Loading...
CM-2023-216 - 9/22/2023Page I of 3 Contract Quantity Adjustment/ Change Order ?:IHXK Ii rev, OV16 Department: Transportation Project Name: Mays St Intersection Improvements N Mays St at Bowman and Logan St Date: 8/22/23 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor EAR Telecommunications 14719 US Hwy 290 East Manor TX, 78653 (512) 218-4200 Company Name Address Phone No. Justification Additional concrete curb, gutter, and sidewalk was removed to make the pedestrian ramps ADA compliant. Different cable was substituted based on Field conditions. Sod was not included in the original bid and is being added as a change order. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval 0 Amount $568,531.10 $16,782.90 $16,782.90 . $585,314.00 $4,655.00 $589,969.00 $21,437.90 Change Prepared By: Carlos Reyes, President, EAR Telecommunications, LLC 8/22/23 Signature Printed Name, Title, Company Date Approvals Contractor: City Project I�Signature m- e;�-Oa,?— (,�7 Printed Name, Title, Company Date Matthew Bushak, P.E., Transportation Engineer 9/12/23 A Name, Title Date n kItIlOIJ6 . AO, rinted Name, Title Date 0% Page 2 of 3 Contract Quantity Adjustment/Change Order Project Name: Mays St Intersection Improvements N Mays St at Bowman and Logan St Quan. Adj./Change Order No.: Change Order Data Rem # Item Description Unit Unit Price Amount Contract Time Adjustment f Days) 62 BLOCK SODDING SY 133 $35.00 $4,655.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $4,655.00 0 Page 3 of 3 Contract Quantity Adjustment/Change Order Project Name: Mays St Intersection Improvements N Mays St at Bowman and Logan St Quan. Adj./Change Order No.: i Quantity Adjustment Data Bid Item # Item Description Unit Unit Price Amount Contract Time Adjustment 2 REMOVING CONC CURB AND GUTTER LF 87 $18.00 $1,566.00 3 REMOVING CONC SIDEWALK OR RAMP SY 84 $80.00 $6,720.00 8 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1 $4,000.00 $4,000.00 9 CONC CURB II LF -37 $45.00 -$1,665.00 10 CONC SIDEWALKS 5" SY -34 $110.00 -$3,740.00 12 CURB RAMPS 7 EA 1 $2,750.00 $2,750.00 17 ELEC CONDR NO.8 BARE LF 249 $2.50 $622.50 18 ELEC CONDR NO.8 INSULATED LF 353 $2.50 $882.50 19 ELEC CONDR NO.6 BARE LF -50 $2.50 -$125.00 20 ELEC CONDR NO.6 INSULATED LF 60 $2.50 $150.00 21 TRAY CABLE 3 CONDR 12 AWG LF 356 $2.40 $854.40 46 TRF SIG CBL TY A 14 AWG 5 CONDR) LF 135 $2.80 $378.00 47 TRF SIG CBL A (14 AWG)(20 CONDR) LF -383 $5.50 -$2,106.50 48 TRF SIG CBL (TY C 12 AWG)2 CONDR LF 1591 $3.50 $5,568.50 59 RADIO CAT 5 CABLE LF 266 $2.50 $665.00 60 CAT 5 CABLE LF 105 $2.50 $262.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $16.782.90 0