Loading...
CM-2023-161 - 7/21/2023SUPPLEMENTAL AGREEMENT NO. 1 TO "CITY OF ROUND ROCK AGREEMENT FOR ELEVATOR INDUSTRY EQUIPMENT, REPAIR, RELATED PRODUCTS AND SERVICES WITH TK ELEVATOR CORPORATION" CITY OF ROUND ROCK § STATE OF TEXAS § COUNTY OF TRAVIS § COUNTY OF WILLIAMSON § KNOW ALL BY THESE PRESENTS: THIS SUPPLEMENTAL AGREEMENT NO. 1 to "City of Round Rock Agreement for Elevator Industry Equipment, Repair, Related Products and Services," called "Supplemental Agreement No. 1," is made by and between the CITY OF ROUND ROCK, TEXAS, a home - rule municipality, with offices located at 221 East Main Street, Round Rock, Texas 78664-5299 (referred to herein as the "City"), and TK ELEVATOR CORPORATION, whose offices are located at 3615 Willow Springs Road, Austin, Texas 78704 (referred to herein as the "Vendor"). WHEREAS, the City and Vendor previously executed the referenced "City of Round Rock Agreement for Elevator Industry Equipment, Repair, Related Products and Services," hereinafter called the "Agreement" on August 19, 2022 in the amount of $47,807.19; and WHEREAS, OMNIA Partners Cooperative is a cooperative purchasing program; and — + WHEREAS, City is a member of OMNIA Partners Cooperative and Vendor is an approved provider through Contract No. R200502; and WHEREAS, it is necessary to amend the existing Scope of Services and increase the Contract Amount by $3,800.00 for a new total not -to -exceed amount of $51,607.19 in the Agreement as set forth herein; NOW THEREFORE, in consideration of the mutual promises and obligations in the Agreement and this Supplemental Agreement No. 1, the City and Vendor agree that said Agreement is amended and supplemented as follows: kI-2o2-�-��l 4 1-5222-3083/ss2 1. Section 5.01 of the Agreement is hereby amended to read as follows: 5.01 COSTS B. The City shall be authorized to pay the Vendor an amount not -to -exceed Fifty_ One Thousand Six Hundred Seven and 191100 Dollars ($51,6_07_19) for the term of this Agreement. 11. This Supplemental Agreement No. 1 shall amend the original Agreement only as set forth herein with no other changes in terms or conditions of the original Agreement. IN WITNESS WHEREOF, the City and Vendor have executed this Supplemental Agreement No. 1 to be effective as of the last date of due execution by both parties. CITY OF ROUND ROCK, TEXAS By: WVAj� Printed Name' 6 Title: Date Signed: FOR CITY, APPROVED AS TO FORM: By: Stephanie L. Sandre, City Attorney TK ELEVATOR CORPORATION By: � 1.4* Printed Name: 10ENT Title: S-,e4;4,Ayt,j�eg1` Date Signed: f t t 2,#b j Addendum to Exhibit "A" Subcontract Change Order Request PROJECT NUMBER: CONTRACT DATE: CHANGE ORDER NUMBER: PROJECT NAME: PROJECT ADDRESS: CONTRACTOR NAME: CONTRACTOR ADDRESS: 187882 9/27/2022 1 ROUND ROCK WATER TREATMENT 5494 1-35 N ROUND ROCK, TX, 78664 TK ELEVATOR CORPORATION 3615 F Willow Springs Rd Austin, TX, 78704 Ina Date: 05/23/2023 This request for a formal Change Order is made for the above -referenced Contractor and specifically intends to modify and amend the work, price and/or terms set forth in above -referenced Subcontract as follows: The City of Round Rock authorized representative agrees to pay TK Elevator at a charge of $1800 to run construction use elevator 6r this or other subcontractors use Work Will be done during regular working hours and as a change order to our original contract TotalAmount of this Change Order to be added to the contract price: $3.800.00 In the event of any conflict between the work, price and/or terms and conditions of the above -referenced Subcontract or prior change orders thereto and this Change Order, this Change Order shall be final. Please sign two (2) copies of this Change order and return two (2) copies to TK Elevator. A fully executed copy of this Change Order will be returned to you for your files. Signed Acceptance: By signing this Change Order where indicated below, the Contractor's signatory hereby acknowledges (a) that the Contractor agrees to all of the terms and conditions contained herein, (b) that the signatory has the authorization necessary to bind the Contractor to agreements of this nature, and (c) that this form is valid and bin&ng notwithstanding any conflicts with procedures and/or forms required by the original Subcontract referenced above which are deemed to have been waived. this change order/notice scope of avrk requires the anticipated or current project schedule, and associated time frames, to be Ousted commensurate with the time necessary for the engineering, material procurement and additional labor. Tl( Elevator will provide a revised project schedule on ewedited schedule change order/notice scope of work to the purchaser upon request. Contractor: Customer: TK EIeva or Corporation City of Round Rock �iw� By: Cabin Kent ate: By: City Authorized- Date: Tale Project Manager Title: Representative City of Round Rock ROUND ROCK -Fxn`. Agenda Item Summary Agenda Number: Title: Cons -.der executing Supplemental Agreement No. 1 to "City of Round Rock Agreement for Elevator tndustry Equipment, Repa"rr Related Products and Services with TK ElevatorCorporation." Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/21/2023 Dept Director: Chad McDowe I, General Services Director Cost: 53,800.00 Indexes: Utility Fund Attachments: Signed Change Order Department: General Services Text of Legislative File CM-2023-161 With this supplemental we will increase the original scope of work for the upgrade elevator modification to include cab operator for other trades to perform work in the shaft. �iZlJ Cost: $3,800.00 Source of Funds: Utility Fund City of Round Rock Page 1 of 1