R-2023-247 - 8/24/2023 RESOLUTION NO. R-2023-247
WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering
Services ("Contract') with LJA Engineering for the Red Bud Lane South Project, and
WHEREAS, LJA Engineering has submitted Supplemental Contract No. 3 to the Contract to
modify the provisions for the scope of services and to increase the compensation, and
WHEREAS, the City Council desires to enter into said Supplemental Contract No. 3 with LJA
Engineering,Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental
Contract No. 3 to the Contract with LJA Engineering, a copy of same being attached hereto as Exhibit
"A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 24th day of August, 2023.
CRAIC;MORCAP,Mayor
City o Round ock, Texas
ATTEST:
EAGAN 13NMVity Clerk
0112.20232;4888-4065-1894
EXHIBIT
STATE OF TEXAS §
COUNTY OF WILLIAMSON §
SUPPLEMENTAL CONTRACT NO.3
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: LJA ENGINEERING ("Engineer")
ADDRESS: 2700 La Frontera Boulevard, Suite 150, Round Rock,TX 78681
PROJECT: Red Bud Lane South
This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between
the City of Round Rock, Texas, hereinafter called the "City" and LJA Engineering, hereinafter
called the"Engineer."
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the"Contract", on the 26th day of September, 2019 for the Red Bud Lane South Project in
the amount of$550,863.65; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on April 8, 2021 to
amend the scope of services and to increase the compensation by $1,370,142.09 to a total of
$1,921,005.74; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on May 26, 2022 to
amend the scope of services and to increase the compensation by $226,790.00 to a total of
$2,147,795.74; and
WHEREAS,it has become necessary to amend the Contract to modify the provisions for the scope
of services and to increase the compensation by $247,003.00 to a total of$2,394,798.74;
NOW THEREFORE,premises considered,the City and the Engineer agree that said Contract is
amended as follows:
I.
Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached
Addendum To Exhibit A.
I1.
Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth
in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth
in the attached Addendum to Exhibit C.
Supplemental Contract Rev.06/16
0199.1950;4871-8345-7649 84275
1
III.
Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by
$247,003.00 the lump sum amount payable under the Contract for a total of $2,394,798.74, as
shown by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF,the City and the Engineer have executed this Supplemental Contract
in duplicate.
[signature pages follow]
Supplemental Contract Rev.06/16
0199.1950;4871-8345-7649 84275
2
LJA ENGINEERING
By: Kenneth G.G. Schrock
7/25/2023
Date
Supplemental Contract Rev.06/16
0199.1950;4871-8345-7649 84275
3
CITY OF ROUND ROCK APPROVED AS TO FORM:
By:
Craig Morgan, Mayor Stephanie L. Sandre, City Attorney
Date
Supplemental Contract Rev.06/16
0199.1950;4871-8345-7649 84275
4
RED BUD LANE SWA#3
Public Utility,TCP and Drainage Improvements
Doris Lane Extension CITY OF ROUND ROCK
ADDENDUM TO EXHIBIT A
City Services
1 . City of Round Rock will provide any as-built drawings for developments
along Red Bud Lane based on availability.
2. City shall any existing CADD/GIS files and pertinent as-built plans of the
roadway, storm sewer, and water and wastewater utilities in the area.
3. City of Round Rock will provide any available traffic information to aid in
pavement design.
4. The City will provide timely reviews in conjunction with the agreed upon
schedule.
5. City of Round Rock will provide all City permits necessary.
6. The City will host monthly utility coordination meetings.
7. The City will provide payment for necessary permitting fees including
TCEQ
RED BUD LANE SWA#3
Public Utility,TCP and Drainage Improvements
Doris Lane Extension CITY OF ROUND ROCK
ADDENDUM TO EXHIBIT B
Engineering Services
Roadway: Red Bud Lane
County: Williamson
Limits: PS&E:from Gattis School Road to Forest Ridge Blvd./Evergreen Dr.
General Work Description: Develop 90%and 100% plans,specifications,and estimates
(PS&E) and topographic survey of proposed reuse line along with drainage, traffic control,
and utility coordination revisions and additional services due to the addition of proposed
City utilities to the Red Bud Lane South Improvement Project. Work to also include the
extension of Doris Lane improvements approximately 200'from proposed Red Bud Lane to
the east.
Summary:
• Design 4,000 LF of reuse line (8-in)upsized to 12 inch from 82+00 to 121+00.
• Extend proposed 24"water line to connect to exist 36"water line. (400'north of
CR123) from 131+50 to 135+00.
• Storm sewer alignment and traffic control plan adjustments to accommodate
utilities added to the project (summarized below).
o Proposed 4,000 LF of reuse line (SWA#3)
o Extension of 24"Water Line(SWA#3)
0 4,830 LF of water line(16"and 12") relocated and extend to CR 123 (SWA
#2)
o Addition of PRV Vault at Forest Creek(SWA#2)
0 5,900 LF of force main (6"and 12") relocated and extend to CR 123 (SWA
#2)
0 16"waterline converted to a reuse line from Forest Creek Drive to CR 123
(SWA#2)
• Traffic Control adjustments to accommodate utilities (summarized above).
• Additional utility coordination to accommodate redesign and longer schedule.
(summarized above).
• Extend Doris Lane 200'east of Red Bud Lane to include roadway,drainage and
pedestrian improvements
FC 130.3 -UTILITY COORDINATION
Provide utility coordination services through construction for relocation and additional
utility coordination efforts due to the addition of multiple proposed public utilities added to
the project.
• Assist City in Utility Coordination
o Attend CORR monthly coordination meetings,up to 12 meetings
o Contact utilities monthly for relocation design status updates
I
RED BUD LANE SWA#3
Public Utility,TCP and Drainage Improvements
Doris Lane Extension CITY OF ROUND ROCK
o Provide utilities recommended relocation alignments to assure
accommodation of all conflicts due to new conflicts
o Provide utilities with roadway PDF plans,cadd files and updates to PDFs and
cadd files
o Discuss proposed relocation alignment assignments with each utility in
conflict
o Provide updates to the city and roadway design teams as needed
o Update Utility conflict matrix
o Update the utility relocation schedule
o Provide conflict services during relocation construction to address field issues
FC 145-PROJECT MANAGEMENT AND COMMUNICATION PLAN
• Meetings and Team Coordination
o Team Coordination Meetings - Hold staff/team/discipline meetings at the
Engineers office to coordinate the proposed utility and traffic signal design.
• Invoicing and Contract Document Coordination
o Prepare Supplemental work authorization contract documents
• Produce Project Scheduling
o Update design schedule in Microsoft Project format for approval by the City
indicating tasks,milestones, major meetings,and reviews. Update schedule
with each milestone deliverable.
• Submittals and QA/QC
o QA/QC of all documents for additional work prior to milestone submittals
(90%, 100%). Detailed Check Review for all designs, Inter-discipline
coordination review, detailed plan and construction reviews.
o QA/QC of additional Utility submittals added to project.
o Prepare Submittals for City Oversight Reviews.
o Document control for project on all submittals,reviews,comments,and any
other project files.
FC 150-TOPOGRAPHICAL&BOUNDARY SURVEY
1. General
LIMITS: Supplemental topographical ground surveying for Red Bud Lane due to the
water line alignment location from Evergreen Dr to 36" tie in point from 120+00 to
135+00 and manhole data from Doris Lane to south side of fire house. Supplemental
topographic ground surveying for the extension of Doris Lane improvements
approximately 300' x 50' within the existing ROW along Doris Lane.
A. Surveys provided will be in accordance with the"Texas State Board of Land
Surveying" and the applicable City of Round Rock regulations.
FC 160-ROADWAY-DORIS LANE
RED BUD LANE SWA#3
Public Utility,TCP and Drainage Improvements
Doris Lane Extension CITY OF ROUND ROCK
Roadway Design: The Engineer shall use Bentley's 31) design technology in the design and
preparation of the roadway plan sheets to incorporate the Doris Lane roadway, drainage
and sidewalk improvements. Improvements will include a 3 lane section extended
approximately 200' east of proposed Red Bud Lane,6'sidewalk,and any necessary drainage
improvements required. The engineer shall prepare and adjust all necessary plan sheets
affected by improvements including but not limited to:
1. Roadway Plan and Profiles
2. Drainage Plan and Profiles
3. Drainage Area Maps
4. Signing and Striping
S. Sidewalk Details
6. Traffic Control Plan
7. Cross sections and Typical Sections
8. Quantity Summaries
9. Earthwork
FC 161 -DRAINAGE ADJUSTMENTS
Storm sewer revisions due to the addition of multiple proposed public utilities added to the
project.
Storm Drains: Revisions to storm sewer design and resulting sheets include:
• Relocating curb/drop inlets,and manholes
• Revising drainage areas and calculations based on new inlet locations
• Relocating storm sewer trunk lines and laterals
• Redesigning storm sewer system to verify sizes,slopes,hydraulic grade lines and
velocities.
• Updating drainage plan and profile sheets
• Updating drainage area maps
• Updating storm sewer lateral profile sheets
• Updating all hydraulic data sheets
• Updating resulting quantity summaries.
FC 163.10-UTILITY DESIGN
The Engineer will develop the following plan sheets in accordance with City of Round Rocks'
guidelines for the addition of a proposed reuse line from 82+00 to 121+00.
• Determine Reuse Alignment Relocation Placement,Limits of Improvements
• Prepare E&Q Sheet: Estimate and Quantity Data Sheet
• Prepare Reuse Layout/Horizontal Alignment Layout
• Prepare Reuse line Improvement Plan&Profile Sheets
• Prepare Connecting Tie-In Lines Plan and Profile
• Waterline Adjustments
• Extend 24-in water to tie to exist 36"water line(400'north of CR123) from 131+50
to 135+00.
• Prepare additional Construction Detail Sheets
• Submit reuse improvement plans to TCEQ for approval
3
RED BUD LANE SWA#3
Public Utility,TCP and Drainage Improvements
Doris Lane Extension CITY OF ROUND ROCK
Milestone Comment Resolution
• Update plans per TCEQ comments received from the 100%milestone review
meetings.
• Deliverables
o Construction Plan Submittals (90%, 100%)
o Specifications Submittals (90%, 100%)
o Electronic Graphics-provide the City an electronic deliverable of the plans
(including standard drawings) submit both PDF&Microstation Format
o Submittals—90%,and 100%submittals- Comments and revisions requested at
the review meetings shall be incorporated into the plans for the subsequent
submittal.
FC 163.3 -TRAFFIC CONTROL&EROSION CONTROL
Traffic Control Plan revisions due to the addition of multiple proposed public utilities added
to the project.
Traffic Control Revisions to multiple phases and resulting sheets include:
• Revise TCP Narrative
• Revise Phase 1 and Layouts
• Revise Phase 2 and Layouts
• Revise Phase 3 and Layouts
• Intersection phasing details
309.2 -Construction Phase Services
Supplemental construction phase services include additional services required due to the
addition of several public utilities to be constructed with this project. During construction
the engineer shall:
• Review and approve submittals/shop drawings as received
• Answer RFIs (5)
• Prepare Design Change Notifications as necessary
• Document,coordinate,and rectify utility conflicts during construction
4
ADDENDUM TO EXHIBIT C
Work Schedule
Attached Behind This Page
EXHIBIT C Red Bud Ln PS&E Schedule
PROTECT NAME:Red Bud Lane SWA#3-Utility Improvements/Traffic Signal
ID Task Name Duration Start Finish 1Qtr 2,2021 Qtr 3.2021 Qtr 4,2021 Qtr 1,2022 Qn 2,2022 Qtr 3,2022 Qtr 1,2022 Qtr 1,8123 Qtr 2,2023 Qtr 3,2023
Qtr 1,202 Qlr 1,2024
_ r r M n ul A Dec lan Feb Mar A r Ma lul Au Se M
1 NTP 0 days 4/1/21 4/1/217P . ul
2 ROW Acquisition 330 days 4/1/21 2/24/22 ROW Acquisition
2124
3 PS&E 1027 days 4/1/21 1/22/24 PS&E
4 60%PS&E 442 days 4/1/21 6/16/22 sox PS&E
5 60%Design 120 days 4/1/21 7/29/21
6 60%Submittal to City 0 days 7/29/21 7/29/21 •�7m
7 City Review 21 days 7/30/21 8/19/21
B Comment Resolution 10 days 8/20/21 8/29/21
9 60%Utility Submittal to City 0 days 5/27/22 5/27/22 5/27
10 City Utility Review 21 days 5/27/22 6/16/22
11 90%PS&E 250 days 2/19/23 10/26/23 90%PS&E
12 90%Design 218 days 2/19/23 9/24/23
dseuiri.
13 90%Submittal to City 1 day 9/25/23 9/25/23 9125
14 City Review 21 days 9/26/23 10/16/23
1s Comment Resolution 10 days 10/17/23 10/26/23
16 100%PS&E 86 days 10/27/23 1/20/24 100%PS&E
f-�
17 100%Design(Including Utilities) 53 days 10/27/23 12/18/23
18 100%Submittal to City 0 days 12/18/23 12/18/23 ��1L14
19 City Review 23 days 12/19/23 1/10/24 r
20 Comment Resolution 10 days 1/11/24 1/20/24 T
21 Final PS&E Submitted to City 0 days 1/22/24 1/22/24 Final PS&E Submitted to City r 1122
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
EXHIBIT D
FEE SCHEDULE-Supplemental Design Services for Plans,Specifications and Estimates
PROJECT NAME: Red Bud Lane SWA#3-Utility, Drainage Improvements,Doris Lane Extension
PRIME PROVIDER NAME: LJA Engineering, Inc.
FEE SUMMARY
Function Code Task Fee
130.3 Utility Coordination $ 31,400.00
145 Project Management $ 18,400.00
150 Topographic Survey $ 13,705.00
160 Roadway-Doris Lane $ 15,010.00
161 Drainage $ 30,380.00
163.1 Utility Design $ 80,330.00
163.3 TCP $ 21,530.00
309.2 Construction Phase Serv. $ 36,248.00
Grand Total: $ 247,003.00
EXHIBIT D
FEE SCHEDULE -Supplemental Design Services for Plans, Specifications and Estimates
PROJECT NAME: Red Bud Lane SWA#3 -Utility, Drainage Improvements, Doris Lane Extension
PRIME PROVIDER NAME: LJA Engineering, Inc.
FEE SUMMARY
Function Code Task Utility Betterment Transportation Fee
Conflicts
130.3 Utility Coordination $ 15,700.00 $ 15,700.00 $ 31,400.00
145 Project Management $ 9,200.00 $ 9,200.00 $ 18,400.00
150 Topographic Survey $ 9,940.00 $ 3,765.00 $ 13,705.00
160 Roadway- Doris Lane $ 15,010.00 $ 15,010.00
161 Drainage $ 15,190.00 $ 15,190.00 $ 30,380.00
163.1 Utility Design $ 80,330.00 $ 80,330.00
163.3 TCP $ 10,765.00 $ 10,765.00 $ 21,530.00
309.2 Construction Phase Serv. $ 36,248.00 $ 36,248.00
Grand Total: $ 141,125.00 $ 105,878.00 $ 247,003.00
RED BUD LANE FEE ESTIMATE
EXHIBIT D
FEE SCHEDULE-Supplemental Design Services for Plans,Specifications and Estimates
PROJECT NAME: Red Bud Lane SWAtt3-Utility,Drainage Improvements,Doris Lane Extension
PRIME PROVIDER NAME: LJA Engineering,Inc. Date: 6/28/2023
RED BUD LANE PROJECT
Senior Senior project Senior Utility Utility Senior CADD GIS Analyst/ GIS
TASK DESCRIPTION Project Engineer/ E.I.T. Engineering Admin Total
Manager Planner Engineer Coordinator Coordinator Tech Operator Cartography Technician
FC 130.3-Utility Coordination
Attend and prepare information for Util Coord Meetings 16.0 16.0 32.0
Contact Utility companies monthly 8.0 24.0 32.0
Provide recommended alignments 16.0 16.0 32.0
Provide utilities with updated roadway plans/cadd files 12.0 12.0
Provide updates to City 16.0 16.0
Update utility conflict matrix 24.0 8.0 32.0
Update utility relocation schedule 16.0 16.0
Provide conflict services during relocation construction 24.0 24.0 48.0
HOURS SUB-TOTALS 0.0 0.0 0.0 0.0 120.0 100.0 0.0 0.0 0 0 0.0 0.0 2200.
LABOR RATE PER HOUR $230 $180 $160 $135 $160 $122 $120 $85 $110 $95 $70
SUBTOTAL $0 $0 $0 $0 $19,200 $12,200 $0 $0 $0 $0 $0 $31,400
Senior Senior Project Senior Utility Utility Senior CADD GIS Analyst) GIS
TASK DESCRIPTION Project Engineer/ E 1. Engineering Admin Total
Manager Planner Engineer Coordinator Coordinator Tech Operator Cartography Technician
FC 145-Project Management
Team Coordination Meetings 8.0 8.0 8.0 24.0
Project Schedule 8.0 8.0
Invoicing and Document Control 12.0 8.0 20.0
Prepare Submittals and QA/QC 16.0 16.0 8.0 12.0 52.0
HOURS SUB-TOTALS 44.0 24 0 16.0 0.0 0 0 0 0 0 0 0 0 0.0 0.0 20.0 104.0
LABOR RATE PER HOUN $230 $180 $160 $135 $160 5122 $120 $85 $110 $95 $70
SUBTOTAL $10,120 $4,320 $2,560 $0 $o $0 $0 $0 $0 $0 F $1,400 $18,400
FC 150-Topographical&Boundary Survey
Survey(see LJAS Fee)
$13,705
Senior Senior Senior
Project Senior Utility Utility CADD GIS Analyst) GIS
TASK DESCRIPTION Project Engineer/ Engineer E.I.T. Coordinator Coordinator Engineering Operator Cartography Technician Admin Total
Manager Planner Tech
FC 160 Roadway-Doris Lane
1.Roadway Plan and Profiles 2.0 8.0 16.0 26.0
2.Drainage Plan and Profiles 1.0 8.0 16.0 25.0
3.Drainage Area Maps 1.0 2.0 2.0 5.0
4.Signing and Striping 1.0 4.0 4.0 9.0
5.Sidewalk Details 1.0 4.0 2.0 7.0
6.Traffic Control Plan/Erosion control 2.0 8.0 10.0
7 Cross sections and Typical Sections :L==J-- 8.0 9.0
8.Quantity Summaries 1.0 2.0 2.0 5.0
9.Earthwork 1.0 2.0 3.0
HOURS SUB-TOTALS O.0 11.0 46.0 42.0 0.0 0.0 0.0 0.0 0 0 0.0 0.0 99.0
LABOR RATE PER HOUR $230 $180 $160 $135 $160 $122 $120 $85 $110 $95 $70
PaNe 3 of 6
RED BUD LANE FEE ESTIMATE
Senior Senior Senior
Project Senior Utility Utility CADD GIS Analyst/ GIS
TASK DESCRIPTION Project Engineer/ Engineer E.I.T. Coordinator Coordinator Engineering Operator Cartography Technician Admin Total
Manager Planner Tech
FC 161-PS&E Drainage Design
Revise Interior Drainage Areas 4.0 16.0 20.0
Place Inlets 8.0 24.0 32.0
Design Storm Sewer System 8.0 24.0 32.0
Drainage Area Map Sheets 2.0 8.0 24.0 34.0
Drainage Plan&Profile Sheets 4.0 24.0 40.0 68.0
Storm Sewer Lateral Profile Sheets 2.0 8.0 16.0 26.0
Hydraulic Data Sheets-Drainage Areas 2.0 4.0 6.0
Hydraulic Data Sheets-Inlets 2.0 4.0 6.0
Hydraulic Data Sheets-Links 2.0 4.0 6.0
Quantity Summaries 2.0 16.0 18.0
HOURS SUB-TOTALS 0.0 0.0 36.0 132.0 0.0 0.0 0.0 80.0 0.0 0.0 0.0 248.0
LABOR RATE PER HOUR $230 $180 $160 $135 $160 $122 $120 $85 $110 $95 $70
Senior Senior Project Senior Utility Utility Senior CADD GIS Analyst/ GIS
TASK DESCRIPTION Project Engineer/ Engineer E.I.T. Coordinator Coordinator Engineering Operator Cartography Technician Admin Total
Manager Planner Tech
FC 163.10-Utility Design
163.10.1 Reuse Alignment Placement 8.0 40.0 48.0
163.10.2 Reuse Horizontal Alignment Layout sheet 5.0 6.0 24.0 35.0
163.10.3 Reuse E&Q Sheet 8.0 8.0
163.10.4 Reuse Plan and profile sheets 5.0 30.0 70.0 225.0 330.0
163.10.5 Waterline Adjustments 6.0 40.0 46.0
163 10.6 Tie-In Lines Plan and Profiles 6.0 24.0 1 1 30.0
163.10.71 Respond to/Address City 90%comments 2.0 6.0 10.0 18.0
163.10.8 Respond to/Address City 100%comments 2.0 6.0 10.0 18.0
163 10.91 Respond to/Address TCEQ comments 2.0 2.0 J 10.0 14.0
163.10.10 Reuse Plan Submission to TCEQ 1.0 1.0 5.0 7.0
HOURS SUB-TOTALS 5.0 62.0 91.0 396.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 554.0
LABOR RATE PER HOUR $230 $180 $160 $135 $160 5122 $120 $85 $110 $95 $70
SUBTOTAL $1,150 $11,160 $14,560 $53,460 $0 $0 $0 $0 $0 $0 $0 $80,330
Senior Senior Project Senior UtilityUtility Senior CADD GIS Analyst/ GIS
TASK DESCRIPTION Project Engineer/ Engineer E.I.T. Coordinator Coordinator Engineering Operator Cartography Technician Admin Total
Manager Planner Tech
FC 163.3-Traffic Control Plan
TCP Narrative-Revisions 8.0 8.0 16.0
TCP Phase 1 Layout-Revisions 4.0 16.0 16.0 36.0
TCP Phase 2 Layout-Revisions 4.0 16.0 16.0 36.0
TCP Phase 3 Layout-Revisions 5.0 4.0 16.0 16.0 41.0
Intersection Phasing Details-Revisions 2.0 4.0 4.0 10.0
HOURS SUB-TOTALS 5.0 22.0 52.0 60.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 139.0
LABOR RATE PER HOUR $230 $180 $160 $135 $160 $122 $120 $85 $110 1 $95 $70
SUBTOTAL $1,150 $3,960 $8,320 $8,100 $0 $o $0 $0 $0 $0 $0 $21,530
Page 4 of 6
RED BUD LANE FEE ESTIMATE
Senior Senior Senior
Project Senior Utility Utility CADD GIS Analyst/ GIS
TASK DESCRIPTION Project Engineerl E.I.T. Engineering Admin Total
Manager Planner Engineer Coordinator Coordinator Tech Operator Cartography Technician
309.2-Construction Phase Services
Review and approve shop drawings 8.0 20.0 32.0 60.0
Answer RFIs 8.0 16.0 16.0 40.0
Prepare Design Change Notifications as necessary 4.0 8.0 8.0 20.0
Assist with utility conflicts during construction 64.0 64.0 128.0
00
HOURS SUB-101ALS 00 20.0 440 56.0 64.0 04.0 0.0 0.0 0.0 0.0 0.0 248 0
LABOR RATE PER HOUR $230 $180 $160 $135 $160 $122 $120 $85 $110 $95 $70
SUBTOTAL $0 $3,600 $7,040 $7,560 $10,240 $7,808 $0 $0 $0 $0 $0 $36,248
1-JA ENGINEERING,INC. TOTAL $247,003.00
Page 5 of 6
TASK 2-TOPOORAINICAL SURVEY-MATER LINE EXTENSION
Task 2.1-RPLSIPro)Task Management 1 2
Task 2.2-Secondary Cornrd(2 Total) 2 6 4
Teak 2.3-Dmw Survey(drelnege,VMAi s ut04lsa,brslge scans,uhlny detatl sketches) 1 10 20 31
Task 2.4-ROWiBound ry Una ReaaanlaM Survey 6 4 10
Task 2.5-L-1 D.C and 8 SUE-Mapping i 2 12 10 25
Task 2.6-OAIOC R—and Doiwery 1 2
TASK 2 TOTAL HOUR 20 10 00 00 40 300 400 10 780 GRAND TOTAL
TASK 2 TOTAL FE $390 $160 $0 $0 1 S420 S2,700 $6,200 1 S70 $9,940 1 $000 9940.
TASK 2-TMORRAIMIOAL SURVEY•OORRI LANE EXTENSION
Task 2.1-RPLSIPro.Task M M 1 1 2
Task 2.2-Seco(dery Control(2 Total) 4
Task 2.3-DsW Suva (dr vnlble utiaws,Or scans,uol detail Sketches) 3 10 12 25
Task 24-ROW/Bound Una RaUacameM Sury 0
Task 2.5-LSM 0,C and 8 SUE-Moppog 0
Task 2.S-ONOC Ravlaw and D.1—y 2 1 3
TASK 2 TOTAL HOURS 10 20 00 00 40 100 120 10 30.0 GRAND TOTAL
TASK 2 TOTAL FEE 6195 $320 $0 $0 $420 $900 51.860 $70 23,765 $000 3 765.00
'
mt
Fk
y ) ~, . CI i, Y �� )f a' 1 Jf t�, ,i ►.'17 wu �f .SY � y
�'4 �� f�r if� •+ f } J r� �i '� '< �
r� gs► +� P
1.
•1
t w
f� �r1
t � cu
t• ri" , .Y•�� -y
a.,., �•�!t +r try rt' �� • e., , r-�
i• a �]!+'1: i { : fit' �; x r.,r•,��^ ,► J
,i' _�z•'k�•� int{ ti.:.r Sa�,►� ♦!� �� I �_� ,?'w1 e.w:i�1�.�1• r ', {
�. L e ,�i.�,.�,1 Ly��i•+�� Y �e�f ��f.S�����y.����' l i !'Y�xY f! • rrt I• ' +1
AL
i �K #.i lam' *lti `•�.�}�Y ! L • 1'
rA '1t x�J • rji/rrt *. ,iir.
er +� LLLLJJ Y- 1
Ar
Wit I
�. 1 �iYt
�: �''t. , 7 ,r a_t7 •-+ •+' .� ,y�Y/'�• �? i ,��c•s '� j',.tr�,l. -r+ 'i;Th � i
* ti ,,- . - •zr �• " �j F �. .yam"! �t t.tJR - +• �.
Y(`•� >yl�..' � Irir I,tl r- •ff 11! }a • _
t+l a y.rr'_•w�—et� .br * f� `.i
o '
1 t 4
r.. rd• l l:' c
e i" T