R-2023-281 - 9/14/2023 RESOLUTION NO. R-2023-281
WHEREAS, the City of Round Rock has duly advertised for bids for the Kenney Fort / Joe
DiMaggio/Brushy Creek Landscape Enhancements Project; and
WHEREAS, DigDug Construction,LLC has submitted the lowest responsible bid; and
WHEREAS, the City Council wishes to accept the bid of DigDug Construction, LLC, Now
Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City a contract
with DigDug Construction, LLC for the Kenney Fort / Joe DiMaggio / Brushy Creek Landscape
Enhancements Project.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 14th day of September, 2023.
CRAIG ORG ,Mayor
City of ound ck, Texas
ATTEST:
-101 J%Z -A
MIEAGAN S KS, Cit Clerk
0112.20232;48W1762-4701
BID TAB -- \
PROJECT NAME: Kenney Fort,Joe Maggio and Brushy Creek Landscape Enhancements studio Ib Iq
design-couo"ote solve-impact
PROJECT LOCATION: Round Rock,TX
OWNER: City of Round Rock-Transportation Dept.
DATE: August 2023
Base Bid&Add Alternate DigDug Construction Jerdon Enterprise CORR/Studio 16:19
Bid Item Approx Unit Item Description and Written Unit Price Unit Prlee Amount Unit Price Amount Unit Price Amount
Quantity
Total Mobilization Payment- $ 45,000.00 $ 45,000,00 $ 73,850.00 $ 73,850.00 $ 39,300.00 $ 39,300.00
1.01 1 LS
Turn-key with all engineering and permitting related costs
Site Clearing and Site Grading- $ 7,500.00 $ 7,500.00 $ 18,000.00 $ 18,000.00 $ - $ -
1.02 1 LS Turn-key with all engineering and permitting related costs (included in
mobilization)
Stabilized Construction Entrance Including Installation and
Removal- $ 3,000.00 $ 3,000.00 $ 3,825.00 $ 3,825.00 $ 1,200.00 $ 1,200.00
1.03 1 LS
Turn-key with all engineering and permitting related costs
Temporary Concrete Wash Out- $ 2,500.00 $ 2,500.00 $ 1,225.00 $ 1,225.00 $ 2,500.00 $ 2,500.00
1.04 1 LS Turn-key with all engineering and permitting related costs
Demolition and Haul Off- $ 22,000.00 $ 22,000.00 $ 55,250.00 $ 55,250.00 $ 35,000.00 $ 35,000.00
1.05 1 LS Turn-key with all related costs.No engineering and
permitting required.
Curb Inlet Protection- $ 10.50 $ 6,037.50 $ 11.50 $ 6,612.50 $ 12.00 $ 6,900.00
1.06 575 LF Turn-key with all related costs.No engineering and
permitting required.
Existing Underground Electrical Relocation(Section 1&2).
Including all associated trenching,conduit,boxes and
1.07 1 LS wiring $ 53,560.00 $ 53,560.00 $ 94,100.00 $ 94,100.00 $ 25,000.00 $ 25,000.00
Turn-key with all related costs.No engineering and
permitting required.
Clean and Power Wash Existing Concrete Flatwork
(Hardscape Type 1)- $ 0.20 $ 1,530.60 $ 1.75 $ 13,392.75 $ 0.50 $ 3,826.50
1.08 7,653 SF Turn-key with all related costs.No engineering and
permitting required.
Stain Existing Concrete Flatwork(Hardscape Type 2),
Including Concrete Preparation and Sealer- $ 3.25 $ 19,695.00 $ 4.50 $ 27,270.00 $ 5.00 $ 30,300.00
1.09 6,060 SF Turn-key with all related costs.No engineering and
permitting required.
1
Base Bid&Add Alternate DigDug Construction Jerdon Enterprise CORR/Studio 16:19
Approx
Bid Item Unit Item Description and Written Unit Price Unit Price Amount Unit Price Amount Unit Price Amount
Quantity
4"Thick P.C.Stained Concrete Flatwork(Hardscape Type
3) Including Joint Fillet and All Associated Work-
1.10 7,201 SF $ 10.50 $ 75,610.50 $ 23.00 $ 165,623.00 $ 11.00 $ 79,211.00
Turn-key with all related costs.No engineering and
permitting required.
4"Thick P.C.Stamped Concrete Flatwork(Hardscape Type
3).Including Joint Fillet and All Associated Work-
1.11 15,998 SF $ 14.25 $ 227,971.50 $ 21.00 $ 335,958.00 $ 12.00 $ 191,976.00
Turn-key with all related costs.No engineering and
permitting required.
Decorative Kenney Fort Sign,Including all associated
materials,appurtenances,signage and work- $ 69,200.00 $ 69,200.00 $ 85,750.00 $ 85,750.00 $ 35,000.00 $ 35,000.00
1.12 1 EA Turn-key with all related costs.No engineering and
permitting required.
Corten Panel Sign 1 Including all associated materials,
appurtenances,signage and work- $ 8,235.00 $ 32,940.00 $ 9,750.00 $ 39,000.00 $ 10,000.00 $ 40,000.00
1.12 4 EA Turn-key with all related costs.No engineering and
permitting required.
Corten Panel Sign 2 Including all associated materials
appurtenances,signage and work- $ 11,920.00 $ 11,920.00 $ 26,550.00 $ 26,550.00 $ 10,000.00 $ 10,000.00
1.13 1 EA Turn-key with all related costs.No engineering and
permitting required.
Road Bore,Including alignment,profile,casing pipe and all
associated appurtenances and work- $ 9,640.00 $ 19,280.00 $ 14,250.00 $ 28,500.00 $ 1,000.00 $ 2,000.00
1.14 2 EA Turn-key with all related costs.No engineering and
permitting required.
Water Surface Connection,Including water main tap,
meter,backflow,pressure regulator,isolation valve and all
1.15 2 EA associated apputenances- $ 18,500.00 $ 37,000.00 $ 18,600.00 $ 37,200.00 $ 2,000.00 $ 4,000.00
Turn-key with all related costs.No engineering and
permitting required.
New Site Irrigation System,Including all trenching,4"
sleeving,backfill wiring,boxes,fixtures.backflow.PRV,
1.16 1 LS controllers,valves and all other appurtenances- $ 57,830.40 $ 57,830.40 $ 60,000.00 $ 60,000.00 $ 2,400.00 $ 2,400.00
Turn-key with all related costs.No engineering and
permitting required.
Installation of Landscape Bed Type 1 Including landscape
bed preparation soil planting,staking,mulching,plant
material trees and all other appurtenances-
1.17 1 EA $ 10,604.29 $ 10,604.29 $ 10,200.00 $ 10,200.00 $ 11,800.00 S 11,800.00
Turn-key with all related costs.No engineering and
permitting required.
2
Base Bid&Add Alternate Dig0ug Construction Jerdon Enterprise CORR/Studio 16:19
Bid Item Approx Unit Item Description and Written Unit Price Unit Price Amount Unit Price Amount Unit Price Amount
Quantity
Installation of Landscape Bed Type 2.Including landscape
bed preparation,soil,planting,staking,mulching,plant
1.18 1 EA material,trees and all other appurtenances-
$ 10,764.85 $ 10,764.85 $ 10,350.00 $ 10,350.00 $ 11,800.00 $ 11,800.00
Turn-key with all related costs.No engineering and
permitting required.
Installation of Landscape Bed Type 3.Including landscape
bed preparation,soil,planting.staking.plant material,
trees landscape rock,quarry block and all other
1.19 6 EA appurtenances- $ 9,825.74 $ 58,954.44 $ 9,500.00 $ 57,000.00 $ 8,300.00 $ 49,800.00
Tum-key with all related costs.No engineering and
permitting required.
Installation of Landscape Bed Type 4.Including landscape
bed preparation,soil,planting,staking,mulching,plant
1.20 2 EA material,trees and all other appurtenances- $ 3,759.38 $ 7,518.76 $ 3,600.00 $ 7,200.00 $ 3,700.00 $ 7,400.00
Tum-key with all related costs.No engineering and
permitting required.
Installation of Landscape Bed Type S.Including landscape
bed preparation,soil,planting,staking,trees,landscape
1.21 7 EA rock.and all other appurtenances- $ 2,870.00 $ 20,090.00 $ 2,750.00 $ 19,250.00 $ 3,400.00 $ 23,800.00
Tum-key with all related costs.No engineering and
permitting required.
Traffic Control Measures- $ 12,500.00 $ 50,000.00 $ 16,250.00 $ 65,000.00 $ -
1.22 4 MO Turn-key with all related costs.No engineering and
oermittine required.
Landscape Maintenance- $ 1,875.00 $ 67,500.00 $ 1,800.00 $ 64,800.00 $ 5,000.00 $ 180,000.00
A.01 36 MO Turn-key with all related costs.No engineering and
permitting required.
6"Cal.Tree,Container Grown.Including planting and
staking- $ 6,428.22 $ 128,564.40 $ 6,500.00 $ 130,000.00 $ 5,000.00 $ 100,000.00
2.01 20 EA Tum-key with all related costs.No engineering and
permitting required.
2"Cal.Tree.Container Grown.Including planting and
staking- $ 1,132.50 $ 15,855.00 $ 1,100.00 $ 15,400.00 $ 250.00 $ 3,500.00
2.02 14 EA Turn-keywith all related costs.No engineering and
permitting required.
Landscape Shrub,3 Gal including planting- $ 65.00 $ 1,690.00 $ 65.00 $ 1,690.00 $ 20.00 $ 520.00
2.03 26 EA Turn-key with all related costs.No engineering and
oermittine required.
Landscape Shrub.1 Gal including Planting- $ 35.00 $ 2,520.00 $ 35.00 $ 2,520.00 $ 10.00 $ 720.00
2.04 72 EA Turn-key with all related costs.No engineering and
Permitting required.
3
Base Bid&Add Alternate DigDug Construction Jerdon Enterprise CORR/Studio 16:19
Bid Item Approx Unit Item Description and Written Unit Price Unit Price Amount Unit Price Amount Unit Price Amount
Quantity
8"Bed Prep including 5"depth prepared soil and 3"depth
hardwood mulch as indicated- $ 8,25 $ 14,148.75 S 8.00 $ 13,720.00 $ 10.00 $ 17,150.00
2.05 1,715 SF Turn-key with all related costs.No engineering and
permitting required.
Steel Edging.Finish:Black- $ 30.50 $ 4,392.00 $ 30.00 $ 4,320.00 $ 25.00 $ 3,600.00
2.06 144 LF Turn-key with all related costs.No engineering and
permitting required.
New Site Irrigation System Including all trenching 4"
sleeving backfill wiring boxes fixtures,backflow,PRV
2.07 1 LS controllers valves,and all other appurtenances- $ 9,177.60 $ 9,177.60 $ 9,500.00 $ 9,500.00 $ 5,000.00 $ 5,000.00
Turn-key with all related costs.No engineering and
permitting required.
Kenney Fort Base Bid 1.01-1.24 $ 850,507.94 $ 1,241,106.25 $ 613,213.50
Kenney Fort Add Alternate A.01 $ 67,500.00 $ 64,800.00 $ 180,000.00
Oakmont Dr.Base Bid 2.01-2.07 $ 176,347.75 $ 177,150.00 $ 130,490.00
Materials $ 437,742.20 $ 405,802.00
,.. All Other Charges $ 656,613.30 $ 1,077,254.25
Total Base Bid $ 1,094,355.59 $ 1,483,056.25 $ 923,703.50
m
ZD
VE Options N y Notes
Items of Concern 2716 Q
Low Bid Item E O
High Bid Item
4
studio I M
"-I
August 7,2023 design•collaborate•solve•impact
City of Round Rock Transportation Department
Gregory Ciaccio
Senior Project Manager
3400 Sunrise Road
Round Rock,TX 78665
Office:512.218.7017
Re: Landscape Architect Letter of Recommendation for Award
Project Name: Kenney Fort I Joe DiMaggio/Brushy Creek Landscape Enhancements
Dear Mr.Ciaccio:
On August 1. 2023. construction bids were received for the above referenced project.A total of two (2) bids
were received,with DigDug Construction of Austin,TX submitting the apparent best value low bid based on
qualifications and experience.DigDug Construction submitted the lowest bid in the amount of$1,094,355.50
for Total project bid.
DigDug Construction provided Bid Bond, Statement of Bidder's Safety Experience, and acknowledged the
addendum as required. Based upon our evaluation and submission of the lowest, most qualified bid, we
recommend the award to DigDug Construction in the amount of$1,094,355.50 for Total Base Bid plus Add
Alternate items.We will defer to the City of Round Rock for final decision and approval.
Please feel free to contact me should you have any questions, comments, or require any additional
information.You may reach me via e-mail at jwagner@studio1619.com or by phone at 512.534.8680.
Respectfully submitted,
studio 16:19, LLC
y�LPN
n\ �zmn
m
4P
Jonath agner A A,LI F '(
Princ al
305 w.liberty,suite 100 x round rock,texas 78664 - 512.534.8680 p www.studiol6l9.com
T �
r
41
GIG
It
• .
1 Of
r
1 Jh�
�, tR�
Round Rock
RDM��
Kenney Fort,Joe Dimaggio and Brushy N
ROU!OROCKIII,. Creek Landscape Enhancements
Round Rock Transportation Department