Loading...
R-2023-215 - 7/27/2023RESOLUTION NO. R-2023-215 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with J.D. Abrams, LP for the Kenney Fort Boulevard Segments 2 & 3 Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 7, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 7 to the Contract with J.D. Abrams, LP for the Kenney Fort Boulevard Segments 2 & 3 Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of July, 2023. CRAIGIMORN, Mayor City of Round Rock, Texas •�, 0112.20232;4859-5970-7504 EXHIBIT "A"" Page I of 3 .00 Contract Quantity Adjustment/Change Order ra, Otl l6 Department'. Department of Transortation Project Date: 6/20123 Name: Kenney Fort Sect. 2 & 3 Change Order/Quant]ty City Project Adjustment No. #7 ID Number S1P 2021 (745) MM Vendor ].D. Abrams LP 5811 Trade Center Dr. Bldg 1 Austin TX 78744 512-322-4000 Company Name Address Phone No. Iustification Quantity Adjustment: Original 9x5 QTY Is to be reduced to 0-LF. Design Change has changed boxes from 9x5 to WE Change Order: Amount o/a Change SUMMARY original Contract Price: Previous Quantity Adjuslment(s): This Quantity Adjustment: Total Quantity Adjustment(s) Total Contract Price with Quantity AdJustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: $23,409,120.97 $254,877 86 -$349,800.00 ij $23 314,198.83 = z $2,471,221.63 11% $743,789.52 3% $3,215 011.15 14% 26,529,209.98 13% $3,120,089.01 450 Original Contract Time: 125 Time Adjustment by previous Quan. Adj./Change order: 0 Time Adjustment by this Quan. Adj./Change Order: 575 New Contract Time: L_-'iwz Marty Mack Project Manager, ].D. Abrams LP 6/20123 Prepared By: Printed Name, Title, Company Date Si nature >t Contractor. Printed Name, Title, Company Date nature City Pro i440 Man Lu ,L� Date Signature PrInted Name, Title Mayor/City Manager Printed Name, Title Date Signature 3 Page 2 of 3 Contract Quantity Adjustment/Change Order �ixK �ws MllOVIG Project Name: Kenney Fort Sect. 2 & 3 Quan. Adj./Change Order No. 7 Contract Time Adjustment Item f Item Description Unit ty• Unit pfit! Amount $0.00 $0.00 a. Material (Salve a to be shi ed to P e Wholesalers t -$8 966-26 -$8 966.26 Material/Labor/E ui ment 000 $0.00 2. Material Non -Salvage to be shipped to CORR) 1 $3,953.g6 $3 953.g5 Frei h Labor E lu meet 00 $0.00 3. 9'x6' Box Culvert ADD ON LF 350 $1,410.97 $493,839.50 Material $0.00 $0.00 4. Crane Standb Tlme + Haul & Unload L3 1 $45662.43 $45 662.43 Standb Tlme $0.00 $0.00 S. CONC BOX CULV 9 FT X 6 FT LABOR, EQUIP SUB)598.00 $209,300.00 Installation of New 9x6 RCB (Labor, Equip, Sub) LF 350 00 $0.00 $0.00 $0.00 $0.00 $0.00- $0.00- $0.00 $0.00 $0.00 TA 74 , 89.52 Page 3 of 3 Contract Quantity Adjustment/Change Order iow m•s M,/oY16 Project Name; Kenney Fort Sect. 2 & 3 Quan. Adj./Change Order No.: 7 4a 11 _ 3+!� 73 + - L �' i•• d �i� •� war- •. •�� ---. � `� . � � / ��}7, •,a+. ,•4� -� 7ev :•y.,1• � i is.��'a�`"1` s" ± '• 'q' ., •i N.",ee , yi �;� <i�ta '��Qp�- •... 1 II I� L'.B -e�� "'i k� '1 " r' f`.''. i+'t I•' fir,