Loading...
R-2014-1916 - 10/23/2014RESOLUTION NO. R-2014-1916 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Patin Construction, LLC for the Red Bud Lane at Forest Creek Drive Southbound Right Turn Lane Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Patin Construction, LLC for the Red Bud Lane at Forest Creek Drive Southbound Right Turn Lane Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of October, 2014. �d;n /1-1� ALK MCGRAW, Mayor City of Round Rock, Texas 0112.4304;00313236 EXHIBIT „A» C t ct t' Adjustment/Change Order z , on ra Quan ity 7 ,w. oanz Department: Transportation Project Red Bud Lane at Forest Creek Drive Name: Southbound Right Turn Lane City Project ID Number RBFLC Justification Paee I oft Date: September 25, 2014 Change Order/Quantity Adjustment No. 2 Quantity Adjustment(Change Order # 2 is needed to adjust final quantities for project closeout SUMMARY Amount % Change Original Contract Price: $165,696.00 Previous Quantity Adjustment(s): $93,600.00 This Quantity Adjustment: -$79,254.00 Total QuantityAdjustment(s): $14,346.00 Total Contract Price with Quantity Adjustment(s): $180,042.00 0.00% Previous Change Order(s): This Change Order: $1,500.00 0.83% Total Change Order(s) To Date: $1,500.00 0.83% Adj6sted Contract Price [Original Contract Price Plus Quantity $181,542.00 Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: $15,846.00 Original Contract Time: 90 Calendar Days Time Adjustment by previous Quan. Adj./Change Order: 2 Calendar Days Time Adjustment by this Quan. Adj./Change Order: 0 Calendar Days New Contract Time: 92 Calendar Days Submitted for roval ' — Prepared By: i T d Keltgen, '6ct Manager, City of Round Rock Date Signature Approvals l Contractor: Tr: , l Si natbre 9 Printed Name, Title, Compan Date City Project ,. Manager: Signature Tcd Keltgen, Pra anager, City of Round Rock Date Mayor/City I Manager Signature Alan McGraw, Mayor, City of Round Rock Date Contract Quantity Adjustment/ Change Order rcv, 03112 Project Name: Red Bud Lane at Forest Creek Drive Southbound Right Turn Lane Quan. Adj./Change Order No.: 2 rk---- n-4nv nnf- Paue 2 of 2 Contract Item # Item Description Unit Qty. Unit Price Amount Time Adjustment (Days) STAMPED AND STAINED CONCRETE LS 1 $1,500.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $1500.00 0 Project Name: Red Bud Lane at Forest Creek Drive Southbound Right Turn Lane Quan. Adj./Change Order No.: 2 Adj1ustment Data Bid Item # Item Description Unit Qty. Unit Price Contract Time Adjustment (Days) Amount 5 Silt Fence for Erosion Control LF 7 $5.00 $35.D0 7 Protective Tree Fencing, Type A Chain Link LF 68 $5.00 $340.00 12 8" HMAC Base Course (Type B) TON -352 5180.00 -$63,360.00 13 2" HMAC Surface Course (Type C) TON -68 $270.00 -$18,360.00 27 28 Thermoplastic Stripe, (WHT) (SLD) (4") Thermoplastic Stripe, (YL) (SLD) (4") LF LF 56 14 $2.00 $2.00 $112.00 $28.00 29 Thermoplastic Stripe, (WHT) (SLD) (8") LF 47 $3.00 $141.00 30 Thermoplastic Stripe, (WHT) (SLD) (12") LF -2 $5.00 -$10.00 31 32 33 Thermoplastic Stripe, (WHT) (SLD) (24") Thermoplastic Arrow, (WHT) (SLD) Thermoplastic Word (WHT) (SLD) LF EA EA 2 2 2 $10.00 $400.00 $500.00 $20.00 $800.00 $1,000.00 $0.00 $0.00 $0.00 TOTALS: -579.254.00 0