Loading...
Contract - J.D. Abrams, LP-Change No. 7 - 7/27/2023 Page 1 ora Contract Quantity Adjustment/Change Order Department: Department of Transportation Project Date: 6/20/23 Name: Kenney Fort Sect.2&3 Change Order/Quantity City Project Adjustment No. #7 ID Number STP 2021 745 MM Vendor J.D.Abrams LP 5811 Trade Center Dr.Bldg1 Austin TX 78744 512-322-4000 Address Phone No. Company Name justification Quantity Adjustment:Original 9x5 QTY Is to be reduced to 0-LF. Design Change has changed boxes from 9x5 to 9x6. Change Order: Amount %Change SUMMARY Original Contract Price: $23,409,120 97 - 01 $254,877.86" ftjL - Previous Quantity Adjustment(s): -$349,800-00 This Quantity Adjustment: Total QuantltyAdjustment(s): -$94,92214 W- IE Total Contract Price with Quantity Adjustment(s): $$2 314,221 63 _ 11% $2,471,221.63 11% Previous Change Order(s): $743,789.52 3% This Change Order $3,215 011.15 14% Total Change Order(s)To Date: Adjusted Contract Price [Orginal Contract Price Plus Quantity Adjustment(s)Plus Change 26,529,209.96 13% order(s)]: $3,120,089.01 Difference between Origin!and Adjusted Contract Prices: 450 Original Contract Time: 125 Time Adjustment by previous QuanAdj./Change order: 0 Time Adjustment by this Quan.Adj./Change Order: 575 New Contract Time: Marty Mack Protect Manager,J.D.Abrams LP 6/20/23 Prepared By: Date Printed Name Title Company _ 5 nave .._�. '� �--� -_- _--- Contractor Date nature J Printed Name, -7,Title,Company City Pro' LGA L,V C) Man Print Name,Title Date SikII Mayor/City tl Z7 Z Manager Date Si Printed ame, �Zr20` '3r 24S' Pnge 2 of 3 Contract Quantity Adjustment/Change Order rev,01/tb Project Name: Kenney Fort Sed.2&3 Quan.Adj./Change Order No.: 7 Chan a Order Data � Contract Time Adjustment Item Item Description Unit ty. Unit Price Amount s $0.00 M=Wff9 $0.00 1.Material(Salva a to be shipped to pipe Wholesalers LS 1 -$8966.26 -$8966.26 Material/Labor/Equipment 0,00 $0.0o 2. Material Non•Salvaee to be thinned to CO— LS 1 $3,953.85 $3,953.85 Frei h Labor E lu ment .00 $0.00 3.9'x6'Box Culvert ADD ON LF 350 $1,410.97 493,639.50 Material $0,00 $0.00 4.Crane Standb Tlme+Haul&Unload LS 1 $45662.43 $45662.43 Standb Time $0.00 $0.00 s.CONC BOX CULV 9 FT X 6 FT LABOR,EQUIP SUB Installation of New 9x6 RCB(Labor,Equip,Sub) LF 350 598.00 $209,300.00 00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TA 74 , 89.52 Page 3 of 3 Contract Quantity Adjustment/Change Order m,oyi6 Project Name: Kenney Fort Sect.2&3 Quan.Adj./Change Order No.: 7 antiMustment Data Contract Time Adjustment Bid Item 41 Item Description Unit 0tv. Unit Price Amount 462 6068 CONC BOX CULV 9 Fr X 5 Fi EXTEND CY -318 $1,100.00 -$349,800.00 OTA 349 00.00 0