Contract - DeNucci Constructors LLC - 6/22/2023 Page I of 3 Contract Quantity Adjustment/Change Order Department: Transportation Project Name: 13001.01 University Blvd Widening Date: 5/8/23 City Project Change Order,/Quantity ID Number 13001.01 Adjustment No. I1.1 Vendor DeNucci Constructors LLC 8310 Capital of TX Hwy N Ste 275 Austin TX 78731 512-335-0600 Company Name Address Phone No. Justification 1.Pass-through invoicing for TSIT investigative work at Sunrise asphalt failure 2.Added TCP,striping, signage etc measures per COP#49(attached)3 Added 8"SW retaining wall at SW end of CBC to shore up existing utility transformer pad per COP #50(attached)4. Final tweaks made to limits of final pavement per COP#51(attached) S.Changes to TS final programming made by Itens.6.Level-Up journal entries for all items[Quantity Adjustments are all per Quantity Level Up correspondence,spreadsheet,and final installed quantities(attached)] Amount %Change Original Contract Price. $12,028,913.00 Previous Quantity Adjustment(s) $487,340.25 This Quantity Adjustment. $297,204 90 Total Quantity Adjustment(s) $784,545.15 Total Contract Price with Quantity Adjustment(s). $12,813,4 88,15 Previous Change Order(s) 9% ;1,156,091.13 This Change Order: $79,836.92 1% Total Change Order(s)To Date: $1,235,928.05 10% Ad)usted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]. ;14,049,386.20 Difference between Onginal and Adjusted Contract Prices $2,020,473.20 Original Contract Time. 760 Time Adjustment by previous Quan.Adj/Change Order. 149 Time Adjustment by this Quan. Adj./Change Order: 2 New Contract Time: 911 Submitted for Approval Prepared By: Z14 Aaron DeNucci, Project Manager, DeNucci Constructors LLC 5/8/23 Signature Printed Name,Title,Company Date Approvals Contractor. Aaron DeN , Pro Mana er DeNucci Constructors L. ect 1 _ � LC 5/8/23 Signature Printed Name, Title, Company Date City Project Manager: --S- 2J-- 23 Signa a Printed Name,Title Date Mayor/City Manager ZZ Z3 Si na re Printed Name, Title Date Contract Quantity Adjustment/Change Order Project Name: 13001.01 University Blvd Widening Quan. Adj./Change Order No.: 11.1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount 1 ITSIT Eng. Asphalt Failure Investigation Bill LS 1.00 $ 6,000.00 $ 6,000,00 0 2 COP #49 Added P4 TCP signs LS 1.00 $ 46,426.67 $ 46,426.67 0 3 COP #50 8" SW Concrete Retaining Wall LS 1.00 $ 11,936.94 $ 11,936.94 1 4 COP #51 Final Paving Changes LS 1.00 $ 13,191.72 $ 13,191.72 0 5 COP #52 TS Additions(programming) LS 1.00 $ 2,281.59 $ 2,281.59 0 TOTALS: 79,836.92 1 Page 3 of"3 Contract Quantity Adjustment/Change Order Project Name: 13001.01 University Blvd Widening Quan. Adj./Change Order No.: 11.1 Quantity Adjustment Data Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment 640 IMortared Rock Wall SF 75.00 $15.00 $ 1,125.00 1 6090 ILSN EA (1.00) $5,200.00 $ (5,200.00) 0 360 Jointed CPCD SY 1,321.00 $118.00 $ 155,878.00 0 132 Embankment Select Fill CY -1337.00 $8.00 $ (10,696.00) 0 340 HMAC TY C TON 1909.52 $95.00 $ 181,404.40 0 315 Surface Milling SY 7138 $4.00 $ 28,552.00 0 401 Flowable Backfill CY -299 $145.00 $ (43,3S5.00) 0 618 CONDT PVC SCH 80 4" LF -220 $20.00 $ (4,400.00) 0 618 CONDT PVC SCH 80 3" LF -6 $15.00 $ (90.00) 0 132-A Embankment Select Fill CY -145 $12.00 $ (1,740.00) 0 450 RAIL (TY C412) LF -81.4 $105.00 $ (4,273.50) 0 TOTALS: $297,204.9011