Loading...
CM-2023-137 - 6/16/2023,., Pagel of4 Contract Quantity Adjustment/Change Order rev, 01116 Department: Parks and Recreation Project Name: Bowman Park Improvement Project 2022 Date: 6/7/23 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Dig Dug Construction LLC PO Box 92583 Austin, Tx. 78709 512-382-0008 Company Name Address Phone No. 3ustification Additional charges for changes requested by City 1. Supply material and labor to construct rock berm perm sheet EV-2 and Detail on Sheet EV-6 2. Remove 2 trasition ramps and haul off spoils. Install Concrete per plan in Lieu of transition ramps SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Pius Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval 0 Amount % Change $306,544.00 $0.00 $0.00 $0.00 $306,544.00 $0.00 0% $4,586.25 1% $4,586.25 1% $311,130.25 $4,586.25 Prepared By: .$tali! �%%i�x Scott McKnight, P.M, Dig Dug Construction LLC 06/07/2023 Signature Printed Name, Title, Company Date �. Approvals :W'' Contractor: $tali.` r%%%Zitlg k _ Scott McKnight, P.M, Dig Dug Construction LLC 06/07/2023 Signatu¢ Printed Name, Title, Company Date City Proji Manager: Mayor/City 137 Patrick Cavanaugh, Parks �z Page 2 of a Contract Quantity Adjustment/Change Order ie.OS r1: Project Name: Bowman Park Improvement Project 2022 Quan. Adj./Change Order No.: Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment p 1 upp y iagflal and 1566-F to construct rock berm perm sheet EV-2 and Detail on Sheet EV-6 1 1 $2,411.25 $2,411.25 0 2 emove 2 trwition ramps and hauloff spoils. Install Concrete per plan in Lieu of transition ramps 1 1 $2,175.00 $2,175.00 0 0.00 $0.00 0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity/Adjustment/Change Order No. 1 with DigDug Construction, LLC for the Bowman Park Improvements 2022 Project, Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/16/2023 Dept Director: Rick Atkins, Parks and Recreation Director Cost: $4,586.25 Indexes: CDBG HUD Entitlement Grants Attachments: LAF - QA-CO#1 with Dig Dug Construction - Bowman Park, Bowman Imp 2022 CO 060723 - Signed Department: Parks & Recreation Text of Legislative File CM-2023-137 Installation of Rock Berm for runoff mitigation at final discharge site and the removal of transition ramps adjacent existing concrete pathways and converting these to concrete paths. Cost: $4,586.25 Source of Funds: CDBG HUD Entitlement Grants City of Round Rock Page 1 of I