Loading...
Contract - Cash Construction - 7/13/2023 Page 1 of Contract Quantity Adjustment/Change Order w ROM W=1 t XAS rev,01/16 Department: UES Project Name: Northeast DowntownRevitalization Date: 6/15/23 City Project Change Order/Quantity ID Number NEDTU/NEDTR Adjustment No. 6 Vendor Cash Construction 217 Kingston Lacy Blvd.-Pflugerville,Texas 78660 (512)251-7872 Company Name Address - Phone No. Justification Change Order/Quantity Adjustment No.6 is for final bid item quantity adjustments,change order additional required work,and additional work days. SUMMARY Amount %Change Original Contract Price: $7,823,780.00 Previous Quantity Adjustment(s): $484,936.65 This Quantity Adjustment: $470,939.50 Total Quantity Adjustment(s): $955,876.15 Total Contract Price with Quantity Adjustment(s): $8,779,656.15 Previous Change Order(s): 9% $759,053.40 This Change Order: $169,681.91 2% Total Change Order(s)To Date: $92.8,_735.31 11% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $9,708,391.46 Difference between Original and Adjusted Contract Prices: $1,884,611.46 Original Contract Time: 365 Time Adjustment by previous Quan.Adj./Change Order: 156 Time Adjustment by this Quan.Adj./Change Order: 81 New Contract Time: 602 Submitt royal 2 Prepared By: Eddie Zapata,Senior Project Manager,City of Round Rock %Wor _ -<' -'2 SI nature Printed Name,Title,Company Yate momAppr Contractor: Shawn Zi ler,CFO Cash Construction 6 atu Printed Name,Title,Company at City Project � Manager: Eddie Zapata,Senior Project Manager Signa a Printed Name,Title Date Mayor/City Manager Craig Morgan,Mayor -7/1312.3 Signatuv Printed Name,Title i Ate -20z!3---201 Page 2 of Contract Quantity Adjustment/Change Order Im ND R=TEXAS rev,01/]6 Project Name: Northeast Downtown Revitalization Quan.Adj./Change Order No.: 6 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount Da s CO 6-1 ADDED LIMESTONE AT BAXTER HAIR SALON LF 55 $65.00. $3,575.00 1 CO 6-2 EXTRA STRIPPING AT RICHARSON LAW OFFICE&RUBY HOTEL LS 1 $4,700.00 $4,700.00 5 CO 6-3 THERMO BLUE&WHITE HANDICAP BACKGROUNDS LS 1 $2,390.91 $2,390.91 CO 6-4 SWITCHBACK RAMP CONCRETE WALLS LF 134 $394.60 $52,876.40 15 CO 6-5 MORTARED ROCK WALL,INCLUDING CONCRETE TURNDOWN SF -75 $40.00 -$3,000.00 CO 6-6 ADJUST TELECOM VAULT AT LIBRARY EA 1 $3,925.00 $3,925.00 CO 6-7 ADJUST STREET LIGHT BOXES AT LIBRARY EA 1 $1,960.00 $1,960.00 CO 6-8 Five additional crew days to install light bases at library site LS 1 $19,383.00 $19,383.00 5 CO 6-9 Flowable fill for void of poles removed CY 4 $167.90 $671.60 CO 6-10 Additional fine grading Days 13 $6,400.00 $83,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTA-19: 1 Page 3 of Contract Quantity Adjustment/Change Order iRGUmmm m F x.ry. rev,01116 Project Name: Northeast Downtown Revitalization Quan.Adj./Change Order No.: 6 QuantitV Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount C 7 Plan&Text Asphalt Concrete Pavement(0 to 2") SY 2247 $15.00 $33,705.00 11 Excavation(Roadway) CY 1122 $25.00 $28,050.00 16 D-GR H MA(SQ)TY-D PG70-22 Ton 231 $130.00 $30,030.00 17 Conc.PVMT(Cont REINF-CRCP)(10") SY 40 $118.00 $4,720.00 19 P.C.CONCRETE CURB AND GUTTER(Fine Grading) LF 794.28 $25.00 $19,857.00 21 Rail(Handrail)(TY,B)- LF 257 $70.00 $17,990.00 22 Curb Ramps(TY-1) EA 12 $1,600.00 $19,200.00 5 23 Driveways(CONC.) SY 628.33 $100.00 $62,833.00 24 P.C.CONCRETE CURB AND GUTTER LF 133.4 $55.00 $7,337.00 33 BARRICADES,SIGNS,AND TRAFFIC HANDLING MO 1 $2,000.00 $2,000.00 COLOR INTEGRATED PORTLAND CEMENT STAMPED CONCRETE 52A SIDEWALKS SY 579 $85.00 $49,215.00 64 CAST IN PLACE TRENCH DRAIN LF 91 $740.00 $67,340.00 66 INLET COMPL)(CURB)(TY II)(15') EA 1 $10,000.00 $10,000.00 110 RECOAT EXISTING WASTEWATER MANHOLE VF 87.5 $95.00 $8,312.50 111 MINOR MANHOLE ADJUSTMENT,48-IN DIAMETER EA 5 $300.00 $1,500.00 153 D-GR HMA(SQ)TY-D PG70-22 TON 1 645 $150.00 $96,750.00 156 RIPRAP CONC 6IN CY 22 $550.00 $12,100.00 ADDITIONAL WORK DAYS 50 TOTALS: $470v939.50 55