Contract - J.D. Abrams, LP-Change No. 7 - 7/27/2023 Page 1 ora
Contract Quantity Adjustment/Change Order
Department: Department of Transportation
Project Date: 6/20/23
Name: Kenney Fort Sect.2&3
Change Order/Quantity
City Project Adjustment No. #7
ID Number STP 2021 745 MM
Vendor J.D.Abrams LP 5811 Trade Center Dr.Bldg1 Austin TX 78744 512-322-4000
Address Phone No.
Company Name
justification
Quantity Adjustment:Original 9x5 QTY Is to be reduced to 0-LF. Design Change has changed boxes from 9x5 to 9x6.
Change Order:
Amount %Change
SUMMARY
Original Contract Price:
$23,409,120 97 -
01
$254,877.86" ftjL -
Previous
Quantity Adjustment(s):
-$349,800-00
This Quantity Adjustment:
Total QuantltyAdjustment(s): -$94,92214 W- IE
Total Contract Price with Quantity Adjustment(s): $$2 314,221 63 _ 11%
$2,471,221.63 11%
Previous Change Order(s):
$743,789.52 3%
This Change Order
$3,215 011.15 14%
Total Change Order(s)To Date:
Adjusted Contract Price [Orginal Contract Price Plus Quantity Adjustment(s)Plus Change 26,529,209.96 13%
order(s)]:
$3,120,089.01
Difference between Origin!and Adjusted Contract Prices:
450
Original Contract Time:
125
Time Adjustment by previous QuanAdj./Change order:
0
Time Adjustment by this Quan.Adj./Change Order:
575
New Contract Time:
Marty Mack Protect Manager,J.D.Abrams LP 6/20/23
Prepared By: Date
Printed Name Title Company _
5 nave .._�. '� �--� -_- _---
Contractor Date
nature J Printed Name,
-7,Title,Company
City Pro' LGA L,V C)
Man Print Name,Title Date
SikII
Mayor/City tl Z7 Z
Manager Date
Si Printed ame,
�Zr20` '3r 24S'
Pnge 2 of 3
Contract Quantity Adjustment/Change Order
rev,01/tb
Project Name: Kenney Fort Sed.2&3
Quan.Adj./Change Order No.: 7
Chan a Order Data
� Contract
Time
Adjustment
Item Item Description Unit ty. Unit Price Amount s
$0.00
M=Wff9
$0.00
1.Material(Salva a to be shipped to pipe Wholesalers LS 1 -$8966.26 -$8966.26
Material/Labor/Equipment 0,00
$0.0o
2. Material Non•Salvaee to be thinned to CO— LS 1 $3,953.85 $3,953.85
Frei h Labor E lu ment .00
$0.00
3.9'x6'Box Culvert ADD ON LF 350 $1,410.97 493,639.50
Material $0,00
$0.00
4.Crane Standb Tlme+Haul&Unload LS 1 $45662.43 $45662.43
Standb Time $0.00
$0.00
s.CONC BOX CULV 9 FT X 6 FT LABOR,EQUIP SUB
Installation of New 9x6 RCB(Labor,Equip,Sub) LF 350 598.00 $209,300.00
00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TA 74 , 89.52
Page 3 of 3
Contract Quantity Adjustment/Change Order
m,oyi6
Project Name: Kenney Fort Sect.2&3
Quan.Adj./Change Order No.: 7
antiMustment Data
Contract
Time
Adjustment
Bid Item 41 Item Description Unit 0tv. Unit Price Amount
462 6068 CONC BOX CULV 9 Fr X 5 Fi EXTEND CY -318 $1,100.00 -$349,800.00
OTA 349 00.00 0