CM-2023-154 - 7/14/2023Page I of 3 Contract Quantity Adjustment/Change Order It--Mi�u No, OU16 Department: FARD Project Name: Old_Setders park East Side Electrical �. Date: 6 27 23 City Project Change Order/Quantity ID Number Adjustment No. i Vendor HCS Inc. 36S Wayside Dr. Waco, Texas 7 - _ 254-829.32DO Company Name Address Phone No. 3ustiigcation :onnection from Oncor pole to transformer - as required for service. Additional lighting at Yonders Point to provide getter aesthetics and safer isage at night. SUMMARY Amount % Change Original Contract Price: $454 580.0 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): .00 Total Contract Price with Quantity Adjustment(s): $454 580. Previous Change Order(s): 09r0 This Change Order: $47,159.63 100/0 Total Change Orders) To Date: $47,159.63 10% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)j: $501739.63 Difference between Original and Adjusted Contract Prices: $47,159.63 Original Contract Tlme: 300 days Time Adjustment by previous Qoan. Adj./Change Order: Tirne Adjustment by this Quan. Adj./Change Order: New Contract Time: 300 days =r 7;t Prepared 9y: 1✓� Ca 4- 6 x Z-6%3 Signature Printed Name, Tide, Company Clate Contractor: 6.27.2023 lure Printed Name, Title, Company Date City Project Manager: Sign re Printed Name, Title' - Date Mayor/City Ma (� UI�► ! J A - �- • Cii %v Y 7—��'"c,� ? na ure Printed Name, Title Date MW - 1�1( ;k 2 -/W Page 2 of i It:, Contract Quantity Adjustment/Change Order o 1. Project Name: Old Settlers park East Side Electrical Quan. Adj./Change Order No.: Chance Order Date item 0 item Desd'ip"n Unit Qty. Unit Price Amount Contract Time Adjustment 1 Merground conduit InstallatIon rom Oncor Pole to Transformer Pad LS t $16,691.23 $16,691.23 2 LIghting at Yonders Point LS 1 $29, $29,966.90 3 Project Management for added scope LS 1 $501.50 $501.50 .00 DO $0.00 $0,00 $0.00 $0.00 .00 $0.00 0.00 $0.00 $0.00 $0.00 $0,00 .00 $0.00 Page I of i Contract Quantity Adjustment/Change Order It—. � .+ -W. 61 1i Project Name: Old Settlers park East Side Electrical Quan. Adj./Change Order No.: uant[ty Adiustment Data 1 f 71 1 1 II1 _- •1 fl Ti f 1 _- oil ROUND ROCK TEXA5 City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with HCS, Inc. Commercial General Contractor for the Old Settlers Park East Side Electrical 2022 Project Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/14/2023 Dept Director: Rick Atkins, Parks and Recreation Director Cost: $47,159.63 Indexes: General Self -Financed Construction Attachments: LAF - QA-CO1#1 with HCS Inc. - Old Settlers Park East Side Electrical, QA-CO#1 with HCS Inc. OSP East Side Electical Department: Parks & Recreation Text of Legislative File CM-2023-154 This item will authorize City Manager to execute CO#1 with HCS, Inc. This change order includes installation of the underground electrical connection from the Oncor pole to the new transformer. Oncor requested the City's contractor to provide this connection to expedite the installation. Additionally, this change order includes adding additional lighting to the Yonders Point area. This lighting will improve the aesthetics and safer usage at night. The Old Setters Park East Side Electrical Project 2022 includes installing permanent power on the east side of the lake. Currently, there is very little power on that side of the lake. Additional power is needed to support the events held in that area, including but not limited to, Yonders Fun Friday Nights, Veterans and Memorial Day Ceremonies, and Light Up the Lake. PARR currently rents generators to support these events. Permanent power is needed to decrease the cost of those events, and decrease man hours for set up. Cost: $47,159.63 Source of Funds: General Self -Financed Construction City of Round Rock Page I of I