Loading...
Contract - Patin Construction - 10/23/2014'V, 08/12 Department: Transportation Project Red Bud Lane at Forest Creek Drive Name: Southbound Right Turn Lane City Project ID Number RBFLC Justification Page 1 of 2 Contract Quantity Adjustment/Change Order Date: September 25, 2014 Change Order/Quantity Adjustment No. 2 Quantity Adjustment/Change Order # 2 is needed to adjust final quantities for project closeout SUMMARY Amount % Change Original Contract Price: $165,696.00 Previous Quantity Adjustment(s): $93,600.00 This Quantity Adjustment: -$79,254.00 Total Quantity Adjustment(s): $14,346.00 Total Contract Price with Quantity Adjustment(s): $180,042.00 0.00% Previous Change Order(s): This Change Order: $1,500.00 0.83% Total Change Order(s) To Date: $1,500.00 0.83% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $181,542.00 Difference between Original and Adjusted Contract Prices: $15,846.00 Original Contract Time: 90 Calendar Days Time Adjustment by previous Quan. Adj./Change Order: 2 Calendar Days Time Adjustment by this Quan. Adj./Change Order: 0 Calendar Days New Contract Time: 92 Calendar Days Submitted for Amaroval Prepared By: Signature d Keltgen ct Manager, City of Round Rock Date Approvals Contractor. Date Signat re Printed Name, Title, Company I" City Project Manager: Signature T Itgen, Pr, ' anager, City of Round Rock Date Mayor/City Manager Signature 94 -2A -k - 19l � Alan—McGraw, Mayor, City of Round Rock Date Pa2c 2 of 2 Contract Quantity Adjustment/ Change Order «, osnz Project Name: Red Bud Lane at Forest Creek Drive Southbound Right Turn Lane Quan. Adj./Change Order No.: Change Order Data Contract Item # Item Description Unit Qty. Unit Price Amount Time Adjustment (Days) STAMPED AND STAINED CONCRETE LS 1 $1,500.00 $1,500.00 _00 -_0 _0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $1500.00 0 Project Name: Red Bud Lane at Forest Creek Drive Southbound Right Turn Lane Quan. Adj./Change Order No.: 2 Quanti Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Contract Time Adjustment (Days) Amount 5 Silt Fence for Erosion Control LF 7 $5.00 $35.00 7 Protective Tree Fencing, Type A Chain Link LF 68 $5.00 $340.00 12 8" HMAC Base Course (Type B) TON -352 $180.00 -$63,360.00 13 2" HMAC Surface Course (Type C) TON -68 $270.00 -$18,360.00 27 Thermoplastic Stripe, (WHT) (SLD) (4") LF 56 $2.00 $112.00 28 Thermoplastic Stripe, (YL) (SLD) (4") LF 14 $2.00 $28.00 29 Thermoplastic Stripe, (WHT) (SLD) (8") LF 47 $3.00 $141.00 30 Thermoplastic Stripe, (WHT) (SLD) (12") LF -2 $5.00 -$10.00 31 Thermoplastic Stripe, (WHT) (SLD) (24") LF 2 $10.00 $20.00 32 Thermoplastic Arrow, (WHT) (SLD) EA 2 $400.00 $800.00 33 Thermoplastic Word (WHT) (SLD) EA 2 $500.00 $1,000.00 $0.00 $0.00 $0.00 TOTALS: 1 -579.254.00 0