatches: Be watertight using a 1-1/2-in drainage coupling provided in the channel frame. Where shown or called for on the Drawings, access doors shall be equipped with a hot dip galvanized telescoping ladder extension as manufactured by the Bilco Co. or equal. K Break bond between dissimilar metals as specified in the "Installation, General" Article in Part 3. PART 3 - EXECUTION 3.1 I`NSTALLATION,GENERAL A. Install all items except those to be embedded in concrete or other masonry which shall be installed under Division 03 and Division 04 respectively. Install items to be attached to concrete or masonry after such work is completed in accordance with the details shown. Fastening to wood plugs in masonry will not be permitted. 13. Touch up abrasions in the shop primer immediately after erection. Paint areas left unprivned for welding after welding. C. Clean and repair, after installation, zinc coating which has been burned by welding,abraded, or otherwise damaged. Thoroughly clean damaged area and remove all traces of welding flux and loose or cracked zinc coating prior to painting. Paint the cleaned area per the requirements of ASTM A780. D. Install specialty products in accordance with the manufacturer's recommendations. E. Weld headed anchor studs in accordance with manufacturer's recommendations. R Cutting, Fitting, and Placerneric Perform cutting, drilling, and fitting required for installing metal fabrications. Set metal fabrications accurately in location, alignment, and elevation; with edges and surfaces level,plumb, true,and free of rack;and measured from established lilies and levels. G, Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints but cannot be shop welded because of`shipping size limitations. Do not weld, cut, or abrade surfaces of exterior units that have been hot-dip galvanized after fabrication and are for bolted or screwed field connections. H. Field Welding: Comply with the following requirements: I Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 1 Obtain fusion without undercut or overlap. 1 Remove welding flux immediately. 4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of"adjacent surface. Waterl'reatmwit Mant Press=Control VAvn� MeW Fabneatkons City of Round Rock O55000 15 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Fastening to In-Place Construction: Provide anchorage devices and fasteners where metal fabrications are required to be fastened to in-place construction. Provide threaded fasteners for use with concrete and masonry inserts,toggle bolts,through bolts,lag screws,wood screws,and other connectors. J. Provide temporary bracing or anchors in formwork for items that are to be built into concrete, masonry,or similar construction. K. Corrosion Protection: Coat concealed surfaces of aluminum and steel that come into contact with grout,concrete,masonry,wood,or dissimilar metals with the following. 1. Aluminum Contacting a Dissimilar Metal: Apply a heavy brush coat of zinc-chromate primer followed by two coats of aluminum metal and masonry paint to the dissimilar metal. 2. Aluminum Contacting Masonry or Concrete: Apply a heavy coat of approved alkali resistant paint to the masonry or concrete. 3. Aluminum Contacting Wood: Apply two coats of aluminum metal and masonry paint to the wood. 4. Steel Contacting Exposed Concrete or Masonry: Apply heavy bitumastic troweling mastic. 5. Between aluminum stair treads, and steel supports, insert 1/4 inch thick neoprene isolator pads, 85 plus or minus 5 Shore A durometer,sized for full width and length of bracket or support. 3.2 INSTALLING MISCELLANEOUS FRAMING AND SUPPORTS A. General: Install framing and supports to comply with requirements of items being supported, including manufacturers'written instructions and requirements indicated on Shop Drawings. B. Anchor supports for overhead grilles securely to,and rigidly brace from,building structure. C. Support steel girders on solid grouted masonry, concrete, or steel pipe colurnns. Secure girders with anchor bolts embedded in grouted masonry or concrete or with bolts through top plates of pipe columns. I. Where grout space under bearing plates is indicated for girders supported on concrete or masonry, install as specified in "Installing Bearing and Leveling Plates"Article. D. Install pipe columns on concrete footings with grouted baseplates. Position and grout column baseplates as specified in "Installing Bearing and Leveling Plates"Article. 1. Grout baseplates of columns supporting steel girders after girders are installed and leveled. 3.3 INSTALLING METAL.BOLLARDS A. Fill metal-capped bollards solidly with concrete and allow concrete to cure seven days before installing. Water Treatment Plant Pressure Control valves Metal Fabrications City of Round Rock 055000.16 6f,",2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Do not fill removable bollards with concrete. B. Anchor bollards to existing construction with anchor bolts. Provide four 7/8-inch bolts at each bollard unless otherwise indicated, 3A INSTALLING NOSINGS AND THRESHOLDS A. Center nosings on tread widths unless otherwise indicated. B. For nosings embedded in concrete steps or curbs, align nosings flush with riser faces and level with tread surfaces. C. Seal thresholds exposed to exterior with elastorneric sealant complying with Section 079200 "Joint Sealants"to provide a watertight installation. 3.5 INSTALLING BEARING AND LEVELING PLATES A. Clean concrete and masonry bearing surfaces of bond-reducing materials, and roughen to improve bond to surfaces. Clean bottom surface of plates. B. Set bearing and leveling plates on wedges, shims, or leveling nuts. After bearing members have been positioned and plumbed, tighten anchor bolts. Do not remove wedges or shims but, if protruding, cut off flush with edge of bearing plate before packing with nonshfink grout. Pack grout solidly between bearing surfaces and plates to ensure that no voids remain. 16 ADJUSTING AND CLEANING A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas. Paint uncoated and abraded areas with the same material as used for shop painting to comply with SSPC-PA I for touching up shop-painted surfaces. 1. Apply by brush or spray to provide a minimum 2.0-mil dry film thickness. B. Touchup Painting: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint are specified. C. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A780/A780M. END OF SECTION 055000 WaterTrealment Phint Pressure Control Valvos, MeW Fabricauons Oty ofllmnid Rock 0550,00 t 7 %2022 CDM Smith 8077-263948 All Rights Reserved February 2022 THIS PACE INTENTIONALL`t' LEFT BLANK Water Treatment Plant Pressure Control Valves Metal Fabrications City of Round Rock 055000-18 �'?2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 079200 -JOINT SEALANTS PART' I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section Includes: L Siliconejoint sealants. 2. Butyl joint sealants. 1.3 PREINSTAI.,LATION MEETINGS A. Preinstallation Conference- Conduct conference at Project site. 1.4 ACTION SUBMITTALS A. Product Data: For each joint-sealant product, B. Samples for Initial Selection: Manufacturer's color charts consisting of strips of cured sealants showing the full range of colors available for each product exposed to view. C. Samples for Verification: For each kind and color of joint sealant required, provide Samples with joint sealants in 1/2-inch- wide joints formed between two 6-inch. long strips of material matching the appearance of exposed surfaces adjacent to joint sealants. D. Joint-Sealant Schedule: Include the following information: I. Joint-sealant application,joint location,and designation. 1 Joint-sealant manufacturer and product name. 3. Joint-sealant formulation. 4. Joint-sealant color, L5 INFORMATIONAL SUBMITTALS A. Qualification Data: For qualified testing agency. B. Product Test Reports: For each kind of joint sealant, for tests performed by manufacturer and witnessed by a qualified testing agency, W,,aerl'reaunent Mant Pressure ContrM Vaives Joint SealanLs City of Round Rod( 0179200 - I 2022 CDM Smith 8077-263948 A11 Rights Reserved February 2022 C. Preconstruction Laboratory Test Schedule: Include the following information for each joint sealant and substrate material to be tested: 1. Joint-sealant location and designation. 2. Manufacturer and product name. 3. "Type of substrate material. 4. Proposed test. S. Number of samples required. D. Preconstruction Laboratory Test Reports: From sealant manufacturer,indicating the following: 1. Materials forming joint substrates and joint-sealant backings have been tested for compatibility and adhesion with joint sealants. 2. Interpretation of test results and written recommendations for primers and substrate preparation are needed for adhesion. E. Preconstruction Field-Adhesion-Test Reports: Indicate which sealants and joint preparation methods resulted in optimum adhesion to joint substrates based on testing specified in "Preconstruction Testing"Article. F. Field-Adhesion-Test Reports: For each sealant application tested. G. Sample'Warranties: For special warranties. 1.6 QUALITY ASSURANCE A. Installer Qualifications: An authorized representative who is trained and approved by manufacturer. B. Product Testing:Test joint sealants using a qualified testing agency. 1. Testing Agency Qualifications: Qualified according to ASTM C 1021 to conduct the testing indicated. C. Mockups: Install sealant in mockups of assemblies specified in other Sections that are indicated to receive joint sealants specified in this Section. Use materials and installation methods specified in this Section. 1.7 PRECONSTRUCTION TESTING A. Preconstruction Laboratory Testing: Submit to joint-sealant manufacturers, for testing indicated below,samples of materials that will contact or affect joint sealants. 1. Adhesion Testing: Use ASTM C 794 to deten-nine whether priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of joint sealants to joint substrates. 2. Compatibility Testing: Use ASTM C 1087 to determine sealant compatibility when in contact with glazing and gasket materials. 3. Submit manufacturer's recommended number of pieces of each type of material, including joint substrates,joint-sealant backings,and miscellaneous materials. Water Treatment Plant Pressure Control Valves Joint Sealants City of Round Rock 079200-2 (0 2022 CDM Smith 9077-263948 All Rights Reserved February 2022 4. Schedule sufficient time for testing and analyzing results to prevent delaying the Work, 5. For materials failing tests, obtain joint-sealant manufacturer's written instructions for corrective measures, including use of specially formulated primers. 6. Testing will not be required if joint-sealant manufacturers submit data that are based oil previous testing, not older than 24 months, of sealant products for adhesion to, staining of,and compatibility with joint substrates and other materials matching those submitted. 13. Preconstruction Field-Adhesion Testing- Before installing sealants, field test their adhesion to Project joint substrates as follows: 1. Locate test joints where indicated on Project or, if`not indicated,as directed by Engineer, 2. Conduct field tests for each kind of sealant and joint substrate. 3. Notify Engineer seven days in advance of dates and times when test joints will be erected. 4. Arrange for tests to take place with joint-sealant manufacturer's technical representative present. a. Test Method: Test joint sealants according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1.1 in ASTM C 1193 or Method A, Tail Procedure, in ASTM C 1521, 1) For joints with dissimilar substrates, verify adhesion to each substrate separately; extend cut along one side, verifying adhesion to opposite side. Repeat procedure for opposite side. 5, Report whether sealant failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each kind of product and joint substrate. For sealants that fail adhesively,retest until satisfactory adhesion is obtained. 6. Evaluation of Preconstruction Field-Adhesion-Test Results: Sealants not evidencing adhesive failure from testing, in absence of other indications of noncompliance with requirements, will be considered satisfactory. Do not use sealants that fail to adhere to joint substrates during testing. L8 FIELD CONDITIONS A. Do not proceed with installation of joint sealants under the following conditions: 1. When ambient and substrate temperature conditions are outside limits permitted by joint- sealant manufacturer or are below 40 deg F. 2. When joint Substrates are wet. 1 Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated, 4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates. Water'T'reatment Plant Pressure Co,ntrol Valves Joint Sealants Cay ot'Round Rock 079200-3 C° 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.9 WARRANTY A. Special Installer's Warranty: Installer agrees to repair or replace joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period. 1. Warranty Period: Two years from date of Substantial Completion. B. Special Manufacturer's Warranty: Manufacturer agrees to furnish joint sealants to repair or replace those joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period. I. Warranty Period: Five years from date of Substantial Completion. C. Special warranties specified in this article exclude deterioration or failure of joint sealants from the following: 1. Movement of the structure caused by stresses on the sealant exceeding sealant manufacturer's written specifications for sealant elongation and compression. 2. Disintegration of joint substrates from causes exceeding design specifications. 3. Mechanical damage caused by individuals,tools,or other outside agents. 4. Changes in sealant appearance caused by accumulation of dirt or other atmospheric contaminants, PART 2- PRODUCTS 11 JOINT SEALANTS,GENERAL A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer,based on testing and field experience. B. Colors of Exposed Joint Sealants: As selected by Engineer from manufacturer's full range. 2.2 SILICONE JOINT SEALANTS A. Silicone, S, NS, 50, NT: Single-component, nonsag, plus 50 percent and minus 50 percent movement capability,nontraffic-use,neutral-curing silicone joint sealant; ASTM C920,Type S, Grade NS,Class 50, Use NT. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following or equal: a. Pecora Corporation. b. Sika Corporation,Joint Sealants. C. The Dow Chemical Company. Water Treatn7ent Plant Pressure Coma)]Valves Joint Sealants City of Round Rock 079200 4 C)2022 CDM Srnith 8077-263948 All Rights Reserved February 2022 2.3 BUTYL JOINT SEALANTS A. Butyl-Rubber-Based Joint Sealants: ASTM C 1311. I Manufacturers: Subject to compliance with requirements,provide products by one of the following or equal: a. Bostik, Inc. b. Pecora Corporation. 2.4 JOINT-SEALANT BACKING A. Sealant Backing Material, General: Non-staining; compatible with joint substrates, sealants, primers,and other joint fillers; and approved for applications indicated by sealant manufacturer based on field experience and laboratory testing. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following or equal: a, BASF Corporation. b, Construction Foarn Products-,a division of Nomaco, Inc. B. Cylindrical Sealant Backings: ASTM C1330,Type C (closed-cell material with a surface skin) or Type B(bicellular material with a surface skin)or any of the preceding types, as approved in writing by joint-sealant manufacturer for joint application indicated, and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance. C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint. Provide self-adhesive tape where applicable. 2.5 MISCELLANEOUS MATERIALS A. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests. B. Cleaners for Nonporous Surfaces: Chemical cleaner-, acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or hanning joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants to joint substrates. C. Masking Tape: Non-staining,nonabsorbent material compatible with joint sealants and surfaces adjacent to joints. WaWr Twatniew Plant Pressure Control VaNes Jon4t Sealants City of Round Rock 079200- 5 ;2022 CDM Sin ith 8077-263948 All Rights Reserved February 2022 PART 3-EXECUTION 3.1 EXAMINATION A. Examine joints indicated to receive joint sealants, with installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements: 1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants,oil,grease,waterproofing,water repellents, water,surface dirt,and frost. 2. Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air. Porous joint substrates include the following: a. Concrete. 3. Remove laitance and form-release agents from concrete. 4. Clean nonporous joint substrate surfaces with chemical cleaners or other means that do not stain, hann substrates,or leave residues capable of interfering with adhesion of joint sealants.Nonporous joint substrates include the following: a. Metal. b. Glass. B. Joint Priming: Prime joint substrates where reconunended by joint-sealant manufacturer or as indicated by preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint- sealant bond;do not allow spillage or migration onto adjoining surfaces. C. Masking "Pape: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal. 3.3 INSTALLATION OF JOINT SEALANTS A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated,unless more stringent requirements apply. Water Treatment Plant Pressure Cotttrol Valves Joitrt Sealants City of Round Rock 079200-6 (0 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 B. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials,applications,and conditions indicated. C. Install sealant backings of kind indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability, I. Do not leave gaps between ends of sealant backings. 2. Do not stretch, twist,puncture, or tear sealant backings, 3. Remove absorbent sealant backings that have become wet before sealant application, and replace them with dry materials. D, Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints, E. Install sealants using proven techniques that comply with the following and at the same time backings are installed: I. Place sealants so they directly contact and fully wet joint substrates. 2. Completely fill recesses in each joint configuration. 3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability. 1�. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified in subparagraphs below to form smooth, uniforna beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint. L Remove excess sealant from surfaces adjacent to joints. 1 Use tooling agents that are approved in writing by sealant manufacturer and that do riot discolor sealants or adjacent surfaces, 3. Provide concave joint profile per Figure 8A in ASTM 01193 unless otherwise indicated. 3A FIELD QUALITY CONTROL A. Field-Adhesion Testing: Field test joint-sealant adhesion to joint substrates as follows: I Extent of"Testing: Test completed and cured sealant joints as follows: a. Perform 10 tests for the first 1000 feet of joint length for each kind of sealant and joint substrate. 2. Test Method: Test joint sealants according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix XI in ASTM 01193 or Method A, Tail Procedure, in ASTM C1521, a. For joints with dissimilar substrates, verify adhesion to each substrate separately; extend cut along one side, verifying adhesion to opposite side, Repeat procedure for opposite side. Water 1'reatment Mant Pressure(.'OntrW Valves Joint Sealants City(A Round Rock 079200-7 2022 CDM Stnith 8077-263948 All Rights Reserved February 2022 3. Inspect tested joints and report on the following: a. Whether sealants filled joint cavities and are free of voids. b. Whether sealant dimensions and configurations comply with specified requirements. C. Whether sealants in joints connected to pulled-out portion failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each kind of product and joint substrate. Compare these results to detennine if adhesion complies with sealant manufacturer's field adhesion hand-pull test criteria. 4. Record test results in a field-adhesion-test log. Include dates when sealants were installed,names of persons who installed sealants,test dates,test locations,whether joints were primed, adhesion results and percent elongations, sealant material, sealant configuration,and sealant dimensions. 5. Repair sealants pulled from test area by applying new sealants following same procedures used originally to seal joints. Ensure that original sealant surfaces are clean and that new sealant contacts original sealant. B. Evaluation of Field-Adhesion-Test Results: Sealants not evidencing adhesive failure from testing or noncompliance with other indicated requirements will be considered satisfactory. Remove sealants that fail to adhere to joint substrates during testing or to comply with other requirements. Retest failed applications until test results prove sealants comply with indicated requirements. 3.5 CLEANING A. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur. 3.6 PROTECTION A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out, remove, and repair damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from original work. 3.7 JOINT-SEALANT SCHEDULE A. Joint-Sealant Application: Exterior joints in vertical surfaces and horizontal nontrafftc surfaces. 1. Joint Locations: a. Joints between metal panels. b. Perimeter joints between materials listed above and frames of doors and louvers. c. Joints between existing conditions and new materials. d. Other joints as indicated on Drawings. Water Treatment Plant Pressure Control Valves Joint Sealants City of Round Rock 079200-8 fx',2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. Joint Sealant: Silicone, S,NS,50,NT. 3, Joint-Sealant Color: As selected by Engineer from manufacturer's full range of colors. B. Joint-Sealant Application: Concealed mastics. I Joint Locations: a. Other joints as indicated on Drawings. 2, Joint Sealant: Butyl-rubber based. I Joint-Sealant Color: As indicated by manufacturer's designations. END OF SECTION 079200 Water Trcatrnenl 111wit Pressure C(qorM VMvcs Joint Sealams Crty of Round Rock 079200-9 K 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 THIS PAGE INTENTIONALLY LEFT BLANK. Water Treatment Plant Pressure Control Valves Joint Sealants City of Round Rock 079200- 10 (r,i 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 SECTION 099010- SHOP PRIMING PART I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section includes shop primers not included in other sections. 13. Related Requirements: I. Division 09 for field applied painting. 2. Other specifications that reference this specification for pfirners. 13 ACTION SUBMITTALS A. Product Data: For each type of product. L Include written statement,or published product data,that the confirms that the shop primer materials are compatible with the finish and field coatings. 1.4 QUALITY ASSURANCE A. Compatibility of Coating Systems- Shop priming with primers that are guaranteed, in writing, by the manufacturer to be compatible with field applied and other coatings. PART2-PRODUCTS 2.1 MATERIALS A, Submerged Surfaces-Shop primer for ferrous metals which will be in contact with water being treated, either submerged or which are subject to splash action or which are specified to be considered submerged service: I. Shop Prime Coat: (Zinc Micaceous Iron Oxide Polyurethane Aromatic Shop Primer): a, TNEMEC: Series I Omnithane. b, Carboline: Carboguard 561, c, Sherwin-Williams Company(The): Corothane I Zinc Primer IK Mio-Zinc, & PPG PMC Durathane MCG 97-679 Serres or PPG PMC Amerlock 400. Warer 1'reatrinent Plant Pressure Control VaNcs Shop Prinimg Cty of Round Rock 099010-I C 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 e. Or equal. B. Non-Submerged Surfaces: Shop primer for ferrous metals which will not be in contact with water being treated,not submerged and not subject to splash action: I Shop Prime Coat:(Zinc Micaceous Iron Oxide Polyurethane Aromatic Shop Primer): a. TNEMEC: Series I Omnithane. b. Carboline: Carbogmard 561. C. Sherwin-Williams Company(The): Corothane I Zinc Primer IK Mio-Zinc. d. PPG PMC Durathane MCZ 97-679 Series or PPG PMC Amercoat 6811S. C. Or equal. PANT -EXECUTION 3.1 PREPARATION A. Surface preparation: Comply with the manufacturer's written requirements for the substrate to be primed. 3.2 PROTECTION A. Non-Primed Surfaces -Apply a heavy shop coat of grease or other suitable rust-resistant coating to gears,bearings surfaces and other similar surfaces which are not to be field painted. I. Maintain this coating to prevent corrosion until final acceptance testing of equipment. END OF SECTION 099010 Water Treatment Plant Pressure Control Valves Shop Priming City of Round Rock 099010-2 ,2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 SECTION 099100 -PAINTING PART I GENERAL Ll RELATFD DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes surface preparation and the application of paint systems on the following substrates- L Steel and iron. 2. Stainless steel. 13. Section includes painting all exposed structural and miscellaneous steel; mechanical and electrical equipment; conveying systems, pipe, fittings and valves; electrical conduit and appurtenances; all as specified in the attached painting schedules and all other work obviously required to be painted unless otherwise specified. Minor iterns not mentioned in the schedule of work shall be included in the work of this Section where they come within the general intent of this Section as stated herein. C. Provide vinyl film letters and numbers for markings as specified. D. Paint items noted in other Specification Sections as having factory finish and other factory finished items are obviously not field painted. E. Paint all factory finish painted items replaced,repaired or damaged during construction. F. The various Sections are responsible, as stated in each, for preparation and field touch-up of abrasions,welds,and damaged primed areas of primed or galvanized components after erection, G. The following items will not be painted: 1. Concrete except where specified above and scheduled to be painted and seamless flooring. 2. Stainless steel louvers, 3. Finish hardware. 4. Non-ferrous metal-,and stainless steel,unless specifically rioted otherwise. 5. Factory pre-finished architectural components. 6. Packing glands,and other adjustable parts and riarne plates of mechanical equipment. 7. Paris of'buildings not exposed to sight,unless specifically rioted otherwise, & Maintenance equipment 9. Plumbing fixtures. 10. Mechanical and Electrical equipment which has been finished painted in the factory as specified in Division 40. Water Treatment Plant Pressure CoiuroValves Painting City of Round Rock 0991004 '.)2022 CDM Smith 5077-263948 All Rights Reserved February 2022 H. Related Requirements: 1. Valve identification is included in Divisions 40 and 43. 2. Shop priming of equipment and piping (except copper piping) are specified in Section 099010 ­ Shop Priming and included in the respective Section with the item to be primed. 3. Section 055000"Metal Fabrications"for shop priming metal fabrications. 1.3 ACTION SUBMITTALS A. Product Data: For each type of product. 1. Indicate VOC content. B. Product List: Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules. Include color designations. 1.4 QUALITY ASSURANCE A. Shop Primers, specified in Section 099010 "Shop Priming," and other Sections are required to be certified by the manufacturer of the field applied painting manufacturer to be compatible with the materials specified in this section. 1.5 DELIVERY,STORAGE, AND FIANDHNG A. Store materials not in use in tightly covered containers in well ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F. I. Maintain containers in clean condition,free of foreign materials and residue, 2. Remove rags and waste from storage areas daily. 1.6 FIELD CONDITIONS A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F. B. Do not apply paints in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point;or to damp or wet surfaces. PART 2-PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Provide products by one of the following: 1. Tnemec,Inc.(TN). 2. The Sherwin Williams Company(SW). Water Treatment Plant Pressure Control Valves Painting City of Round Rock 099100-2 (0 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 PPG Architectural Finishes, Inc. (PPG). 4. PPG Architectural Finishes, Inc, Ameron(AME). 5. Or equal, 12 MATERIALS A, Material Compatibility: 1. Provide materials for use within each coating systern that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer,based on testing and field experience. 2. Provide products of same manufacturer for each coat in a coating system. 13, Use paint materials without adulteration and mixed, thinned and applied in strict accordance with manufacturer's directions for the applicable materials and surface. C. Colors: As selected by Engineer from manufacturer's full range, Match existing coating and color of the existing Belton Ground Storage Tank. PART 3- PART 3-EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting perfonuance of work. B. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers. C. Proceed with coating application only after unsatisfactory conditions have been corrected. I. Application of coating indicates acceptance of surfaces and conditions. 3.2 PREPARATION A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual" applicable to substrates and paint systems indicated. B. Remove hardware,covers,plates,and similar items already in place that are removable and are riot to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting. I. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection, Water Treatment 11ant Pressure Control Valves Patnting C�ly of Round Rock 099100-3 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Clean substrates of substances that could impair bond of paints, including dust, dirt,oil,grease, and incompatible paints and encapsulants, I Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated. D. Steel Substrates: Remove rust, loose mill scale, oil, grease, dirt, and shop primer if any with approved solvents, wire brushing, or sanding. Clean using methods recommended in writing by paint manufacturer but not less than the following: I. SSPC-SP 2. E. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and areas where shop paint is abraded. Paint exposed areas with the same material as used for shop priming to comply with SSPC-PA I for touching up shop-primed surfaces. 3.3 APPLICATION A. Apply paints according to manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual." I. Use applicators and techniques suited for paint and substrate indicated. 2. Paint surfaces behind movable items same as similar exposed surfaces. Before final installation,paint surfaces behind permanently fixed items with prime coat only. 3. Paint both sides and edges of exterior doors and entire exposed surface of exterior door frames. 4. Paint entire exposed surface of window frames and sashes. 5. Do not paint over labels of independent testing agencies or equipment name, identification,performance rating,or nomenclature plates. 6. Primer-, specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers. B. Tint undercoats same color as topcoat, but tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of same material are to be applied. Provide sufficient difference in shade of undercoats to distinguish each separate coat. C. If undercoats or other conditions show through topcoat, apply additional Coats until cured film has a uniform paint finish,color,and appearance. D. Apply paints to produce surface films without cloudiness,spotting, holidays, laps, brush marks, roller tracking, runs,sags,ropiness, or other surface imperfections. Cut in sharp lines and color breaks. 3.4 FIELD QUALITY CONTROL A. Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting agency to inspect and test paint for dry film thickness. 1. Contractor shall touch up and restore painted surfaces damaged by testing. 2. If test results show that dry film thickness of applied paint does not comply with paint manufacturer's written recommendations, Contractor shall pay for testing and apply Water Treatment Plant Pressure Control Valves Painting City o€Round Rock 099100-4 (x"2022 CDM Smith 8077-263948 All Rights Reserved February 2022 additional coats as needed to provide dry film thickness that complies with paint manufacturer's written recommendations. 3.5 CLEANING AND PROTECTION A. At end of each workday,remove rubbish, empty cans,rags, and other discarded materials from Project site. B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing,scraping,or other methods. Do not scratch or damage adjacent finished surfaces. C. Protect work of other trades against damage froth paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Engineer, and leave in an undamaged condition. D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. 3.6 PAINTING SCHEDULE A, Dry Film Thickness(DFT)for each paint product is not part of paint schedule. Submit both the Wet Film Thickness (WFT)and DFI'for each product as part of submittal process. Apply paint and coating products to comply with manufacturer's DFT thickness and application recommendations in the approved submittal. 3.7 The following types of paints by'rnernec Co.(TN),The Sherwin Williams Company(SW), PPG Protective&Marine Coatings,(PPG),and Ameron International(AME)have been used as a basis for the paint schedule;use one of these paints or equal: A. Epoxy: 1. TN:I-li-build Epoxciline 11, Series N69. 2, SW: Macropoxy 646, B58 Series. 1 PPG: Pitt-Guard 97-145 Series Epoxy Mastic. 4. AME: Amerlock 2f400 Series Epoxy. B. Waterborne Cementitious Acrylic: Result in pinhole free surface. I. TN:Envirofil, Series 130-6602. 2. SW: Cement-Flex 875, B42 Series. 3, PPG: Cementitious Waterproofing Block Filter 95-217 Series. 4. AME: Amerlock 400 BF Epoxy Block Filler. C. High-Build Acrylic Polyurethane Enamel: L TN:Endura-Shield-semi-gloss,Series V73. 1 SW: Acrolon 218 HS, B65 Series, 1 PPG: Pitthane FIB Semigloss Urethane 95-8800 Series. 4, AME: Amercoat 450HSG,Polyurethane. Water Treatment Plant Pressure Commit Valves Painting City of'Round Rock 099100-5 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 D. The following surfaces shall have the types of paint scheduled below applied at the dry film thickness(DFT) in mils per coat as recommended by manufacturer: 1. Exterior non-submerged ferrous metals(except first coat-hollow metal-pressed metal work): a. First Coat: On properly prepared unprimed metal or for touch-up: 1) TN: Hi-build Epoxoline II,Series N69. 2) SW: Macropoxy 646,B58 Series. 3) PPG: Pitt-Guard 97-145 Series Epoxy Mastic. 4) AME: Amerlock 2/400 Series Epoxy. b. Second Coat: 1) TN: Hi-build Epoxoline 1I, Series N69. 2) SW: Macropoxy 646,B58 Series. 3) PPG: Pitt-Guard 97-145 Series Epoxy Mastic. 4) AME: Amerlock 26400 Series Epoxy. C. Third Coat: 1) TN: Endura-Shield semi-gloss,Series V73, 2) SW: Acrolon 218 HS,B65 Series. 3) PPG: Pitthanc HB Semigloss Urethane 95-8800 Series. 4) AME: Amercoat 450HSG Polyurethane. 2. Interior non-submerged ferrous metals(except first coat of previously painted metal work),on properly prepared unprimed metal or for touch-up: a. First Coat: I) TN: Hi-build Epoxoline Il, Series N69. 2) SW:Macropoxy 646,B58 Series. 3) PPG: Pitt-Guard 97-145 Series Epoxy Mastic. 4) AME: Amerlock 2/'400 Series Epoxy. b. Second and Third Coats: I) TN: Hi-build Epoxoline 11, Series N69. 2) SW: Macropoxy 646, B58 Series. 3) PPG: Pitt-Guard 97-145 Series Epoxy Mastic. 4) PPG: Amerlock 26400 Series Epoxy. 3. Submerged ferrous metals and ferrous metals subject to submersion or splashing. Surface shall be lightly sanded or abraded before application of first field coat. a. First and Second Coats: I) TN: Hi-build Epoxoline 11, Series N69. 2) SW: Macropoxy 646,B58 Series. 3) PPG: Pitt-Guard 97.145 Series Epoxy Mastic. 4) PPG: Amerlock 21400 Series Epoxy. 4. Plastic piping and,where scheduled to be painted,plastic components: a. First and Second Coats: 1) TN: Hi-build Epoxoline II,Series N69. 2) SW: Macropoxy 646„B58 Series. 3) PPG: Pitt-Guard 97-145 Series Epoxy Mastic. 4) AME: Amerlock 2/400 Series Epoxy. 5. Previously Painted Metal Surfaces: Water Treatment Plant Pressurc Control Valves Painting City of Round Rock 099100,6 Cr 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 a. First coat on substrates prepared as approved and replacing first coat of'above- specified systems, Complete painting with remainder of specified system for each type of substrate, b, First Coat: 1) TN: FCTypoxy, Series V27. 2) SW: Macropoxy 646, B58 Series, 3) PPG: Pitt-Guard 97-145 Series Epoxy Mastic. 4) AME: Amerlock 2/400 Series Epoxy. 6. Exterior galvanized steel surfaces: a. Mechanically abrade surfaces to comply with SSPC SP 16"Brush-off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non- ferrous Metals". b. First Coat: 1) TN: FC Typoxy, Series V27. 2) SW: Macropoxy 646,B58 Series, 3) PPG: Pitt-Guard Epoxy Mastic 95-245 Series. 4) AME: Amercoat 385 Multi-Purpose Epoxy. c. Second Coat: 1) TN: Endura-Shield-semi-gloss, Series V73. 2) SW: Acrolon 218 H& 3) PPG: Pitthane HB Semigloss Urethane 95-8800 Series. 4) AME: Amercoat 450HSG Polyurethane. END OF SECTION 099 100 Water l"reatiment Plant Pressure Control Vaives Painting Cuy of'Round Rock 099100.7 C,,,,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Painting City of'Round Rock 099100-8 s)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 260519 -LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART I GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section Includes: 1, Copper building wire rated 600 V or less. 2. Tray cable,Type TC,rated 600 V or less. 3. Connectors,splices,and terminations rated 600 V and less. B. Related Requirements: L Section 260523 "Control-Voltage Electrical Power Cables" for control systems communications cables and Classes 1,2,and 3 control cables, 13 DEFINITIONS A. PV: Photovoltaic, K RoHS: Restriction of Hazardous Substances. C, VFC: Variable-frequency controller. 1.4 ACTION SUBMITTALS A, Product Data: For each type of product. B, Product Schedule: Indicate type, use, location,and termination locations. 1.5 INFORMATIONAL SUBMITTALS A. Qualification Data: For testing agency. B. Field quality-control reports, Wa(er Treauricnt Plant Pressure Control Valves Low Voltage Elecutcal Power Conductors and Cables City of Round Rock 26050, 1 2022 CUM Smith 8077-263945 All Rights Reserved February 2022 1.6 QUALITY ASSURANCE A. Testing Agency Qualifications: Member company ofNETA. 1. Testing Agency's Field Supervisor:Certified by META to supervise on-site testing. PART2-PRODUCTS 2.1 COPPER BUILDING WIRE A. Description: Flexible, insulated and uninsulated,drawn copper current-carrying conductor with an overall insulation layer or jacket,or both,rated 600 V or less. B. Manufacturers: Subject to compliance with requirements, provide products by one of the following: I. American Bare Conductor. 2. Belden Inc. 3. Cerro Wire LLC. 4. General Cable; Prysmian Group North America. 5. Okonite Company(The). 6. Southwire Company. C. Standards: I. Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and use. 2. RoHS compliant. 3. Conductor and Cable Marking: Comply with wire and cable marking according to UL's "Wire and Cable Marking and Application Guide." D. Conductors: Copper, complying with ASTM B3 for bare annealed copper and with ASTM B496 for stranded conductors. E. Conductor Insulation: I. Type TC-ER: Comply with NEMA WC 701ICEA 5-95-658 and UL 1277. 2. Type XHHW-2:Comply with UL 44. 3. Identify and color-code conductors and cables according with the National Electrical Code, F. Shield: I. Type TC-Eft: Cable designed for use with VFCs, with oversized crosslinked polyethylene insulation, dual spirally wrapped copper tape shields and three bare symmetrically applied ground wires,and sunlight-and oil-resistant outer PVC jacket. Water Trcannent Plant Pressure Control Valves Law---Voltage Electrical Power Conductors and Cables City of Round Rock 260519-2 C 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2.2 T CABLE,TYPE TC A. Description: A factory assembly of insulated current-carrying conductors with or without an equipment grounding conductor in a nonmetallic jacket, 13, Manufacturers: Subject to compliance with requirements, provide products by one of the following: I. General Cable Technologies Corporation. 2. Okonite Company(The). 1 Southwire Company. Standards: I. Listed and labeled as defined in NFPA 70, by a qualified testing agency,and marked for intended location and use, 1 Rol-IS compliant, 3. Comply with UL 1277. 4, Comply with ICER S-73-532/NEMA WC 57 for Type TC cables used for control, thermocouple extension,and instrumentation. 5, Comply with ILEA S-95-658/NEMA WC 70 for Type TC cables used for power distribution. 6. Conductor and Cable Marking: Comply with wire and cable marking according to UL's "Wire and Cable Marking and Application Guide." D, Conductors: Copper, complying with ASTM B3 for bare annealed copper and with ASTM B8 for stranded conductors. E, Ground Conductor: Insulated, F. Conductor Insulation: Type XI-11-[W-2. Comply with UL 44. G. Shield: Metallic. 2.3 CONNECTORS AND SPLICES A. Description: Factory-fabricated connectors, splices, and lugs of size, ampacity rating, material, type, and class for application and service indicated; listed and labeled as defined in NFPA 70, by a qualified testing agency,and marked for intended location and use. B. Manufacturers: Subject to compliance with requirements,provide products by the following: 1. 3M Company. 2. FCI Burndy; A subsidiary of the Hubbell Company. 1 Thomas&Betts Corporation; A Member of the ABB Group, C, Jacketed Cable Connectors. For steel and aluminum jacketed cables, zinc die-cast with set screws,designed to connect conductors specified in this Section. Wateir'Treatmwit Plara Pressure Control Valves Low-Voltage Econcal Pover Conductors and Cables Oly ol'Round Rock 2605l9-3, K;"2022 CDM Smith 8077-263948 All Rights Reserved February 2022 D. Lugs: One piece,seamless,designed to terminate conductors specified in this Section. 1. Material:Copper. 2. Type:Two hole with long barrels. 3. Termination: Compression. PART 3 -EXECUTION 3.1 CONDUCTOR MATERIAL APPLICATIONS A. Feeders: Copper; solid for No. 10 AWG and smaller;stranded for No.8 AWG and larger. B. Branch Circuits: Copper. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger. C, VFC Output Circuits Cable: Extra-flexible stranded for all sizes. D. Power-Limited Fire Alam►and Control: Solid for No. 12 AWG and smaller. 3.2 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS AND WIRING METHODS A. Feeders Concealed in Ceilings, Walls, Partitions, and Crawlspaces: Type XHHW-2, single conductors in raceway. B. Feeders Concealed in Concrete, below Slabs-on-Grade, and Underground: Type XHHW-2, single conductors in raceway. C. Feeders in Cable Tray:Type XHHW-2,Type TC,multi-conductor. D. Branch Circuits Concealed in Concrete, below Slabs-on-Grade, and Underground: Type XHHW-2,single conductors in raceway. E. Branch Circuits in Cable Tray: Type XHHW-2,Type TC,multi-conductor. F. Cord Drops and Portable Appliance Connections: Type SO, hard service cord with stainless- steel,wire-mesh,strain relief device at terminations to suit application. G. VFC Output Circuits:Type TC-ER cable with dual tape shield. 3.3 INSTALLATION OF CONDUCTORS AND CABLES A. Power cable splices are not accepted on new installations. I. Splices in the case where the required length of the cable exceeds the length of the cable that is available on the available reel will be considered. Splices require approval by IEUA. Water Treatment Plant Pressure Control Valves Low,Voltage Electrical Power Conductors and Cables City of Round Rock 260519-4 C)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Conceal cables in finished walls,ceilings, and floors unless otherwise indicated. C. Complete raceway installation between conductor and cable termination points according to Section 260533 "Raceways and Boxes for Electrical Systems" prior to pulling conductors and cables. D. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values. E. Use pulling means, including fish tape, cable, rope,and basket-weave wire/cable grips, that will not damage cables or raceway, F. Install exposed cables parallel and perpendicular to surfaces of exposed structural members,and follow surface contours where possible. 3A CONNECTIONS A. Tighten electrical connectors and tofinalsaccording to manufacturer's published torque- tightening values. If manufacturer's torque values are riot indicated, use those specified in UL 486A-48613. B. Make splices, terminations, and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors. I. Splice Points:Conductor colors shall not change color at splice points. C. Wiring at Outlets: Install conductor at each outlet,with at least 12 inches of slack. 3.5 IDENTIFICATION A. Identify and color-code conductors and cables according with the National Electrical Code, B. Identify each spare conductor at each end with identity number and location of other end of conductor and identify as spare conductor. 16 FIELD QUALITY CONTROL A. Testing Agency: Contractor will engage a qualified testing agency to perform tests and inspections, B. Perlonii tests and inspections, I After installing conductors and cables and before electrical circuitry has been energized, test service entrance and feeder conductors for compliance with requirements, 2. Perform each of the following visual and electrical tests: Water'Treauneni Nam Pressure C�)nvol Valves Low-VoRage Eleorical Power Conductors and CaNes City of'Round Rock 260519, 5 %2022 CDM Smith 8077-263948 All Rights Reserved February 2022 a. Inspect exposed sections of conductor and cable for physical damage and correct connection according to the single-line diagram. b. Test bolted connections for high resistance using one of the following: 1) A low-resistance ohmmeter. 2) Calibrated torque wrench. 3) Thermographic survey. C. Inspect compression-applied connectors for correct cable match and indentation. d. Inspect for correct identification. e. Inspect cable jacket and condition. f. Insulation-resistance test on each conductor for ground and adjacent conductors. Apply a potential of 500-V do for 300-V rated cable and 1000-V do for 600-V rated cable for a one-minute duration. g. Continuity test on each conductor and cable. h, Uniform resistance of parallel conductors. C. Cables will be considered defective if they do not pass tests and inspections. D. Prepare test and inspection reports to record the following: 1. Procedures used. 2. Results that comply with requirements, 3. Results that do not comply with requirements, and corrective action taken to achieve compliance with requirements. END OF SECTION 260519 Water Treatment Plant.Pressure Control Valves Low Voltage Electrical Power Conductors and Cables City of Round Rock 260519-6 x j 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 260523 -CONTROL-VOLTAGE EH,ECTRICAL POWER CABLES PART I ..GENERAL IA RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section Includes: I. Category 6 balanced twisted pair cable, 2. Balanced twisted pair cabling hardware. 3. RS-485 cabling. 4. Low-voltage control cabling. 5. Control-circuit conductors. 6. Identification products. 1.3 DEFINITIONS A. EMI: Electromagnetic interference, B. Low Voltage: As defined in NPA 70 for circuits and equipment operating at less than 50 V or for remote-control and signaling power-limited circuits. C. Plenum: A space forming part of the air distribution system to which one or more air ducts are connected. An air duct is a passageway, other than a plenum, for transporting air to or from heating,ventilating,or air-conditioning equipment, D. RCDD: Registered Communications Distribution Designer. tA ACTION SUBMITTALS A. Product Data: For each type of product. L5 INFORMA,riONAL SUBMITTALS A. Qualification Data: For testing agency, RCDD, layout technician, installation supervisor, and field inspector. B. Source quality-control reports. C. Field quality-control reports, WaterTreau-nent Plant Pressure Conrrot Valves Controt,Volrage Eecrncaf flower CaMes C'ay of'Round Rock 260523 , I 2022 CDM Smith 5077-263948 All Rights Reserved February 2022 1.6 QUALITY ASSURANCE A. Testing Agency Qualifications: Accredited by NETA. 1. Testing Agency's Field Supervisor: Currently certified by BICSI as an RCDD to supervise on-site testing. PART2-PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Electrical Components, Devices,and Accessories: Listed and labeled as defined in NFPA 70,by a qualified testing agency,and marked for intended location and application. B. Flame Travel and Smoke Density in Plenums: As determined by testing identical products according to NFPA 262, by a qualified testing agency. Identify products for installation in plenums with appropriate markings of applicable testing agency. 1. Flame Travel Distance:60 inches or less. 2. Peak Optical Smoke Density: 0.5 or less. 3. Average Optical Smoke Density: 0.15 or less. C. Flame Travel and Smoke Density for Riser Cables in Non-Plenum Building Spaces: As determined by testing identical products according to UL 1666. D. Flame Travel and Smoke Density for Cables in Non-Riser Applications and Non-Plenum Building Spaces: As detennined by testing identical products according to UL 1685. E. Rol-IS compliant. 2.2 CKI'EGORY 6 BALANCED TWISTED PAIR CABLE A. Description: Four-pair, balanced-twisted pair cable,with internal spline, certified to meet transmission characteristics of Category 6 cable at frequencies up to 250 MHz. B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include,but are not limited to the following: I. 3M. 2. Belden,Inc. 3. General Cable; Prysmian Group North America. C. Standard: Comply with NEMA WC 66FICEA 5-116-732 and TIA-568-C.2 for Category 6 cables. D. Conductors: I00-ohm,23 AWG solid copper. E. Shielding!Screening: Shielded twisted pairs(FTP). Water Treatment Plant Pressure Control Valves Control Voltage Electrical Power Cables City of Round Rock 260523,2 (jrt 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 F. Cable Rating: Riser. G. Jacket: Yellow thermoplastic. 2.3 RS-485 CABLE A. Standard Cable: NFPA 70,Type CMG. 1. Paired,one pair, twisted,No, 22 AWG,stranded(700)tinned-copper conductors. 2. PVC insulation. 3. Unshielded. 4. PVC jacket. 5. Flame Resistance: Comply with UL 1685. 2.4 LOW-VOLTAGE CONTROL CABLE A. Paired Cable:NFPA 70,"Type CMG. I. One pair,twisted,No. 16 AWG,stranded (19x29)tinned-copper conductors. 2. 80 deg C. 1 600VAC PVC insulation, 4. Foil shield, 5. O/A HD polyethylene jacket, 6. Flame Resistance: Comply with UL 1685. B, Triad Cable:NFPA 70,Type CMG. 1. Single triad,twisted,No. 16 AWG,stranded(19x29)tinned-copper conductors. 1 90 deg C. 3, 600VAC PVC insulation. 4. Foil shield. 5. O/A FID polyethylene jacket. 6. Flame Resistance:Comply with UL 1685. 2.5 CONTROL-CIRCUIT CONDUCTORS A. Manufacturers: Subject to compliance with requirements, provide products by one ol' the following: I. Encore Wire Corporation. 2. General Cable;General Cable Corporation. 3. Southwire Company, 13, Stranded copper,Type XHHW-2,complying with UL 44 in raceway, I. Single conductor: a. Copper,solid or stranded,600VAC, b, 14 AWG minimum, Water'Treatryient Plant Pressure Control Valves Control-Voltage Heetrical Power Cables Cay of Round Rock 260523-3 K 20122 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Insulation Color: Red. 2. Multi-Conductor: a. Copper,solid or stranded,600 VAC, b. 14 AWG minimum,with an overall protective PVC jacket. C. Circuit identification shall consist of Method I - color coding in accordance with ILEA S-66-524,Appendix K Table K-2. C. Class 2 Control Circuits and Class 3 Remote-Contras and Signal Circuits That Supply Critical Circuits:Circuit Integrity(CI)cable. 1. Smoke control signaling and control circuits. 2.6 SOURCE QUALITY CONTROL A. Testing Agency: Engage a qualified testing agency to evaluate cables. B. Factory test twisted pair cables according to TIA-568-C.2. C. Cable will be considered defective if it does not pass tests and inspections. D. Prepare test and inspection reports. PART 3 -EXECUTION 3.1 EXAMINATION A. "fest cables on receipt at Project site. I. Test each pair of twisted pair cable for open and short circuits. 3.2 INSTALLATION OF RACEWAYS AND BOXES A. Comply with requirements in Section 260533 "Raceways and Boxes for Electrical Systems" for raceway selection and installation requirements for boxes, conduits, and wireways as supplemented or modified in this Section. 1. Outlet boxes for cables shall be no smaller than 4 inches square by 1-U2 inches deep with extension ring sized to bring edge of ring to within 1/8 inch of the finished wall surface. 2. Flexible metal conduit shall not be used. B. Comply with TIA-569-D for pull-box sizing and length of conduit and number of bends between pull points. C. Install manufactured conduit sweeps and long-radius elbows if possible. Water'freatment Plant Pressure Control Valves Control,Voltage Electrical Power Cables City of Round Rack 260523 .4 °%2 12'2 CDM Smith 8077-263948 All Rights Reserved February 2022 D. Raceway Installation in Equipment Rooms: I. Install cable trays to route cables if conduits cannot be located in these positions. 2. Extend conduits 3 inches above finished floor. 3. Install metal conduits with grounding bushings and connect with grounding conductor to grounding system. 3.3 INSTALLATION OF CONDUCTORS AND CABLES A. Comply with NECA I. B. General Requirements for Cabling: I. Comply with TIA-568-C Series of standards, 2. Comply with BICSI ITSIMM,Ch. 5, "Copper Structured Cabling Systems." 3, Terminate all conductors; no cable shall contain unterminated elements. Make ten-ninations only at indicated outlets,to finals,and cross-connect and patch panels. 4. Cables may not be spliced and shall be continuous from terminal to terminal. Do not splice cable between termination,tap, or junction points. 5. Cables serving a common system may be grouped in a common raceway. Install network cabling and control wiring and cable in separate raceway from power wiring. Do riot group conductors from different systems or different voltages, 6. Secure and support cables at intervals not exceeding 30 inches and not more than 6 inches from cabinets,boxes,fittings,outlets,racks,frames,and terminals. 7. Bundle, lace, and train conductors to tenninal points without exceeding manufacturer's limitations on bending radii, but not less than radii specified in BICSI ITSIMM, Ch. 5, "Copper Structured Cabling Systems." Install lacing bars and distribution spools. 8. Do not install bruised, kinked, scored, deformed, or abraded cable. Remove and discard cable if damaged during installation and replace it with new cable. 9. Cold-Weather Installation: Bring cable to room temperature before dereeling. Do not use heat lamps for heating. 10. Pulling Cable: Comply with BICSI ITSIMM, Ch. 5, "Copper Structured Cabling Systems,"Monitor cable pull tensions. 11. Support: Do not allow cables to lie on removable ceiling tiles, 12. Secure: Fasten securely in place with hardware specifically designed and installed so as to not damage cables. 13. Provide strain relief. 14. Keep runs short. Allow extra length for connecting to terminals. Do not bend cables in a radius less than 10 times the cable OD. Use sleeves or grommets to protect cables from vibration at points where they pass around sharp carriers and through penetrations. 15. Ground wire shall be copper, and grounding methods shall comply with IEEE C1 Demonstrate ground resistance, C. Balanced Twisted Pair Cable Installation: 1. Comply with TIA-568-C-2. 2. Do not untwist balanced twisted pair cables more than 1/'2 inch at the point of termination to maintain cable geometry. D. Installation of Control-Circuit Conductors: Water Treatnient Plant Pressure Control Valves Control Voltage Hect6cal flower Cables City of Romid Rock 260523 -5 k, 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Install wiring in raceways. 2. Use insulated spade lugs for wire and cable connection to screw terminals. 3. Comply with requirements specified in Section 260533 "Raceways and Boxes for Electrical Systems." E. Installation of Ethernet Cable: L Terminate with shielded connectors at receiving end(RTU, PLC,IS barrier,etc). 2. Insulate shield at the field end unless otherwise required. 3. Terminations: a. Terminate all field cables at a patch panel or RJ45 coupler before continuing to equipment connection with jumper. b. All shielded Cath cabling shall be terminated at a patch panel. C. Provide CAT6 patch panel in each RIO cabinet so that field network cables are terminated on patch panel,not directly on switches. F. Open-Cable Installation: 1. Install cabling with horizontal and vertical cable guides in telecommunications spaces with terminating hardware and interconnection equipment. 2. Suspend copper cable not in a wireway or pathway a minimum of 8 inches above ceilings by cable supports not more than 30 inches apart. 3. Cable shall not be run through or on structural members or in contact with pipes,ducts,or other potentially damaging items. Do not run cables between structural members and corrugated panels. G. Separation from EMI Sources: 1. Comply with BICSI TDMM and TIA-569-D recommendations for separating unshielded copper voice and data communications cable from potential EMI sources including electrical power lines and equipment. 2. Separation between open communications cables or cables in nonmetallic raceways and unshielded power conductors and electrical equipment shall be as follows: a. Electrical Equipment or Circuit Rating Less Than 2 kVA: A minimum of 5 inches. b. Electrical Equipment or Circuit Rating between 2 and 5 kVA: A minimum of 12 inches. c. Electrical Equipment or Circuit Rating More Than 5 kVA: A minimum of 24 inches. 3. Separation between communications cables in grounded metallic raceways and unshielded power lines or electrical equipment shall be as follows: a. Electrical Equipment or Circuit Rating Less Than 2 kVA: A minimum of 2-1/2 inches. b. Electrical Equipment or Circuit Rating between 2 and 5 kVA: A minimum of 6 inches. C. Electrical Equipment or Circuit Rating More Than 5 kVA: A minimum of 12 inches. Water Treatment Plant Pressure Control Valves Control-Voltage Electrical Power Cables City of Round Pock 260523-6 (0 2022 CDM Smith 8077-263'948 All Rights Reserved February 2022 4. Separation between communications cables in grounded metallic raceways and power lines and electrical equipment located in grounded metallic conduits or enclosures shall be as follows: a. Electrical Equipment or Circuit Rating Less Than 2 WA:No requirement. b. Electrical Equipment or Circuit Rating between 2 and 5 kVA-. A minimum of 3 inches. C. Electrical Equipment or Circuit Rating More Than 5 kVA: A minimum of 6 inches. 5. Separation between Communications Cables and Electrical Motors and Transfort-ners, 5 kVA or 5 HP and Larger: A minimum of'48 inches. 6. Separation between Communications Cables and Fluorescent Fixtures: A minimum of 5 inches. 3.4 REMOVAL OF CONDUCTORS AND CABLES A. Remove abandoned conductors and cables. Abandoned conductors and cables are those installed that are not terminated at equipment and are not identified with a tag for future use, 15 CONTROL-CIRCUIT CONDUCTORS A. Minimum Conductor Sizes: 1. Class I remote-control and signal circuits; No 14 AWG. 1 Class 2 low-energy,remote-control,and signal circuits;No. 16 AWG. 1 Class 3 low-energy,remote-control,alarm,and signal circuits; No 12 AWG. 3.6 GROUNDING A. For data communication wiring, comply with "CIA-607-B and with BICSI TDMM, "Bonding and Grounding(Earthing)"Chapter, 3.7 IDENTIFICATION A. Identify data and communication►s system components, wiring, and cabling according to TIA- 606-B; label printers shall use label stocks, laminating adhesives, and inks complying with UL 969. B. Identify each wire on each end and at each ter►ninal with a number-coded identification tag. Each wire shall have a unique tag. 18 FIELD QUALITY CONTROL A. Testing Agency: Engage a qualified testing agency to perform tests and inspections. B, Perfor►ra tests and inspections with the assistance of a factory-authorized service representative. Water Treatment Plant PreSSUre Control Valves Control Voltage Electrical Power Cables City of'Round Rock 260523- 7 C 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Tests and Inspections: 1. Visually inspect cable jacket materials for UL or third-party certification markings. Inspect cabling terminations to confirm color-coding for pin assignments, and inspect cabling connections to confirm compliance with TIA-568-C.1. 2. Visually inspect cable placement, cable termination, grounding and bonding, equipment and patch cords,and labeling of all components. 3. Test cabling for direct-current loop resistance, shorts, opens, intermittent faults, and polarity between conductors. Test operation of shorting bars in connection blocks. Test cables after termination,but not after cross-connection. a. Test instruments shall meet or exceed applicable requirements in TIA-568-C.2. Perform tests with a tester that complies with performance requirements in its "Test Instruments (Normative)" Annex, complying with measurement accuracy specified in its"Measurement Accuracy(Informative)"Annex. Use only test cords and adapters that are qualified by test equipment manufacturer for channel or link test configuration. D. Document data for each measurement. Print data for submittals in a summary report that is formatted using Table 10.1 in BICSI TDMM as a guide,or transfer the data from the instrument to the computer,save as text files,print,and submit. E. End-to-end cabling will be considered defective if it does not pass tests and inspections. 1j. Prepare test and inspection reports. END OF SECTION 260523 Water Treatment Plant Pressure Control Valves Control Noltage Electrical Power Cables City of Round Rock 260523 8 I v 2022 CDM Snaith 8077-263948 All Rights Reserved February 2022 SECTION 260533 -RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PARTI -GENERAL LI RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section Includes: I. Metal conduits and fittings. 1 Nonmetallic conduits and fittings. 3. Metal wireways and auxiliary gutters, 4. Nonmetal wireways and auxiliary gutters, 5. Surface raceways. 6. Boxes,enclosures,and cabinets, 7. Handholes,and boxes for exterior underground cabling. B. Related Requirements: L Section 078413 "Penetration Firestopping" for firestopping at conduit and box entrances. 2. Section 260543 "Underground Ducts and Raceways for Electrical Systems" for exterior ductbanks,manholes,and underground utility construction. L3 DEFINITIONS A. ARC: Aluminum rigid conduit. B. GRC: Galvanized rigid steel conduit. C. IMC: Intermediate metal conduit, D. SSC: Stainless steel conduit, 1.4 ACTION SUBMITTALS A. Product Data: For surface raceways, wireways and fittings, floor boxes, hinged-cover enclosures,and cabinets. Water'Freaonesit Mant Pressure Control Viflves Raceways and Boxes fbr Electrical Sytenis City of Round Rock 260533- 1 �O 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.5 INFORMATIONAL SUBMITTALS A. Coordination Drawings: Conduit routing plans, drawn to scale, on which the following items are shown and coordinated with each other,using input from installers of items involved: 1. Structural members in paths of conduit groups with common supports. 2. HVAC and plumbing items and architectural features in paths of conduit groups with common supports. B. Qualification Data: For professional engineer. C. Seismic Qualification Data: Certificates, for enclosures, cabinets, and conduit racks and their mounting provisions,including those for internal components,from manufacturer. I. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation. 2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions. 3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements. 4. Detailed description of conduit support devices and interconnections on which the certification is based and their installation requirements, D. Source quality-control reports. PART2-PRODUCTS 2.1 SYSTEM DESCRIPTION A. Raceway and boxes located as indicated on Drawings, and at other locations required for splices, taps, wire pulling, equipment connections, and compliance with regulatory requirements. Raceway and boxes are shown in approximate locations unless dimensioned. Provide raceway to complete wiring system. B. Underground More than 5 feet outside Foundation Wall: Provide Type EPC-40,-PVC conduit encased in concrete. Provide cast metal boxes or nonmetallic handhole. C. Underground Within 5 feet from Foundation Wall: Provide PVC Coated rigid steel conduit. Provide cast metal or nonmetallic boxes. D. Under Slab or Below Grade: Type EPC Schedule 40 PVC conduit encased in concrete. PVC Coated rigid steel factory bends greater than 22,5 degrees and for stub-ups through concrete slabs. Provide cast or nonmetallic metal boxes. E. On Grade: Type EPC Schedule 40 PUC conduit encased in concrete. PVC Coated rigid steel factory bends greater than 22.5 degrees and for stub-ups through concrete slabs. Provide cast or nonmetallic metal boxes. F. Outdoor Locations, Above Grade: Provide FVC coated rigid steel. Provide PVC coated cast metal outlet,pull,and junction boxes. Water Treatment Plant Pressure Control Valvas Raceways and Boxes for Electrical Syterms City of Round Rock 260533 -2 %'a 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 G. In Slab Above Grade: Provide PVC coated rigid steel conduit. Provide cast boxes, H. Wet and Damp Locations: Provide rigid steel. Provide cast metal or nonmetallic outlet,junction, and pull boxes. Provide flush mounting outlet box in finished areas. 1. Concealed Dry Locations: Provide rigid steel. Provide sheet-metal boxes. Provide flush mounting outlet box in finished areas. Provide hinged enclosure for large pull boxes. J. Exposed Dry Locations: Provide PVC coated rigid steel. Provide PVC coated cast boxes. Provide hinged enclosure for large pull boxes. K. Corrosive Locations: Provide PVC Coated Rigid Steel Conduit. Provide PVC coated cast or sheet metal boxes, L. Hazardous/Explosion Proof Locations(Class 1, Group D, Division 1): Provide PVC Rigid Steel Conduit. Provide PVC coated cast iron boxes. M. Exposed Equipment Connection: Liquid-Tight Flexible Metal Conduit, plastic jacketed, galvanized steel, Anaconda "Sealtite" Type EF for general service areas, Type HC for high temperature when used under raised floor or in air plenurns, 2.2 METAL CONDUITS AND FITTINGS A. Metal Conduit: 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Allied Tube&Conduit;a part of Atkore International. b. Anamet Electrical, Inc. C. O-Z/Gedney;a brand of Emerson Industrial Automation, d. Or Equal. 2. Listing and Labeling: Listed and labeled as defined in NFPA 70, by a qualified testing agency,and marked for intended location and application. 3. GRC: Comply with ANSI C80.1 and UL 6. 4, ARC: Comply with ANSI 080.5 and UL 6A. 5, IMC: Comply with ANSI 080.6 and UL 1242. 6, PVC-Coated Steel Conduit: PVC-coated rigid steel conduit. a. Comply with NEMA RN 1. b. Coating Thickness: 0.040 inch,minimum. 7. EMT- Comply with ANSI 080.3 and UL 797. 8. FMC: Comply with UL 1; zinc-coated steel, 9. LFMC: Flexible steel conduit with PVC jacket and complying with UL 3% 10, SSC: Comply with ASTM A312 and UL 6A. Type 316, Water'Freatment Mant Pressure Cwarot Valves Raceways and Boxes,for Electirwal Sytems Oty of Round Rock 2641531-3 ............... 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Metal Fittings: 1. Manufacturers: Subject to compliance with requirements, provide products by the following: a. Allied Tube&Conduit;a part of Atkore International. b. Or Equal. 2. Comply with NEMA F13 I and UL 51413, 3. Listing and Labeling: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 4, Fittings,General: Listed and labeled for type of conduit, location,and use. 5. Conduit Fittings for Hazardous (Classified) Locations: Comply with UL 1203 and NFPA 70. 6. Fittings for EMT: a. Material: Steel. b. Type:compression. 7. Expansion Fittings: PVC or steel to match conduit type, complying with UL 651, rated for environmental conditions where installed, and including flexible external bonding jumper. 8. Coating for Fittings for PVC-Coated Conduit: Minimum thickness of 0.040 inch, with overlapping sleeves protecting threaded joints. 9. Couplings and Thread Protectors: Threaded conduit shall have coupling on one end and a thread protector on the other to protect the threads during normal handling and storage. 10. Galvanized iron or galvanized steel with steel conduit. Minimum of five threads for threaded conduit. 11. Liquid-Tight Flexible Conduit Fittings: Galvanized steel, T&B 53XX series insulated throat connector.Die-cast malleable fittings are not acceptable. 11 PVC Coated Fittings: Fittings for use with PVC coated RGS shall be PVC coated and shall be products of the same manufacturer as the conduit. C. Joint Compound for IMC, GRC, or ARC: Approved, as defined in NFPA 70, by authorities having jurisdiction for use in conduit assemblies, and compounded for use to lubricate and protect threaded conduit joints from corrosion and to enhance their conductivity. D. All steel conduit, exposed to weather or in contact with earth, shall be re-galvanized after Threading: 1. "Galvanizing Powder M-32 I" (American Solder and Flux Company). 2. "Zincilate 810" (industrial Metal Protective, Inc.). 3. "Zinc Rich"coating(ZRC Chemical Products Company). 4. Or approved equal. 2.3 NONMETALLIC CONDUITS AND FITTINGS A. Nonmetallic Conduit: Water Treatment Plant Pressure Control Valves Raceways and Boxes for Electrical Syterns City of Round Rock 260533 A c)2022 CDM Sn)itli 8077-263948 All Rights Reserved February 2022 1 Manufacturers: Subject to compliance with requirements, provide products by the following: a. Thomas& Betts Corporation; A Member of the ABB Group. b. Or Equal, 2. Listing and Labeling: Nonmetallic conduit shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 3. Fiberglass: a. Comply with NEMA TC 14. b. Comply with UL 2515 for aboveground raceways. c. Comply with Ul,2420 for belowground raceways. 4. ENT: Comply with NEMA TC 13 and UL 1653. 5. RNC: Type EPC-40-PVC, complying with NEMA TC 2 and UL 651 unless otherwise indicated. 6. LFNC: Comply with UL 1660. * Rigid HDPE:Comply with UL 651 A. * Continuous HDPE: Comply with UL 651A. 9, Coilable HDPE: Preassernbled with conductors or cables and complying with ASTM D 3485. 10. RTRC: Comply with UL 2515A and NEMA TC 14. B. Nonmetallic Fittings: I Manufacturers: Subject to compliance with requirements, provide products by the following: a. Thomas &Betts Corporation; A Member of the ABB Group. b. Or Equal. 2. Material /strength characteristics to match conduit. Solvent welded as recommended by manufacturer. Non-metallic female "ten-ninal" adapter for transition from non-metallic to metallic. 3. Fittings,General: Listed and labeled for(ype of conduit, location,and use. 4. Fittings for ENT and RNC: Comply with NEMA TC 3; match to conduit or tubing type and material, a. Fittings for LFNC: Comply with UL 5148, 5. Solvents and Adhesives: As recommended by conduit manufacturer. C. Conduit Supports- Provide the following types of conduit supports. 1. Trapezes: a. Provide galvanized steel beams, channels, struts, hangers, bracing, rods, beam clamps,accessories and components,in dry indoor areas. Water Treaumit Mmi Pressure Conw.0 Vahves Racewaysand Boxes for Eleokcal Sytons C4y of Round Rf,)ck 260533 5 (f,"f 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 b. in areas designated "WET', "DAMP" and "CORROSIVE" where indicated and in outdoor locations use PVC coated steel beams, channels, struts or fiberglass beams, channels, struts with stainless steel hangers, bracing, rods, beam clamps, accessories and components. Provide fiberglass channels resistant to the chemicals present in the area in which it is used, 2. Flush Mounted Supports: a. In dry indoor areas, channels, struts, accessories and components shall be galvanized steel. b. In areas designated "WET", "DAMP" and "CORROSIVE" where indicated and in outdoor locations use PVC coated steel channels, struts or fiberglass channels, struts with stainless, accessories and components. Provide fiberglass channels, struts resistant to the chemicals present in the area in which it is used. 3. Conduit Racks: a. Provide galvanized steel, conduit racks, accessories and components in dry indoor areas. b. In areas designated "WET", "DAMP" and "CORROSIVE" where indicated and in outdoor locations use PVC coated steel conduit racks or fiberglass conduit racks with stainless, accessories and components. Provide fiberglass channels resistant to the chemicals present in the area in which it is used. 4. Conduit Hangers: a. Provide galvanized steel conduit clamps, rods, beam clamps, bracing, accessories and components,in dry indoor areas. b. In areas designated "WET", "DAMP" and "CORROSIVE" where indicated and in outdoor locations use stainless steel conduit clamps, rods, beam clamps, bracing, accessories and components. 2.4 METAL WIREWAYS AND AUXILIARY GUTTERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: I. 13-line,an Eaton business. 2. Hoffman; a brand of nVent. 3. Square D. 4. Or Equal. B. Description: Sheet metal, complying with UL 870 and NEMA 250, Type 4 unless otherwise indicated,and sized according to NFPA 70. 1 Metal wireways installed outdoors shall be listed and labeled as defined in NFPA 70,by a qualified testing agency,and marked for intended location and application, Water Treatment Plant Pressure Control Valves Raceways and Boxes for Electrical Syterns City of Round Rock 260533-6 Oc 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Fittings and Accessories: Include covers, couplings, offsets, elbows, expansion joints, adapters, hold-down straps, end caps,and other fittings to match and mate with wireways as required for complete system. D. Wireway Covers: Flanged-and-gasketed type unless otherwise indicated, E. Finish: Manufacturer's standard enamel finish. 15 NONMETALLIC WIRE-WAYS AND AUXILIARY GUTTERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1, Allied Moulded Products,Inc. 2. floffinan;a brand of nVent. 3. Lamson &Sessions. 4, Or Equal. B. Listing and Labeling: Nonmetallic wireways and auxiliary gutters shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application, C. Description: PVC, extruded and fabricated to required size and shape, and having snap-on cover, mechanically coupled connections,and plastic fasteners. D. Fittings and Accessories: Couplings, offsets, elbows, expansion joints, adapters, hold-down straps,end caps,and other fittings shall match and mate with wireways as required for complete system. E, Solvents and Adhesives: As recommended by conduit manufacturer, 16 SURFACE RACEWAYS A, Listing and Labeling- Surface raceways and tele-power poles shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. B. Surface Metal Raceways: Galvanized steel with snap-on covers complying with UL 5. Manufacturer's standard enamel finish in color selected by Engineer. 1. Manufacturers: Subject to compliance with requirements, provide products by the following: a. Hubbell Incorporated; Wiring Device-Kellems, b. Or Equal, C. Surface Nonmetallic Raceways: Two- or three-piece construction, complying with UL 5A, and manufactured of rigid PVC with texture and color selected by Engineer from manufacturer's standard colors. Product shall comply with UL 94 V-0 requirements for self-extinguishing characteristics. WmerTreatment Martz Pressure,Controt Valves Raceways and Boxes for Mccuical Symns Cay oaf Round Rock 260533 -7 2022 CDM smith 8077-263948 All Rights Deserved February 2022 1. Manufacturers: Subject to compliance with requirements, provide products by the following: a. Hubbell Incorporated. b. Or Equal. 2.7 HAZARDOUS(CLASSIFIED)LOCATION BOXES A. Design explosion-proof boxes for Class 1, Group D, Division I hazardous locations. Provide cast iron with cadmium-zinc or hot-dipped galvanized finish, stainless steel or hot-dipped galvanized bolts; 1. Manufacturer: Provide products by one of the following: a. -Type EJB,"by the Crouse-Hinds Company. b. Appleton Electric Co. c. The Pyle-National Co. d. Or equal. B. Design explosion-proof boxes for Class 1, Group D, Division I hazardous locations, provided with O-ring seals to meet NEMA 4 requirements. 1. Boxes and Covers: Aluminum,with stainless steel hinges and stainless-steel bolts. 2. Manufacturer: Provide products by one of the following: a. "Type EJB-N4,"by the Crouse-Hinds Co. b. Appleton Electric Co. C. Adalet-PLM. d. Or equal. 2.8 MISCELLANEOUS FITTINGS A. Flexible Couplings: I. Manufacturers: Provide products by one of the following: a. "Type ECGJH,"by the Crouse-Hinds Co. K Appleton Electric Co. C. Killark Electric Manufacturing Co. d. Or equal. B. Conduit Hubs: I. Grounding type. 2. Manufacturers: Provide products by one of the following: a. Myers Electric Products, Inc. b. Or equal. Water Treatment Plant Pressure Control valves Raceways and Boxes for Electrical Sytems City of*Round Rock 260533-8 %''2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Conduit Wall Seats For New Concrete Walls Below Grade: I Products: Provide one of the following: a. O.Z_�Gedney Co.,Type WSK; Linkscal. b. Spring City Electrical Manufacturing Co.,Type WDI). C. Or equal. D, Conduit Wall Seals For Cored Holes: 1. Products: Provide one of the following: a. Type CSMC as manufactured by the O.Z./Gedney Co. b. Or equal. E. Conduit Wall And Floor Seals For Sleeved Openings: 1. Products: Provide one of the following: a, Type CSMI as manufactured by the O.Z./Gedney Co. b, Or equal. F. Combination Expansion-Deflection Fittings Embedded In Concrete: I Products: Provide one of the following: a. Type XD as manufactured by the Crouse-l-linds Co. b. Type DX as manufactured by O.Z./Gedney Co. C. Type DF as manufactured by Appleton Electric Co. d. Or equal. G. Combination Expansion-Deflection Fittings Installed Exposed: I Products: Provide one of the following: a. Type XD as manufactured by Crouse-Hinds Co. b. Type DX as manufactured by O.Z.Gedney Co. C, Type DF as manufactured by Appleton Electric Co. & Or equal. 11. Explosion Proof Fittings: I Manufacturers: Provide products by one of the following: a. Crouse-Hinds Co, b. Appleton Electric Co, c" O.Z./Gedney Co, tl. Or equal. 2, Suitable for the area classification and environment. Water'Treanuerit Plant Pressure Control valves Raceways arid Boxes for IEne ctrwal Sytems City of Rourid Rock 260533-9 C',,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 L Conduit Scaling Bushings: 1. Products: Provide one of the following: a. O.Z./Gedney,Type CSB. b. Or equal. J. Grounding Bushings: Malleable iron with integral insulated throat rated for 300 degrees F, with solderless lugs. 1. Products: Provide one of the following: a. Crouse Hinds/Cooper,Series HGLL. b. Appleton,Series GIB. C. O.Z./Gedney,Type HBLG. d. Or equal. 2.9 HARDWARE A. Conduit Mounting Equipment: 1. In dry indoor areas, provide hangers, rods, backplates, beam clamps, channel, etc. fabricated from galvanized iron or steel. 2. In areas indicated "WET" or "CORROSIVE" on the Drawings and in outdoor locations use PVC coated steel channel with stainless steel hardware. Provide fiberglass channel resistant to the chemicals present in the area in which it is used. B. Furnish all supports, brackets, conduit sleeves, racks and bracing required. Provide boxes and hardware fabricated from galvanized zinc plated steel, except provide stainless steel in areas indicated as"WET"or"CORROSIVE" on the Drawings. 2.10 BOXES,ENCLOSURES,AND CABINETS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: I. Hoffman;a brand of nVent. 2. Hubbell Incorporated;Wiring Device-Kellems. 3. Or Equal. B. General Requirements for Boxes, Enclosures, and Cabinets: Boxes, enclosures, and cabinets installed in wet locations shall be listed for use in wet locations. C. Sheet Metal Outlet and Device Boxes: Comply with NEMA OS 1 and UL 514A. D. Cast-Metal Outlet and Device Boxes: Comply with NEMA FB 1, ferrous alloy, Type FD, with gasketed cover. E. Nonmetallic Outlet and Device Boxes: Comply with NEMA OS 2 and UL 5140. Water Treatment Plant Pressure Control Valves Raceways and Boxes for Electrical Syterns City of Round Rock 260533-10 (9)2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 1 Listing and Labeling: Nonmetallic floor boxes shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. F. Luminaire Outlet Boxes: Nonadjustable, designed for attachment of luminaire weighing 50 lb_ Outlet boxes designed for attachment of luminaires weighing more than 50 lb. shall be listed and marked for the maximum allowable weight, G. Small Sheet Metal Pull and Junction Boxes:NEMA OS I H. Cast-Metal Access, Pull, and Junction Boxes: Comply with NEMA FB I and UL 1773, galvanized,cast iron with gasketed cover, 1. Box extensions used to accommodate new building finishes shall be of same material as recessed box. J. Device Box Dimensions:4 inches square by 2-1/8 inches deep. K. Gangable boxes are prohibited. L. Hinged-Cover Enclosures: Comply with UL 50 and NEMA 250,Type 4 with continuous-hinge cover with flush latch unless otherwise indicated, I, Metal Enclosures: Steel,finished inside and out with manufacturer's standard enamel. a. Minimum 16 gauge galvanized steel, b. Finish:Wash and phosphate undercoat with ANSI 61 gray polyester power finish, 1 Nonmetallic Enclosures: Fiberglass. 1 Interior Panels: Steel;all sides finished with manufacturer's standard enamel. 4. Stainless steel hinged cover with neoprene gasket, 5. Door: Continuous, full length, piano type hinge and stainless-steel pin on one side and captive screw on the other. Door shall be equipped with padlock hasp with sealing hole provisions, 6. Ground Lug Kit: #10-32 tapped hole provisions. 2.11 SOURCE QUALITY CONTROL FOR UNDERGROUND ENCLOSURES A. Flandhole and Pull-Box Prototype Test: Test prototypes of handholes and boxes for compliance with SCTE 77. Strength tests shall be for specified tier ratings of products supplied. I, Tests of materials shall be performed by an independent testing agency. 2, Strength tests of complete boxes and covers shall be by either an independent testing agency or manufacturer. A qualified registered professional engineer shall certify tests by manufacturer. 3, 'resting machine pressure gages shall have current calibration certification complying with ISO 9000 and ISO 10012 and traceable to NIST standards. Waterl`rcatinctil Mant Pressure Contro�VAves Raceways and Bor xes for Decirical Sytmis Cay of'Rotir)d Rock 260533- i I ,'r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 PART`3-EXECUTION 3.1 RACEWAY APPLICATION A. Outdoors: Apply raceway products as specified below unless otherwise indicated: I. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric Solenoid,or Motor-Driven Equipment): LFMC. 2. Boxes and Enclosures,Aboveground:NEMA 250,Type 4XSS. B. Indoors: Apply raceway products as specified below unless otherwise indicated: I. Boxes and Enclosures: NEMA 250, Type 1, except use NEMA 250, Type 4 stainless steel in damp or wet locations. C. Minimum Raceway Size: 3 4-inch trade size. D. Raceway Fittings:Compatible with raceways and suitable for use and location. I. Rigid and Intermediate Steel Conduit: Use threaded rigid steel conduit fittings unless otherwise indicated.Comply with NEMA FB 2.10. 2. PVC Externally Coated, Rigid Steel Conduits: Use only fittings listed for use with this type of conduit. Patch and seal all joints, nicks, and scrapes in PVC coating after installing conduits and fittings. Use sealant recommended by fitting manufacturer and apply in thickness and number of coats recommended by manufacturer. 3. Flexible Conduit: Use only fittings listed for use with flexible conduit. Comply with NEMA FB 2.20, E. Do not install aluminum conduits,boxes,or fittings in contact with concrete or earth. F. Install surface raceways only where indicated on Drawings. G. Do not install nonmetallic conduit where ambient temperature exceeds 120 deg F. H. Bond raceway and boxes in accordance with the NEC. 3.2 IDENTIFICATION 1. Junction or Tenninal Box: a. Engraved, laminated plastic, not less than t/16-in thick by 3d4-in by 2-1/2-in with 3,16-inch high white letters on a black background. b. Label shall identify the name or number of the junction or terminal box. 2. Branch Circuits in Outlet Boxes: Wrap-around labels (T&B, BRADY or 3M) showing circuit number. Water Treatment Plant Pressure Control Valves Raceways and Boxes for Electrical Syterns City of Round Rock 260533- 12 (0 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3.3 INSTALLATION A. Comply with NECA I and NECA 101 for installation requirements except where requirements on Drawings or in this article are stricter. Comply with NECA 102 for aluminum conduits, Comply with NFA 70 limitations for types of raceways allowed in specific occupancies and number of floors, B. Do not install raceways or electrical items on any "explosion-relief" walls or rotating equipment. C. Do not fasten conduits onto the bottom side of a metal deck roof, D. Keep raceways at least 6 inches away from parallel runs of flues and steam or hot-water pipes. Install horizontal raceway runs above water and steam piping. E. Complete raceway installation before starting conductor installation. F. Arrange stub-ups so curved portions of bends are not visible above finished slab, G. Install no more than the equivalent of three 90-degree bends in any conduit run except for control wiring conduits, for which fewer bends are allowed. Support within 12 inches of changes in direction. H. Make bends in raceway using large-radius preformed ells. Field bending shall be according to NFPA 70 minimum radii requirements. Use only equipment specifically designed for material and size involved. 1. Changes in direction of conduits shall be made with fittings or bends,meeting the requirements of NEC and minimum bend radius of the cable. J. Bends and offsets for non-metallic conduit or plastic-coated steel shall be factory approved. K. Conceal conduit within finished walls, ceilings, and floors unless otherwise indicated. Install conduits parallel or perpendicular to building lines, L. Support conduit within 12 inches of enclosures to which attached. M, Raceways Embedded in Slabs: I Run conduit larger than 1-inch trade size, parallel or at fight angles to main reinforcement. Where at right angles to reinforcement, place conduit close to slab support. Secure raceways to reinforcement at maximum 10-foot intervals. 1 Arrange raceways to cross building expansion joints at right angles with expansion fittings. 1 Arrange raceways to keep a minimum of 2 inches of concrete cover in all directions. 4, Do not embed threadless fittings in concrete unless specifically approved by Engineer for each specific location, N. Threaded Conduit Joints, Exposed to Wet, Damp, Corrosive, or Outdoor Conditions: Apply listed compound to threads of raceway and fittings before making up joints. Follow compound manufacturer's written instructions. Waterl reaMent Mant Pressure Convot Valves Raceways and Boxes for Hectrwal Sytems City of'Round R(Kk 260533 - 13 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 O. All steel conduit, exposed to weather or in contact with earth, shall be re-galvanized after threading. P. Coat field-cut threads on PVC-coated raceway with a corrosion-preventing conductive compound prior to assembly. Q. Raceway'Terminations at Locations Subject to Moisture or Vibration: Use insulating bushings to protect conductors including conductors smaller than No.4 AWG. R. Terminate threaded conduits into threaded hubs or with locknuts on inside and outside of boxes or cabinets. Install bushings on conduits up to 1-1/4-inch trade size and insulated throat metal bushings on 1-1,12-inch trade size and larger conduits terminated with locknuts. Install insulated throat metal grounding bushings on service conduits. S. Install raceways square to the enclosure and terminate at outdoor or in wet enclosures with hubs. T. Install raceways square to the enclosure and ten-ninate at enclosures with locknuts. Install locknuts hand tight plus 1/4 turn more. U. Do not rely on locknuts to penetrate nonconductive coatings on enclosures. Remove coatings in the locknut area prior to assembling conduit to enclosure to assure a continuous ground path. V. Cut conduit perpendicular to the length. For conduits 2-inch trade size and larger, use roll cutter or a guide to make cut straight and perpendicular to the length. W. Install pull wires in empty raceways. Use polypropylene or monofilament plastic line with not less than 200-1b tensile strength. Leave at least 12 inches of slack at each end of pull wire. Cap underground raceways designated as spare above grade alongside raceways in use. I. Jet Line,Cat.No.232,polyolefin,or approved equal. X Surface Raceways: I. Install surface raceway with a minimum 2-inch radius control at bend points. 2. Secure surface raceway with screws or other anchor-type devices at intervals not exceeding 48 inches and with no less than two supports per straight raceway section. Support surface raceway according to manufacturer's written instructions. Tape and glue are not acceptable support methods. Y. Install raceway sealing fittings at accessible locations according to NFPA 70 and fill them with listed sealing compound. For concealed raceways, install each fitting in a flush steel box with a blank cover plate having a finish similar to that of adjacent plates or surfaces. Install raceway sealing fittings according to NFPA 70. Z. Install devices to seal raceway interiors at accessible locations. Locate seals so no fittings or boxes are between the seal and the following changes of environments. Seal the interior of all raceways at the following points: I. Where conduits pass from warm to cold locations, such as boundaries of refrigerated spaces. Water Treatment Plant Pressure Control Valves Raceways and Boxes for Electrical Sytems City of Round Rock 260533 14 «2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. Where an underground service raceway enters a building or structure. 3. Conduit extending from interior to exterior of building. 4. Conduit extending into pressurized duct and equipment. 5. Conduit extending into pressurized zones that are automatically controlled to maintain different pressure set points. 6. Where otherwise required by NFPA 70, 7. Seat conduit entries with approved mastic sealant, listed by the manufacturer. AA. Comply with manufacturer's written instructions for solvent welding RNC and fittings. 1313. Expansion-Joint Fittings: L Install in each run of aboveground RNC that is located where environmental temperature change may exceed 30 deg F and that has straight-run length that exceeds 25 feet. Install in each run of aboveground RMC conduit that is located where environmental temperature change may exceed 100 deg F and that has straight-run length that exceeds 100 feet. 2. Install type and quantity of fittings that accommodate temperature change listed for each of the following locations: a. Outdoor Locations Not Exposed to Direct Sunlight: 125 deg F temperature change. b. Outdoor Locations Exposed to Direct Sunlight: 155 deg F temperature change, C. Indoor Spaces Connected with Outdoors without Physical Separation: 125 deg F temperature change. 3. Install fitting(s)that provide expansion and contraction for at least 0.00041 inch per foot of length of straight run per deg F of temperature change for PVC conduits. Install fitting(s) that provide expansion and contraction for at least 0.000078 inch per foot of length of straight run per deg F of temperature change for metal conduits. 4. Install expansion fittings at all locations where conduits cross building or structure expansion joints. 5. Install each expansion joint fitting with position, mounting, and piston setting selected according to manufacturer's written instructions for conditions at specific location at time of installation. Install conduit supports to allow for expansion movement. CC, Flexible Conduit Connections: Comply with NEMA RV 3. Use a maximum of 36 inches of flexible conduit for recessed and semi-recessed luminaires,equipment subject to vibration, noise transmission,or movement; and for transformers and motors. I. Use LFMC in damp or wet locations subject to severe physical damage, 1 Use LFMC or LFNC in damp or wet locations not subject to severe physical damage. DD, Mount boxes at heights indicated on Drawings. If mounting heights of boxes are not individually indicated,give priority to ADA requirements. Install boxes with height measured to center of box unless otherwise indicated. EE. Recessed Boxes in Masonry Walls: Saw-cut opening for box in center ot'cell of masonry block and install box flush with surface of wall. Prepare block surfaces to provide a flat surface for a raintight connection between box and cover plate or supported equipment and box. WaterTreatme"t Plaint Presiure Control Valves Raceways and Boxei for Electncal Sytenss Cay of'Round R4wk 260533- l 5 0 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 FF. Horizontally separate boxes mounted on opposite sides of walls, so they are not in the same vertical channel. GG. Locate boxes so that cover or plate will not span different building finishes. HH. Support boxes of three gangs or more from more than one side by spanning two framing members or mounting on brackets specifically designed for the purpose. It. Fasten junction and pull boxes to or support from building structure. Do not support boxes by conduits. JJ. Set metal floor boxes level and flush with finished floor surface. KK Set nonmetallic floor boxes level.Trim after installation to fit flush with finished floor surface. LL. In hazardous locations, seal conduits tenninating at boxes enclosing circuit opening equipment at the entrance to the enclosure with approved compound filled scaling fittings to prevent passage of explosive or combustible gases through the conduits. Similarly seal all conduits leading from or entering hazardous locations at points of exit or entrance. Seal exposed conduits passing through hazardous locations at both the entrance to and the exit from the hazardous locations. A sealing compound installation schedule shall be presented to the Engineer for approval. Sign off on each installation and present the compound installation schedule to the Engineer for final sign-off. Each fitting shall be legibly marked with red paint to indicate that the sealing compound has been installed. MM. Install conduit sealing and drain fittings in all hazardous (classified) areas designated Class 1, Division 1,and Class 1, Division 2. NN. Install conduit sealing and drain fittings on all conduits entering and leaving any area containing noxious gases to prevent contamination into clean areas via the conduit system. Areas requiring this protection are: rooms where chlorine, ammonia, and ozone are stored, generated or heated. A sealing compound installation schedule shall be presented to Engineer for approval. Sign off on each installation and present the compound installation schedule to the Engineer for final sign-off. Each fitting shall be legibly marked with red paint to indicate that the sealing compound has been installed. 00. Use liquid-tight flexible metal conduit for all motor terminations, the primary and secondary of transformers, generator terminations and other equipment where vibration is present or may require removal. The length of liquid-fight flexible metal conduit shall not exceed 36 incheswhen used for vibration isolation and shall not exceed 72 inchesin length when attaching to luminaires. Non-i-netallic flexible conduit shall only be allowed for use with rigid PVC conduit systems. PP. Flexible couplings shall be used in hazardous locations for all motor terminations and other equipment where vibration is present. 3.4 INSTALLATION OF UNDERGROUND CONDUIT A. Direct-Buried Conduit: Water'freatment Plant Pressure Control Valves Raceways and Boxes for Electrical Syterns City of Round Rock 260533 16 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 All steel conduit, exposed to weather or in contact with earth,shall be re-galvanized after threading, 1 Steel conduit in contact with earth shall be PVC Coated rigid steel. 3. Excavate trench bottom to provide firm and uniform support for conduit. Prepare trench bottom as specified in Section 312000 "Earth Moving" for pipe less than 6 inches in nominal diameter. 4. Install backfill as specified in Section 312000"Earth Moving." 5. After installing conduit, backfill and compact. Start at tie-in point, and work toward end of conduit run,leaving conduit at end of run free to move with expansion and contraction as temperature changes during this process. Firmly hand tamp backfill around conduit to provide maximum supporting strength. After placing controlled backfill to within 12 inches of finished grade, make final conduit connection at end of run and complete backfilling with normal compaction as specified in Section 312000"Earth Moving," 6. Install manufactured duct elbows for stub-ups at poles and equipment and at building entrances through floor unless otherwise indicated. Encase elbows for stub-tip ducts throughout length of elbow. a. Couple steel conduits to ducts with adapters designed for this purpose and encase coupling with 3 inches of concrete for a minimum of 12 inches on each side of the coupling. b. For stub-ups at equipment mounted on outdoor concrete bases and where conduits penetrate building foundations, extend steel conduit horizontally a minimum of 60 inches from edge of foundation or equipment base. Install insulated grounding bushings on terminations at equipment. 7. Underground Warning Tape, 15 INSTALLATION OFUNDERGROUND HANDHOLES AND BOXES A. Install handholes and boxes level and plumb and with orientation and depth coordinated with connecting conduits to minimize bends and deflections required for proper entrances. B. Unless otherwise indicated,support units on a level bed of crushed stone or gravel,graded from 1/2-inch sieve to No,4 sieve and compacted to same density as adjacent undisturbed earth. C. Elevation- In paved areas, set so cover surface will be flush with finished grade. Set covers of other enclosures I inch above finished grade. D. Install liandlioles with bottom below frost line, E. Install removable hardware,including pulling eyes, cable stanchions, cable arms, and insulators, as required for installation and support of cables and conductors and as indicated. Select arm lengths to be long enough to provide spare space for future cables but short enough to preserve adequate working clearances in enclosure. F. Field-cut openings for conduits according to enclosure manufacturer's written instructions. Cut wall of enclosure with a tool designed for material to be cut. Size holes for terminating fittings to be used,and seal around penetrations after fittings are installed. Water Treatment Plant Presswe Convol VaNes Raceways and Bexes for Fleemcal Sytems Coy offkokind Rock 260533- q7 ............ C 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3.6 SLEEVE AND SLEEVE-SEAL INSTALLATION FOR ELECTRICAL PENETRATIONS A. Install Osleeves and sleeve seals at penetrations of exterior floor and wall assemblies. 33 FIRESTOPPING A. Install firestopping at penetrations of fire-rated floor and wall assemblies. Comply with requirements in Section 078413 "Penetration Firestopping." 3.8 PROTECTION A. Protect coatings,finishes,and cabinets from damage and deterioration. 1. Repair damage to galvanized finishes with zinc-rich paint recommended by manufacturer. 1 Repair damage to PVC coatings or paint finishes with matching touchup coating recommended by manufacturer. END OF SECTION 260533 Water Treatment Plant Pressure Control Valves Raceways and Boxes for Electrical Sytems City of Round Rock 260533- 18 #0 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 330519-DUCTILE-IRON UTILITY PIPE FOR WATER SERVICE PART I -GENERAL I'l RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Materials, equipment and incidentals required to install, disinfect, and test ductile iron pipe and fittings for yard piping as shown on Drawings and as specified. a. The word"pipe" is used to refer to pipe, fittings,or appurtenances unless otherwise noted. 1 Yard Piping: Includes piping and fittings extending outward, upward and downward into the ground frorn the outside face of all buildings. Unless otherwise noted, non-buried pipe outside a building,including in utility tunnels,shall be specified in Division 40. 3. Locate piping as shown on the Drawings. The Engineer reserves the right to make modifications in locations as may be found desirable to avoid interference between pipes or for other reasons. B. Related Requirements: I. Section 312333'*Trenching and Backfilling," 1 Section 312500"Erosion and Sedimentation Controls." L3 ACTION SUBMI'17ALS A. Shop Drawings and Product Data: L Including piping layouts, design calculations, warranty infitinnation, test reports, in accordance with Section 013300"Submittal Procedures"and referenced standards. 2. Design calculations in accordance with "Pipe Wall Thickness Analysis" Paragraph under Part 2 Products, signed by a Professional Engineer, as noted in Section 013300 "Submittal Procedures", 1 Name of pipe and fitting suppliers and a list of materials to be furnished. 4. Anticipated production and delivery schedule. IA INFORMATIONAL SUBMITTALS A. Prior to Pipe Shipment: Water Treament Hant Pressure Contro�Valves Dixtile-Iron Utdity Pipe for Water Service City of Round Rock 330519 . 1 C 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Certified copies of mill tests confirming type of materials used in pipe, and shop testing of pipe to show compliance with requirements of applicable standards, along with a sworn affidavit of compliance that pipe complies with referenced standards. 2. Certified affidavit of compliance from manufacturer stating that pipe, fittings, gaskets, linings and exterior coatings for project have been manufactured and tested in accordance with AWWA and ASTM standards and requirements specified herein. B. Copies of shop tests,including hydrostatic tests. C. Field Quality Control Submittals: Document results of required tests and inspections. D. Qualifications Statements: 1. Manufacturer's approval of fabricator. 1.5 QUALITY ASSURANCE A. Perform Work according to standard specifications. B. Pipe and Fitting Connections: Pipe to be supplied by a single manufacturer and fittings supplied by multiple manufacturers. C. Hydrostatically tested at point of manufacture to 500 psi for a duration of 10 seconds per AWWA 0151.Testing may be performed prior to machining bell and spigot. I. Test Failure: Defined as any leak or rupture of pipe wall. 2. Certified test results furnished in duplicate to Engineer 5 days prior to shipment. D. Pipe and Fittings: I. Tested at foundry as required by specified referenced standards. 1 Certified test results furnished in duplicate to Engineer 5 days prior to shipment. E. Inspection of Pipe and Fittings After Delivery: By Engineer or representative of Owner. 1. Pipe and fittings subject to rejection if failing to meet specified requirements even though pipe may have been accepted as satisfactory at the place of manufacture. 2. Pipe rejected after delivery (including defects from manufacturing or delivery/transport) to be marked for identification and immediately removed from the job. F. Pipe and fittings installed under this Contract may be inspected at the factory for compliance with this Section by an independent testing laboratory selected by Owner at Owner's expense. G. Manufacturer's Representative: L Made available to Owner and owner's representative during the manufacturing, furnishing, transporting, and unloading of pipe, as well as during installation and testing of pipe to assist in insuring that pipe is properly fabricated, transported, unloaded, stored in the field,joined and tested. 1 Manufacturer's responsibilities relate only to the proper care and treatment of pipe during these procedures and not techniques or procedures used during installation and testing. Water Treatment Plant Pressure Control Valves Ductile-iron Utility Pipe for Water Service City of Round Rock 330519-2 K')2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. Cost for services of the factory representative, including expenses, to be considered incidental to the project and will not be paid separately. 1-1. Pipe and fittings marked in accordance with all applicable AWWA standards. Legibly and permanently mark pipe, fittings, specials and appurtenances to be consistent with the laying schedule and marking drawings(if required)with the following information: 1. Manufacturer. 2. Date of manufacture. 3. Size,type,class,or wall thickness. 4. AWWA Standard(s)produced to. 5. Pipe identified with sequential numbering consistent with the laying schedule and marking drawings and each marked pipe will appear on the marking drawings in the identified location for installation, 6. Special fittings, bends, and appurtenances requiring specific orientation will be appropriately marked with words"TOP"in correct position and in a consistent location. 1.6 QUALIFICATIONS A. Manufacturer shall meet the following criteria and furnish necessary project information, which demonstrates required experience: I Experience that includes successful fabrication (followed by installation, acceptance and service) to AWWA 0151 standards of' at least 50,000 lineal feet of largest specified diameter or larger ductile iron pipe with similar linings/coatings within the past 5 years. 2. Experience to include successful fabrication of at least 50 fittings it) compliance with AWWA 0110 or 0153 of largest specified diameter or larger with similar lining/coatings within the past 5 years. 3. Experience that includes successful fabrication (followed by installation, acceptance and service) of at least 10,000 lineal feet of largest specified diameter or larger push-on style, boldess restrained joint for ductile iron pipe within the last 5 years. B, Pipe Origin: Manufactured in the United States. Ductile iron pipe to be supplied by a single manufacturer. C. Fittings Origin: Manufactured in or outside the United States, but supplied by one of the named pipe fitting manufacturers in Part 2 or Engineer approved equal. Ductile iron fittings to be supplied by a single manufacturer. Written certification fittings are compatible with the supplied brand of pipe. 1.7 DELIVERY, STORAGE,AND HANDLING A. Delivery: Per AWWA 0600 and referenced AWWA Standards for shipping, handling arid storage procedures, 1. Deliver materials in manufacturer's packaging including application instructions. 2. Handle to prevent injury to pipe,pipe linings and pipe coatings. Water Treatineni Hant Pressure Control VMves Dueffle4roni Utday Npe for Water Service City ofRound Rock 33050, 3 20 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 a. Examine pipe and fittings as noted in Division 01. Damage to linings or coatings discovered during examination to be repaired to the satisfaction of Engineer before proceeding with work. 3. Transport pipe to job site on padded bunks or oak timbers and secured with steel banding or nylon tic down straps adequately protecting pipe and coating. a. Handle pipe using slings, hooks, pipe tongs or other devices acceptable to Engineer. b. Do not use non-cushioned ropes, chairs, wedges, cables or levers when handling finished pipe,fittings or couplings. C. Do not drop pipe or fittings. d. Do not skid pipe or fittings against each other. e. Do not mar pipe or fitting coatings. f. Utilize padded wooden pipe cradles, or chocks suitable for protecting coatings between and beneath finished pipes when pipes are placed upon rough surfaces. B. Storage: I Do not store pipe on bare ground unless soft sand berms are used to support pipe and is approved by Engineer. 2. Keep materials safe from damage if stored. Interior of pipe, fittings and other appurtenances to be kept free from dirt,excessive corrosion or foreign matter. 3. Do not stack pipe higher than lit-nits recommended by manufacturer. Keep bottom tier off ground using timbers, rails, or concrete. Stacking to conform to manufacturer's recommendations and/or AWWA 0600. 4. Store gaskets for mechanical and push-on joints in a coot location out of direct sunlight; not in contact with petroleum products. Use gaskets on a first-in, first-out basis. C. Protection: I Lined and coated pipe: Suitably protected from exposure and heating from sun. Follow procedures recommended by coating and lining system manufacturer. a. Exposure will not be allowed except for short periods such as installation, assembly and repairs. 2. Metal tools or heavy objects are not permitted to come in contact unnecessarily with finished coating. a. Workers may walk on coated pipe only when necessary, and only when wearing footwear with rubber or composition soles and heels sufficiently free of dirt and mud so coating remains undamaged. 3. Prevent damage to linings and coatings caused by handling, onsite storage, and exposure to low temperatures(due to embrittlement),high temperatures,or direct sunlight. D. Inspection: Inspect for damage. Water Treatment Plant Pressure Control Valves Ductile,Iron Utility Pipe for Water Service City of Round Rock 330519-4 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.8 EXISTING CONDITIONS A. Field Measurements: Verify field locations and sizes of connections to existing piping and equipment prior to submitting pipe lay drawings. I. Indicate field measurements on Shop Drawings, 1.9 WARRANTY A. Furnish two year manufacturer's warranty for ductile iron pipe and fittings front date of substantial completion. 13. Manufacturer warrants materials and workmanship from defects for ductile iron pipe and fittings. PART 2-PRODUCTS 2.1 SYSTEMS A. Assure compatibility between joints of all items supplied. 2.2 DUCTILE IRON PIPE A. Manufacturers: Provide pipe and fittings supplied by: I. American Cast Iron Pipe Co. 2. U,S. Pipe and Foundry. 3. Griffin Pipe Products. B. Fitting Certification: From Fitting manufacturer, written certification that fittings are compatible with supplied brand of pipe, C. Ductile Iron Pipe: Per AWWA 0151. Provide in standard lengths as much as possible. D. Thickness Design: Per AWWA C 150,except as follows: I. Piping 12 inches(305 mm)and Smaller: Minimum Class 350, 1 Piping 14 inches(355 mm)to 20 inches(508 mm): Minimum Class 250. 1 Piping Larger than 24 inches(6 10 rnin): Minimum Class 200. E. Pipe Wall Thickness Analysis: I. Tensile strength: 60,000 psi. 2. Yield strength of'42,000 psi (per AWWA M-41). 3. Design and analyze external and internal pressures separately. Use the larger of two to determine the net design thickness. 4. Design additional allowances for service allowance and casting tolerance per AWWA C150. WaiCer`t`reatrnenr Ma nt Pressure Control VaVves Duefile-Iron 1julay'P'pe for Water Servirce Cay of Round Rock 330519-5 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 23 END TREATMENTS/JOfNTS 1. Unrestrained Pipe and Fitting Joints: Push-on rubber gasket type or rubber-gasket mechanical joint per AWWA C 111. 2. Unless otherwise specifically noted,all piping shall be restrained, 3. Restrained Pipe and Fitting Joints: Push-on rubber gasket, locking ring type joints per manufacturer'standard described below. 4. Gasket materials: Per Table 5-1 of AWWA M-41. a. Rubber-Gasket Joints: Per AWWA CI 11. Styrene butadiene rubber(SBR). 5. Restraints for push-on joint pipe and fittings to be positive locking, utilizing restraints independent of joint gasket. a. Joint Test Pressure 150 psig. b, Joint Fabrication: Heavy section ductile iron casting. C. Bolts and Nuts: Low carbon steel conforming to ASTM At 93,Grade B7. d. Restraint for mechanical joint pipe shall use retainer glands for restraining joint. 6. Provide restrained push on joints from one of the following manufacturers or an Engineer approved equivalent. a. US Pipe and Foundry Company: "TR Flex." b. American Cast Iron Pipe Company: "Lok-Ring" or "Flex Ring (positive locking style)." C. Griffin Pipe Products Company: "Snap Lok." d. Clow Water Systems Company: "Superlok." 7. Determine minimum number of restrained joints required for resisting forces at fittings and changes in direction of pipe from length of restrained pipe on each side of fittings and changes in direction necessary to develop adequate resistance friction with soil, a. Required lengths of restrained joints shall be as shown on Drawings. 8. Restrained pipe joints incorporating cut out sections in pipe wall must have a minimum wall thickness at cut out corresponding with minimum specified wall thickness for the rest of pipe. 9. For up through 48-inch diameter ductile iron pipe only, the following may be used as an alternative restraint system. M Pipe manufacturer proprietary mechanical joint restraint systems that utilize a wedge- style gripping system or a gland/ring positive restraint system will be considered acceptable on a case-by-case basis as determined by Engineer. a. Optional mechanical joint restraint shall be incorporated in the design of a follower gland. Gland shall be manufactured of ductile iron per ASTM A536. Dimensions of gland must be such that it can be used with standard mechanical joint bell and tee-headed bolts,as specified with pipe. b. Restraint Mechanism: 1) Individually activated gripping surfaces maximizing restraint capability. 2) Wedges designed to spread bearing surfaces on pipe. 3) Torque limiting twist-off nuts sized same as T bolts for mechanical joints. When nut is sheared off,standard hex nut shall remain. Water Treatment Plant Pressure Control Valves Ductile•tron Utility Pipe for Water Service City of Round Rock 330519-6 .. ........ ........................_,__ , 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Restraint Device for Ductile Iron Pipe: EBAA Iron Megalug Series 1100, or approved equivalent, 1) Working Pressure: 250 psi and a safety factor of 2:1. 11. Couplings and Adapters Sleeve Type Couplings: Dresser Style 38, 138 or equivalent by: a. Ford Meter Box Co. b, Smith Blair C. Romac Industries. 12, Buried Sleeve-Type Couplings: Protective wrapping of"Denso" material by DENSO Inc. of Texas or equivalent. a. Where "Dense" material is used, pack joint with "Densyl mastic" to give an even contour for wrapping with "Densopol" tape, b. Apply a 1/16 inch (1.5 mm) thick coating of "Denso" paste followed by 4 inch (100 mm) or more wide "Densopol" tape wound spirally around joint with at least 50 percent overlap. 2.4 FI'T'"T"INGS I Pipe Fittings: Ductile iron per AWWA 0110 or AWWA 0153 as applicable. Fittings to have the same pressure rating,as a minimum,of the connecting pipe. a. Piping 24 inch and smaller: minimum pressure rating of 200 psi, 2. Closures: Made with mechanical joint ductile iron solid sleeves. Locate in straight runs of pipe at minimum cover outside the limits of restrained joint sections; subject to approval of Engineer. 1 Weld-on Outlets: May be used as an alternative to ductile iron cast fittings. Limited to branch outlets having a nominal diameter not greater than 30 percent of nominal diameter of main pipe,or 14 inches diameter,whichever is smaller. a. May be provided as radial tee outlet, tangential outlet,or lateral outlet fabricated at a specific angle to main pipe (in I degree increments between 45 and 90 degrees from axis of main pipe). b. Welded onto pipe under supervision of a qualified welder at same facility where pipe is manufactured. Pipe manufacturer to have 5 years' experience in fabrication and testing of outlets of similar size and configuration. Field welding of outlets is not acceptable. c. Joints to be compatible with connecting pipe and meet where applicable, requirements of ANSFAWWA CI I I/A2 1,11 and/or ANSI/'AWWA C I 151A2 1.1 5. d. Welding Procedures: As determined by pipe manufacturer, I Parent pipe and branch outlet candidate pipe shall be centrifugally cast ductile iron pipe. a) Designed per ANSFAWWA C 150/A21.50 b) Manufactured per ANSFAWWA CIS VA2 1.5 1. c) Minimum class for sizes 4 through 54 inch;special thickness class 53, e. Rated for working pressure indicated on Drawings and connecting pipe. Water'rreannent Nant Pressure Convol Valves Mode Iron Uhh�y Npe For Water Service C'uty of'Round Rock 3305N-7 t' 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 f. Prior to application of coating or lining in outlet area,weldments for branch outlets supplied for this project will be subjected to a hydrostatic test of 500 psi. No leakage is allowed on hydrostatic test. Hydrostatic test shall be done prior to cutting out parent pipe. Rating, safety factor and testing must be certified and contained in manufacturer's submittal package. 2.5 LININGS,COATINGS& CORROSION PROTECTION A. Interior Lining: 1. Ductile iron pipe and fittings shall have same type of lining. 2. Cement Mortar Lining: Per AWWA 0104 standard thickness. Cement type per ASTM C150. B. Exterior Coating I. Buried pipe installed with bituminous coating per AWWA 0151 and CI 10 respectively. 2. Install buried pipe with polyethylene encasement. a. Polyethylene Encasement: 8 mils thickness meeting standards per AWWA 0105. I Three layers of co-extruded linear low-density polyethylene(LLDPE), fused into a single thickness not less than eight mils. lnftise inside surface in contact with pipe exterior with an antimicrobial compound and volatile corrosion inhibitor blend, mitigating microbiologically influenced corrosion galvanic corrosion. 2) Polyethylene encasement shall be V-Bio,as patented by DIPRA. b. Manufacturers: I) North Town Company. 2) AA Thread and Seal Tape,Inc. 3) Sigma Corp, C. Size Requirements: Per TABLE 3, section 2.15 of DIPRA's Installation Guide for Ductile Iron Pipe. d, Test Results: Submitted to Engineer for approval prior to use. 1) Testing: Independent testing agency certifying polyethylene encasement meets criteria established by AWWA 0105 associated with tensile strength, elongation, dielectric strength, impact resistance, and propagation tear resistance. 2) Samples: Include with test results, C. Plastic Adhesive Tape: 2 inch (50 mm) for seating seams, cuts, or tears in polyethylene encasement.Duct tape is not acceptable. 1) Calpico Vinyl. 2) Polyken. 3) U.P.C. Water Treatment Plant Pressure Control Valves Ductile-Iron Utility Pipe for Water Service City of Round Rock 330519-8 ,c)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 PART - EXECUTION 3.1 PREPARATION A. Handle piping and fittings per "Delivery, Storage, and Handling" Article in Part I of this specification. B. Examine pipe and fittings before laying. Repair any damage to pipe, lining or coatings per manufacturer's recommendations prior to installation. C. Interior of all pipe, fittings and other appurtenances shall be kept free from dirt, excessive corrosion or foreign matter at all times, 3.2 INSTALLATION A. Installed per requirements of A 0600,unless otherwise specified. I Provide firm, even bearing length of pipe. Dig bell holes at each joint. Tamp backfill materials on pipe sides to springline per details on Drawings, 2. Blocking is not permitted. 3, Replace with sound pipe or fitting, defective pipe or fitting discovered after having been laid, 4. When laid, pipe and fittings shall perform to lines and grades required. When laying is not in progress,close open ends of pipe with watertight plug or other approved means. 5. Place sufficient backfill to prevent flotation. Joint deflection not to exceed manufacturer's recommendation. 6. Pipe Laid Underground: 4 feet cover unless Drawings show otherwise or otherwise specified. 7. Lay pipe such that invert elevations shown on Drawings are not exceeded. 8. Provide fittings, in addition to those shown on Drawings, where required, in crossing utilities which may be encountered upon opening trench. Install solid sleeve closures at locations approved by Engineer. 9. Pipe Interior: Maintain dry and broom clean throughout construction period. M Field Cutting Pipe: When required, smooth cut by machine perpendicular to pipe axis. Bevel cut pipe ends per manufacturer's recommendations for spigot end, a. Repair coating removed from cut per manufacturer's recommendation and/or coating and lining paragraphs of Part 2 above(whichever method is more stringent in opinion of Engineer), b. Cement lining shall be undamaged. c. Cutting of restrained joint pipe will not be allowed, unless approved at specific joints in conjunction with use of restrainer glands by EB AA Iron or field adaptable restrained joints. d. "Where Field Cuts are Permitted"Pipe supplied by factory as "gauged full length". I Gauged Full Length Pipe is Unavailable: Pipe to be field gauged at location of new spigot using a measuring tape, or other means approved by manufacturer, to verify that diameter is within tolerances permitted in Table I of AWWA C151. WarerTreaurient Maw Pressure Cowrol Valves Ducide tron Willay Pipe for Water Service 011y of Round Rock 3305 N-9 )2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Jointing Ductile-Iron Pipe: I Push-On Joints: Install per manufacturer's instructions,AWWA 0600 and Appendix B of AWWA 0111. If there is conflict,manufacturer's instructions take precedence. a. Lay pipe with bell ends looking ahead. b. Insert rubber gasket in groove of bell end of pipe. C. Clean and lubricate joint surfaces d. Align plain end of pipe with bell of pipe to which it is to be joined and pushed home. e. Metal feeler shall be used to make certain that rubber gasket is properly seated. 2. Mechanical Joints: Assembled per manufacturer's instructions, AWWA 0600 and Appendix A of AWWA 0111. If there is conflict, manufacturer's instructions take precedence. a. Lay pipe with bell ends looking ahead. K Clean and lubricate joint surfaces and rubber gasket. C. Tighten bolts to specified torques. d. Extension wrenches or pipe over handle of ordinary ratchet wrench are not allowed to secure greater leverage. e. Encapsulate bolts and nuts using wax sealing tape per AWWA Standard 0217. f. Install polyethylene encasement as specified. 3. Bolts in Mechanical or Restrained Joints:Tightened alternately and evenly. 4. Restraint for Mechanical Joint Pipe: a. Retainer glands for restraining joint. b. Restrained mechanical joints to be suitable for specified test pressure. C, Installed according to pipe manufacturer's instructions. 5. Flanged Joints: Assembled per manufacturer's instructions and Appendix C of AWWA CI 11. If there is conflict, manufacturer's instructions take precedence. a, Ensure there is no restraint on opposite ends of pipe or fitting, which would prevent uniform gasket compression, cause unnecessary stress, bending or torsional strains,or distortion of flanges or flanged fittings. b. Adjoining push-on joints are not to be assembled until flanged joints have been tightened. C. Tighten flange bolts for uniform gasket compression and sealing. 1) Leave flange bolts with approximately 1/2 inch (13 mm) projection beyond nut face after tightening. d. Encapsulate bolts and nuts using wax sealing tape per AWWA Standard 0217. 6, Sleeve Couplings: Only installed for closure or as shown on Drawings. Do not assemble couplings until adjoining joints have been assembled. a. Encapsulate bolts and nuts using wax sealing tape per AWWA Standard 0217. Water Treatment Plant pressure Control Valves Ductile.Iron Utility Pipe for Water Service City of Round Rock 330519 ti 10 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 b. Install protective wrap recommended by manufacturer or as required herein. Maintain insulating properties of insulating and dielectric couplings. T Blowoffs, outlets, valves, fittings and other appurtenances to be set and jointed as indicated on Drawings and per manufacturer's instructions, C. Polyethylene Encasement: I. Install polyethylene encasement around ductile iron pipe to limits shown on Drawings and in accordance with pipe manufacturer's recommendations, a. Installed per ANSF AWWA C1051A21.5, Method 'A' in accordance with section 2.15 of DIPRA's Installation Guide for Ductile Iron Pipe, 1 Use a fabric type or padded sling when handling pipe to prevent damage to encasement. 3, Seal seams with approved 2 inch(50 mm)wide plastic adhesive tape. 4. Repair encasement rips or tears with tape and film per ANSI/AWWA C 105/A21.5. 5. When backfilling do not damage polyethylene encasement. 3.3 CONNECTIONS TO s,rRUCTURES A. Utilize wall sleeves for pipes passing through walls designed to pass through wall via restrained piping unless otherwise specified, 13. Encase piping underneath structures in reinforced concrete as shown in Drawings. 3.4 FIELD QUALITY CONTROL A, Replace with sound pipe or fitting,defective pipe or fitting discovered after having been laid. B. Thoroughly clean pipe and fittings before laying. Keep clean until used in Work. C. Pipe and fittings,when installed or laid,shall conform to lines and grades required. 15 FILLING AND TESTING I. After Installation: Test pipe shall for compliance as specified. a. Furnish necessary equipment and labor for hydrostatic pressure,testing pipelines. b. Submit detailed test procedures and methods per AWWA 0600 for Engineer's review and approval at least 10 days prior to testing 2. Pressure Pipelines: Subjected to hydrostatic pressure of 50 psig greater than the working pressure at the highest point along the test segment, or as below, the greater of the two shall apply. a. Potable Water Service:Test at 125 prig minimum. b. Maintained test pressure for 4 hours. C, Hydrostatic testing allowances are not to exceed those indicated in AWWA C600. Water 1"reatinoir Plaw Pressur�e,Conlroll Valves Ductile-lroii Mlity P")e for Water So-vice City of Rokisid Rock 33015l9 V I *)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 d. Provide suitable restrained bulkheads as required to complete specified hydrostatic testing. e. Make taps and furnish necessary caps,plugs,etc.,required to conduct testing. 3. Valves and Valve Boxes"Properly located,installed and operable prior to testing. 4. Owner will provide a source of supply from existing treated water distribution system for use in filling lines. An air break shall be maintained at all times between the distribution system and equipment to prevent cross-connection. a. Fill pipeline at a rate of 1400 gpm or less. Maintain specified test pressure in pipe for entire test period. Provide accurate means for measuring quantity of makeup water required to maintain this pressure. 5. Pressure Test Duration:4 hours. a. Correct visible deficiencies and continue testing at same test pressure for additional four hours to determine leakage rate. b. Maintain pressure within plus or minus 5 psi of test pressure. C, Leakage is defined as quantity of water supplied to piping necessary to maintain test pressure during period of test. d. Compute maximum allowable leakage by following formula: I) L— SD x sqrt(P)/C. 2) L testing allowance in gpli, 3) S length of pipe tested in feet. 4) D nominal diameter of pipe in inches. 5) P average test pressure during hydrostatic test in psig. 6) C 155,400. 7) If pipe under test contains sections of various diameters,calculate allowable leakage from sum of computed leakage for each size. e. If test of pipe indicates leakage greater than allowed, locate source of leakage, make corrections,and retest until leakage is within allowable limits. f. Correct visible leaks regardless of quantity of leakage. g. Repair leaks evident at the surface regardless of total leakage as shown by test. K Repair lines failing to meet tests. Retest as necessary until test requirements are met. i. Defective materials,pipes,valves,and accessories shall be removed and replaced. 3.6 CLEANING AND DISINFECTION A. At conclusion of Work,thoroughly clean pipes by flushing with water or other means to remove dirt, stones, pieces of wood, or other material which may have entered during construction period. Remove all debris from pipeline. Lowest segment outlet shall be flushed last to assure debris removal, B. After pipes have been cleaned and if groundwater level is above pipes or water in pipe trench is above pipe following a heavy rain,Engineer will examine pipe for leaks. I. Repair and replace defective pipes,fittings or joints that are discovered. Water Treatment Plant Pressure Control Valves Ductile-Cron Utility Pipe for Water Service City of Round Rock 330519- 12 ................................... 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Potable Water Service: Disinfect ductile iron pipe used for potable water service after cleaning. Provide necessary equipment and labor. 1. Disinfection per AWWA 0651 standard, 1 Discharge chlorinated water in compliance with Federal, State and local standards, Provide sodium bisulfite for de-chlorination prior to discharge. 3.7 PROTECTION A. Section 017300 "Execution" and Section 01770 "Closeout Procedures" for protecting finished Work requirements. END OF SECTION 330519 Wmei'Treatixwnt Mant Pressure Control Valves Ductile-hon Ufflity Pipe for Water Service Oty of'Roand ltock 330519- 13 C�2022 CDM smith 8077-263948 All Rights Reserved February 2022 Water Treatment Plant Pressure Control Valves Ductile-Iron Utility Pipe for Water Service City of Round hock 330519- Y 4 ,A',`2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 330526-UTILITY IDENTIFICATION PART I -GENERAL LI SUMMARY A. Section Includes: L Pipeline marker posts, 2, Plastic ribbon tape for placement above direct-buried utility. 3, Trace wire for placement above direct-buried utility, B. Related Requirements'. 1. Section 312,333 "Trenching and Backfilling." 2. Section 312000"Eartliwork." 1.2 ACTION SUBMITTALS A. Product Data: Submit manufacturer's catalog information for each product required. B, Manufacturer's Certificate:Certify that products meet or exceed specified requirements. C. Qualifications Statement.- 1, Submit qualifications for manufacturer. 1.3 CLOSEOUT SUBMITTALS A. Project Record Documents: Record actual locations of tagged valves. IA QUALITY ASSURANCE A, Conform to APWA Uniform Color Code, ANSI Z535.1,and ASME A13.I for color scheme for identification of piping systems and accessories. 1.5 QUALIFICATIONS A, Manufacturer: Company specializing in tnanufacturing products specified in this Section with minimum three years'documented experience. PART 2-PRODUCTS Water'rreunient Plant Pressure CmilrolVallves Unlay Identification Oty of Round Rock 330526 SFL- 1 01022 CDM Smith 8077-263948 All Rights Reserved February 2022 2.1 PIPELINE MARKER POSTS A. Manufacturers: 1. Berntsen International Inc.of Madison,Wisconsin, 2. William Frick&Company,of Libertyville, Illinois. B. Description: I. Material: High-density polypropylene. 1 Diameter: 3-1/2 inches. 1 Length: 72 inches. 4. Color: as requested by Owner. 5. Embedment:T-anchor, 2.2 RIBBON TAPE A. Manufacturers: 1. Berntsen International Inc. 2. Pipernarker.com; Brimar Industries, Inc. B. Description: 1. Material: Polyethylene. 1 Brightly colored,continuously printed. 3. Minimum Size: 3 inches wide by 4 mils thick, 4. Manufactured for direct burial service. 5. Imprint: "Caution Buried Waterline"in large letters. 2.3 TRACE WIRE A. Manufacturers: I. Northtown Company. 2. Priority Wire and Cable, Inc. 3. Tracerwire. 4. Description: a. Conductor: Magnetically detectable. b. Covering: Brightly colored plastic,imprinted with<"Waterline">in large letters. PART 3-EXECUTION 3.1 INSTALLATION A. Pipeline Marker Posts,Utility Markers,and Marking Flags:As recommended by manufacturer. Water Treatment Plant Pressure Control Valves Utility Identification City of Round Rock 330526 SFL=2 ............ ()6)2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 B. Ribbon Tape and Trace Wire: L Continuous over top of pipe. 2. If multiple pipes occur in common trench,locate tape or wire above centerline of trench. 1 Place Ribbon Tape and Trace Wire in the correct orientation,and anchor as necessary to prevent dislocation during placement of backfill. 4. Backfill above Ribbon Tape andTrace Wire taking care to avoid dislocation.Compaction equipment shall not directly contact the Ribbon'rape or Trace Wire. 5. Coordinate with trench Work as specified in Section 312333 "Trenching and Backfilling" Section 312000"Earthwork". END OF SECTION 330526 Water Treatment Mant Pressure Control Valves ()t0ity Identification City of Round Rock 330526 SFL-3 Q022 CDM Smith 8077-263948 All Rights Reserved February 2022 THIS PAGE INTENTIONALLY LEFT BLANK. Water Treatment Plant Pressure Control Valves Utility Identification City of Round Rock 330526_SFL-4 C 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 331300- DISINFECTING OF WATER unixrY DISTRIBUTION PART I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section Includes: I. Disinfection of potable water distribution system, 1 Testing and reporting of results. B. Related Requirements: I. Section 330519 "Ductile-Iron Utility Pipe"for product and execution requirements for installation and testing of site domestic water distribution piping. L3 UNIT PRICE-MEASUREMENT AND PAYMENT A. Disinfection: L Basis of Measurement: By linear foot, 1 Basis of Payment: Includes preparing,disinfecting,testing,and reporting. 1.4 ACTION SUBMITTALS A. Product Data: Procedures,proposed chemicals,and treatment levels. L5 INFORMATIONAL SUBMITTALS A. Manufacturer's Certificate: Products meet or exceed specified requirements. B. Certify cleanliness of water distribution system meets or exceeds specified requirements. C. Certify water conforms or fails to conform to bacteria]standards of authority having jurisdiction. D. Certify water conforms to quality standards of authority having jurisdiction. E. Test and Evaluation Reports: Testing results comparative to specified requirements, F. Field Quality-Control Submittals: Results of Contractor-furnished tests and inspections. G. Disinfection and Chlorination Water Disposal Plan: To be submitted by Contractor for review and acceptance by Owner and Engineer. Wager Treatment Plana Pressure Control Valves Disinfecting of Water Utflay Distribution Cay ofRound Rock 33130,01, 1 (rz 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1-1. Qualifications Statements: Qualifications for water treatment firm and testing firm. Include operator's license to perform the disinfection Work as required by Authorities Having Jurisdiction. 1.6 CLOSEOUT SUBMITTALS A. Disinfection Report: I. Type and form of disinfectant used. 1 Date and time of disinfectant injection start and time of completion. 3. Test locations. 4. Special disinfecting procedures used for connections to existing pipes. 5. Name of person collecting samples. 6. Initial and 24-hour disinfectant residuals in treated water in ppm for each outlet tested. 7. Date and time of flushing start and completion. 8. Disinfectant residual after flushing in ppm for each outlet tested. B. Bacteriological Report: 1. Date issued,project name,and testing laboratory name,address,and telephone number. 2. Time and date of water sample collection. 3. Name of person collecting samples. 4. Test locations. 5. Initial and 24-hour disinfectant residuals in ppm for each outlet tested. 6. Coliform bacteria test results for each outlet tested. 7. Submit bacteriologist's signature and authority associated with testing. 1.7 QUALITY ASSURANCE A. Perform Work according to AWWA 0651;continuous feed or AWWA 0651;slug method. 1.8 QUALIFICATIONS A. Water Treatment Firm: Company specializing in disinfecting potable water systems specified in this Section with minimum three years'documented experience, B. Testing Finn: Company specializing in testing potable water systems,approved by State of Texas. PART2-PRODUCTS 2.1 DISINFECTION CHEMICALS A. Chemicals: Hypochlorite:Comply with AWWA 8300. Water Treatment Plant Pressure Control Valves Disinfecting of Water Utility Distribution City of Round Rock 331300-2 ^A,)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that piping system has been cleaned,inspected,and pressure tested. B. Perform scheduling and disinfecting activity with startup,water pressure testing,adjusting and balancing,and demonstration procedures, including coordination with related systems. 3,2 INSTALLATION A. Provide and attach required equipment to perform Work of this Section. Closely coordinate efforts with Owner for maintenance of site operations and for testing services. B. Perform disinfection of water distribution system and installation of system and pressure testing as specified in Section 330519"Ductile-Iron Utility Pipe", C. Introduce treatment into piping system. D. Maintain disinfectant in system for 24 hours, E. Flush,circulate,and clean until required cleanliness is achieved using municipal domestic water. R Replace permanent system devices that were removed for disinfection. 33 FIELD QUALITY CONTROL A. Disinfection,Flushing,and Sampling: I, Disinfect pipeline installation. 2. Use of liquid chlorine(gas)is permitted. 3. Upon completion of retention period required for disinfection, flush pipeline until chlorine concentration in water leaving pipeline is no higher than that generally prevailing in existing system or is acceptable for domestic use. 4. Disposal: a. Legally dispose of chlorinated water. b. When chlorinated discharge may cause damage to environment, apply neutralizing chemical to chlorinated water to neutralize chlorine residual remaining in water. 5. After final flushing and before pipeline is connected to existing system or placed in service, employ an approved independent testing laboratory to sample,test,and certify that water quality meets quality standards of authority having jurisdiction. END OF SECTION 331,300 Water Treatnient Plant Pressure Contgol Values Disinfeoing of Water thility Distribution City of Round Rock 331300-3 r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 THIS PAGE INTENTIONFiLLY LEFT BLANK. Water Treatment Plant Pressure Control Valves Disinfecting of Water Utility Distribution City of Round Rock 331300.4 14�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 406100-PROCESS CONTROL AND ENTERPRISE MANAGEMENT SYSTEMS GENERAL PROVISIONS PART I GENERAL 1.1 RELATED DOCUMENTS A, Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1,2 SUMMARY ,A,, Section includes procurement of the services of a Process Control System Supplier (PCSS) to provide all materials, equipment, labor, and services required to achieve a fully integrated and operational system as specified herein, in "Related Requirements" under this Article, and in related drawings, except for those services and materials specifically noted, B. Under this contract, the PCSS will also serve as the Applications Engineer System Supplier (AESS). CPCSS to wire signals from the new North Pressure Control Globe Valve controller to RIO located in the High Service Pump 7-9 Electrical Building No.I. The signals must be terminated at the existing spare 1/0 points in the RIO as indicated on drawing 1-3. RIO and the HMI to be configured and programmed as per specification 406196. D. PCS S to wire signals from the new South Pressure Control Globe Valve controller to PLC-D located in the High Service Pump 1-6 Electrical Building. The signals must be terminated at the existing spare FO points in PLC-D as indicated on drawing 1-3. PLC-D and the HMI to be configured and programmed as per specification 406196. E. Include auxiliary and accessory devices necessary for system operation or perfon-nance,such as transducers, relays, signal amplifiers, intrinsic safety barriers, signal isolators, software, and drivers to interface with existing equipment or equipment provided by others under other Sections of these specifications,whether indicated on the Drawings or not. F. All equipment and installations to satisfy applicable Federal, State and local codes. Refer to Electrical drawings for area classifications for Class and/Division ratings, G. Use the equipment, instrument, and loop numbering scheme indicated on the Drawings and in the specifications in the development of the submittals. Do not deviate from or modify the numbering scheme. 1-1, Related Requirements: I. Section 406121.20"Process Control System Testing." 2. Section 406196"Process Control Description." 3, Section 407000"Instrumentation for Process Systems." Water,rreatment Plant Pressure Control Valves Procss Control and Entertiwe Management Systems General Provisions City of Round Rock 406100 1 (' 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 4. Section 407326"Gauge Pressure Transmitter." 5. Section 407856 "Isolators, Intrinsically Safe Barriers and Surge Suppressors." 1.3 DEFINITIONS A. Process Control System Supplier (PCSS): The entity responsible for providing all materials, equipment, labor, and services required to achieve a fully integrated and operational control system. B. Applications Engineering System Supplier(AESS): The entity who provides all programming, configuration,and related services for the control system equipment provided by the PCSS. C. Maintenance of Plant Operations(MOPO): A construction plan which prevents or limits process disruptions during construction. D. Leadership in Energy and Environmental Design (LEED): A green building certification indicating that a building was designed and constructed to be environmentally responsible and use resources efficiently. E. Section 4062XX "Sections for Computer System Hardware": The XX in the number indicates all spec sections starting with the first 4 numbers (indicating a category described in the accompanying text) are included in the reference. 1.4 PREINSTALLATION MEETINGS A. Preinstallation Conference: Conduct conference at Project site for purpose of a preinstallation meeting. B. Conduct a project kickoff coordination meeting within two weeks after submitting the Project Plan. The purpose of the meeting is to discuss the PCSS's Project Plan, to summarize the PCSS's understanding of the project; discuss any proposed substitutions or alternatives; schedule testing and delivery deadline dates; provide a forum to coordinate hardware and software related issues; and request any additional information required from the Owner. The meeting will last up to 4 hours. C. Monthly on-site or conference call coordination meetings with Engineer, Contractor, Vendors, and AESS as required prior to any field start-up or activity testing begins. D. Schedule the mandatory coordination meetings as described herein. Hold the meetings at the Owner's designated location and include attendance by the Owner,the Engineer,the Contractor, the PCSS's Project Engineer, and the AESS Project Engineer, if applicable. Other Division 40 specifications may require additional meetings. Prepare and distribute an agenda for this meeting a minimum of one week before the scheduled meeting date. Schedule the meeting for a minimum of one week before the requested meeting date. 1.5 ACTION SUBMITTALS A. Product Data: For each type of product. Water Treatment Plant Pressure Control Valves Process Control and Enterprise Management Systems General Provisions City of Round Rock 406100, 2 V5 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 1 Include construction details, material descriptions, dimensions of individual components and profiles,and finishes. 2. Include rated capacities, operating characteristics, electrical characteristics,and furnished specialties and accessories. B. Shop Drawings: I. Include plans,elevations, sections,mountings,and attachment details. 1 Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection. 1 Detail fabrication and assembly of control equipment,control panels,and instrumentation as specified herein. 4. Include diagrams for power, signal,and control wiring. C. Project Plan, Deviation List,and Schedule Submittal: I Submit, within 45 calendar days after Notice to Proceed, a Project plan. Submit for approval the Project Plan before further submittals are accepted. The Project Plan to contain the following: a. Overview of the proposed control system describing the understanding of the project work, a preliminary system architecture drawing, interfaces to other systems, schedule, startup, and coordination. Include a general discussion of startup, approach to testing and training, and other tasks as required by these specifications. K Project personnel and organization including the PCSS project manager, project engineer,and lead project technicians, Include resumes of each of these individuals and specify in writing their commitment to this project. These do not need to be submitted again if already submitted in the Qualification submittal. c. Sample formats of the shop drawings to be submitted and in conformance with the requirements of the Specifications. At a ininimurn include samples of control system architecture and UO wiring diagrams. 1 Define Exceptions to the Specifications or Drawings in a Deviation List consisting of a paragraph-by-paragraph review at' the Specifications indicating acceptance or any proposed deviations, the reason for exception, the exact nature of the exception and the proposed substitution so that an evaluation may be made by the Engineer. Specifically, state if no exceptions are taken to the specifications or drawings, If there is no statement by the PCSS,then it is acknowledged that no exceptions are taken. 3. The PCSS must coordinate their work with the General Contractor's overall schedule. PCSS schedule incorporates all PCSS milestones including but not limited to the following: a. Schedule for all subsequent project submittals. Include the time required for Contractor's submittal preparation, Engineer's review time,and a minimum of two complete review cycles, b. Proposed dates for all project coordination meetings. C. Installation of instrument and control system equipment. d. Testing: Schedule for all testing. Water Treatment Plant Pressure Control Valves Process Control and Enterprise Management Systems General Provisions City of Round Rock 406100, 3 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 e. Schedule for system cutover, startup, and/or going on-line for each major system. At a minimum include the schedule for each process controller provided under this Contract. f. Schedule for all training including submittal and approval of O&M manuals, factory training,and site training. 4. Component and Wiring Identification and Tagging Plan: a. All components provided by PCSS require a tag, label, or nameplate. Review specifications and provide a drawing indicating the tagging and labeling scheme used by the PCSS. b. Provide detailed information so Engineer can review the following characteristics for each type of tag, label, or nameplate for the different types of components provided above: 1) Size or range of size of the tag,label or nameplate. 2) Font style. 3) Material. 4) Color(s). D. Input/Output(1/0)List Submittal: 1. Submit, within 60 days after Notice to Proceed, a complete system InputIoutput (1/0) address list for equipment connected to the control system under this Contract. 2. Base the 1/0 list on the P&ID's, the Drawings, the design 1/0 list (if included), and requirements in the Specifications. 3. Submit the 1/0 list in both a Microsoft Excel readable electronic file format and an 8.1/2 inch by I I-inch hard copy. 4. Arrange the I/O list so that each control panel has a dedicated worksheet,which includes the following information: a. 'FAG NUMBER(S): As indicated on the Drawings, the identifier assigned to a device that performs a function in the control system. As part of this information, break out the tag loop number to allow for sorting by loop. b, DESCRIPTION: A description of the function of the device (text that includes signal source, control function, etc.) Include the text "Spare Points" for all F0 module points that are not connected to equipment. C. PHYSICAL LOCATION: The Control Panel designation of where the F0 point is wired to. d. PHYSICAL POINT ADDRESS: Rack, Slot, and Point (or Channel) assignment for each F0 point. e. ICO TYPE: use DO-Discrete Output,DI -Discrete Input,AO-Analog Output,Al -Analog Input, PI-Pulse Input,or PO-Pulse Output. f. RANGE/STATE: The range in engineering units corresponding to an analog 4-20 mA signal,or,the state at which the value of the discrete points is"1." g. ENGINEERING UNITS:The engineering units associated with the Analog 1/0. h. ALARM LIMITS: Include alarm limits based on the control descriptions and the Drawings. Water Treatment Plant Pressure Control Valves Process Control and Enterprise Management Systems General Provisions City of Round Rock 406100-4 ................. 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 i, PI D - the P&ID or drawing where the 1/0 point appears on. Mark as "NA" (Not Applicable) if the 1/0 point is derived from a specification requirement and is not on the P&IDs. j. LOGICAL POINT ADDRESS: FO address of each point, 5. Sort the 1/0 list in order by: a. Physical location, b, 1/0 Type. C. Loop Number. d. Device Tag.. 6. Once the 1/0 list is approved, the PLC 1/0 addresses are not be modified without approval by the Engineer, E. Wiring Diagrams Submittal: I Wiring Diagrams Submittal: a. PCSS to provide complete wiring diagrams showing all wiring connections in the 1/0 system where direct hardwired interfaces exist between the PCSS control panels and vendor provided control panels furnished under other Divisions. This includes but is not limited to terminal block numbering, relay contact information, instruments, equipment, and control panel names. Include drawings in Final O&M submittal. Leaving this information blank on Final Documentation drawings is not acceptable. b. Panel wiring diagrams depicting wiring within and on the panel as well as connections to external devices. If ISA Loop Wiring Diagrams are specified below, equipment external to the control panel and related external connections do not need to he shown on the Panel Wiring Diagrams. Panel wiring diagrams include power and signal connections, UPS and normal power sources, all panel ancillary equipment, protective devices, wiring and wire numbers, and ten-ninal blocks and numbering. Field device wiring includes the device ISA-tag and a unique numeric identifier. Diagrams identify all device tenninal points that the system connects to, including terminal points where 1/0 wiring lands on equipment not supplied by the PCSS, Wiring labeling used on the drawings match that shown on the Contract Documents or as developed by the PCSS and approved by the Engineer. 1/0 wiring numbered with rack number, slot number, and point number. Two-wire and four-wire equipment to be clearly identified, and power sources noted. Submit final wire numbering scheme. Provide panel drawings that are I I- inch x 17-inch in size. c. ISA Loop Wiring Diagrams: Not required. F. Testing Plan Submittals: I Refer to Section 406121.20 "Process Control System Testing" for specific testing submittal requirements, Waier Treatrnent Plant Pressure Cwurol VaNcs Process Control and Enterpnse Management Symerns General Provimons City of'Round Rock 406WO-5 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 1.6 INFORMATIONAL SUBMITTALS A. Qualification Data: For any named PCSS, submit a statement on company letterhead indicating that the requirements in the"Quality Assurance"paragraph below are met by the firm. L7 CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: For all PCSS supplied hardware to include in operation and maintenance manuals. 1. Submit in accordance with Section 017823 "Operation and Maintenance Data." a. Provide the record documentation of the completed test forms with sign-offs as specified in Section 406121.20"Process Control System Testing." B. Operations and Maintenance Data-Operators' Manual: I. Provide Operator's Manuals prior to final acceptance of the system. 2. Include in the manual all information necessary for the operator to monitor and control the new components. Write the manuals in non-technical terms and organize for quick access to each detailed description of the operator's procedure. Retain "Software and Firmware Operational Documentation"Paragraph below for PC-based control systems. 1.8 QUALITY ASSURANCE A. Manufacturer Qualifications: PCSS to hold a valid UL-508 certification for their panel fabrication facility. B, Responsible for the technical supervision of the installation by providing on-site supervision to the installers of the various components. C. The Process Control System Supplier(PCSS)to be a"systems integrator" regularly engaged in the design and the installation of instrumentation systems and their associated subsystems as they are applied to the municipal water and wastewater industry. For the purposes of this Specification Section,a"systems integrator"means an organization that complies with all of the following criteria: I. Employs personnel on this project who have successfully completed ISA or manufacturer's training courses on general process instrumentation and configuration and implementation of the specific programmable controllers, computers, and software proposed for this project, Key personnel to hold ISA CCST Level I certification or have a minimum of 10 years of verifiable plant startup experience, Key personnel includes, as a minimum,the lead field technician. 1 Has successfully completed work of similar or greater complexity on at least three previous projects within the last five years. Successful completion is defined as a finished project completed on time, without any outstanding claims or litigation involving the PCSS. Potential references for projects where the PCSS's contract was of similar size to this project. Water Treatment Plant Pressure Control Valves Process Control and Enterprise Management Systems General Provisions City of Round Rock 406100-6 2022 CDM Smith 8077,263948 All Rights Reserved February 2022 3. Has been actively engaged in the type of work specified in this Section for a minimum of five years. D. Maintain a permanent, fully staffed and equipped service facility within 60 miles of the project site with full-time employees capable of designing, fabricating, installing, calibrating, and testing the systems specified herein. Respond to on-site problems within 12 hours of notice. Provide an on-site response within four hours of notification starting at two months before scheduled startup to two months after startup completion. E, PCS S should be: I. CP USA I'. Being listed in this specification does not relieve any potential PCSS from meeting the qualifications specified in this Section, 1.9 DELIVERY,STORAGE,AND I IANDLING A. Refer to Section 016000 "Product Requirements" for delivery, storage, and handling requirements. 1.10 FIELD CONDITIONS A. Environmental Requirements: Refer to Electrical Drawings for specific environmental and hazardous area classifications. B. Elevation: Design equipment to operate at the project ground elevation, C. Temperature: 1. Outdoor area equipment to operate between-4 to 122 degrees Fambient. 2. Equipment in indoor locations operate between 50 to 95 degrees Fdegrees ambient minimum. 3. Storage temperatures range from 32 to 122 degrees Fdegrees ambient minimurn. 4. Furnish additional cooling or heating if required by the equipment specified herein. 5. Relative Humidity. Air-conditioned area equipment operate between 20 to 95 percent relative, non-condensing humidity. All other equipment operates between 5 to 100 percent relative,condensing humidity, D. Do not ship control system equipment located in the control room until the control room areas comply with specified ambient temperature and humidity and free of dust and debris. I'll WARRANTY I. Warranty Period: 2 year(s)from date of Substantial Completion unless noted otherwise in individual specification sections. WaterTreatment Plant Pressure Control Valves Process Corarr.)l and Enterpnse Managerrient Systcins General Provtskons City of Round Rock 406l 00-7 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 PART2-PRODUCTS 2.1 GENERAL A. Electrical Requirements for Control System: 1. Operate equipment on a 60 Hertz alternating current power source at a nominal 120 volts, plus or minus 10 percent,except where specifically noted. Regulators and power supplies required for compliance with the above to be provided between power supply and interconnected instrument loop. Supply constant voltage transformers where equipment requires voltage regulation. 2. With the exception for field device network connected devices, all electronic instrumentation utilize linear transmission signals of isolated 4 to 20 mA DC (milliampere direct current) capable of driving a load up to 750 ohms, unless specified otherwise. However, signals between instruments within the same panel or cabinet may be 1-5 VDC(volts direct current). 3. Outputs of equipment that are not of the standard signals as outlined, have the output immediately raised and/or converted to compatible standard signals for remote transmission.No zero-based signals will be allowed. 4. All switches have double-pole,double-throw(DPDT)contacts rated at a minimum of 600 VA,unless noted otherwise. 5. Switches and/or signals indicating an alarm, failure or upset condition wired in a fail-safe manner. A fail-safe condition is when an open circuit generates an alarm state (i.e. contact opens). 6. Materials and equipment UL approved whenever such approved equipment and materials are available. 7. All equipment furnished designed and constructed so that in the event of power interruption, the systems specified all go through an orderly shutdown with no loss of memory and resume non-nal operation without manual resetting when power is restored, unless otherwise noted. Surge protection requirements for control system power,signal,and communication lines are specified in Section 407856 "Isolators, Intrinsically Safe Barriers, and Surge Suppressors." PART 3-EXECUTION 3.1 EXAMINATION A. Examine areas with Installer present for compliance with requirements for maximum moisture content,installation tolerances and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected. Water Treatment Plant Pressure Control Valves Process Control and Enterprise Management Systems General Provisions City of Round Rock 406100 8 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 12 GENERAL INSTALLATION A. The shield on each process instrumentation cable to be continuous from source to destination and be grounded at only one ground point for each shield. B. Provide sunshades for equipment mounted outdoors in direct sunlight. Include sunshades standoffs to allow air circulation around the cabinet. Orient equipment outdoors to face to the North to minimize the impact of glare and ultraviolet exposure on digital readouts. 33 IDENTIFICATION A. Provide identification system for all PCSS provided hardware, instrumentation, and communication cabling, 3.4 FIELD QUALITY CONTROL A. Refer to individual hardware and instrument specification sections. 15 STARTUP SERVICE A, Refer to Section 406121.20"Process Control System Testing." 13, Weekly on-site coordination meetings with Contractor and Vendor as required during active construction period. END OF SECTION 406100 Water'Treaimcru Mann Pressure Control Valves Process ContrcA and Enterprise Management Systems General Provmons Cuy oRound Rock 406100 9 eVl',2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Process Control and Enterprise Management Systems General Provisions City of Round Rock 406100- 10 ........... ,0 2022 CDM Sauth 8077-263948 All Rights Reserved February 2022 SECTION 406121.20 - PROCESS CONTROL. SYSTEM TESTING [CONTRACTOR PERFORMS PROGRAMMING] PARTI - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section includes process control system testing, where the Applications Engineering services are performed by the Contractor. 13. Related Requirements: 1. Section 406100 "Process Control and Enterprise Management Systems General Provisions," 2. Section 019113 "General Commissioning Requirements." C. Furnish all labor, materials, equipment and incidentals, required to complete the testing of all devices and systems furnished and installed as detailed on Drawings,and as specified herein. 1.3 DEFINITIONS A. Process Control System Supplier ( CS ): The entity responsible for providing all materials, equipment, labor, and services required to achieve a fully integrated and operational control system. K Applications Engineering System Supplier (AESS): The entity who provides all programming, configuration,and related services for the control system equipment provided by the PCSS. C. Human Machine Interface (11MI): A software-based user interface with supervisory level control and of machine level equipment. D. Operator Interface Ten-ninal (OIT): A hardware component of the 14MI used for device level control and monitoring, E. Programmable Logic Controller (PLC): A ruggedized programmable computer used for industrial automation. F. Input/Output (1/0): Analog or digital field instrument signals to be received and interpreted by a PLC. G. Uninterruptible Power Supply (UPS): A device capable of providing emergency battery power when the main power source fails. water Tircatinent Plant PressureControl Valves Proccss Control Srsternl'esiii*contractor Performs Prograrnmng] City of Rowed Rock 406121.x;0- I 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.4 PRE-INSTALLATION MEETINGS A. Preinstallation Conference: Refer to Section 4061000 "Process Control and Enterprise Management Systems General Provisions." 1.5 ACTION SUBMITTALS A. Refer to Section 406100 "Process Control and Enterprise Management Systems General Provisions." B. Testing Submittals- Submit,in one submittal,the following testing related documents: 1. Status signoff forms: a. Develop and submit project specific 1/0 Status and Automatic Control Strategy signoff forms to be used during field testing to organize and track each loop's inspection, adjustment, calibration, configuration, and testing status and sign off. Include sign-off forms for each testing phase showing all loops. 1) Example forms are shown in the Appendices. 2) Separate forms for factory and field testing can be used, or they can be combined,at the discretion of the PCSS. 3) Submit testing forms prior to start of testing. 1. Testing Procedures: a. Submit detailed procedures proposed to be followed for each of the tests specified herein.The test procedures serve as the basis for the execution of the required tests to demonstrate that the systern meets and functions as specified. At a mimmurn, provide the following test procedures: I) i/oTesting. 2) Control panel power, indictors,and hardwired logic tests. b. Structure documents in an orderly and easy to follow manner to facilitate an efficient and comprehensive test. C. Indicate in test procedures all pre-testing setup requirements, all required test equipment,and simulation techniques to be used. d. Structure test procedures in a cause and effect manner where the inputs are indicated,and the outputs are recorded. C. Include in test procedures the demonstration and validation under normal operating conditions and under various failure scenarios as specified in Contract Documents. f. Do not start testing until all Testing Submittals have been approved. C. 'rest Documentation: I Upon completion of each required test, docurnent the test by submitting a copy of the signed off Testing Status forms. Testing is not be considered complete until the signed- off forms have been submitted and approved. Submittals of other test documentation, Water Treatment Plant Pressure Control Valves Process Control System Testing[comractor Performs Programming] City of Pound Rock 406121.20-2 1,',2022 CDM Smith 8077-263948 All Rights Reserved February 2022 including "highlighted" wiring diagrams with field technician notes, are not acceptable substitutes for the formal test documentation. 1.6 INFORMATIONAL SUBMITTALS A. Evaluation Reports: ForTest Documentation of system: 1. Upon completion of each required test, document the test by submitting a copy of the signed-off Testing Status forms. Testing is not considered complete until the signed-off forms are submitted and approved. Submittal of other test documentation, including "highlighted" wiring diagrams with field technician notes, are not acceptable substitutes for the fon-nal test documentation. 1.7 CLOSEOUT SUBMITTALS A. Refer to Section 406100 "Process Control and Enterprise Management System General Provisions." 1.8 COST OF TRAVEL A. Scheduled tests will only be attended once by Engineer /Owner. If test is not successful, all subsequent tests will be performed at Contractor's expense. Reimburse Owner for all costs, including labor and expenses, invoiced by Engineer and incurred by Owner for subsequent retests. PART 2- PRODUCTS(NOT USED) PART - EXECUTION 3.1 TESTING -GENERAL A. Refer to Section 406100 "Process Control and Enterprise Management System General Provisions." B. Track results of all testing on a project specific status sign-off form or similar document. The PCSS is responsible for maintaining the sheet. Appendix of this Section has all example template for this sheet, C, Tests the PCSS is required to perform are as follows: 1. Field Testing: a. Operational Readiness Test(ORT). b. Functional Demonstration Test(FDT). c. Site Acceptance Test (SAT). water Treatment Mant Pressure Control Valves Process Control Syst=Testings contractor Perfix-ins 1'n)grainm01gJ City of Round Rock 406121.20-3 C 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 D. Wherever possible, perform tests using actual process variables,equipment, and data. Where it is not practical to test with real process variables, equipment, and data, provide all special testing materials and equipment required for a suitable means of simulation. E. PCSS to coordinate all required testing with Contractor, affected Subcontractors, Engineer, and Owner, F. Engineer reserves the right to test or re-test any functions. G. Correction of Deficiencies: I Correct deficiencies in workmanship and/or items not meeting specified testing requirements to meet specification requirements at no additional cost to Owner. 2. Repeat testing,as specified herein, after correction of deficiencies is made until specified requirements are met. Perform work at no additional cost to Owner. 3.2 FIELD TESTING -OPERATIONAL READINESS TEST(ORT) A. Purpose of ORT is to check that process equipment, instrument installation, instrument calibration, instrument configuration, field wiring, control panels, and all other related system components are ready to monitor and control the processes. This test determines if equipment is ready for operation. B. This test to take place prior to FDT and startup. Prior to starting this test,install relevant process equipment and mechanically test instruments installed,control panels installed,and field wiring complete. C. Required Documents for Test: I. Master copy of the PCSS developed field testing sign-off forms. 2. Testing procedures. 3. Calibration farms. D. These inspections, calibrations, and tests do not require witnessing. However, Engineer may review and spot-check testing process periodically. All deficiencies found to be corrected by PCSS prior to commencement of Functional Demonstration Test. E. PCSS to maintain Sign-off forms and Calibration forms at job site and make them available to Engineer/Owner at any time. F. Perform the following tests as part of ORT: I. Instrument calibration, configuration,and set-up. 2, Input/Output(FO)Testing to HMI and OlTs. 3. Testing of control strategies. G 1/0 Testing: I. Purpose of 1/0 testing is to check that process equipment, instrument installation, calibration,configuration, field wiring,and control panels are set-up correctly to monitor Water Treatment Plant Pressure Control Valves Process Control systen,'resting[con tractor Performs Programming] City of Round Rock 406121.20,4 ............................ o(J 2022 CDM Stnith 8077-263948 All Rights Reserved February 2022 and control the processes. This test is commonly referred to as a "loop test" or an 1/0 checkout. 2. PCSS in conjunction with Contractor to test signals under process conditions. Preferred test method will always be to execute test wherever possible to end elements. For example,preferred test will prove valve open/close limit switches by operating valve, not by installing a jumper on limit switch contacts. However, if equipment or process is not available to test a signal over its entire calibrated range, PCSS may test using a simulation method and make a note on sign-off form. 1 Perform the following 1/0 tests: a. Discrete Input: At device or instrument, change signal condition from inactive to active state. Observe results on all indicators within loop such as I-IMI screens, OIT screens,pilot lights,horns,beacons,etc. b. Analog Input: Test analog signal over entire engineering range at various intervals including 0, 50%, and 100% as well as on increasing and decreasing range. Observe results on all indicators within loop such as HM1 screens, OIT screens, recorders,digital indicators,etc. C. Test discrete output signals by switching equipment to manual control at the HMI and OCT nodes and turning output on or using other means to turn output on. Then verify equipment responds accordingly. d. Test analog output signals by switching equipment to manual control at HMI and OIT nodes and turning output on or other means to turn output on, Then verify equipment responds accordingly. 1-1. Testing of Automatic Control Strategies: I Verify all automatic control strategies using actual process equipment and instruments, or other means, to verify logic performs as expected. Verify faults and logical failure scenarios for control strategies such as instrument failures, equipment failures, loss of communication between I-IMI Server and PLC, loss of peer-to-peer communication, out of range testing for analog inputs, loss of power, and ail other strategies specified in control strategy document. 1, For all panels with enclosures modified by this Contract, test internal control panel temperature tinder full running conditions to ensure proper cooling/ventilation is being provided. J. Upon successful completion of ORT, PCSS to submit a record copy of test results as specified in PART I and request scheduling of FDT, 33 FIELD TESTING-FUNCTIONAL DEMON STPATI ON TEST`(F DT) A. After facility is started-up and running treatment process in automatic control to extent possible, perform a 1-unctional Demonstration Test. Purpose of FDT is to allow Engineer or Owner representatives to witness actual functionality, performance, and stability of system while connected to process equipment, B. Required Documents for Test: 1. Set of panel drawings and wiring diagrarns from ORT with corrections noted. 2. Set of Contract Documents -all drawings and specifications. Water'Freaanetit Plant Pressure Control Valves Process Control Systern Test ing[con tractor Perfonns Pro r=aring) City of Round Rock 406121.20- 5 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. All design-change related documentation. 4. Signcd-off master copy of the PCSS developed field testing signoff forms. 5. Testing procedures, 6. Copy of completed calibration forms. 7. One copy of all 0&M Manuals for PCSS supplied equipment. C. Perform a witnessed FDT on each process area. To extent possible, repeat testing performed during ORT. D. Follow specified daily schedule during factory tests and FDT. E. Document punch list items and resolutions noted during test on Punch list/Resolution form. In event of rejection of any part or function test procedure, PCSS to perform repairs,replacement, and/or retest within 10 days. F. Upon successful completion of the FDT, PCSS to submit a record copy of test results as specified in PART 1. 3.4 FIELD TESTING-SITE ACCEPTANCE TEST"(SAT) A. After completion of FDT,and system is started-up and running treatment process in automatic control to extent possible, perform a test on the system as defined in Section 019113 "General Commissioning Requirements." B. While this test is proceeding, Engineer and Owner have full use of system. Only allow plant operating personnel to operate equipment associated with live plant processes. Plan( operations remain the responsibility of Owner and decision of plant operators regarding plant operations are final. C. During this test, PCSS personnel to be present as required to address any potential issues that would impact system operation. PCSS is expected to provide personnel for this test who have an intimate knowledge of hardware and software of system, When PCSS personnel are not on-site, PCSS to provide cell plione/pager numbers that Owner personnel can use to ensure that support staff is available by phone and/or on-site within four hours of a request by operations staff, D. PCSS to analyze and correct any malfunctions during test. In event of rejection of any part or function, PCSS to perform repairs or replacement within 5 days. E. Throughout duration of SAT, do not make software or hardware modifications to the system without prior approval from Owner or Engineer. END OF SECTION 406121.20 Water Treatment Plant Pressure Control Valves Process Control Systern Testing[contractor Performs Programming] City of Round Rock 406121.20 6 to 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 APPENDIX 40 612 I-A: EXAMPLE INPUT"OUTPUT(1/0)STATUS SIGN OFF FORM An example template for I/O Status signoff f'()n-n to be used for documenting testing results to Owner is attached, PCSS is required,prior to testing,to create a project specific 1/0 Status signoff form based on attached template or approved equal. PCSS may obtain an electronic copy of template from Engineer or develop it on their own. APPENDIX 40 6121-F3: EXAMPLE AUTOMATIC CONTROL STRATEGIES SIGN OFF FORM An example template for Automatic Control Strategies signoff form to be used for documenting testing results to Owner is attached. PCSS is required, prior to testing,to create a project specific Automatic Control Strategies signoff form based on attached template or approved equal. PCSS may obtain an electronic copy of template from Engineer or develop it on their own. water Trcaaiient If larst Pressure Control Valves Process Control Systern Testiiigicoatractor IReilbrrns Prograrnming) City o,f Romid Rock 406M.20-7 Rf 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 lip H11 1111,111 JIM i � «'N a"1 N w",. W,wm',mi+-.rev w1 W W5 F•ai ....�'�r•... t5 u ......... } w sv ri av tM N ^x i"V my<W V M n n n Cry M Nb ..............wWwwwY`Www wW w Y 8 8 „!78 8181d81819 C38CY 6 �a1 w r(411:17 u, 4,141-1-fl- ,1 '". ^„ ,"#r ^' w 3 6 4, h d 3 3 uas0UUl1 Ilii IIell r rr�ry 1$W � m tl.>>•• d < < U <+K K K ary a,r e u&' Water Treatment Plant Pressure Control'Valves Process Control System Testing[contractor Performs Programming) City of Round Rock 40&121.20-8 e N 4- -1 [Project Name] Appendix€3-Automatic Control Strategies Sig Forth tj All Sections glow are required to be by PCSS as part of Testing ? Auto.Control s.-L t bc as defined in Control Statesws Ln Auto. Control Strategies Loop control _ If Control Strategy DescriptionP&ID Scat is I LOOP 261-284 LOW FLOW PUMPS 8 LOOP 290 LOW Erb CHANNEL FLOW NO 6 LOOP 300 MICROFILTRATION AIR SUPPLY LOW PRESSI RE 70 LOOP 351 352 S=.E LIFT STATION PUMP NO,1 AND NO,2 12 '} LOOP 355 SITE LIFT STATION HGH AND LOW LEVEL CONTROL < LOOP 371.372 SLUDGE HOLDING TANK NO I AND NO,2 LEVEL 14 LOOP 381,382 SLUDGE TRANSFER PUMPS SLUDGE TRANSFER PUMPS REMOTE STARTISTOP F'385 COMMAND 14 LOOP 700 EFFLUENT PUMPING STATION LEVEL 4 LOOP 701,70Z, 703 EFFLUENT PUMP NO.1 LOOP 840 T AERATION CHANNEL AIR FLOW N LOOP 900 SLUDGE TRANSFER PUMPS DISCHARGE W 8 r L P 971 CENTRIFUGE SLUDGE FEE NOA LOOP 1-001 CENTRIFUGE NO 1 SLUR FEED CON. L 8 LOOK 1411.1412 SODIUM HYPOCHLORME O T E 8 LOOP 1421,1422 SODWM HYP€3CH°QR.TE P 8 SODIUM HYP- RITE ST RA E LOOP 1430 CONTAINfv1ENT HIGH L L ET 14 LOOP 2051,2052.2653 DIESEL ENGINEUENIERATOR AT 14 LOOP 2055 T E HTATUS k 14 LOOP 2060 G OR KILOWA ONI R 14 °-I TA DURA R LOSS WITH APPENDIX ONE T GENERATO R' 14 O €P NT REs R W TH RESTORE AP a A APPENDIX WER 14 WA SK F- °ING CA ITIES OF NETWORK N;A f ED IDANT=ASERVERFAILOVERAND N=A CO NIA Page 1 of 1 s r_J 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Process Control System Testing[eontractor Perforins Programming] City elf Round Rock 406121.20- 10 V 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 406196-PROCESS CONTROL DESCRIPTIONS PART I -GENERAL Ll RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Applications Engineer System Supplier(AESS) Programming Scope: I. Develop the control system applications to implement the process control descriptions for all new and existing systems,This Section is provided to define control strategies to be used for PLC programming of the system. 2, The Contract Documents are a single integrated document, and as such, all Drawings, Specifications Divisions and Specifications Sections apply. It is the responsibility of the Contractor and Subcontractors to review all Sections to ensure a complete and coordinated project. 3. The PCSS is cautioned to read this Section and all related Sections and their entirety prior to starting any programming. Many general control strategies and requirements are defined once in the body of this Section with the specific requirement called out in the individual control strategy. Implement these general strategies throughout this Contract unless specifically directed otherwise in the individual loop process control descriptions. 4. Follow loop and device tagging criteria shown on the Drawings without exception. 5, Establish programming approach and database/variable identification standards prior to performing any programming work, Review the proposed standards and conventions with the Owner during the coordination workshop, B. Related Requirements: I Section 406100"Process Control and Enterprise Management Systems General Provisions." 1.3 DEFINITIONS A. Applications Engineering Systern Supplier (AESS): The entity who provides all programming, configuration, and related services for the control system equipment provided by the PCSS. E. Human Machine Interface (I-IMI): A software-based user interface with supervisory level control of machine level equipment. Wmer Trealnwnt Ma nt Pressure Controt Vatves Process Control Descriptions City of'Round Rock 40606.00 1 4',2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Input/Output (1/0): Analog or digital field instrument signals to be received and interpreted by a PLC, D. Operator Interface Terminal (OIT): A hardware component of the SCADA system used for device level control and monitoring. E. Operator Workstation(OWS):A hardware component of the SCADA system used for supervisory level control and monitoring. F. Process Control System Supplier (PCSS): The entity responsible for providing all materials, equipment, labor, and services required to achieve a fully integrated and operational control system. G. Programmable Logic Controller(PLC): A ruggedized programmable computer used for industrial automation. H. Supervisor Control and Data Acquisition (SCADA): Hardware and software components used for high-level supervisory monitoring of industrial processes. Typical devices that are part of the SCADA network include computers(OW S),PLCs, Ethernet switches,OITs,and HMIs. PART -PRODUCTS(NOT USED) PART 3 - EXECUTION 3.1 GENERAL A. Control System Hierarchy: I. The control descriptions are broken into a hierarchical layer concept.There may be one layer or multiple layers per loop,depending upon that loop.An example of multiple layered loop is shown in Figure 1. -----1...............­­­­................................................­...................................................................................... Operator Workstations/Interface Terminal SCADA/PLC Control (OWS/OIT) ....... ............................. Plant PLC SCADA/PLC Control .................... Vendor Supplied PLC IntermediateNendor Control Local C ontrol Panel Local Control ..................... ........ ........................................*............................... ............................ Equipment Local Control ................................................................................................... Water Treatment Plant Pressure Control Valves Process Control Descriptions City of Round Rock 406196.00-2 2022 CDM Srnith 8077-263948 All Rights Reserved February 2022 Figure 1.Control System Hierarchy 3.2 GENERAL CONTROLS AND MONITORING A. Overview: I. The hardware and/or software functions noted by this paragraph reference are to be implemented in the PLC control system. 2. Setpoints, as defined by this section, refer to numerical values adjustable from the HMI, 1 The PLC is responsible for resetting command bits sent from the I-IMI to the PLC. Ifthe commanded state cannot be achieved for any reason, the PLC resets the bit to allow the operator to set the command bit again. For example, when pressing the AUTO button on the HMI, the PLC resets the AUTO command frorn the HMI after the device is in the AUTO Mode. If the AUTO Mode is not available for any reason, the PLC resets the bit, so the AUTO button can be selected at the HMI once AUTO control is available. B. lnterlocks: I. Hardwired interlocks will interlock the controls locally,at the vendor PLC,and at the plant PLC. If the interlock occurs,the shutdown will cause the equipment to be inoperable at all levels of control. 2. Software interlocks are represented in a particular layer of the operation description and interlock the controls in that layer and the layers above it, However, the interlock does not interlock the commands in the layer before it. For example, a software interlock implemented at the SCADA/PLC level will not stop equipment from being controlled locally. 3. Interlocks that shutdown (stop a piece of equipment and prevent it from being restarted or moved)are displayed on the faceplate pop-up graphic for that piece of equipment, C. Motors: L Provide monitoring and control of the signals shown on the P&IDs, 2. Hardwired and software interlocks are defined in individual loop descriptions, 3. Motors can be started manually by the operator at the HMI,or automatically by the control strategy, 4, Automatic control strategies are defined in individual loop descriptions. 5. The SCALA system stops a motor or drive, if it does not receive the AUTO or REMOTE status or one of its software interlocks trips. If the drive or motor is in HAND or LOCAL, it will continue to run but the SCADA start/stop output will be open. 6. If a motor stops for any reason, it cannot be restarted automatically once the problem with the motor has been resolved. A manual reset from the OWS or OIT is required to resume operation, T Motors that have a HAND-OFF-AUTO(HOA)selector, indicate to the operator that the pump is being run in the HAND position,A motor is being run in HAND when the AUTO position is not tnie and the run confirm status is true, If not in Water Treatment Mani Pres2mre Control valves Procd�s("Onuioll IDescriptai ns City of"Round Rock 40606.00 3 k"/2022 CDM Smith 8077-263948 All Rights Reserved February 2022 AUTO, the SCADA PLC output contact will open and stop (shutdown) the pump. D. Valves: I. Provide monitoring and control of the signals shown on the P&IDs. 2. Hardwired and software interlocks are defined in individual loop descriptions. 3. Valves with only full travel capability can be opened or closed manually by the operator at the HMI,or automatically by the control strategy. 4. Modulating valves with position feedback can be positioned between 0% and 100%open manually by the operator at the HMI,or automatically by the control strategy. 5. Automatic control strategies are defined in individual loop descriptions with their corresponding process variable used for control. E. Analog Instruments: 1. Analog instruments refer to indicating devices capable of providing a continuous output relative to time. 2. Provide monitoring of the analog signals shown on the P&IDs. 3. Analog signals may be a continuous voltage (-I OV to I OV, OV to 5V, OV to I OV)or current(0 mA to 20mA,4mA to 20mA)as determined by the output of the field instrument. The output range corresponds to the minimum and maximum full-scale measurement. 4. The PLC will linearly scale the output range (voltage or current) to the equivalent values in engineering units. 5. Provide cutoff deadbands for when the analog signal is approaching the minimum or maximum full-scale measurement. a. An analog signal measuring less than or equal to 2u,,u of full-scale will be forced to zero after an adjustable time delay. b. An analog signal measuring greater than 1000,,0 of full-scale will be clamped at 100%. 6. Provide a CALIBRATION mode with an adjustable time setpoint(in hours), a. When entering CALIBRATION mode,the last good value is held prior to CALIBRATION mode being activated. The value is held until the calibration time setpoint expires. b. The Operator may enter a calibration value,which will be the value held until the calibration time setpoint expires. C. When active,clearly indicate the instrument is in CALIBRATION mode on any local OlTs and in the HMI system. F. Discrete Instruments: I Discrete instruments refer to indicating devices with any Dumber of non- continuous defined states(e.g., ON OFF,0 or 1) 2. Provide monitoring of the discrete signals shown on the P&IDs. Water Treatment Plant Pressure Control Valves Process Control Descriptions City of Round Rock 406196,00-4 C 2022 CDM Smith 8077-263948 All Rigbts Reserved February 2022 a, When a contact or status from the instrument is true,the PLC will receive power to its input channel. The PLC registers this as a binary bit of L b. When a contact or status from the instrument is false,the PLC will receive no power(open circuit)to its input channel.The PLC registers this as a binary bit of 0. Cr. PLC Hardware: I Monitor status and communication faults at the I. a. Implement watchdog timers to monitor CPU and 1/0 module health,and execution time for PLC routines, b. Generate an alarm at the 14MI if any watchdog timer expires. 1 Program the system time for all PI-Cs to synchronize with a Network Time Protocol(NTP) server once every 24 hours. H. Input Validation: I. Provide input validation for setpoints used in process control (e.g., chernical dosage setpoints,pump flow setpoints). 1 The PLC will verify that the HMI setpoint is within an acceptable predefined range. 3. Out of range values will be rejected by the PLC and the current value will be retained. 3.3 ACCUMULATORS AND TOTALIZERS A. Accumulators: I Display accumulated run time for all equipment with a RUNNING status. Each run time accumulation is resertable from the HMI with a reset push button. 1 The PLC will update the flow totals at 12:00 a.m. local time. Runtime Display Format Current Day: XXXX Hrs. Yesterday: XX.XX Hrs. Current Month: XXXX Hrs, Previous Month: XXXX Hrs. Accumulated Total: XXXXXX I Irs. B. Flow Totalizers: I. Totalize all flow indications. a. If the flowmeter provided has a configurable pulse output for totalized flow, perform flow totalization using the pulse output, The PLC calculates totalized flow by multiplying the number ol'pulses by the volume per pulse, Water Treatment Plant Pressure Control Valves Process Control Descriptions City of'Round Rock 406196.00-5 C";2022 CDM Smith 8077-263948 All Rights Reserved February 2022 K If the flowmeter provided does not have a configurable pulse output for totalized flow,perform flow totalization using the analog 4-20mA signal. 1) Do not totalize if the analog signal is outside the 4-20 mA range. 2) Do not totalize if the value of the flow input is less than 2%of the full range of the input. 3) Do not totalize if a discrete status exists that can be used to determine if flow is present(for example,no flow can be present unless a pump is running). 2. Each flow totalization is resettable from the HMI/OlT with a reset push button. 3. Display totalized flow in million gallons(MG),thousands of gallons(kGal),or Gallons(Gal) in accordance with the following: 4. Use appropriate flow totalizer units for the total volume anticipated for the time period. Unless requested by the Owner, water process flows are totalized in million gallons (MG) and chemical flows are totalized in gallons (Gal). Auxiliary flow(e.g.,backwash)units are determined based on the total flow for the day. S. Chemical systems which do not have flowmeters will calculate usage based on the chemical tank volurne. The PLC will calculate tank volume based on the measured level and the vessel geometry or the measured weight and the specific weight of the chemical. 6. The PLC will update the flow totals at 12:00 a.m. local time. 3.4 ALARMING AND EQUIPMENT FAILURES A. Analog Alarms: I. Provide analog alarming capability for all analog signals monitored by the PLC. 2. Supervisor level users can set a common time setpoint(initially set to 5 seconds) that is used to generate alarms. The following alarms(setpoints to be Supervisor adjustable) are generated based on the analog feedback value. Each alarm includes the ability for individual enabling and disabling. a. High-l-ligh. b. High. C. Low. d. Low-Low. e. Loss of Signal, 3. LOSS OF SIGNAL alarm is generated when an analog signal goes outside the 420 rnA range due to a failure at the instrument or PLC card. The following SCADA programming occurs: a. If the analog signal is used in a control loop or ratio control loop,that loop is placed into MANUAL. b. If the analog signal is used in a calculation,that calculation uses the last good analog signal. If the calculation is used in a control loop,that loop is placed into MANUAL. Water'freannent Plant Pressure Control Valves Process Control Descriptions City of Round Rock 406196,00-6 r 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 4. SETPOINT REJECTED alarm is generated at the HMI when an analog setpoint is out of range and rejected by the PLC. B. Discrete Alarms: I Program all discrete alarm signals wired to the PLC (float switches, pressure switches,overload alarms)to alarm after an HMI adjustable time delay expires. 2. The maximum alarm delay for Safety related alarms(e.g.,E-stop)is 500ms. Set each alarm timer during startup. C. Motor Failure Alarms: I Supervisor level users can set a common elapsed time setpoint for each scenario below: a. Motors being remotely controlled generate a FAIL-TO-START alarm when the PLC sends the START command to the motor and it does not receive a RUNNING status from the motor after a supervisor adjustable time setpoint. When a FAIL-TO-START alarm is generated, the START output command from the PLC is deenergized and the motor is prevented from starting until a reset is issued from the HMI, b. Motors being remotely controlled generate a FAIL-TO-STOP alarm when the PLC sends the STOP command to the motor and it continues to run after a supervisor adjustable time setpoint. C. Motors with adjustable speed control generate a SPEED DEVIATION alarm when the motor is running and the PLC sends a speed setpoint to the motor and it does not reach the correct speed(within a deadband, initially set to 10%)within a supervisor adjustable time setpoint. The motor remains running if the SPEED DEVIATION alarm is activated. D. Valve Failures: I Supervisor level users can set a common time setpoint that is used to generate the following alarms. When a valve position alarm is active, the PLC output is maintained unless explicitly stated in the individual loop descriptions (e.g., a fail to open alarm does not trigger the PLC to close the valve). a. All discrete valves(OPEN-CLOSE)being remotely controlled generate a FAIL-TO-OPEN alarm when the PLC sends the OPEN command to the valve and it does not reach the OPENED limit within a supervisor adjustable time setpoint. b. All discrete valves(OPEN-CLOSE)being remotely controlled generate a FAIL-TO-CLOSE alarm when the PLC sends the CLOSE command to the valve and it does not reach the CLOSED limit within a supervisor adjustable time setpoint. C. All modulating valves(POSITIONING)being remotely controlled generate a FAIL-TO-POSITION alarm when the valve feedback does not match the PLC commanded position within a supervisor adjustable time setpoint, Water Trealinent Mant Pressure Control Valvo, Process Control I)Lscripiions City of Round Rock 406 96.00-7 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3.5 AUTOMATIC CONTROLS A. PID Control: 1. When individual control loops require PLD control, use the PLC manufacturer's standard PID control functions. Provide a PID faceplate with the following parameters: a. Setpoint(SP): Reference to the setpoint. This is the setpoint entered (either manually from the HMI or via program logic,as required by the individual loop description)and is maintained by the PID controller. b. Process Variable(PV): Reference to the process variable. The process variable is the feedback from a field device or instrument for comparison to the SP by the PID controller. C. Output(CV): Reference to the controlled variable. This is the signal varied by the PID controller in order to maintain the PV at the desired SP, 2. PID controller accepts inputs for proportional (P), integral (1), and derivative (D)setpoints used to tune the controller response. PID tuning parameters can be entered manually by the Operator at the HMI or calculated automatically if the PID controller supports autotuning functionality. 3. Operator can place the PID controller in MANUAL or AUTOMATIC mode. a. In MANUAL, the Operator will enter the desired output(CV). The PID controller will use setpoint tracking to write the process variable(PV)to the controller setpoint(SP)to ensure bumpless transfer when the controller is switched from MANUAL to AUTO. b. In AUTO,the PID controller adjusts the output(CV)to hold the process variable(PV)at the setpoint(SP). 4. Configure PID controller to prevent reset windup when operating in MANUAL mode or when the output(CV)has reached maximum limit. 3.6 INDIVIDUAL CONTROL DESCRIPTIONS AND CONTROL SEQUENCES LOOP 100 NORTH PRESSURE CONTROL GLOBE VALVE A. Genera: 1. The North Pressure Control valve is a hydraulic valve which will be used as a pressure sustaining pressure relief valve on the north side of the Round Rock Water Treatment Plant. The valve will be used when the Burton Hill EST is taken out of service for painting and maintenance. The valve will be installed off the High Service Purnp Station 30"discharge line and will direct the water back into the 2.0 MG Clearwell as needed. When the Burton Hill EST is taken out of service, the valve will operate to maintain the required flow out of the plant and will also maintain the discharge pressure, Water Treannen(Plant Pressure Control Valves Process Control Descriptions City(,)17 Round Rock 406196.00 8 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Control: I Local: a. The valve will be provided with an electronic controller. A Hand/Off'Auto switch will be provided on the controller to manually operate the valve in the field. 2. Remote: a. Auto:When the H/O/A switch on the valve controller is in Auto,the valve will be controlled from SCADA. The valve is a pressure sustaining valve and it will open and close to keep the upstream pressure within the preset limit set at the valve, As the valve opens, it measures flow passing from the upstream side to the Clearwell and sends the flow signal to the HMI. The Plant PLC currently controls the pumps at the High Service Pump Station 7- 11,based on the level at Barton Hill EST,When the North valve is brought into service, the pump control will be based on flow through the valve and the discharge pressure. The existing pump controls will be adjusted as given below: I The smallest adjustable speed pump will be the lead pump and run continuously to maintain the pressure in the system. The pump speed will change based on the distribution pressure as measured by PIT-104. As the pressure in the system drops,the pump speed will increase,The increase in pump speed will be inversely proportional to the decrease in pressure. 2) If the lead pump is running at 100%speed for a preset amount of time,the Lag I pump will be called to start by the PLC. The operator will have the capability of assigning Lead, Lag 1,Lag 2, Lag 3 and Lag 4 designation for all the pumps. If the Lag I pump has an adjustable speed drive, the speed of the Lead and the Lag I pump will drop down to a minimum,and speed of both pumps will change based on the discharge pressure. If the pressure in the system drops further,the PLC will then call the Lag 2, Lag 3 and Lag 4 pumps as needed. 3) The water pumped by the High Service pump station is measured by a flowmeter and the reading is recorded at the HMI, The PLC will constantly compare the discharge flow with flow through the valve. If the flow from the High Service pump station is greater than the flow through the valve by an amount which is equivalent to the capacity of a pump,the PLC shall command the pump to turn off. The capacity of each pump is listed below: Pump 7 -4200 GPM Pump 8-5200 GPM Waw'freatineni Phw Pressure Cmirol Valves Process Control Descriptions City of Round Rock 406l96,00-9 %�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 Pump 9—5200 GPM Pump 10—5200 GPM Pump 11 —5200 GPM 4) When a pump is turned off based on the flow,the pressure in the system will drop. A delay timer will be set in the PLC to prevent a pump from starting right away.After the timer times out,and the pressure in the system is below the preset setpoint,the PLC will command a pump to turn on. C. Alarins/Monitormg: I. Flow(FIT-100). 2. Valve Position(Zl-100). 3. Line Pressure(PIT-100). LOOP 200 SOUTH PRESSURE CONTROL GLOBE VALVE A. General: 1. The South Pressure Control valve will be provided on the south side of the Round Rock Water Treatment Plant.The valve will be installed to intercept the water coming from 1431 EST and divert it to the Clearwells. The valve will be used in the event that water needs to be supplemented to the east of 1-35. B. Alarms/Monitoring: I Local: a. The valve will be provided with an electronic controller. A Hand/Off/Auto switch will be provided on the controller to manually operate the valve in the field. 2. Remote: a. Manual: When the H/O/A switch on the valve controller is in Auto, the valve will be controlled from SCADA. In the manual mode,the operator will be able to send an open/close command to the valve and will be able to enter the flow setpoint at the HMI. The valve will open based on the flow setpoint while maintaining the upstream pressure set at the valve. b. Auto: When the valve control is in automatic mode, the valve will open and close based on the level in the clearwell. The operator shall enter a flow setpoint at the HMI and the valve will open to match the flow setpoint while maintaining the upstream pressure as set at the valve. The valve controller calculates the flow based on valve position and sends the signal to the HMI. The operator will manually select the clearwell (I M or 2 MG) at the HMI to which the water will be diverted. The operator will make the selection after manually adjusting the valves in the field. Based on this selection,the PLC will close the valve when the level in the selected clearwell is above a preset setpoint. When the level drops below Water Treatinent Plant Pressure Control Valves Process Control Descriptions City of Round Rock 406196.00- 10 v,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 a preset setpoint,the valve will open.The valve will continue to open and close based on level until the control is in automatic mode. C Alarms/Monitoring: I. Flow(FIT-200). 2. Valve Position (ZI-200). 3. Line Pressure(PIT-200). END OF SECTION 406196 WaterTircaiment Kim Pressure Control Valves Proc(zs Conqol Descripfions City of Round Rock 406196.00- t I C,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Process Control Descriptions City of Round Rock 406196.00-12 t)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 407000- INSTRUMENTATION FOR PROCESS SYSTEMS PART I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1,2 SUMMARY A, Section includes the general requirements to furnishing,installing,and servicing PCSS provided instruments, B. Related Requirements: I Section 406100 "Process Control and Enterprise Management Systems General Provisions"for submittal requirements, 2. Section 407326"Sections for Gauge Pressure Transmitter." 1.3 DEFINITIONS A. Process Control System Supplier (PCSS): The entity responsible for providing all materials, equipment, labor, and services required to achieve a fully integrated and operational control system. B. Section 4071XX "Sections for flow measurement": The XX in the number indicates all spec sections starting with the first 4 numbers (indicating a category described in the accompanying text)are included in the reference. 1.4 ACTION SUBMITTALS A. Submit complete documentation for all field instruments in one comprehensive submittal. Use ISA-TP,20.00.01-2007 data sheet for-mat as a cover sheet for each instrument prior to data sheets, Submit a complete Bill of Materials (BOM) or Index that lists all instrumentation equipment,sorted by Loop Number. K Submit separate data sheets for each instrument type: L Plant Equipment Number and ISA tag number per the Drawings. 2. Product(item)name used herein and on the Drawings, 3. Manufacturer's complete model number. 4. Location of the device. S. Input -output characteristics, 6. Range,size,and graduations in engineering units. C, Submit the following information for cacti instrument type: Water Treatment Mant Pressure Control Valves Instrumentation for 11rocess Systems City of Round Rock 407000• 1 C>2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Include construction details, material descriptions, dimensions of individual components and profiles. 2. Sizing calculations where applicable. 3. Indicate which instruments will be provided with certified calibration data (i.e., all flow metering devices)as part of O&M manual. 4. Include rated capacities,operating characteristics, electrical characteristics and furnished specialties and accessories. 5. Two-wire or four-wire device type as applicable. 6. Indicate which instruments will be provided with manufacturer's maintenance services if specified. D. Instrument Vendor Shop Drawings: I. Include plans,elevations,sections,and mounting details. 2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection. 3. Detail fabrication and assembly of instrument. 4. Include diagrams for power, signal,and control Wiring. E. Submit catalog cuts for all instruments. Submit descriptive literature for each hardware component,which fully describes the units being provided. F. Submit index and data sheets <in electronic formal as well><as hard copies> on 8-1/2" x I I formats. Submit electronic copies in Microsoft Excel or Word format on DVD disk or USB thumb drive. 1.5 INFORMATIONAL SUBMITTALS A. Refer to Section 406100 "Process Control and Enterprise Management Systems General Provisions." 1.6 CLOSEOUT SUBMITTALS A. Refer to Section 406100 "Process Control and Enterprise Management Systems General Provisions." 1.7 MAINTENANCE MATERIAL SUBMITTALS A. Refer to individual instrument specifications for spare parts requirements. B, Refer to Section 406100 "Process Control and Enterprise Management Systems General Provisions"for PCSS requirements regarding submission of maintenance materials. 1.8 QUALITY ASSURANCE A. Refer to individual instrument specifications for quality assurance requirements as well as which specific instruments require manufacturer's start-up and training services, Water Treatment Plant Pressure Control Valves Instrumentation for Process Systems City of Round Rock 407000-2 .............. 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Provide components compatible with functions required to form complete working system. CRefer to Section 406100 "Process Control and Enterprise Management Systems General Provisions"for overall quality assurance requirements for PCSS scope of work. 1.9 DELIVERY,STORAGE,AND HANDLING A. Refer to Section 016000 "Product Requirements" for delivery, storage, and handling requirements. 1.10 FIELD CONDITIONS A. Refer to Section 406100 "Process Control and Enterprise Management Systems General Provisions." I'll WARRANTY A. Refer to Section 406100 "Process Control and Enterprise Management Systems General Provisions." PART 2-PRODUCTS 2.1 rNSTRUMENT'FAGS A. Permanent stainless steel or other non-corrosive material tag firmly attached and indelibly marked with the instrument tag number, as indicated in the Drawings. Tag equipment before shipping to the site. B. Provide 1/'8-in by 3/8-in,Type 316 stainless-steel button head machine screws. C. All supplied instrument transmitters and instrument transmitter elements require a stainless-steel identification tag. Attach tag via stainless steel chain or stainless-steel wire(24-gauge min) to a non-removable part of the device. Starnp,the ISA alphanumeric instrument number as indicated on the P&ID, loop,or detail drawings into the tag. Minimum tag size is 1"14 x 3"W with 3/16" high alphanumeric characters. PART3 - EXECUTION 3.1 INSTALLATION A. See installation requirements in individual specification sections, B. Mount instrumentation on instrumentation racks or stands, unless otherwise indicated. Provide shutoff and drain valves on all instrumentation connections. Watex Treatment Plant Presiure Control Valves, I nstruirrwntar ion for Process Systems Cay of Round Rock 407000, 3 C',2022 CDM Smith 8077-263948 All Rights Reserved February 2022 END OF SECTION 407000 Water Treatment Plant Pressure Control Valves Instrumentation for Process Systems City of Round Rock 407000-4 1�)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 407326-GAUGE-PRESSURE'I'RANSMI'I-I'ERS PARTI -GENERAL Ll RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Condi- tions and Division 01 Specification Sections,apply to this Section. L.2 SUMMARY A. Section includes gauge-pressure transmitters. B. Related Requirements: I. Section 406100 "Process Control and Enterprise Management Systems General Provi- sions." 2. Section 407000 "Instrumentation for Process Systems." L3 DEFINITIONS A. Not used. 1.4 ACTION SUBMITTALS A. Product Data: For each type of product, L Refer to Section 407000"Instrumentation for Process Systems." B. Shop Drawings: I. Refer to Section 407000"Instrumentation for Process Systems.," E5 INFORMATIONAL SUBMITTALS A, Refer to Section 406100 "Process Control and Enterprise Management Systems General Provi- sions"for any PCSS requirements regarding informational submittals for instruments. B. Product Test Reports: For each pressure transmitter, for tests performed by manufacturer and witnessed by a qualified testing agency. 1.6 CLOSEOUT SUBMITTALS X Refer to Section 406100 "Process Control and Enterprise Management System General Provi- sions." Water Treannent Pkint Pressure Contnfl Valves Gauge-Pressure Transmitters City of Round Rock 407,326• 1 ((,')2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.7 MAINTENANCE MATERIAL SUBMITTALS A. None Required. 1.8 QUALITY ASSURANCE A. Provide components compatible with functions required to form complete working system. B. Ensure that materials of construction of wetted parts are compatible with process liquid. C. Materials in Contact with Potable Water:Certified to NSF 61 and NSF 372. 1.9 DELIVERY,STORAGE,AND HANDLING A. Refer to Section 016000 "Product Requirements" for delivery, storage, and handling require- ments. 1.10 FIELD CONDITIONS A. Refer to Section 406100"Process Control and Enterprise Management Systems General Provi- sions." 1.11 WARRANTY A. Refer to Section 406100 "Process Control and Enterprise Management Systems General Provisions." PART 2-PRODUCTS 2.1 GAUGE PRESSURE TRANSMITTERS A. Manufacturers: 1, Manufacturers and their products are subject to compliance with requirements. Provide one of the following: a. Rosemount 3051 CG. b. Siemens Sitrans P DS Ill. C. Or approved equal A. Type: I. Microprocessor based,intelligent type. B. Function/Performance: I. Measuring Range: 0-200 psi, 2. Accuracy: 0.075 percent of span. Water Treatment Plant Pressure Control Valves Gauge-Pressure Transmitters City of Round Rock 407326-2 %,)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. Operating Temperature: -4 to 176 degrees F, 4. Temperature Effect: Combined temperature effects less than 0.2 percent of maximum spat)per 82 degrees F temperature change. 5. Output Signal: 4 to 20 rnA DC linear with pressure,with HART protocol. 6. Output: Zero adjustable over the range of the instrument calibrated span is greater than the minimum calibrated span. T Stability: 0.05 percent of tipper range limit for I year, S. Response Time: Less than I ms. 9. Display: Digital indicator displaying pressure in the engineering units indicated on the Drawings or in the instrument device schedule. 10. Diagnostics: a. Self-diagnostics with transmitter failure driving output to above or below out of range limits, b. Simulation capability for inputs and loop outputs. c. Test terminals available to case connection for test equipment without opening the loop. d. Registers to record minimum and maximum pressure and temperatures transmitter has been exposed to be available. 11. Over Range Protection: Provide positive over range protection to 150 percent of the maximum pressure of the system being monitored. C. Physical: I. Power Supply: 24 VDC loop power. 2. Enclosure: a. NEMA 4X(IP66),explosion proof. b. Approved for,Class 1,Division 1,Groups C and D. C, Instruments for hazardous locations have Factory Mutual(FM),Canadian Stand- ards Association(CSA),and CENELEC approvals and certifications as specified herein and as indicated on the Drawings or in the instrument device schedule. 3. Process Wetted Parts(except for ozone/oxygen service): a. Isolating diaphragm and other wetted metal parts:Type 316L stainless-steel. b. Gaskets and 0-rings:Teflon, 4. Sensor Fill Fluid(except for ozone/oxygen service): Silicone. D. Required Accessories: 1. Shutoff Cocks: Furnished by gauge manufacturer. 2. Provide diaphragm seals as shown on the drawings, 2.2 SOURCE QUALITY CONTROL A. Provide shop inspection and testing of completed assembly. waoer'rreatrnem Plant Pressure Control Valves Gauge-Pressure Trimsminers Oty of Round Rock 40b7326-3 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 PART 3 -EXECUTION 3.1 EXAMINATION A. Examine walls, floors, roofs, and process area for suitable conditions where gauge pressure transmitter will be installed. B. Prepare written report,endorsed by Installer, listing conditions detrimental to performance. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Comply with NECA 1. B. Wiring Method: Conceal conductors and cables in accessible ceilings, walls, and floors where possible. C. Wiring within Enclosures: Bundle, lace, and train conductors to terminal points with no excess and without exceeding manufacturer's limitations on bending radii. 3.3 IDENTIFICATION A. Refer to drawings for tagging designations 3.4 FIELD QUALITY CONTROL A, Testing Agency: Engage a qualified testing agency to perform tests and inspections. B. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components,assemblies,and equipment installations,including connections. C. Gauge-pressure transmitters will be considered defective if it does not pass tests and inspections. D. Prepare test and inspection reports. 3.5 STARTUP SERVICE A. Perform startup service. I. Complete installation and startup checks according to manufacturer's written instructions. 3.6 MAINTENANCE SERVICE A. Not Required. Water Treatment Plant Pressure Control Valves Gauge-Pressure Transmitters City of Round Rock 407326-4 ---------- 2.022 CDM Smith 8077-263948 All Rights Reserved February 2022 3,7 DEMONSTRATION A. Train Owner's maintenance personnel to adjust, operate,and maintain units, E. While starting up the instruments, the manufacturer to provide training to the Owner's instrumentation technicians as follows: I How to calibrate, install, troubleshoot, read the diagnostics, and maintain the sensor and transmitter. 2. Provided I times and last up to 2 hours in the field. END OF SECTION 407326 Water Treatmoit Plant Pressure Cmitrol Valves Gauge.PressureTransrm t ters Cay cat Round Rock 407326 5 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Gauge-Pressure Transmitters City of Round Rock 407326-6 'e 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 SECTION 407856-ISOLATORS, INTRINSICALLY SAFE BARRIERS,AND SURGE SUPPRESSORS PART I -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section includes isolators, intrinsically safe barriers,and surge suppressors. B. Related Requirements: L Section 406100 "Process Control and Enterprise Management Systems General Provisions"for submittal requirements. 1.3 DEFINITIONS A. Section 4072XX "Sections for level measurernent'% The XX in the number indicates all spec sections starting with the first 4 numbers (indicating a category described in the accompanying text)are included in the reference. 1.4 ACTION SUBMITTALS A. Product Data: For each type of product. I. Refer to Section 407000"Instrumentation for Process Systems," B. Shop Drawings: I. Refer to Section 407000"Instrumentation for Process Systems," 1.5 INFORMATIONAL SUBMITTALS A. Refer to Section 406100 "Process Control and Enterprise Management Systems General Provisions" for any PCS S requirements regarding informational submittals for instruments. 1.6 CLOSEOUTSUBMI'l-FALS A. Refer to Section 406100 "Process Control and Enterprise Management System General Provisions." Water Treatment Plant Pressure Control Valves isolators,intrinsically Safe Barriers,and Surge Suppressors City of Round Rock 407856. I 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.7 MAINTENANCE MATERIAL SUBMITTALS A. None Required. 1.8 QUALITY ASSURANCE A. Provide components compatible with functions required to form complete working system. 1.9 DELIVERY,STORAGE, AND HANDLING A. Refer to Section 016000 "Product Requirements" for delivery, storage, and handling requirements. 1.10 FIELD CONDITIONS A. Refer to Section 406100 "Process Control and Enterprise Management Systems General Provisions." LI I WARRANTY A. Refer to Section 406 100"Process Control and Enterprise Management Systems General Provisions." PART 2-PRODUCTS 2.1 SIGNAL ISOLATORSIBOOSTERS/CONVERTERS A. Manufacturers: 1. Manufacturers and their products are subject to compliance with requirements. Provide one of the following: a. Acromag. b. Action Instruments Shm Pak. C. Or equal. B. Type: I. Solid state,ASIC technology;electronic type. C. Function/Performance: I. Accuracy: 0.15 percent. 2. Inputs: Current,voltage,frequency,temperature,or resistance as required. 3. Outputs: Current or voltage as required, Water Treatment Plant Pressure Control Valves Isolators,Intrinsically Safe Barriers,and Surge Suppressors City of Round Rock 407856.2 .......... 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 4. Isolation: Complete isolation between input circuihy,output circuitry,and the power supply. S. Adjustments: Zero and span adjustment. 6. Protection: Provide RFI protection. D. Physical: 1. Mounting: DIN Rail, 2.2 INTRINSIC SAFETY BARRIERS A. Manufacturers: I. Manufacturers and their products are subject to compliance with requirements. Provide one of the following: a. Gems 54800(4-20mA)and 65800(dry contacts), b. R. Stahl -Intrinspak. C. Siemens Water Tech-nologies.. IS I (4-20mA)and IS6(dry contacts). & Or equal. 13. Type: I. Solid state electronic type in which the energy level of the sensing or actuation circuit is low enough to allow safe,usage in hazardous areas. C. Function/Performance: I Provide a barrier for instrumentation and equipment transmitting analog or digital signals that originate in a hazardous area as indicated in the design documents. 2, Locate in non-hazardous,areas. 3, Match power supply provided, D. Physical: I. Mounting: DIN Rail. 2.3 INTRINSIC SAFETY BARRIERS(101K 2-WIRE TRANSMITTER SYSTEMS) A. Manufacturers: I. Manufacturers and their products are subject to compliance with requirements. Provide one of the following: a. Gems. b. MR C, Unitech. d. Or equal. e. Water Treatment Plant flreswreCornroValves lsolalors,Intrinsically Safe Barrwrs,and Surge Suppressors Oty of Rcwnd Rock 407856 3 Cl 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Type: 1. Passive devices requiring no external voltage supply. C. Function/Performance: 1. Supplied with series resistors,series fuse and shunt zener diodes to limit the transfer of energy to levels required by intrinsically safe protection between safe and hazardous locations. 2. Factory Mutual approved and certified for use in accordance With National Fire Protection Association(NFPA 493). D. Physical: I. Mounting: DIN Rail. 2.4 SURGE PROTECTION FOR CONTROL SYSTEMS A. Manufacturers: I. Manufacturers and their products are subject to compliance with requirements. Provide one of the following: a. Citel DLA series. b. MJ8 series. C. MTL Surge Technologies(Telematic)NP Series. d. Phoenix Contact PlugTrab Series. e. Transtector FSP Series. f. Or equal. B. Function/Performance: I. Provides surge protection of electronic instrumentation from induced surges propagated along the signal and power supply lines from lightning,utility,or the plan electrical systems. 1 Protection system lower than the instrument withstand level,while not interfering with normal operation. 1 Maintenance free and self-restoring. 4. Response time: Less than 50 nanoseconds. 5. Discharge surge current: At least 8kA(at an 8x20ps impulse waveform) C. Required Surge Protection: 1. Analog Signal(4-20mA)Circuits: a. Provide surge protection where any part of the circuit is outside of the building envelope. b. Protect circuits at both the transmitter and the control system end of the circuit. C. Mount transmitter surge protectors in separate NEMA 4X enclosure or conduit mount. d. Use of a single device to protect both 120VAC and 4-20mA wires is acceptable. Water Treatment Plant Pressure Control Valves Isolators,Intrinsically Safe Barriers,and Surge Suppressors City of Round Rock 407856-4 k 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 e. Provide surge protector from one of the following: 1) Phoenix Contact PTSeries. 2) MTL Surge'rechnologies(Telematic)TP48. 3) Citel DLA or CAD series. 4) Or equal. 2, Control Panel Power Feed(120VAC): a. Provide protection of 120VAC power feed into control panels, instruments,and control room equipment. b. Provide surge protector from one of the following: 1) Citel DS40 series. 2) MCG Surge Protection 400 Series. 3) Phoenix Contact"Mains-PlugTrab". 4) Transtector ACP-I OOBW Series. 5) Or equal. 3. Non-Fiber Based Data Highway or Communications Circuits: a. Provide protection on all communication and data highway circuits that leave a building or are routed external to a building. b. Provide circuit protection at both ends of the line. c. Provide surge protector from one of the following: I) Phoenix Contact PlugTrab Series 2) Transtector FSP Series, 3) MTL Surge Technologies(Telematic)NP Series. 4) Citel DLA series. 5) MJ8 series. 6) Or equal. 4. RF Coaxial Cable: il. Provide protection on communication cables between radios and antennas, mounted either inside the panel,or in the wall of the enclosure. b. Protected in accordance with NEMA and UL 497E standards. c. Provide surge protector from one of the following: I) Citel P8AX series. 2) Polyphaser. 3) Or equal. 5. Inductive Loads: a. Provide coil surge suppression devices,such as varistors or interposing relays,on all process controller outputs or switches rated 120VA or less that drive solenoid, coil,or motor loads. 6. Telephone Circuits: Water Treatment Plant Pressure Control Valves Isolators,Intrinsically Safe Barriers,and Surge Suppressors City of Round Rock 407856,5 ((,,;2022 CDM Smith 8077-263948 All Rights Reserved February 2022 a. Provide Telephone Company approved line protection units for all telephone lines used for telemetry or SCADA system use under this Contract. b. Provide surge protector from one of the following: I) Citel DLA-170. 2) Or equal. PART 3 -EXECUTION 3.1 EXAMINATION A. Examine walls, floors, roofs, and rooms for suitable conditions where -,computers> will be installed. B. Prepare written report,endorsed by Installer, listing conditions detrimental to performance. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3,2 INSTALLATION A. Comply with NECA 1. B. Wiring Method: Conceal conductors and cables in accessible ceilings, walls, and floors where possible, C. Wiring within Enclosures: Bundle, lace, and train conductors to terminal points with no excess and without exceeding manufacturer's limitations on bending radii. 3.3 FIELD QUALITY CONTROL A. Testing Agency: Engage a qualified testing agency to perforin tests and inspections. B. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components,assemblies,and equipment installations,including connections. C. Isolators, intrinsically safe barriers and surge suppressors will be considered defective if it does not pass tests and inspections. D. Prepare test and inspection reports. 3.4 STARTUP SERVICE A. Perform startup service. 1. Complete installation and startup checks according to manufacturer's written instructions. Water Treatment Plant Pressure Control Valves Isolators,Intrinsically Safe barriers,and Surge Suppressors City of Round Rock 407856.6 (0 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 15 MAINTENANCE SERVICE A, Not Required. 16 DEMONSTRATION A. 'Frain Owner's maintenance personnel to adjust,operate, and maintain units. END OF SECTION 407856 Water'freairnent Plant Pressure Control VaNcs Isolators,Intrinswally Safe Barriers,and Surge Suppressors Oty ot'Round R(wk 407856-7 C)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Isolators,Intrinsically Safe Barriers,and Surge Suppressors City of Round Rock 407856-8 2022 CDM Smith 8077 2394 All Rights Reserved February 2022 PART I -GENERAL Ll RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0l Specification Sections,apply to this Section. 1.2 SUMMARY A. Section Includes; 1. Pipe penetrations. 2. Restrained joints. I Flexible connections. 4. Expansion joints. 5. Expansion loops. 6. Sleeve-type couplings. B. Related Requirements: I Section 055000 "Metal Fabrications" for miscellaneous metalwork and fasteners as required by this Section 2. Section 079200"Joint Sealants" for sleeve sealant for pipe penetrations 3. Section 099100 "Painting" for product and execution requirements for painting specified by this Section 4. Section 330509"33—Thrust Restraint for Utility Piping" for pipe restraints 5. Section 331300 "Disinfecting of Water Utility Distribution" for disinfection of potable water piping 6. Section 400507 "Hangers and Supports for Process Piping" for hangers, anchors,sleeves, and sealing of piping to adjacent structures 7. Section 400551 "Common Requirements for Process Valves" for common product requirements for valves for placement by this Section 1.3 COORDINATION A. Coordinate Work of this Section with installation of piping, valves and equipment connections specified in other Sections and indicated on Drawings. 1.4 ACTION SUBMITTALS A. Product Data: I Submit manufacturer catalog information for each specified product, including installation instructions. B. Shop Drawings: Water Treatment Plarn Pressure Control Valves Couplings,Adapters,and Specials for Process Piping City of Round Rock 400506- 1 �,v 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1 Identification: a. Submit list of wording, symbols, letter size, and color coding for pipe identification. b. Comply with ASME A]3.L 2. Indicate restrained joint details and materials. 3. Submit layout drawings showing piece numbers and location, indicating restrained joint locations. 1.5 INFORMATIONAL SUBMITTALS A. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. B. Welder Certificates: Certify welders and welding procedures employed on Work, verifying AWS qualification within previous 12 months. C. Manufacturer Instructions: Submit special procedures and setting dimensions. D. Source Quality-Control Submittals: Indicate results of factory tests and inspections. E. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections. 1'-. Qualifications Statements: 1. Submit qualifications for manufacturer, installer,and licensed professional. 2. Submit manufacturer's approval of installer. 3. Welders: Qualify procedures and personnel according to AWS DI.I/DI.I M. 1.6 CLOSEOUT SUBMITTALS A. Project Record Documents: Record actual locations of piping appurtenances. B. Identify and describe unexpected variations to pipe routing or discovery of uncharted utilities. 1.7 QUALITY ASSURANCE A. Materials in Contact with Potable Water: Certified to NSF Standards 61 and 372. B. Perform Work according to ASME 831.9 for installation of piping systems and according to AWS DLVDI.IM for welding materials and procedures. C. Perform Work according to ASME 831.3 for installation of piping systems. D. Perform Work according to City of Round Rock standards. Water Treatment Plant Pressure Control Valves Couplings,Adapters,and Specials for Process Piping City of Round Rock 400506-2 (45 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.8 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing products specified in this Section with minirnurn five years documented experience. B, Installer: Company specializing in performing Work of this Section with minimum five years documented experience. C. Welders: AWS qualified within previous 12 months for employed weld types. 1.9 DELIVERY,STORAGE,AND HANDLING A. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage. B. Store materials according to manufacturer instructions. C. Protection: I. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas. 2. Furnish temporary end caps and closures on piping and fittings and maintain in place until installation, 3. Provide additional protection according to Manufacturer instructions, LIO EXISTING CONDITIONS A. Field Measurements: I. Verify field measurements prior to fabrication. 2. Indicate field measurements on Shop Drawings. 1.11 WARRANTY A, Manufacturer's Warranty: Warrant against material and workmanship defects for products included within this Section. I, Warranty Period:Two years from date of Substantial Completion. PART 2-PRODUCTS 11 PIPE SLEEVES A. All construction except new concrete walls: L Material: Schedule 40 galvanized steel conforming to ASTM A53, 2. 2-irich minimum circumference water stop welded to exterior sleeve at midpoint water Tycatment Plant Prcswure Control V'alves Couplings,Adapters,and SpeeWs for Proccis Pipng C'ay of Round Rock 400506 3 oo 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. Ends cut and ground to be: a. Flush with ground. b. Flush with ceiling. C. 2 inches above finished floors. d. Sealed with caulking. e. Sized as required. & New concrete walls with pipes up to 20 inches in diameter: I. Material: non-metallic High-Density Polyethylene Sleeves(HDPE). 2. Integral hollow molded water stops. a. 4 inches larger than the outside diameter of the sleeve, 1 End caps for forming and reinforcing ribs. 4. Domestically manufactured by: a. Century-Line as manufactured by Pipeline Seal & Insulator, Inc., Houston, TX,or equal. C. New concrete with pipes 20 to 60 inches in diameter: I. Material:molded HDPE modular interlocking discs to make the width of the wall a. Corrugated. b. Cell-Cast as manufactured by Pipeline Seal & Insulator, Inc,, Houston, TX, or equal. D. External wall penetrations: I. 36-in diameter and less may be made by means of a ductile iron sleeve capable of being bolted directly to the fonriwork: 2. Seal of the annular space between the carrier pipe and the sleeve made by means of a confined rubber gasket and be capable of withstanding 350 psi. 3. Sleeve to have an integrally cast waterstop of 1/2-inch minimum thickness, 2-1/2-inch minimum height. 4. Manufacturers: Omni-Sleeve,Maiden, MA or equal. 2.2 SEALING MATERIALS A. Mechanical seals: 1. Of rubber links shaped to continuously fill the annular space between the pipe and the wall opening or sleeve. 1 Link pressure plates molded of glass reinforced nylon: a. Colored throughout elastomer, b. Permanent identification of the size and manufacturer's name molded into the pressure plate and scaling element. Water,rreatment Plant Pressure Control Valves Couplings,Adapters,and Specials for Process Piping City of Round Rock 400506-4 c,2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 3. Hardware: a. Mild steel with a 60,000 psi minimum tensile strength. K 2-part Zinc Dichromate coating per ASTM B-633. cl Organic Coating, tested in accordance with ASTM B-117 to pass a 1,500-hour salt spray test. d. Use Type 316 Stainless Steel hardware: I) In chemical areas, 2) For submerged service, 3) For penetrations in tanks containing sludge or wastewater. 4. Completed sealing system: a. Duty pressure rated for 20 prig differential pressure. b. EPDM for all services except fire rated assemblies. 1) Fire rated seals use silicone link material. C. Manufacturer: PSI-Thunderfine/ Link-Seal as manufactured by Pipeline Seal & Insulator, Inc., Houston,TX,or pre-approved equal. B. Sealant: I A two-part foamed silicone elastomer manufactured by: a. Dow Coming Co., Product No. 3-6548 silicone R.T.V, b, 3M brand fire barrier products caulk C.P.25 and 3M brand moldable putty MP+-, c. Flame-Safe fire stop systems FS-900 by Rectorseal. 2, Sealant head configuration, depth and width in accordance with manufacturer's recommendations. 23 HARDWARE,APPURTENANCES,AND MISCELLANEOUS ITEMS A. Provide glands, bolts, nuts, stud bolts, and other required hardware, and all gaskets, for connection of piping and appurtenances. Provide bolts, nuts,and washers of the same number and size as the flange, or other joint, standard they are connected to with the strength rating as noted for that connection. Proivde studs same as for bolts. Provide high strength bolts, nuts, and nuts waders. If not otherwise indicated, provide bolts and nuts as noted above, ASTM A193, Grade B7. After installation, coat any non-stainless uncoated, buried hardware as indicated in 09910 "Pipeline Coatings and Linings". Provide all interior fen-ous metals not intended to be coated or installed as stainless steel as hot dip galvanized in accordance with ASTM A153, Where suitable,galvanizing may be used in lieu of coating systems at the option of the System Engineer. Provide other hardware of the size, type, and number as required and recommended by the piping or appurtenance manufacturer and as specified herein. Project bolts a minimum of 1/4-inch beyond the nut when fully tightened. For buried applications, the requirements of Division 33 also apply. When in conflict, the more conservative requirement, in the opinion ofthe System Engineer,shall apply. Water Treatment Plant Pressure Control Valves Couphngs,Adapters,and Specials fbr Process Riping City or Round Rock 400506-5 1 2022 CDM Sm4h 8077-263948 All Rights Reserved February 2022 B. Provide gaskets for flanges, minimum 1/8-inch thick and full face and suitable for 200 degrees F operating temperature, unless higher temperature required on individual systems and the, fluids carried. High pressure and large diameter flanges and ANSI 816.5 or custom flanges may require ring gaskets. Gaskets for potable water systems shall be NSF 61 approved for drinking water use. C. Provide fabric reinforced petroleum special protective tape as manufactured by Denso, Inc., or equal. D. Teflon sheet to be bonded to concrete saddles and steel straps at pipe supports, low-friction, virgin PTFE sheets etched on one side for bonding with epoxy adhesive. Thickness as noted on Drawings.Adhesive as recommended by the manufacturer. E. Teflon Faced Steel Bearing Plates: Fluorogold Slide Bearings as manufactured by Furon, Structural Bearings Division,Athens,Texas, or equal. 2.4 FINISHES A. Prepare piping appurtenances for field finishes as specified in Section 099 100"Painting." 15 SOURCE QUALITY CONTROL A. Provide shop inspection and testing of completed assemblies. B. Certificate of Compliance: 1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents. 2. Specified shop tests are not required for Work performed by approved manufacturer. PART 3-EXECUTION 3.1 EXAMINATION A. Verify that field dimensions are as indicated on Drawings. B. Inspect existing flanges for nonstandard bolthole configurations or design and verify that new pipe and flanges mate properly. C. Verify that openings are ready to receive sleeves. D. Verify that pipe plain ends to receive sleeve-type couplings are smooth and round for 12 inches (305 mm) from pipe ends. E. Verify that pipe outside diameter conforms to sleeve manufacturer's requirements. Water Treatment Plant Pressure Control Valves Couplings,Adapters,and Specials for Process Piping City of Round Rock 400506-6 K` 2022 CDM smith 8077-263948 All Rights Reserved February 2022 3.2 PREPAR-ATION A. Cleaning: Thoroughly clean end connections before installation. B. Close pipe and equipment openings with caps or plugs during installation. C. Surface Preparation: Clean surfaces to remove foreign substances. 3.3 INSTALLATION A. According to ASME 1331 A B. Coating: Finish piping appurtenances as specified in Section 099100 "Painting" for service conditions. C. Restrained Joints: As specified in Section 330519 "Ductile Iron Utility Pipe" and 330509.33 "Thrust Restraint for Utility Piping". D. Flexible Connections- Install flexible couplings at connections to equipment and where indicated on Shop Drawings. E, Air Release and Vacuum Breakers: Provide vacuum breakers as indicated on Drawings. F. Disinfection: Disinfect potable water piping as specified in Section 331300 - Disinfecting of Water Utility Distribution. 3.4 FIELD QUALITY CONTROL A. After installation,inspect for proper supports and interferences. B, Repair damaged coatings with material equal to original coating. 3.5 CLEANING X Keep equipment interior clean as installation progresses, END OF SECTION 400506 Water"t-reatment Mani Pressure Coustrol Valves Cokiphngs,Adapters,and Spemls for Process Pipiing City of Round Rock 400506-7 C�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank. Water Treatment Plant Pressure Control Valves Couplings,Adapters,and Specials for Process Piping City of Round Rock 400506-9 K)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 400507-HANGERS AND SUPPORTS FOR PROCESS PIPING PART I GENERAL Ll RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A, Section includes: B. Related Requirements: L Section 030110 "Concrete and Reinforcing": Execution requirements for placement of concrete housekeeping pads specified by this Section. 2. Section 055000"Metal Fabrications'% Miscellaneous metalwork and fasteners as required by this Section 3. Section 0990tO "Shop Priming" and 099100 "Painting: Product and execution requirements for painting specified by this Section. 4. Section 400506"Couplings,Adapters,and Specials for Process Piping" 1.3 DEFINITIONS A. Ferrous Metal: Iron,steel,stainless steel, and alloys with iron as principal component. B. Wetted or submerged: Submerged, less than 1-foot above liquid surface, below top of channel or tank wall,under cover or slab of channel or tank,or in other damp locations. C. "Pipe" or "piping": Piping, piping system(s), hose, tube, fittings, joints, valves, and similar appurtenances. D. Supports: wherever the word "supports" or "pipe supports" are used, they shall mean pipe supports, hangers, structural connection,,, concrete inserts (if allowed), anchors, guides, bolts, expansion units,restraints and all restraint, hanging,supporting, allowing controlled expansion, or other means of attaching piping along with the necessary appurtenances. 1,4 COORDINATION X Coordinate Work of this Section with piping and equipment connections specified ill other Sections and indicated on Drawings. B. When in conflict with details shown oil Drawings,the more stringent requirement shall apply. Water Treatiment Plant Pressure Controt valves Hangers and Supp(orts for Process Nping City of'Rourid Rock 400507- 1 (e,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.5 ACTION SUBMITTALS A. Product Data: Submit manufacturer's catalog data including load capacity. B. Shop Drawings: Submit scaled piping layouts for each system. Indicate flow stream, pipe size(s) material(s), schedule(s), lining(s), critical dimensions between pipes, equipment and building features. Indicate by schedule pipe hanger/support type and locations. Provide detail of each type of hangers,supports,anchors,and guides. 1.6 DELEGATED DESIGN SUBMITTALS A. Support System Design 1. Engage the services of an independent registered professional engineer licensed in the State of Texas ordinarily engaged in the business of pipe support systems analysis and design, to analyze system piping and service conditions,and to develop a detailed support system design, specific to the piping material, pipe joints, valves, and piping appurtenances proposed for use. a. The proposed support system engineer shall have at least 5 years of experience in the analysis and design of similar systems, including the use of commercial and custom pipe supports and in the use of commercial pipe stress software programs. b. Support system engineering groups include the following: 1) J. Blanco Associates,Inc.Hawthorne,NJ. 2) Fenny Engineering Company,Venice, FL. 3) LCI Engineering,Ottawa,Ontario,Canada. 2. The support system design shall include: a. Criteria by piping system. b. Summary of Contractor-selected related components including joints,class,valves, appurtenances, etc., and commercial supports and especially including pipe materials. C, Dead weight and dynamic analysis, including system thermal effects and pressure thrusts. Computer-based software system equivalent to Bentley Systems AutoPIPE or SST Systems CAEPIPE. 1) Present each system in an isometric graphic and show the resolved and resultant force and moment systems, as well as all recommended hangers, supports,anchors,restraints,and expansion/flexible joints. d. Submit support system design to the Engineer for review. The submittal needs to be stamped by a professional engineer registered in the State of Texas. e. All aspects of the analysis and design to comply with the provisions of ANSI B31.3 and the referenced standards. f. Coordinate support arrangements to eliminate interference with similar systems to be installed under HVAC, Plumbing, and Electrical; to account for structural expansion joints and to maintain access for both personnel and for the removal of equipment. Water Treatment Plant Pressure Control Valves Hangers and Supports for Process Piping City of Round Rock 400507-2 2022 CDM Srnith 8077-263948 All Rights Reserved February 2022 B. Manufacturers' Instructions: Submit special procedures and assembly of components. L7 INFORMATIONAL SUBMITTALS A. Manufacturer's Certificate:Certify that products rneet or exceed specified requirements. B. Welders' Certificate: Submit welders' certification of compliance with ASME Section IX AWS D I.1,verifying qualification within previous 12 months, C. Qualifications Statements: L Submit qualifications for manufacturer and licensed professional. L8 DELIVERY,STORAGE AND HANDLING A. All supports and hangers shall be crated, delivered and uncrated so as to protect against any damage. B. All parts shall be properly protected so that no damage or deterioration shall occur during a prolonged delay from the time of'shipment until installation is completed. C. Finished metal surfaces not galvanized, that are not of stainless-steel construction, or that are not coated,shall be grease coated,to prevent rust and corrosion. 1.9 QUALITY ASSURANCE X Perforin Work according to AWS D1.1 for welding hanger and support attachments to building structure. 1.10 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing Products specified in this Section with minitnum three years'documented experience, B. Licensed Professional: Professional engineer experienced in design of specified Work and licensed in State of Texas. 1.11 DELIVERY,STORAGE,AND HANDLING A. Inspection: Accept materials on-Site in original factory packaging, labeled with manufacturer's identification. B. protect products from weather and construction traffic, dirt, water, chemical, and damage by storing in original packaging. Water Treatunent Plant Pressure Controt Valves Hangers and Supports for Process Piping City of Round Rock 44 0505 -3 C,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1.12 EXISTING CONDITIONS A. Field Measurements: Verify field measurements prior to fabrication. Indicate field measurements on Shop Drawings, PART 2- PRODUCTS 2.1 GENERAL A. Support pipe and appurtenances connected to equipment to prevent any strain being imposed on the equipment. Comply with manufacturer's requirements regarding piping loads being or not being transmitted to their equipment. Submit certification stating that such requirements have been met. B. Support and secure all pipe and tubing in the intended position and alignment to prevent significant stresses in the pipe or tubing material, valves, fittings,and other pipe appurtenances. Design all supports to adequately secure the pipe against excessive dislocation due to thermal expansion and contraction, internal flow forces, and all probable external forces such as equipment, pipe, and personnel contact. Any structural steel members required to brace any piping from excessive dislocation shall conform to the applicable requirements of Section 055000"Metal Fabrications"and shall be furnished and installed under this Section. C. Contractor may propose minor adjustments to the piping arrangements in order to simplify the supports, or in order to resolve minor conflicts in the work. Such an adjustment might involve minor change to a pipe centerline elevation so that a single trapeze support may be used. D. Where flexible sleeve, split ring,vibration, or other couplings are required at equipment, tanks, etc., the end opposite to the piece of equipment, tank,etc., shall be rigidly supported to prevent transfer of force systems to the equipment.Do not install fixed or restraining supports between a flexible coupling and the piece of equipment. E. Pipe Supports: 1. Shall not induce point loadings but shall distribute pipe loads evenly along the pipe circumference. 2. Provide supports at changes in direction and elsewhere as shown in the Drawings or as specified herein. 3. No piping shall be supported from other piping or from metal stairs, ladders, and walkways,unless specifically directed or authorized by the Engineer. 4. Provide pipe supports to minimize lateral forces through valves, both sides of flexible split ring type couplings and sleeve type couplings, and to minimize all pipe forces on pump housings. Pump housings shall not be utilized to support connecting pipes. 5. Effects of thermal expansion and contraction of the pipe to be accounted for in the pipe support selection and installation. F. Insofar as is possible, floor supports shall be given preference. Where specifically indicated, concrete supports, as shown on the Drawings, may be used. Base elbow and base tees shall be supported on concrete pedestals. Water Treatment Plant Pressure Control Valves Hangers and Supports for Process Piping City of Round Rock 400507-4 �',,�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2.2 PERFORMANCE REQUIREMENTS/DESIGN CRITERIA A. All supports and appurtenances shall be standard products from approved manufacturers wherever possible and shall be adequate to maintain the supported load in proper position under all operating conditions. Any reference to a specific figure number of a specific manufacturer is for the purpose of establishing a type and quality of product and shall not be considered as proprietary. Note that different materials required, as specified in Part 2 MATERIALS, may require different figures or model numbers than those shown. I. The minimum working factor of safety for all items, with the exception of springs, shall be five times the ultimate tensile strength of the material, assuming 10 feet (3 in) of water-filled pipe being supported and normal test pressures. 2. Design for all loads using a safety factor of 5. & Piping schedule is included in the contract drawings. C. All items shall be designed with strength and stiffness to support, restrain, and allow expansion of the respective pipes under the maximum combination of peak loading conditions to include pipe weight, liquid weight, liquid movement and pressure forces, thennal expansion and contraction,vibrations,and all probable externally applied forces. D. Complete design details of the pipe system components shall be submitted for review and approval as specified in Part 1, No support shall be installed without approved support system Drawings. E. The pipe support system shall not impose loads on the supporting structures in excess of the loads for which the supporting structure is designed. F. Coordinate loads detennined by the Contractor's pipe support design engineer with the Contractor's pre-engineered structure manufacturer to ensure the pre-engineered structure is designed to support and accommodate loads from the pipe support system. G. G. Seismic Design and restraint requirements,in accordance with the Structural Design criteria, 23 MATERIALS A. For support of metallic pipe: I Submerged, buried, or within outdoor structures (vaults, etc.): "Type 316 stainless steel (SS). 2. Within chemical areas: Vinyl ester fiberglass reinforced plastic (FRP) for pipe size up to 2 inch (51 rnm),epoxy coated steel for 2-112 inches(64 mm)size and larger. 3. Other locations: steel with galvanizing where noted, or if not otherwise noted, coating as required in Division 09 Finished Painting. 4. Additional requirements(including dielectric insulation): see following paragraphs, B. For support of non-metallic pipe: I. Submerged,buried,or within vaults, Type 316 stainless steel or FRP, 'Arater,rreatment Plant Pressure Controi Wvcs Hangers wid Supporls for Process Piping City of Round Rock 4001.507 -5 (V 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. Within chemical areas: vinyl ester FRP. 3. Other locations: steel with galvanizing where noted,or if not otherwise noted,coating as required in Division 09 Finished Painting;all with local stress protection shields. 4. Additional requirements(including stress protection shields): see following paragraphs C. Wherever stainless steel is noted,it shall be Type 316 unless noted otherwise. 2.4 SUPPORT AND RE,STPLAINT SYSTEMS A. Steel or Ductile Iron Piping I. Cast iron and ductile iron, steel, and stainless- steel piping shall be supported at a maximum support spacing of 10 feet (3 m) with a minimum of one support per pipe section at the joints. 2. Support spacing for ductile iron, steel, and stainless-steel piping 2-in and smaller diameter shall not exceed 5 feet(1.5 m). B. Copper Piping 1. Supports for copper pipe shall be copper plated or shall have a 1/16 inch(1.6 mm)plastic coating. 2. Support spacing for copper piping and tubing 2 inch (51 mm)and smaller diameter shall not exceed 5 feet (1.5 m) and greater than 2 inch (51 nurt) diameter shall not exceed 8 feet(2.4 in). 3. Where pipe supports come in contact with copper piping, provide protection from galvanic corrosion by: wrapping pipe with 1/16 inch (1.6 mm) thick neoprene sheet material and galvanized protection shield; isolators similar to Cooper B-Line B3195CT; or copper-plated or PVC-coated hangers and supports, C. Non-Metallic Piping I. All uninsulated non-metallic piping such as PVC, CPUC, HDPE, PVDF, etc., shall be protected from local stress concentrations at each support point. Protection shall be provided by non-metallic protection shields or other method as approved by the Engineer, a. Where pipes are bottom supported 180 degrees, arc shields shall be furnished. Where 360-degree arc support is required, such as U-bolts, protection shields shall be provided for the entire pipe circumference. All U-bolts or clamps for non- metallic pipes shall be plastic coated. b. Protection shields shall have an 18-gauge minimum thickness, not be less than 12 inches (305 mm)in length and be securely fastened to pipe with Type 316 stainless steel straps not less than 1/2 inch(13 mm)wide. 2. Individually supported PVC pipes shall be supported as recornmended by the pipe manufacturer except that support-spacing shall be manufacturers recommendation minus 2-ft. down to 5 ft spacing recommendation,then spacing shall be 3 feet. 3. Supports for horizontal multiple PVC plastic piping: a. Shall be continuous wherever possible. Water Treatment Plant Pressure Control Valves Hangers and Supports for Process Piping City of Round Rock 400507-6 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 b. Multiple, suspended, horizontal plastic PVC pipe runs, where possible, shall be supported by ladder type cable trays such as: Husky Ladder Flange Out by MPHusky-1 or equal. C. Rung spacing shall be 12 inches (305 min). Tray width shall be approximately 6 inch(152 mrn) for single runs and 12 inches(305 mrn) for double runs. d. I-adder type cable trays shall be furnished complete with all hanger rods, rod couplings, concrete inserts, hanger clips, etc,, required for a complete support system. Individual plastic pipes shall be secured to the rungs of the cable tray by strap clamps or fasteners similar to: Globe, Series 600; Unistrut Piper'Conduit Clamps and Hangers;or equal. e. Spacing between clamps shall not exceed 9 feet (2.7 rn). The cable trays shall provide continuous support along the length of the pipe. Individual clamps, hangers, and supports in contact with plastic PVC pipe shall provide firm support but not so firm as to prevent longitudinal movement due to thermal expansion and contraction, D. Frarning Support System I. See Part 2 MATERIALS for materials of construction. 1 Beams: Size such that beam stress does not exceed 25,000 psi (172 MPa) and maximurn deflection does riot exceed 1/240 of span, 1 Column Members: Size in accordance with manufacturer's recommended method. 4. Support Loads: Calculate using weight of pipes filled with water, 5. Maximum Spans: a. Steel and ductile iron pipe 3 inch (75 nim) diameter and larger: 10 feet (3 m) centers,unless otherwise shown, b. Other pipelines and special situations: Sarre as noted in previous paragraphs, Supplementary hangers and supports may be required. E, All vertical pipes shall be supported at each floor or at intervals of not more than 12 feet (6.4 m) by approved pipe collars, clamps, brackets, or wall rests and at all points necessary to ensure rigid construction. All vertical pipes passing through pipe sleeves shall be secured using a pipe collar. 2.5 ANCHOR SYSTEMS A, Anchoring Devices: Design, size, and space support anchoring devices, including anchor bolts, inserts,and other devices used to anchor support, to withstand shear, and pullout loads imposed by loading and spacing on each particular support, DO NOTE USE ADHESIVE ANCHOR BOLTS ON ANY PIPE SUPPORT HUNG FROM A ROOF OR CEILING, unless specifically noted otherwise, B. All post-installed anchors in concrete shall have current published ICC-ES Evaluation Report indicating the anchor is approved for installation in cracked concrete. C. The latest edition of the following specification and recommended practices shall becorne part of this specification as if written herein. Wberever requirements conflict, the more stringent shall govern. I. ACI 318, Appendix D. Wa(er Trcarnreiit Phint Pressure Control Valves I laingers,and Supix)ns for Process Nping City of Round Rock 4010507 7 (`P 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. ACI 355.2, Mechanical Anchors "Qualification of Post-Installed Mechanical Anchors in Concrete" 3. Anchor manufacturer's published installation requirements. D. Expansion anchors: I. The length of expansion bolts shall be sufficient to place the wedge portion of the bolt a minimum of I inch(25 mm)behind the steel reinforcement. 1 Manufacturers: a. Power-Studs SD4 and Power-Stud+ SD6 by Powers Fasteners,Brewster,NY, b. Kwik Bolt as manufactured by Hilti USA,Tulsa,Oklahoma;or C. Wej-it by Wej-it Expansion Products, Inc.,Broomfield,Colorado. E. Unless otherwise noted: use Type 304 stainless steel anchoring parts/bolts and hardware for non-submerged supports,Type 316 stainless steel for submerged anchors. F. Size of anchor bolts as designed by manufacturer, 1/2 inch(13 min) minimum diameter, or as shown on the Drawings. G. Anchors to concrete in chemical areas shall be epoxy secured vinyl ester FRP all thread, insertion depth and size as required by the manufacturer for the design loads. Nuts, bolts and hardware shall all be vinyl ester FRP construction. 2.6 HANGER RODS A. Where use of steel is allowed, hanger rods shall be hot-rolled steel, machine-threaded, and, except for stainless steel,galvanized after fabrication. The strength of the rod shall be based on its root diameter. 1. Hanger rods shall be attached to concrete structures using single or continuous concrete inserts by the named support manufacturers above. Where use of steel is allowed, inserts shall be malleable iron or steel with galvanized finish. 2. Beata-clamps, C-clamps, or welded-beam attachments shall be used for attaching hanger rods to structural steel members. B. Minimum rod size for metallic rod hangers: (* For pipe diameters less than 14 inch(356 nu-n),if using. ... ......roller,use 2 iapggy with minimum diameter noted below fiqr_pipe,'s diameter............................­ ....................... Nominal tjpejjube Diameter Minirnurn.Hari er Rod Diameter Less than 2-1/2 inch(64 nun) V4 inch .......................... .......... 2 3 to g inches 75 to 203 mm) 1/2 inch 13 mm) —------------------------ 3 10 to 14 inches(254 to 356 min) 3/4 inch 19 rnm) .......... .............. 4 16 to 20 inches C406 to 508 m 2 at 1_.inch(25 mm ......................... ....................................................................................... ....................................... 524 inches(610 min) 2 at I-1/'4 inch 3 Water Treatment Plant Pressure Control Valves Hangers and Supports for Process Piping City of Round Rock 400507 .8 rx2022 CDM Snaith 8077-263948 All Rights Reserved February 2022 it 1-1/2 inch(38 mun) 10 inches(?A') 23 SINGLE PIPE HANGERS A. Unless otherwise indicated,pipe hangers and supports shall be standard catalogued components, conforming to the requirements of MSS-41, 58, or 69 and shall be of the following type: 1. Anvil International 2. Equal models by: Carpenter& Patterson, Inc.,Woburn, MA; Cooper B-Line; Gulf State Manufacturing;or Unistrut Northeast,Cambridge, Massachusetts. B. Single pipes shall be supported by hangers suspended by hanger rods from structural steel members,concrete ceilings,bottom of trapeze hangers,and wall-mounted steel angle brackets. C. Where pipes are near walls, beams, columns, etc., and located an excessive distance from ceilings or underside of beams, welded steel wall brackets similar to Carpenter and Patterson, Figure Nos. 68, 79,84,or 139 shall be used for hanging pipe. Where single pipes rest on top of bracket pipe supports, attachments shall meet requirements as specified under multiple pipe hangers. 18 MULTIPLE PIPE HANGERS A, Suspended multiple pipes,running parallel in the same horizontal plane that are adjacent to each other, shall be suspended by trapeze type hangers or wall brackets. Where use of steel is allowed, trapeze hangers shall consist of galvanized structural steel channel supported from galvanized threaded rod or attached to concrete walls, columns, or structural steel support members. See previous paragraphs about multiple PVC pipe supports. B. Except as otherwise specified herein, pipe anchors used for attaching pipe to trapeze or multiple pipe wall brackets shall be anchor or pipe chairs similar to: I, Anvil Fig. 175. I Cooper B-Line B3147A or B3147B. 3. Where use of steel is allowed, material of construction shall be galvanized steel, Chair U bolts shall be tightened to allow freedom of movement for normal expansion and contraction except where pipe must be anchored to control direction of movement or act as a thrust anchor. 2,9 SINGLE PIPE SUPPORTS FROM BELOW A. Single pipes located in a horizontal plane close to the floor shall be Pedestal type- Schedule 40 pipe stanchion,saddle,and anchoring flange. I Nonadjustable Saddle: MSS SP 58,Type 37 with U-Bolt, a, Anvil, Figure 259, b. Cooper B-Line, Figure B3090. water Treatnient Mant Pressure Curwol Valves Hangers and Supports for Process Piping Cay of Rmnd Rock 4010507, 9 f 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. Adjustable Saddle: MSS SP 58,Type 38 without clamp: a. Anvil,Figure 264. b. Cooper B-Line,Figure B3093. B. Pipes less than 3 inch(75 mm) in diameter: I. Hold in position by supports fabricated from steel C channel, welded post base similar to Unistrut, Figure P2072A, where use of steel is allowed; and pipe clamps similar to Unistrut, Figures P 1109 through 26. 2. Where required to assure adequate support, fabricate supports using two vertical members and post bases connected by horizontal member of sufficient load capacity to support pipe. 3. Fasten supports to nearby walls or other structural member to provide horizontal rigidity. 4. More than one pipe may be supported from a common fabricated support. C. Pipes 3 inch(75 mm)in diameter and larger: I. Support by adjustable stanchions. 2. Provide at least 4 inch(102 mm)adjustment. 3. Flange mount to floor. D. Use yoked saddles for piping whose centerline elevation is 18 inch (458 mm) or greater above the floor and for all exterior installations. E. Pipe roller type supports shall be used where required to accommodate thermal movement in conjunction with axial supports. 2.10 WALL SUPPORTED SINGLE AND MULTIPLE PIPES A. Single or multiple pipes located adjacent to walls,columns,or other structural members shall be supported using welded steel wall brackets, where use of steel is allowed, as manufactured by Carpenter and Patterson,Figure No.69,84,or 139. B. Where noted, multiple pipes may be supported on C-channel with steel brackets similar to Unistrut pipe clamps;with pipe anchor chairs;or equal. C. Individual pipes, up to 8-in diameter, where noted, may use MSS Type 8 pipe clamps as noted on the Drawings. D. Securely fasten all members to wall, column, etc., using double-expansion shields or other method as approved by the Engineer. Provide additional wall bearing plates as required. 2.11 BASE ANCHOR SUPPORT A. Bend Support: Where pipes change direction from horizontal to vertical via a bend, install a welded or cast base bend support to carry the load. Fasten to the floor, pipe stanchion, or concrete pedestal using expansion anchors or other method as approved by the Engineer. Water Treatment Plant Pressure Control Valves Hangers and Supports for Process Piping City of Round Rock 400507- 10 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 B. Concrete Supports: Where indicated, securely fasten pipe bends to concrete supports with suitable metal bands as required and approved by the Frigineer, Isolate piping from poured concrete with a neoprene insert. 2.12 VERTICAL PIPE SUPPORTS A. Where vertical pipes are not supported by a Unistrut type system as specified, they shall be supported in one of the following methods. I. For pipes 1/4 to 2 inch(6A to 51 min)in diameter, a. Provide extension hanger ring with an extension rod and hanger flange. b. The rod diameter shall be as recommended by the manufacturer for the type of pipe to be supported, C. Where use of steel is allowed, the hanger ring shall be steel- or PVC-clad depending on the supported pipe material of construction. The hanger ring shall be equal to Carpenter& Patterson,Figure Nos, 8 1. & Where use of steel is allowed,the anchor flange shall be galvanized malleable iron similar to Carpenter and Patterson, Figure No.85, 1 For pipes equal to or greater than 2 inch(51 min)in diameter, a. extended pipe clamps similar to Carpenter & Patterson, Figure No, 267 may be used. b. Attach hanger to concrete structures using double expansion shields, c. Attach hanger to metal support members using welding lugs similar to Carpenter & Patterson, Figure No. 114. 13. Pipe supports shall be provided for closely spaced vertical piping systems required to provide a rigid installation. The interval of vertical support spacing shall be as specified, but in no case shall vertical interval exceed 12 feet(3,66 m), The support system shall consist of a framework suitably anchored to floors,ceilings,or roofs. C. Unless otherwise specified, shown, or specifically approved by the Engineer, vertical runs exceeding 12 feet (3.7 m) shall be supported by base elbows/tees, clamps, brackets, wall rests, and pipe collars,all located as required to ensure a rigid installation. D. Pipe riser clamps, per MSS SP58, shall be used to support all vertical pipes extending through floor slabs. Where use of steel is allowed, riser clamps shall be galvanized steel manufactured by: I. Carpenter& Patterson,Figure No. 12& 1 Anvil, Figure 261. 3. Cooper B-Line, Figure 133373. E. Copper-clad or PVC-coated clamps shall be used on copper pipes. Insulation shall be rernoved from insulated pipes prior to installing riser clamps. Insulation shall not be damaged by clamp installation. Witer'Fremment Mame Pressure C'ontro➢VaNes Haingers,and Supports for Process I'trong City of Round Rock 400507- I I ki 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2,13 SPECIAL SUPPORTS A. Frame work supports 1. Vertical and horizontal supporting members shall be U-shaped channels similar to Unistrut, Series P1000. Vertical piping shall be secured to the horizontal members by pipe clamps or pipe straps.See pipe clamp and strap requirements. 2. For piping 3 inch(75 mm)and smaller,framework shall be as manufactured by: a. Unistrut Corporation; b, Power-Strut(or Ackinstrut where fiberglass systems are specified); C. Multi-Strut by Carpenter-Paterson d. or equal. 3. For piping larger than 3 inch (75 nim), the support frame shall be fabricated from structural stainless steel or steel shapes,depending upon the support location, and secured through the use of drop in,adhesive or expansion anchors. 4. The assemblies shall be furnished complete with all nuts,bolts,and fittings required for a complete assembly including end caps for all Unistrut members. 5. Electrical Conduit Support: Under Division 26. 6. The design of each individual framing system shall be the responsibility of the Contractor. Submit shop drawings, and show all details of the installation, including dimensions and types of supports. In all instances the completed frame shall be adequately braced to provide a complete rigid structure when all the piping has been attached. See also Article SUPPORT AND RESTRAINT. B. Supports not otherwise described in this Section shall be fabricated or constructed from standard structural stainless steel or steel shapes in accordance with applicable provisions of Section 055000 "Metal Fabrications," or Unistrut-type frame; have anchor hardware similar to items previously specified herein; shall meet the minimum requirements listed below; and be subject to the approval of the Engineer. C. Additional Pipe Support Situations: 1. Supporting Multiple Chemical and Related Piping: a. Location: indicated on Drawings or otherwise required, especially adjacent to chemical pumps. b. Use: framework support. C. Materials: FRP,with proper local stress protection. 2.14 SHOP FACTORY FINISHING A. Prepare and prime metallic(except stainless steel)supports in accordance with Division 09. 2.15 ACCESSORIES A. Insulation Shield: Install on insulated non-steel piping. Oversize the rollers and supports, as required. Manufacturers: Water Treatment Plant Pressure Control Valves Hangers and Supports for Process Piping City of Round Rock 400507- 12 4','�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. Anvil, Figure 167. 2. Cooper B-Line, Series 133151. B. Welding Insulation Saddle: Install on insulated metal pipe. Oversize the rollers and supports, as required. Manufacturers: I. Anvil, Figure 160. 1 Cooper B-Line, Series 83160. C. Vibration Isolation Pad: Install under base flange of pedestal type pipe supports adjacent to equipment,and where required to isolate vibration. I. Isolation pads to be neoprene,waffle type. 2. Manufacturers: a. Mason Industries,Type W. lb. Korfund, D. Dielectric Barrier I. Install between carbon steel members and copper or stainless-steel pipe, 1 Install between stainless steel supports and non-stainless steel ferrous metal piping. 3. All stainless steel piping shall be isolated from all ferrous materials, including galvanized steel by use of neoprene sheet material and protection shields. E. Electrical Isolation: Install 1/4 by 3 inch (6.4 by 75 min) neoprene rubber wrap between submerged metal pipe and oversized clamps. PART 3- EXECUTION 11 EXAMINATION A. Verify field dimensions as indicated on Drawings. 12 INSTALLATION A. Obtain permission from Engineer before using powder-actuated anchors. B. Obtain permission from Engineer before drilling or cutting structural members. C. Inserts: I Install inserts for placement in concrete forms. Before setting inserts, all drawings and figures shall be checked that have a direct bearing on the pipe location, Responsibility for the proper location of pipe supports is included under this Section. 1 Install inserts for suspending hangers from reinforced concrete stabs and sides of reinforced concrete beams. 3. Provide hooked rod to concrete reinforcement section for inserts carrying pipe 4 in (100 mm)and larger. Water Treatment Plant Pressure Control Valves Hangers and Supports for Process Piping City of Round Rock 400507- 13 k"i 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 4. Where concrete slabs form finished ceiling,locate inserts flush with slab surface. 5. Where inserts are omitted, drill through concrete slab from below and provide through- bolt with recessed square steel plate and nut above or flush with top of slab. D. Pipe Hangers and Supports: I. Install according to: MSS SP 58. 2. Support horizontal piping as indicated on Shop Drawings,depending upon pipe size. 3. Install hangers with minimum 1/2 in (13 nun) space between finished covering and adjacent Work. 4. Place hangers within 12 in(300 mm)of each horizontal elbow. 5. Use hangers with 1-1/2 in(38 mm)minimum vertical adjustment. 6. Support horizontal cast iron pipe adjacent to each hub, with 5 ft (1.5 in) maximum spacing between hangers. 7, Support vertical piping at every floor. Support vertical cast iron pipe at each floor at hub. 8. Where piping is installed in parallel and at same elevation, provide multiple pipe or trapeze hangers. 9. Support riser piping independently of connected horizontal piping. 10, Design hangers for pipe movement without disengagement of supported pipe. 11. Support piping independently so that equipment is not stressed by piping weight or expansion in piping system. 12. Support large or heavy valves, fittings, and appurtenances independently of connected piping. 13. Provide welded steel brackets where piping is to be run adjacent to building walls or columns. 14. Use beam clamps where piping is to be suspended from building steel. 15. Insulated Piping: Provide two bolted clamps designed to accommodate insulated piping. 16. Use offset clamps where pipes are indicated as offset from wall surfaces, 17. Proceed with installation of piping and supports only after any building structural work has been completed and new concrete has reached its 28-day compressive strength. 18. The installation of pipe support systems shall not interfere with the operation of any overhead bridge cranes,monorails,access hatches,etc.No piping shall be supported from stairs,other pipes, ladders,and walkways unless authorized by the Engineer, 19. Repair mounting surfaces to original condition after attaclunents are made. 20. Brace horizontal pipe movements by both longitudinal and lateral sway bracing. 21. Where supports are required in areas to receive chemical resistant seamless flooring, install supports prior to application of flooring system. E. Equipment Bases and Supports: I Provide housekeeping pads of concrete, minimum 3-1/2 in (87 nun) thick and extending 6 in(150 mm)beyond supported equipment. 2. Using templates furnished with equipment, install anchor bolts and accessories for mounting and anchoring equipment. F. Prime Coat: I. Prime coat exposed steel hangers and supports. 2. Conform to Section 099100"Painting." 3. Hangers and supports located in crawl spaces, pipe shafts, and suspended ceiling spaces are not considered exposed. Water Treatment Plant Pressure Control Valves Hangers and Supports for Process Piping City of Round Rock 400507-14 ....................... 4")2022 CDM Smith 8077-263948 All Rights Reserved February 2022 33 FIELD QUALITY CONTROL A. All pipe support systems shall be tested after installation in conjunction with the respective piping pressure tests. If any part of the pipe support system proves to be defective or inadequate, it shall be repaired,augmented or replaced to the satisfaction of the Engineer. B. After the work is installed, but before it is filled for start-up and testing, the Support System Design Engineer shall inspect the work and shall certify its complete adequacy, Each system shall be inspected and certified in the same way. C. Submit a report,including all field modifications and including all certificates. I. Insert state where project is located 1 The report shall bear the stamp of a professional engineer registered in the State of Texas and shall be subject to the review of the Engineer. 3.4 ATTACHMENT SCHEDULE A. Pipe Hanger Spacing: I Pipe Material: ABS. a. Maximum Hanger Spacing:4 feet(11 in). b. Hanger Rod Diameter:3/8 inch (9 mm). 1 Pipe Material: Aluminum. a. Maximum Hanger Spacing: 10 feet(3.0 m). b. Hanger Rod Diameter:1/2 inch(13 mm). 1 Pipe Material: Cast iron. a. Maximum Hanger Spacing: 5 feet(1.5 m). K Hanger Rod Diameter:5/8 inch(15 mm), 4, Pipe Material: Cast Iron,with 10-foot(3-m)length of pipe, a. Maximum Hanger Spacing: 10 feet(3.0 rn). b. Hanger Rod Diameter-5/8 inch(15 mm), 5. Pipe Material: CPVC. a. Size: I inch(25 mm)and smaller. b. Maximum Hanger Spacing: 3 feet(0.9 m). C, Hanger Rod Diameter:1/2 inch (13 nim). & Pipe Material: CPVC, a. Size: I-1/4 inches(32 mm)and larger. b, Maximum Hanger Spacing:4 feet(11 in), c. Hanger Rod Diameter:1/2 inch (13 turn). WaterTireatment Plant Pressure Control Valves Rangers and Supports for Process Pipirig Cay of Round Rock 400507. 15 �2022 CDM Smith 8077-263948 All Rights Reserved February 2022 7. Pipe Material:Copper tube. a. Size: 1-114 inches(32 mm)and smaller. b. Maximum Hanger Spacing:6 feet(1.8 in). C. Hanger Rod Diameter:1/2 inch(13 mm). 8. Pipe Material: Copper tube. a. Size: I-1/2 inches(39 mm)and larger. b. Maximum Hanger Spacing: 10 feet(3.0 m). C, Hanger Rod Diameter:1/2 inch(13 mm). 9. Pipe Material: Fiberglass: a. Maximum Hanger Spacing:4 feet(1.2 m). b. Hanger Rod Diameter:1/2 inch(13 trim). 10. Pipe Material: Glass. a. Maximum Hanger Spacing: 8 feet(2.4 m). b. Hanger Rod Diameter:1/2 inch(13 mm). 11. Pipe Material: Polybutylene. a. Maximum Hanger Spacing: 2.7 feet(0.8 m). b. Hanger Rod Diameter:3/8 inch(9 mm). 12. Pipe Material: Polypropylene. a. Maximum Hanger Spacing: 4 feet(1.2 m). b. Hanger Rad Diameter:3/8 inch(9 mm). 13. Pipe Material PVC. a. Maximum Hanger Spacing:4 fect(1.2 m). b. Hanger Rod Diameter:3/8 inch(9 mm). 14. Pipe Material: Steel. a. Size: 3 inches(75 mm)and smaller. b. Maximum Hanger Spacing: 12 feet(3.7 m). C. Hanger Rod Diameter:1/2 inch(13 mm). 15. Pipe Material: Steel. a. Size:4 inches(100 nun)and larger. b. Maximum Hanger Spacing: 12 feet(3.7 m). C. Hanger Rod Diameter:518 inch(15 mm). END OF SECTION 400507 Water Treatment Plant Pressure Control Valves Hangers and Supports for Process Piping City of Round Rock 400507- 16 1,)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 400551 -COMMON REQUIREMENTS FOR PROCESS VALVES PART I GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Common requirements for valves. B. Related Requirements; I Section 030110 "Concrete and Reinforcing Steel" for execution requirements for placement of concrete and reinforcing steel as required by this Section. 1 Section 055000 "Metal Fabrications" for miscellaneous metalwork and fasteners specified by this Section. 3. Section 099100"Painting" for product and execution requirements for painting specified by this Section. 4. Section 330110.58 "Disinfection of Water Utility Piping Systems," 5, Section 400507 "Hangers and Supports for Process Piping" for product and execution requirements for valve supports specified by this Section. 13 COORDINATION A. Coordinate Work of this Section with individual process valve specifications. 1.4 ACTION SUBMITTALS A. Valve Schedule: I. Submit valve schedule populated with all Division 40 process valves specified for this project. Include all infonriation shown on the Sample Valve Schedule included in this project. 2. Approval of' valve schedule submittal to precede all individual valve submittals. All subsequent individual valve submittals to include the approved valve tag number or group on the submittal cover sheet. B. Valve Tags; I Materials, dimensions and thickness of tags, materials and gauge of cable and splicing hardware. Water Treatment 111ant Pressure Control VaWes Common Rcquvenients for Process Valvas City of Round Rock 400551 I. ,, 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2. Color palate for Owner selection. 3. Full scale drawing of sample with lettering dimensions and scribe depth. 4. Valve tag lettering provided with Valve Schedule above. C. Shop Drawings: I. Certified shop and erection drawings showing parts arrangement,details and materials of construction and dimensions. 2. Valve and actuator model number and size, valve parts list, materials of each part including material standard designation (ASTM or other), position indicators, limit switches,actuator mounting. D. Provide certified hydrostatic test data,per manufacturer's standard procedure or MSS-SP-61 for all valves. 1.5 DELEGATED DESIGN SUBMITTALS A. If required per individual valve specifications, submit signed and sealed Shop Drawings with design calculations and assumptions for sizing of control valves. 1.6 INFORMATIONAL SUBMITTALS A. Manufacturer Instructions: Submit installation and operation instructions for each component including valve,actuator,gearbox,and any included instrumentation. B. Source Quality-Control Submittals: Indicate results of integrators facility tests and manufacturers factory tests and inspections. C. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections. D. Manufacturer Certification of Installation: Certify that equipment has been installed according to manufacturer instructions. E. Qualifications Statement: 1. Submit qualifications for manufacturer and licensed professional. 1.7 CLOSEOUT SUBMITTALS A. Record actual locations of valves. 1.8 QUALITY ASSURANCE A. Maintain clearances as indicated on Drawings. B. Ensure that materials of construction of wetted parts are compatible with process liquid. Water Treatment Plant Pressure Control Valves Common Requirements for Process Valves City of Round Rock 400551 -2 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 C. Mate valves to actuators at manufacturer's or integrator's facility. Fully test assembled product and certify ready for installation prior to shipment to the job site. I Only in special cases for extremely large assemblies where installation requires disassembly,may actuators be mounted to the valves in the field. D. Materials in Contact with Potable Water: Certified to NSF 61 and NSF 371 E. Submit affidavit of compliance with testing and manufacturing standards referred in this specification and the individual valve specifications. F. Provide the services of a qualified and factory-trained service representative of the manufacturer to provide installation inspection and check out, and operational and maintenance instruction, for each type of the following equipment for the following durations: Equipment -Valve Installation 0 and M Instruction Sizes !!Is�ectiou_. Pressure regulating valves 12-in and I day, 8 hr. I day,8 hr, Surge relief valves 12-in and I day,8 hr, I day,8 hr. --LIP- Blow Off valves I-in and I day,8 fir. I day, 8 In-. __________---�Llp--------------------------------------- G. Obtain Manufacturer's Certification of Proper Installation for Specified valves and valve assemblies, 1.9 QUALIFICKrIONS A. Manufacturer: Company specializing in manufacturing valves and actuators with minimum ten years'experience. B. Licensed Professional: Professional engineer experienced in design of specified Work and licensed in the State of Texas. L10 DELIVERY,STORAGE,AND HANDLING A. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage. B. Deliver factory mated power actuated valves on rigid wooden skids, fully braced and strapped to prevent damage to valve,actuator or coupling system. C. Store materials according to manufacturer instructions. D. Protection: I Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas. WaterTrealment Plant Pressure Control Valves Common Requirements fear Process Valves Cty of'Round Rock 400551 3 t,)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 2, Protect valve ends from entry of foreign materials by providing temporary covers and plugs, 1 Provide additional protection according to manufacturer instructions. 1.11 EXISTING CONDITIONS A. Field Measurements: I. Verify field measurements prior to materials ordering or any fabrication. 2. Indicate field measurements on Shop Drawings. 1.12 WARRANTY A. Furnish five-year manufacturer's warranty for valves and actuators. PART2-PRODUCTS 2.1 VALVES A. Description: Valves, operator, actuator, handwheel, chainwheel, extension stem, floor stand, worm and gear operator,operating nut,chain,wrench,and other accessories as required. B. Provide all valves of the same type by same manufacturer C. Valve Materials: Can withstand continuous chloramine concentration of up to 4 mg/L for potable water service. D. Valve Ends: Compatible with adjacent piping system and as indicated as shown on the Drawings. E. Operation: 1. Close by turning clockwise. 2. Cast directional arrow on valve or actuator with OPEN and CLOSE cast on valve in appropriate location. F. Valve Marking and Labeling: I. Marking:Comply with MSS SP-25. 2. Labeling(valve tags): a. Fiberglass reinforced plastic, ASTM D709, 70 mil thick, 2 1/2-inch diameter or 2 1/2-inch by I r�-inch. b. Lettering 1/16-inch thick of silk screening or other permanent embedment of subsurface printed graphics,permanently sealed. C. Colors of lettering and backing as selected by Owner. d. Two, 1/4-inch clear opening 316 stainless steel grommets at each end, center of hole 3/8-inch from tag edge. Water Treatment Plant Pressure Control Valves Common Requirements for Process Valves City of Round Rock 400551 -4 fc 2022 CDM Sinith 8077-263948 All Rights Reserved February 2022 e, 3/32-inch 316 SS cable and splice hardware. G. Valve Construction:As Specified in Valve Sections. H, Do not use Van Stone flanges with pinch valves, industrial butterfly valves; elastomer bellows style expansion joints or other piping system components having an elastomer liner (rubber seat)that is used as a gasket. 2.2 FINISHES A. Valve Coating: Comply with AWWA 0550. B. Factory finishes are included in individual valve sections, C. Exposed Valves: As specified in Section 099100"Painting." D. Stainless Body Valves: Do not coat. E. Do not coat flange faces of'valves unless otherwise specified. 23 SOURCE QUALITY CONTROL A, 'resting: Test valves according to manufacturer's standard testing protocol, including hydrostatic, seal,and performance testing. B. Certificate of Compliance: t. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents. 2. Specified shop tests are not required for Work performed by approved manufacturer. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that piping system is ready for valve installation. B. Fully examine valves for debris, damage and interior finish blemishes prior to installation. Do not install valves with soiled interior or any visible damage to seats, discs or interior finish. C. Identify any piping,plant or equipment clearance issues prior to installation, bring to Engineer's attention via job meetings,submittal process or request for information process, Water Treatment Plant Pressure Control VaNes Conuiron ReApreinenu.;for Process Valves Crty of'Round Rock 400551 -5 %�,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3.2 INSTALLATION A. Install valves, actuators, extensions, valve boxes, and accessories according to manufacturer instructions. B. Inspect valve interiors before line closure for the presence of debris. At the option of the Engineer, internal inspection of valve and appurtenances may be required any time that the likelihood of debris is a possibility. Clean connecting pipes prior to installation, testing, disinfection and final acceptance. C. Disinfect valves installed in potable water lines with approved pipeline disinfection process. D. Rigidly support valves to avoid stresses on piping. E. Coat studs,bolts and nuts with anti-seizing lubricant. F. Dielectric Fittings: Provide between dissimilar metals. G. Clean field welds of slag and splatter to provide a smooth surface. H. Mate, adjust and fully test gearboxes, electric, hydraulic and pneumatic actuators to valves at manufacturer's or integrator's facility. 1. Only in special cases for extremely large assemblies where installation requires disassembly may actuators be mounted to the valves in the field. These circumstances require preinstallation meetings. I. Do not install stems vertically downward. J. Unless otherwise indicated on the Drawings: I. Install Gate,Globe, Ball valves with stem vertical in the 12 o'clock position. 2. Install Plug valves with stem horizontal and plug opening to the top of the body unless position will not allow proper actuator access, in which case stem may be vertical in the 12 o'clock position. 3. Install Butterfly valves 12 inch and smaller with stem horizontal or vertical in the 12 o'clock position, 4. Install Butterfly valves 14 inch and larger with the stem horizontal unless position will not allow proper actuator access, in which case stem may be vertical in the 12 o'clock position. 5. Install Control valves in horizontal pipelines with top works vertically upward. K. Install all brackets, extension rods, guides, the various types of operators and appurtenances as indicated. Before properly setting these items, check all drawings and figures which have a direct bearing on their location. L. Inspect all materials for defects in construction and materials. Clean debris and foreign material out of openings, etc. Verify valve flange covers remain in place until connected piping is in place. Verify operability of all operating mechanisms for proper functioning. Check all nuts and bolts for tightness. Repaired or replace valves and other equipment Which do not operate easily or are otherwise defective. Water Treatment Plant Pressure Control Valves, Common Requirements for Process Valves City of Round Rock 400551 -6 C,2022 CDM Smith 8077-263948 All Rights Reserved February 2022 M. Where installation is covered by a referenced standard, install and certify in accordance with that standard,except as herein modified. Also note additional requirements in other parts of this Section. N. Unless otherwise noted, provide joints for valves and appurtenances utilizing the same procedures as specified under the applicable type connecting pipe joint. Install valves and other items as recommended by the manufacturer. Verify manufacturers' torqueing requirements for all valves. 0. Coordinate direction of flow through offset type and shaped butterfly valve discs with the mated actuator torque capacity. P. Rotate valve operators and indicator-, to display toward no al operation locations. Consult with Engineer prior to installing valves with handwheels to confirm final position of handwheel. Q, Vertically center floor boxes, valve boxes, extension stems, and low floor stands over the operating nut, with couplings as required. 1. Adjust elevation of the box top to conform to the elevation of the finished floor surface or grade at the completion of the Contract. 2. Support boxes and stem guides during concrete placernent to maintain vertical alignment, R. Install brass rnale adapters on each side of valves in copper-piped system and solder adapters to pipe. S. Install 1-inch (24-mm) gate and ball valves with cap for drains at main shutoff' valves, low points of piping,bases of vertical risers,and equipment. T. Install valves with clearance for installation of insulation and to allow access, U. Provide access where valves and fittings are not accessible. V. Pipe Hangers and Supports: As specified in Section 400507 - Hangers and Supports for Process Piping. W. Comply with Division 40 - Process Interconnections for piping materials applying to various system types. 13 FIELD QUALITY CONTROL A. Obtain Manufacturer's Certification of proper Installation for specified valves and valve assemblies. B, Valve Field Testing: 1. Test for proper alignment. 2. If specified by valve Section, field test equipment to demonstrate operation without undue noise,vibration,or overheating. 3. Engineer will witness field testing. 4. Functional Test: Water'Freavrient Mani Pressure Cowrof Valves Common Rquirements for Process Valves Cay of Round Rock 400551 ,-7 2022 CDM Smith 80177-263948 All Rights Reserved February 2022 a, Prior to system startup, inspect valves and actuators for proper alignment, quiet operation,proper connection and satisfactory performance. b. After installation,open and close all manual valves in the presence of the Engineer to show the valve operates smoothly from full open to full close and without leakage, C. Cycle valves equipped with electric,pneumatic or hydraulic actuators 5 times from full open to full closed in the presence of the Engineer to exhibit operation without vibration,jamming,leakage,or overheating. d. Operate pressure control and pressure relief valves in the presence of the Engineer to show they perform their specified function at some time prior to placing the piping system in operation and as agreed during construction coordination meetings. 5. Field test pipe lines in which the valves and appurtenances are to be installed, During these tests, adjust, remove or replace defective valve or appurtenance,or otherwise make acceptable to the Engineer. Test regulating valves, strainers, or other appurtenances to demonstrate conformance with the specified operational capabilities. Correct deficiencies,replace device or otherwise made acceptable to the Engineer. 3.4 ATTACHMENTS END OF SECTION 400551 Water Treatment Plant Pressure Control Valves Common Requirements for Process Valves City of Round Rock 400551 -8 4112022 CDM Smith 8077-263948 All Rights Reserved February 2022 SECTION 400561 -GATE VALVES PART I GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,apply to this Section. L2 SUMMARY A. Section Includes: L Solid wedge,resilient-seated gate valves 2. Tapping valves and sleeves B. Related Requirements: I. Section 400551 "Common Requirements for Process Valves" for basic materials and methods related to valves commonly used for process systems. 13 DEFINITIONS X, Outside screw and yoke (os&y) valve: A valve in which the operating screw is driven by a threaded nut that is built into the handle. 1A SUBMITTALS A. As specified in Section 400551 — Common Requirements for Process Valves: Submittal requirements for compliance with this section. L5 QUALITY ASSURANCE A. Test valves in accordance with AWWA 0500,0509,05 15.. B. Provide testing and inspection certificates, PART2- PRODUCTS 2.1 SOLID WEDGE, RESILIENT-SEATED GATE VALVES TAG TYPE GV4 A. Mari ufacturers: WaterTneavnent Plant Pressure Convol Valves Gate V,,,flves Cay of'Round Rock 400561 - I ((�2022 CDM Smith 8077-263948 All Rights Reserved February 2022 1. M&H Valve. 2. J&S Valve, American R/D Valve. 3. Stockham Valve,Walworth, B. Description: I. Wastewater service. 2. As specified in Section 400551 -Common Requirements for Process Valves. 3. Comply with AWWA 0509 or AWWA 0515. 4. Working Pressure: 100 psig at 70 deg. F. 5. Maximum Process Fluid Temperature: 100 deg. F 6. End Connections: ASME 816.1, ASME B16,5, and ASME 816.42, flanged, or Mechanical joint. 7. Gear Actuators for Manual Valves: Comply with AWWA 0509. 8. Body: no recesses in valve body C. Operation: I. As specified in Section 400551 "Common Requirements for Process Valves." 2. Stem: Nonrising. 3. 2-inch AWWA top nut. 4. Furnish gear operators for valves 8 inches and larger,and chainwheel operators for valves mounted over 8 feet above operating floor. D. Materials: 1. Wedge: Resilient ASTM A126, cast iron, fully encapsulated with chloramine resistant Buna-N. 2. Body and Disc: AWWA 0509 all-metal cast iron valves shall be manufactured of ASTM A126, cast iron. AWWA 0515 all-metal ductile iron valves shall be manufactured of ASTM A536,ductile iron. 3. Stein,Stem Nuts,Glands,and Bushings: ASTM 8584,bronze. 4. Connecting Hardware: Type 316 stainless steel. E. Finishes: 1. As specified in Section 400551 "Common Requirements for Process Valves." 2. Body, internal and external, including bonnet: AWWA 0550, Epoxy, 4-mil minimum thickness;Gate: ASTM D2000 EPDM encapsulated,ASTM D429 Method B Bonded and vulcanized. 2.2 TAPPING VALVES AND SLEEVES ­Tag Type TPGV A. Manufacturers: 1. Furnish materials according to City of Round Rock standards and standard products list. B, Description: 1. Water service. 2. As specified in Section 400551 "Common Requirements for Process Valves." Water Treatment Plant Pressure Control Valves Gate Valves City of Round Rock 400561 2 �K)2022 CDM Smith 8077-263948 All Rights Reserved February 2022 3. As specified above depending on valve type. 4. Gate Guide: Plugged,bottom flush port. 5. Include tap for pressure/leak testing. 6. Pass full,normal sized cutter. C. Connection: 1. ASME B16.1,ASME B 16.5,and ASME B 16.42, flanged, MSS-SP-60, Mechanical joint. 2. Tapping service port. D. Materials: I. Wedge Disc: Styrene butadiene rubber. 2.3 SOURCE QUALITY CONTROL A. As specified in Section 400551 "Common Requirements for Process Valves." B. Testing:Test gate valves according to A 0509. C. UL and FM approved. PART 3-EXECUTION A. As specified in Section 400551 "Common Requirements for Process Valves" for submittal requirements for compliance with this Section. 12 INSTALLATION A. According to AWWA CSOO or C509. END OF SECTION 400561 Wmcr'Trealmem Kmt Pressure Control Valves Gate Valves (-ity of Round Rock 400561 -3 (1 2022 CDM Smith 8077-263948 All Rights Reserved February 2022 This page intentionally left blank, Water Treatment Plant Pressure Control Valves Gate Valves City of Round Rook 400561 -4 02000 PLANS, DETAILS AND NOTES No Text If applicable, insert refcrcnce(s)to project plans; details; and notes .......... Included as a separate document. No Text