Loading...
Contract - Kimley-Horn and Associates, Inc. - 8/24/2023 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: KIMLEY-HORN AND ASSOCIATES,INC. ("Engineer") ADDRESS: 5301 Southwest Parkway,Building 2,Suite 100,Austin,TX 78735 PROJECT: Kenney Fort 24-inch Reuse Line Extension This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Kimley-Horn and Associates, Inc.,hereinafter called the "Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 27th day of October, 2022 for the Kenney Fort 24-inch Reuse Line Extension Project in the amount of$616,200.00; and WHEREAS,it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $110,000.00 to a total of$726,200.00; NOW THEREFORE,premises considered,the City and the Engineer agree that said Contract is amended as follows: 1. Article 2,Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $110,000.00 the maximum amount payable under the Contract for a total of$726,200.00,as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF,the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.202238;4858-1768-7410 84275 x•2023-:mot KIMLEY-HORN AND ASSOCIATES,INC. By: i��_ Date Supplemental Contract Rev.06/16 0199.202238;4858-1768-7410 84275 2 CITY OF ROUND ROCK APPROVED AS TO FORM: By: V , , Craig Morgan Mayor Stephanie L. Sandre, City Attorney q174 23 Date Supplemental Contract Rev.06/16 0199.202238;4858-1768-7410 84275 3 ADDENDUM TO EXHIBIT B Engineering Services Based on coordination with landowners and City staff the proposed alignment has been extended. This supplementary design will include an additional 3,600 linear feet of 24-inch reuse water line. • Kenney Fort Blvd 24-inch Reuse Water Line—Approximately 10,600 linear feet o Proposed 24-inch reuse water line along Kenney Fort Blvd from Forest Creek Drive to the Southernmost access drive into Kalahari, approximately 1,500' southeast of Kalahari Blvd. The reuse line will traverse the tree line on the South side of the Kalahari property and then travel northeast to connect to an existing reuse line at the Brushy Creek East Regional WWTP. Task 1—Design Management,Project Meetings,and Data Collection Design Management The Engineer will manage the design and work associated with the scope described in subsequent sections and provide the following communication and reporting: • Progress Report(one per month) • Communication and reporting for an additional four(4)months for a total of sixteen (16)month duration for design Project Meetings The Engineer will prepare for and attend meetings with the Owner,to the extent requested by the Owner and budgeted for in this agreement. The following project meetings are anticipated: • An additional two(2)for a total of eight(8)progress meetings to discuss specific design or coordination items associated with the project Task Deliverables: • Meeting minutes for each meeting attended Task 2—Routing and Conceptual Design (30%) • Routing-The Engineer will conduct an additional routing alignment for the reuse water line based on landowner input. • Task Deliverables: o One additional(1)PDF of the updated OPCC and alignment exhibit • Task Meetings B-1 o One(1)additional for a total of two(2)constructability and routing field visits with the City Project Manager,to review the proposed alignment alternatives. Task 3—Preliminary Design(60%) • Design and Boundary Survey—(Sub-Consultant-Inland Geodetics, LLC.) o Design Survey for additional 3,600 linear feet of water line route. ■ On the ground survey: • Topo survey along the recommended alignment for a width up to 80'. • Existing manholes,valves, inlets,road poles, driveway connections,and other observable above ground existing structures will be located within the project area. • Establish control points along the route. • Geotechnical Analysis—(Subconsultant: Raba Kistner Consultants,Inc.)The Consultant will perform a geotechnical analysis of the proposed reuse water alignment utilizing a geotechnical laboratory to determine subsurface conditions and make recommendations regarding tunneling,embedment,backfill and excavation parameters. The geotechnical analysis will include the following: o Subsurface exploration including an additional five(5)for a total of thirteen (13) sample bores,at various locations and depths along the proposed line. o Laboratory tests for classification purposes and strength characteristics. o Engineering services that address soil and groundwater conditions for proposed horizontal boring locations. o Prepare a geotechnical report that presents the results of the field and laboratory data as well as analysis and recommendations. The data contained in the geotechnical report will be made available to contractors during the bidding process for information purposes. • 60%Plans—The Engineer will prepare 60% plans and easement boundaries for the reuse water line. These plans will be prepared on 22"04". Plans will consist of: o An additional four(4)Plan(only)Sheets at 1"=40',for a total of eleven(11) Task 4—Final Design(90%/100%) • Plans—The Engineer will prepare plans for the water line. These plans will be prepared on 22"04". Plans will consist of: o An additional two(2)Project Access Plan and Recommended Sequencing Sheets, for a total of four(4) o An additional four(4)Plan and Profiles Sheets at 1"=40',for a total of eleven (11) o An additional two(2)Erosion Control Plans for a total of six(6) B-2 Task 6—Construction Contract Administration(CCA) The estimated construction period for the basis of establishing the Engineer's Fee for each phase is as follows: • An additional two(2)months,for a total of up to twelve(12)months B-3 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page u 6kc work soM1wb ID %Cmtpleke Tek Name Dprakm Sbd F-I RMawa 2023 202' 2023 mw e Aug Sp Oct N. pc Jan FM Mar AN Mry JW JW AW Sap 04 Nw DK Jen Fab Mr Ayr May Jul Jul Aug Sep Oct Noy Dc Jan Fab Mw Ayr M,y Jul JW Abg Sap Oct Nw Dec J- 1 O%2—Reux U.-SupplemanMl 01 830 Gaya Men IO24 2 F6122928 20% DA Caemion 5 Gays Mm 1022u22 Fn 102422 3 0% Repre slDceeudam wntracb 3 bis Mm 10/!1122 Wad 1112222 1 0% Routing 180 Gays Tllu11/172 Wsd821123 5 0% Ngnment—bit, 30Eays TIM 111122 W/12/1123 6 m Ragan o- 5bri Thu 1211522 Wad 1221225 1 0% Fbld 11100110111, t5 d""'Thu 1222m Wad 1111236 B 0% Wlabri Abrrid.ROWir,i and 100 bri T11I12m Watl W1237 C—dwln 9 0% s—yMUM,h,ironrrcmalIG-1 41 by, TtM 9423 Thu 121m 10 0% Rghl.-Erby ld'C0y1 1Ddari T1 Win Wb dtu234 OX Field Survey 30 tlsri Thu dt 523 Wed 7242310 12 0% Subrktlalb kHA 1by T1 Tm TM1u 712212311 t3 0% Reliminary Design 68 Gays FO TOW m Tue ldlTm 1d 0% Racerve Surrey 1 day Fri 7128In Fn 7IMIn 12 t5 O% Braaxbvn Survey 6tlays Mon 7131 In Mm 92123 t4 I6 0% Ran Sheets 37 days Tae 80n Mm 911823 t5 12 0% G.ri—I a1 Debi—t, 5 bri Tae 9114'2] Mon 9252]16 t8 0% Repva OPCC 3bri Tua 92423 Thu92d2317 19 m OAIOC 3 Bari Fr192912] Tua 1917318 20 0% Rwbims 5 bri wed tdxn Tus 1910m 19 21 096 CmcepbalPbn Submtbl Obys Tw 191O1n I.1910m 20 18010 22 m Cry Redav Id-—101111M Tw1917m21 23 o% _4 28 day,—1048m Wed 12124 24 % Prepare plans TB days Wad 104923 Wad 1/31124 25 0% Gsnml-1 t by Wed toll423 Wad 19142322 26 0% Ran sr— pdari Thu 141923 Wb 1VlW n 21 m Dab?Sh-. 5 dry"Thu 12/1411]WM 122fY7]2B 16 m Tr—Control 5bri Thu 1121273 WW 12/272327 25 m S'—Irons 5bri Thu1221223WW12/27/2322 30 m OPCC 2briThu 12282] Fn 12292329 31 m — 10deri Mm 11124 Fri 11122430 32 m Ran 3ubmtbl Odsys Fri 11IM4 Fn 11122431 1012 33 m CMR.. 5bri Mont/1524 F011192432 34 0% -vera F1m 8&11 Mm 12224 Wee 11312433 35 0% Eaxmems ane Permtkn9 231 dry,Wb IOMd23 --4>6 0% Rapmy 0—Maetinps G days Wad IWIW3 Tue1211923n 37 0% Roper.Eemril Boulane 10em Tho 21124 wee 21142'31 )8 0% S_Retire Mens a1 Md" TIM 211174 Wed 12924 37 1pna1 39 0% Easement N epobmon(by City/ 120 iMp TN32124 Wa0942438 40 0% &ashy Creek—dribbn 3odari TM1u 2/124 Wad1112434 41 0% 100%Design 1380rys 234424 WW 901824 42 0% prepare pians 136 days Tle]4424 Wtl 911424 43 096 General Sheets1by TM1u311u24 TM1UY142434FSe30 O% Ran Sheets 15 tlari F-1— Thu 4/4244] 45 m Debl Sheers 3d,ya Fd ud24 Tus"124N m Triih,Control 1b" Wb*1924 Tua119241 0% Spxdicalbm 4bri Wedu1924 Monu152445 0% OPCC 2tlari Tuau1624 Wadu172442 49 O% Q-ic 2bri Thio bl&24 F-92446 50 m Ran Sub— Obri FriN19l3I Fn N192449 Ws 51 m CMR— 5bri Mon*12124 Fri*282450 52 096 Revere Raps 10da Thu 9524 Wa0WM451,39,35 53 O% Biddirg K bye Thu 94921 T-1121!4 54 0% Ndice tO BMbn 3ft" Thu9/1924 lWbb n 434,52,39 55 0% Adrern—. 154 Tua92'/24 101m1d1A2454 5fi 096 Open Bide 1 day T.191524 Tua 191174% 57 0% Rwiaw Rlb 15 day,Wed 10/1424 Tua 111174% 50 0% cM Cwncil Apmb Sbri W.IIIW4 Tu a 111122452 59 0% Cry Cwncl Approrel 5bri WW11/tY2/Tua11I192455 fi0 0% Ckwlatbn of Cmbact 5 ori~11242'Tua 1112824% 61 O% c-.-..h283drys Wtl112T24 F0122179 62 0% Re-comb-b`.Mealbp 3 ori Wad 112724 Fn 112924 W fi] 0% c...- 2)0 bye Mon 122124 Fn 12/12/2582 64 m Fknl WskdMOuph 10 ori Mm 12412 Fn 12/M5 63 To Teak 64mneY EGamal Msastma ♦ InecMa 3umnry M,ruN SM RoWp FWshp* ] Dols'.TM1u 7Idn SpN ................... R9jacl Summary ^1 1--Tek Manual Tek Manu,lRogrea Mketans ♦ 'I 1—MiNsbne Duction—OV SMnaNY C D dit Papa 1 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page Project Name: Kenney Fort Blvd 24-inch Reuse Water Line Original Contract Supplemental#1 Total Total Other Total Total Other Subtotal Subtotal TOTALS Task Labor Hours Loaded Labor Cost Direct Costs Subconsuaants Labor Hours Loaded Labor Cost Direct Costs SubconsuNants Task 1:Design Management,Project Meetings,and Data Col. 180 $31,400.00 $500.00 $0.00 $31,900.00 40 $6,300.00 $0.00 $0.00 $6,300.00 $38,200.00 Task 2:Ro utirg and Conceptual Design 170 $32,800.00 $1,000.00 $0.00 $33,800.00 50 $10,500.00 $1,000.00 $0.00 $11,500.00 $45,300.00 Task 3:Preliminary Design(60%) 240 $45,400.00 $1,000.00 $139,000.00 $185,400.00 80 $14,500.00 $0.00 $46,000.00 $60,500.00 $245,900.00 Task 4:Final Design(90%/100%) 600 $115,200.00 $1,000.00 $0.00 $116,200.00 136 $25,000.00 $0.00 $0.00 $25,000.00E$726,200.00 0 Task 5:Easements and Permitting 300 $58,400.00 $1,300.00 $94,000.00 $153,700.00 0 $0.00 $0.00 $0.00 $0.000 Task 6:Bidding Services 75 $13,900.00 $500.00 $0.00 $14,400.00 0 $0.00 $0.00 $0.00 $0.000 Task 7:Construction Cordract Administration 410 $79,800.00 $1,000.00 $0.00 $80,800.00 30 $6,700.00 $0.00 $0.00 $6,700.000 GRAND TOTAL: 1975 $376,900.00 $6,300.00 $233,000.00 $616,200.00 336 $63,000.00 $1,000.00 $46,000.00 $110,000.00 EXHIBIT D - DETAILED Project Name: Kenney Fort Blvd 24-inch Reuse Water LIIO Prepared By: Kimley-Horn and Associates,Inc. Direct Labor(Person-Hours) Task# Senior Senior Prof Analyst Project Admin Misc. Subtask Task Name Assumptions Prof Prof Controller Labor Labor Direct Number Subtask Name/Description H 1 1 fn(al Total Expense $315.011 2811.1111 1 1911.00 1711.110 1 95.011 1 $95.110 (unu-s) (Round) ($) 1 Design Management,P11,and DC Project Management I I General Administration and Subs 1 2 5 8 Invoicing and Progress Reports 16 mo pro/24 mo inv 2 4 6 12 Data Collection 1 2 4 7 Progress Meetings 2 additional(8 total) _' 2 7 0 Task'lotal(I lours)l0 7 1 11 1 7 1 6 1 5 36 40 Task otal(Dollars)l 1 $0 1 $1,960 52.090 S1.190 $570 $475 $6,285 $6,300 SO Routing and Conceptual Design GIS Basemap Development 2 2 2 6 Alignment Exhibits 3 additional 2 4 8 14 S I,000 Field Visit 2 additional 3 3 3 9 Analysis and Recommendation of Routes 1 2 4 7 Updatet OPCC 1 2 2 5 QA/QC 2 4 Revisions per QA/QC I 2 4 7 0 Task Total(Hours) 0 12 17 0 0 52 50 TaskTotal(Dolar,) 5U S3.."oo $3,230 $�"M) So wo slo,Soo S10,500 $1,000 3 Preliminary Design(60%) Survey 3,600 linear feet addt 0 $25,000 Geotech Fee 5 additional bores 0 $21,000 Survey Clean-up and Utilities 2 4 6 Prepare Plan Sheets 4 additional(1 I total) 4 12 40 56 Develop OPCC 1 2 2 5 QA/QC 1 2 3 Revisions and Deliverables 1 2 4 7 0 Task Total(Ilours) I 8 18 50 0 0 77 80 Task]otal(Dollars) $315 1 $2,240 1 $3,420 $8,500 $0 1 $0 1 $14,475 $14,500 $46,000 4 Final Design(90%,/100) 0 90%Design 0 Prepare Plan-Profile Sheets 4 additional(11 total) 4 12 40 56 Prepare Erosion Control Plans 2 additional 6 total 1 2 4 Prepare Quantities and OPCC 2 3 3 8 QA/QC 1 2 3 Revisions per QA/QC 2 2 4 8 0 100%Design Prepare Project Access and Easement Plan 2 additional Sheets 1 2 4 1 8 14 Prepare Plan-Profile Sheets 4 additional(11 total) I1 1 14 17 Prepare Erosion Control Plans 2 additional(6 total) 1 3 Prepare Quantities and OPCC I 1 4 QA/QC I 3 Revisions per QA/QC I 4 7 6 Task Total(Hours 2 1 18 '9 81 0 0 136 1 140 Task otal(Dollars) $630 $5,040 55.510 S13,770 SO $0 $24,950 S25,(10(1 $11 5 Easements and Permitting 'l ask Fot:d(I lours)l 0 IU Task ota (Dollars)j SO $(1 SII $(I $0 ISOI SII So $0 6 jBidding Task Total(Hours)l I0I UII I0I I'ask Total (Dollars)l $0 I $0 I SO I $0 I $0 $0 $0 S0 $0 7 Construction Contract Administration Monthly Coordination Meetings and Notes/Observation 2 additional 6 8 20 Pay Application Review 1 8 Testing Report 4 (l 0 Task Total(Hours) U 9 14 U Il 32 all Task ota (Dollars)j 511 53,520 1 $1,710 1 $2,380 1 S(1 I S0 1 $6,610 1 $6,700 1 511 I0lAl.(Ilour,)j 54 1 84 1 175 1 b 333 KINIIIA-11ORN TOTAL(Du lar') 59.15 I 515,1201 1 515,9611 1 $29,7511 1 55711 1 $475 1 562,8211 1So"MO Sl B ' : .'l'LTANT 546,000.00 . isce aneous )ieect xpenses $1,000.00 GRAND TOTAL $109,820.00 $u0,000