R-2023-187 - 6/22/2023RESOLUTION NO. R-2023-187 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Plummer Associates, Inc. for the BCRWWS East WWTP SCADA and HMI Programming Services Project, and WHEREAS, Plummer Associates, Inc. has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services and to increase the compensation, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with Plummer Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with Plummer Associates, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of June, 2023. CRtp MOAN, Mayor City `of Rou Rock, Texas ATTEST: 0112.20232;4854-1402-5321 EXHIBIT ttA„ 10 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PLUMMER ASSOCIATES, INC. ("Engineer") ADDRESS: 1221 Auraria Parkway, Denver, CO 80204 PROJECT: BCRWWS East WWTP SCADA and HMI Programming Services This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Plummer Associates, Inc., hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 14th day of November, 2019 for the BCRW WS East W WTP SCADA and HMI Programming Services Project in the amount of $1,005,580.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $183,250.00 to a total of $1,188,830.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. II. Article 4, Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $183,250.00 the maximum amount payable under the Contract for a total of $1,188,830.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.1955;4861-3906-5699 84275 PLUMMER ASSOCIATES, INC. By: Rti PAUMAWL Date Supplemental Contract Rev.06/16 0199.1955;4861-3906-5699 84275 CITY OF ROUND ROCK By: Craig Morgan, Mayor Date Supplemental Contract 0199.1955;4861-3906-5699 APPROVED AS TO FORM: Stephanie L. Sandre, City Attorney Rev.06/16 84275 ADDENDUM TO EXHIBIT B Engineering Services This Exhibit is part of the Agreement between Plummer Associates, Inc. (Plummer) (the "Engineer") and the City of Round Rock (the "City") for the project generally described as; Brushy Creek Regional Wastewater Treatment System East Plant (BCE) Expansion to 30 MGD SCADA and HMI Programming Services Amendment 1 Introduction The scope of this amendment is to complete Phase B services for PLC and HMI programming for the 20MGD TO 30 MGD plant expansion, including continued coordination with the construction teams through final completion of the construction project. The scope of this amendment also includes the addition of maintenance services through 2023, including additional operator training and HMI software support. This is intended to maintain the Ignition HMI servers as well as the Programmable Logic Controllers (PLCs) as version upgrades and additional support packs are released. It also includes firmware upgrades to the cellular radios in service at the lift stations and at the gateway in the WWTF. Work Remaining Major Tasks B has been completed. Tasks A, C & D have remaining tasks to be completed, Task E (Maintenance Services) has been added and the work tasks are described below: Task A — Project Management Services Project Management services are included to support the remaining work including the programming HMI configuration and on -site testing and commissioning tasks. We are estimating three months duration for the contractor to complete the remaining work. A.1 Additional time for PM services to include: 1. Bi-Weekly progress meetings to monitor the scope tasks and completion of the tasks. Conduct internal team coordination as required to accomplish the work. 2. Project status reporting includes the percent complete for scope tasks and the issues, budget status, and schedule. Maintain and update monthly, an action item log, a decision log, and a project change log as well as the schedule. 3. Conduct final QC review for the deliverables. Task B — Bid Phase Services Phase B services are complete. Task C - Construction Phase Services Phase C services (Bid Phase) are nearly complete. We anticipate additional time required due to the project stretching into 2023 with construction in several areas not yet completed and requiring electrical, instrumentation and control testing, commissioning, and final punch listing before substantial completion is reached by the contractor. C.1 Additional time for construction items to include: 1. On -site Input/Output checks and commissioning of Trains 1 & 2 PLCs. 2. On -site commissioning of Train 1 & 2 Anoxic mixers 3. On -site commissioning of Train 1 & 2 Anerobic mixers 4. On -site commissioning of Train 1 & 2 Return Pumps 5. On -site commissioning of Train 1 & 2 Dissolved Oxygen analyzers 6. On -site commissioning of Aeration blowers 7. On -site commissioning of UV controls and tie in to SCADA 8. On -site commissioning of post -Aeration Blowers 9. On -site commissioning of Alum systems 10. On -site tie-in of PTU PLCs and control systems D.01 PLC programming Programming needs to be completed in the following areas and will include site testing and commissioning activities for the areas listed below in Section D.04. Construction progress is expected to be completed in the next few months to allow the PLC programming to be completed and tested in the following areas: 1. AB Train 1 Air Flow Valve AB Train 2. AB Train 1 Anoxic Mixers AB Train 3. AB Train 1 Instruments AB Train 4. AB Train 1 Aner Mixers AB Train 5. AB Train 1 Return Pumps AB Train 6. AB Train 2 Air Flow Valve AB Train 7. AB Train 2 Anoxic Mixers AB Train 8. AB Train 2 Instruments AB Train 9. AB Train 2 Aner Mixers AB Train 10. AB Train 2 Return Pumps AB Train 11. AB Trains 1-3 DO programming. 12. East Electrical building programming additions 13. Post Aeration Blowers UV Complex 2 14. Flow Split to UV1, UV2 UV1, UV2 15. UV PLC programming 16. Primary Alum Pumps Thickener Building 17. Secondary Alum Pumps Thickener Building 18. Sludge PLC programming 19. PTU coordination with contractor, commissioning, and communication setup. 20. Blower System Coordination and assistance to Howden during checkout of Master Blower control panel. E.02 HMI Configuration 1. Database tag additions for AB Trains 1&2 a. Air flow meters b. DO instrumentation. c. Anoxic mixers d. Return Pumps 2. Additional tags for new blowers after Howden PLC program revisions completed 3. Changes/additions to Daily Report 4. Cleanup of duplicate tags on ILS2 a. Updating of flow tags since equipment changes b. Tuning and operational items on ILS2 after equipment resolution c. Updates after Thalle/Alterman completion 5. Resolution of PTU effluent meters 6. Resolution of RAS/WAS flow meters. 7. Revise tags for DO tags on Train 1, Aeration Basins 1-4, Train 2, Aeration Basins 1-4 after equipment changes. 8. UV System screen updates and additions 9. Sludge system tags, alarms, and display screens 10. Revise screens/pages on Reuse system for better operations a. Upgrade register list for swap to new Modicon PLC 11. Add dewatering press summary screens. F.01 Training and Maintenance Services City staff have indicated a need for additional training as the project started in March 2020, and the staffing has changed significantly since that time. In addition, conversion of the HMI system at the WTP has provided data on the need for maintenance services which has benefited the City with helpful transition to the new system. The following services are proposed: 1. HMI training for operations staff 2. PLC/HMI configuration training for SCADA Technicians and maintenance staff 3. Software upgrades to the Ignition HMI software 4. Configuration support and minor updates/additions to the system through 2023 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page BCRWS East WWTP SCADA and HMI PROGRAMMING ID Task Task Name Duration Start ;Apr'23 May'23 Jun'23 Jul'23 Aug'23 Sep'23 Oct'23 Nov'23 Dec'23 Jar O Mode I26 2 9 162330 7 1421!29 4111 1825 2 9 162330 6 132027 3 101724 1 8 152229 5 121926 3 10112431 Phase B Construction 180 days Thu 4/20/23 2 W. Phase B HMI & PLC Programming 180 days Thu 4/20/23 3 Opt Aeration Basin Train 1 180 days Thu 4/20/23 4 W. AB Train 1 Anoxic Mixers 30 days Thu 4/20/23 5 AB Train 1 Anerobic Mixers 30 days Thu 4/20/23 6 AB Train 1 Instruments 30 days Thu 6/1/23 7 AB Train 1 Air Flow Valves 30 days Thu 6/1/23 (0400-PLC-1001/2) 8 AB Train 1 Return Pumps 30 days Thu 6/1/23til 9 W* Aeration Basin Train 2 120 days Thu 7/13/23 10 AB Train 2 Anoxic Mixers 30 days Thu 7/13/23 11 AB Train 2 Anerobic Mixers 30 days Thu 7/13/23 12 1K AB Train 2 Instruments 30 days Thu 8/24/23 13 WO AB Train 2 Air Flow Valves 30 days Thu 8/24/23 1• (0400-PLC-1001/2) 14 up, AB Train 2 Return Pumps 30 days Thu 8/24/23 15 EK RAS/WAS Pump Station (T3) 60 days Thu 10/5/23 16 = Sludge Pumps 60 days Thu 10/5/23 17 UV Controls 30 days Thu 7/13/23 18 W4 Flow Split to UV1/UV2 30 days Thu 7/13/23 191 W, Post Aeration Blowers 20 days Thu 8/24/23 1--I 20 Blower Electrical Checks 10 days Thu 8/24/23 21 Blower 1/0 checks 10 days Thu 9/7/23 22 Alum Feed System 40 days Thu 10/5/23 23 Alum Instrumentation 20 days Thu 10/5/23 24 up, Alum Pump Checkout 20 days Thu 11/2/23 25 Sodium Hypo Feed Pumps 20 days Thu 11/30/23 1 26 Instrument Checkout 10 days Thu 11/30/23 27 Pump Checkout 10 days Thu 12/14/23 28 Sodium Bisulfate Feed Pumps 20 days Thu 11/30/23 1 29 Instrument Checkout 10 days Thu 11/30/23 30 Pump Checkout 10 days Thu 12/14/23 Plummer V2 - Fri 5/12/23 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page oaa©mmaa r . aaaoaoao ©o©ommoo 00000000 oasomosa I T�."':." I 1 1 ..-1 1 ��-_�� NMImm-M ©C�11111111111e� �M IIIIIIW� %BMBURSABLE E PERSES Lear .�nNa Iffl !� l�Merry luwnu 3 �! { __ uJ r nq i � exNl PV 1p.ae+rveruon. 3 PS _ 3---