CM-2023-187 - 8/18/2023} Page I of 3 Contract Quantity Adjustment/Change Order I-*-- ra ens rev, 01/16 Department: Utilties & Environmental Services Project Name: 36" Chandler Creek Wastewater Line Rehabilitation Project Date: 8/10/23 City Project Change Order/Quantity ID Number CIP23-00032 Adjustment No. 1 Vendor Fuquay, Inc. _ 4861 Old Hwy 81, New Braunfels, TX 78132 (830) 606-1885 Company Name Address Phone No. Justification ro rehabilitate and coat the upstream and downstream manholes for the 36" Line Rehabilitation. We were unable to fully assess the manholes until the bypass with the project was installed, and it is advantageous to correct any coating issues with this current project and bypass in place rather than a separate project. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: Amount % Change 120 Days 0 0 New Contract Time: 120 Days Signature City Project Manager: President, Fuquay, Inc. Printed Name, Title, Company Adam Levy, Staff Ei of Round Rock $0.00 0% $8,999.00 3% $8,999.00 3% $276,947.00 $8,999.00 Date Signature Printed Name, Title Date Mayor/Ci Manager W � ° 1 4v Si ature cl Printed Name, Title ~Date - Page 2 of 3 Contract Quantity Adjustment/ Change Order �.,JP,e Project Name: 36" Chandler Creek Wastewater Line Rehabilitation Project Quan. Adj./Change Order No_: Chance Order Data Item # Item Description Unit ky. Unit Price Amount Contract Time Adjustment (Davs) 22107 Manhole Bench Repair and Invert Repair 5' Base EA 1 $650.00 $650.00 0 22116 Manhole Rehabilitation - Cementicious 1/2" Thick SQFT 249 $9.00 $2,241.00 0 22118 Manhole Rehabilitation - Polyurethane - 250 mils thickness SQFT 1 249 $24.00 $5,976.00 0 22130 Travel and Mobilization - Manhole Repair Crew - New Branfels, TX MILE 66 $2.00 $132.00 0 $0.00 $0.001 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $a.0a $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/ Change Order wan.e�oo� rcxs rev. 01 ;6 Project Name: 36" Chandler Creek Wastewater Line Rehabilltetion Project Quan. Adj./Change Order No.: Uantity Adjustment Data Bid Item # Item Description Unit Unit Price Amount Contract Time Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0 0199.202320 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCILICITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Utilities & Environmental Services Project Mgr/Resource: Kit Perkins Council Action: F ORDINANCE Agenda Wording F71city Manager Approval 0 36" Chand:er Creek Wastewater Line Project Name: Rehabilitation ContractorNendor: Fuquay, Inc. RESOLUTION UVIA vvoraing Consider executing Quantity Adjustment/Change Order No. 1 with Fuquay, Inc. for the 36" Chandler Creek Wastewater Line Rehabilitation Project. Attorney Approval 2) (11'toorney Date 0 Notes/Comments C:kUserskrmcmil'1inkND Office Echo1VAULT-D6RSLZUWILAF - QA-CO No. 1 with Fuquay, Inc. - 36 inch Chandler Creek Wastewater line Rehabilitation project 4883-2236-3254 v_1 Updated 613/08 Y r � * f wool Q; Q 1 3 F � t riy� l y Iy ' f�i CD E CD CD r 1 r � err "! • X � � � -' . -t�;�� #� .Y • fit-{ 'S x f eL VD ^'4 a tip. * � - ,its 4, Y 4 A a � �:w •e r ,� awl+. �`cf�- 'r'}� � # �'# „rf ` i 'Y',� i AL -40 01 r { C �k#}t►i�t{+Kily� r�On*1&,4. SfiC � d { k ♦ 7yL'�i . �,r#�'�� I. .tiyT� `. . . - rQV ._� ram. •' I, . ri r. 'ty Yi. ! O y. 1 3�5 :!�Ir`,ti f./ `: City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No.1 with Fuquay, Inc for the 36" Chandler Creek Wastewater Line Rehabilitation Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 8/18/2023 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $8,999.00 Indexes: Self -Financed Wastewater Construction Attachments: Changer Order, LAF, Map Department: Utilities & Environmental Services Text of Legislative File CM-2023-187 As a part of the City of Round Rock's ongoing work on lowering the Inflow and Infiltration (1&1) into our wastewater collection system, many recent wastewater pipe inspections were performed. During the inspection of the 36-inch Chandler Creek gravity wastewater interceptor, several pipe issues were identified. During the pipe inspections, approximately 200 linear feet of pipe was noted to be in poor condition. This specific line segment extends through an earthen dam at the Upper Brushy Creek WCID Dam No.11. Since this is a sensitive segment with a high risk should the pipe fail, the City contracted with Fuquay to rehabilitate the wastewater line. The rehabilitation method selected is cast -in -plate -pipe (CIPP), which is a large "fabric sock" that is soaked in an epoxy solution then blown into the pipe. An ultraviolet light array is used to set off the hardening reaction to harden the linear after it is blown into place. This process creates a new fiberglass pipe repair on a 15-inch wastewater line along Brushy Creek by the same company. Change Order No. 1 adds rehabilitating and coating the upstream and downstream manholes for the 36" Line Rehabilitation. The condition of the manholes could not be assessed until the wastewater bypass with the project was installed. It is advantageous to correct any coating issues with this current project while the bypass is in place rather than a separate project. Change Order No.1 will increase cost by $8,999 bringing the total contract cost to $276,947. City of Round Rock Page 1 of 2 Agenda Item Summary Continued CM•2023.187 Cost: $8,999 Source of Funds: Self -Finance Wastewater Cityof Round Rock Page 2 of 2