Loading...
R-2023-101 - 4/13/2023 RESOLUTION NO. R-2023-101 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with J.D. Abrams, LP for the Kenney Fort Boulevard Segments 2 & 3 Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 6, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 6 to the Contract with J.D. Abrams, LP for the Kenney Fort Boulevard Segments 2 & 3 Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of April, 2023. 4 Al CRAI MOR AN, Mayor City o Roun F ock, Texas ATTEST: MEAGAN S KS, ity Clerk 0112.20232:4869-8424-8424-9946 EXHIBIT "A" Page I,f 1 Contract Quantity Adjustment/Change Order ,tr15 Department: Department of Transportation Project Name: Kenney Fort Sed.2&3 Date: 3/8/23 City Project Change Order/Quantity ID Number STP 2021(745)MM Adjustment No, 6 Vendor J.D.Abrams,LP 5811 Trade Center Dr.Bldg 1,Austin,TX 78744 512-322-4000 Company Name Address Phone No. Justification Quantity Adjustment:Change Order is adding an additional left turn-lane Southbound and an additional right turn-lane Northbound. Center median will be opened to account for SB left turn-lane. Change Order-Prior to 3rd Party Developer requesting these additional turn-lanes,JD Abrams had installed existing drainage at this location. Change Order will need to accommodate existing Roadway,Drainage,Illumination,Erosion Control Bid Items(overrun/underrun)as well as additional work to remove&relocate the pipe that has currently been installed. SUMMARY Amount %Change Original Contract Price $23,409,120.97 Previous Quantity Adjustment(s): $207,613.28 This Quantity Adjustment: $47,264.58 Total Quantity Adjustment(s): $254,877.86 Total Contract Price with Quantity Adjustment(s): $23,663,998.83 Previous Change Order(s): $2,363,021.08 10% This Change Order: $108,200.55 0% Total Change Order(s)To Date: $2,471,221.63 10% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $26,135,220.46 12% Difference between Original and Adjusted Contract Prices: $2,726,099.49 Original Contract Time: 450 Time Adjustment by previous Quan.Adj./Change Order: 106 Time Adjustment by this Quan.Adj./Change Order: 19 New Contract Time: 575 Submitted for Approval Prepared By: Joe Hernandez,Project Manager,J.D.Abrams,LP 3/8/23 Signature Printed Name,Title,Company Date Approvals Contractor: Si re Printed Name,Title,Company Date City Project Manager: Signature Printed Name,Title Die Mayor/City Manager Signature Printed Name,Title Date In— Contract Quantity Adjustment/Change Order Project Name: Kenney Fort Sect.2&3 Quan.Adj./Change Order No.: 6 Change Order Data Contrail Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) Remove Existing Storm Drain Pipe&Inlets♦Reset $0.00 $0.00 Remove&Stage Inlets(3ea) LS 1 $6,179.46 $9,420.46 3 Remove RCP(122-If)&Backfill Trench(6"Lifts) LS 1 $10,680.80 $13,921.80 7 Excavate/Set/Backfill Inlets(3ea)-Excavating in Rock LS 1 $12,551.25 $15,792.25 4 Excavate/Lay/Backfill 24"RCO(122-LF)-Excavating in Rock LS 1 $13,108.00 $16,349.00 Remove&Replace Inlet Inverts(3ea) LS 1 $1,006.00 $4,247.01 Remove Excess Trees/Shrubs LS 1 $2,893.82 $6,134.83 1 Inneficiency due to Small Quantities LS 1 $39,094.19 $42,335.20 4 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS-- $108,200.55 19 Contract Quantity Adjustment/Change Order Project Name: Kenney Fort Sect.2&3 Quan.Adj./Change Order No.: 6 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount (Days) ROADWAY 6 EXCAVATION(ROADWAY) CY 897 $5.00 $4,485.00 7 EMBANKMENT(FINAL)(ORD COMP/)(TY B) CY -462 $8.00 -$3,696.00 8 FL BS(CMP IN PLC)(TY A GR 5)(FNAL POS) CY 644 $0.01 $6.44 9 LIME(HYDRATED LIME)(SLURRY) TON -3 $150.00 -$450.00 10 LIME TRT(SUBGRADE)(12") SY -111 $4.00 -$444.00 11 PRIME COAT(MULTI OPTION) GAL 194 $4.00 $776.00 28 COLORED TEXTURED CONC S") SY 74 $85.00 $6,290.00 29 CONC CURB&GUTTER(TY II) LF -94 $18.00 -$1,692.00 40 IN SM RD SN SUP&AMTYI08WG(1)SA(P) EA 2 $545.90 $1,091.80 57 REFL PAV MRK TY I(W)8"(SLD)(090MIL) LF 330 $5.10 $1,683.00 60 REFL PAV MRK TYI(W)(ARROW)(090MIL) EA 4 $154.50 $618.00 62 REFL PAV MRK TY I(W)(WORD)(090MIL) EA 4 $154.50 $618.00 72 REFL PAV MRKR TYII-C-R EA 16 $3.61 $57.76 80 D-GR HMA TY-8 PG64-22 TON 375 $73.00 $27,375.00 81 D-GR HMA TY-D PG76-22 TON 119 $9TOO $11,543.00 82 TACK COAT GAL 87 $4.00 $348.00 85 GEOGRID BASE REINFORCEMENT(TY II) SY 966 $1.60 $1,545.60 DRAINAGE 104 RC PIPE(CL 111)(24 IN) LF 1 $70.00 $70.00 ILLUMINATION 194 CON DT )(ICH 40)(2") LF 9 $8.24 $74.16 147 ELEC CONOR(NO.6)BARE LF 9 $1.65 $14.85 148 JELEC CONDR(N0.6)INSULATED LF 18 $2.06 $37.08 EROSION CONTROL 197 FURNISHING AND PLACING TOPSOI 4") SY -1755 $0.97 -$1,702.35 198 BROADCAST SEED PERM(URBAN)(CLAY) SY -1755 $0.29 -$508.95 199 BROADCAST SEED(TEMP)(WARM) SY 878 -$0.29 -$254.48 200 BROADCAST SEED(TEMP)(COOL) SY -878 -$0.29 -$254,48 201 VEGETATIVE WATERING MG -123 $5.00 -$613.85 214 BIODEG EROSN CONT LOGS(INSTL)(8") LF 38 $6.00 $228.00 216 BIODEG EROSN CONT LOGS(REMOVE) LF 38 $0.50 $19.00 TOTALS: $47,264.581 0 S�A•N es A • ne Palhn-' Path In B ' 1 O t v -yd•sewoul-uo --I► a��tiatQ� :• j Oma t �� - eel sso,y a''C 3mC } Fo 25pc /y S& 10 S � \ wwlS. 4• I;. . �i{ - ' a •' •� Jib �+uaoUd-1 .� �, �, r � � G.�` •fit°� S�• O 4 O m d �aA� ��an�a • 4ehM6u,ssor!b%- o * E Belvedeg rn 6. aSpe�ed n> ,•Oka+ntsa�;,,--• ..b•�'t C> 10 r i(lie � ► � s oa.. l � -4 as ��--�—•- ° ..• { s, •.� o n�,y,,ray• �; e'L•n h' o -- ,n C.,,�.eLak st-Gif �- nliH.ia�aON . 06 0 + .•fF�i � a :�. < 'p►rwopeaW�lsar�/� !a ;�• i •r - 6 T _i t t t0•isaJoj a`' ; r�0 ! ..j i' �i:. .; y, Tom-->>:...� r :�•-.--^ \.y,N.Apeyg � w. . 91. %• t c aoJ�er' 'mac y4ei les Da r . F• ; 4r •�� �.f y- •F' Q• r cr 73 10ti 10 ,. r Dr—.,,�•;�,,• v;n a 11". � Twp /r' _ � �a���SGlryvw�n: - �.��= -.. Dr - c t oa D s.• r o{T mis Z' ' anoJ'i�4 ^` � r t � 1 . i"` ,�^ape:1 , .� •1•a a J �� O� t �JQ.ueSy/ ' � I(eiJtt•�e$-aa'��� iC � B., " t► ��'f"!x''�t� Z+•U;t�.��e