CM-2023-233 - 10/6/2023STATE OF TEXAS §
COUNTY OF WILLIAMSON §
SUPPLEMENTAL CONTRACT NO. 1
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: GARVER, LLC ("Engineer")
ADDRESS: 3755 S. Capital, of Texas Highway, Suite 325, Austin, TX 78704
PROJECT: Round Rock West Area 3 — Water, Wastewater, & Storm Drain
Improvements
This Supplemental Contract No. I to Contract for Engineering Services is made by and between
the City of Round Rock, Texas, hereinafter called the "City" and Garver, LLC, hereinafter called
the "Engineer."
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract," on the 23rd day of June, 2022 for the Round Rock West Area 3 - Water,
Wastewater, & Storm Drain Improvements Project in the amount of $350,065.00; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope
of services and to increase the compensation by $72,415.00 to a total of $422,480.00;
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is
amended as follows:
Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth
in the attached Addendum to Exhibit B.
Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by
$72,415.00 the maximum amount payable under the Contract for a total of $422,480.00, as shown
by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract
in duplicate.
[signalure pages follow]
Supplemental Contract
0199 202329,4884-4584-2051
Rev.06/ 16
84275
GARVER,LLC
By:
Daniel N. Olson, PE Vice President
10/02/2023
Date
Supplemental Contract Rev,06116
0199 202329,4884-4584-2051 84275
CITY OF ROUNDIRO APPROVED AS TO FORM:
By:
au ale "ty Manager ephanie L. Sandre, City Attorney
�v U.
62441a3
Date
Supplemental Contract Rev.06116
0199 202329, 4884-45 84-2051 84275
ADDENDUM TO EXHIBIT B
Engineering Services
General
The scope of services includes surveying, geotechnical services, environmental services, permitting,
subsurface utility investigation, design, bidding services and construction administration services for the
Round Rock West Area 3. The improvements will be located at Area 3 System 7 and Area 3 system 6 as
shown in the attached map. The design will include improvements to the storm drain system, water and
wastewater line replacement including service lines within ROW and pavement reconstruction for the project
limits.
1.0 60% Design Phase Services
Consultant will provide preliminary design phase services for a 60% design deliverable. The preliminary
design phase services will include:
• Revise general, civil, water and wastewater, sidewalk and pedestrian access, and drainage plans.
The scope of work has been developed assuming the following lengths:
An additional 600 linear feet of drainage improvements
No additional linear feet of wastewater improvements
v No additional linear feet of water improvements
• Revise paving plans for:
;1 Asphalt concrete pavement replacement limits
Mill and overlay, and full depth repairs including flexible base and joint trench embankment
where two or more utilities are adjacent within the street and for closely spaced storm sewer
improvements such as trunk lines, laterals, and curb inlets;
rSidewalk, pedestrian ramp and driveway reconstruction where required due to utility line
service improvements, and;
o Intersection striping notes for one (1) intersection.
• Revise traffic control plans and standard details, including pavement repair and joint trench details.
• Revise Erosion and Sedimentation Control Plans.
• Running a 1 D hydraulic model to confirm that the proposed drainage improvements comply with the
goals of the project.
• Inserting and running the approved drainage features into the 2D hydraulic model to confirm
conformance with the project goals.
• Providing an update to the Opinion of Probable Construction Cost (OPCC) to include full depth
pavement repair zones, flexible base and storm sewer, joint trench repairs, and backfill.
• Meetinglcoordination with City to review 60% design.
Key Understanding:
Design Files will be completed using MicroStation and will be converted to AutoCAD at
completion of design.
2.0 Final Design Phase Services
Consultant will provide final design phase services. The final design phase services will include:
• Prepare 90% complete general, civil. water and wastewater, sidewalk and pedestrian access, and
drainage plans. The scope of work has been developed assuming the following lengths:
o An additional 600 linear feet of drainage improvements
o No additional linear feet of wastewater improvements
o No additional linear feet of water improvements
• Updates to paving plans for:
o Asphalt concrete pavement replacement limits
o Mill and overlay, and full depth repair limits;
o Sidewalk and pedestrian ramp reconstruction where required due to utility line service
improvements, and;
o Intersection striping notes for up to one (1) intersection.
• Providing an update to the Opinion of Probable Construction Cost (OPCC).
• Meetinglcoordination with City to review 90% design.
• Insert final features to confirm the approved drainage features into the 2D hydraulic model to confirm
conformance with the final project goals. This model will be submitted to the City as a final product.
• Finalize the Erosion and Sedimentation Control Plans for the Water Pollution Abatement Plan
(WPAP) submission.
Prepare 100% complete (bid set documents) for additional general, civil, water and wastewater and drainage
plans.
• Prepare bid set documents including contract documents, plans, and specifications for additional
storm and roadway improvements.
Key Understanding:
• The City will be responsible for obtaining any temporary or permanent easement for the sites.
• Design Files will be completed using MicroStation and delivered to the City in AutoCAD format.
• General construction notes will be included to require the contractor to prepare, implement, and
maintain a Stormwater Pollution Prevention Plan (SWPPP), as required.
• Any required permit fees will be paid for by the City.
3.0 Project Deliverables
The following will be submitted to the City, or others as indicated, by the Consultant. No additional
deliverable is noted in this amendment.:
• PDF of the Kick-off Meeting notes.
• PDF of draft and final wetland delineation report.
• PDF of pre -construction notification (PCN) package for a Nationwide Permit (NWP).
• PDF of the letter documenting the cultural resources findings.
• PDFs of the 30%, 60% and 90% plans and specifications with opinion of probable construction
cost.
• PDF and three (3) half-size (11"x17") copies of the final (bid set) plans and specifications with
opinion of probable construction cost.
• PDF and three (3) half-size (11"x17") copies of the conformed set of plans and specifications.
• PDF and one (1) half-size (11" x 17") copy of Record Drawings.
• Record drawings will be provided in dwg format. Shape files will be provided for proposed
utilities.
• Consultant Acceptance Letter.
2
4.0 Extra Work
The following items are not included under this agreement but will be considered as Extra Work. Extra Work
will be as directed by the City in writing for an additional fee as agreed upon by the City and the Consultant,
1. SCADA Programming or Integration.
2. TxDOT coordination.
3. Materials testing.
4. Preparation of easement descriptions or land acquisition assistance.
5. Subsurface Utility Exploration (SUE), except as noted above
6. Design of utilities and roadway outside the project limits identified on the attached exhibit.
7. Design of pavement profiles, curb and gutter, curb, valley gutter, and/or sidewalk, except as
noted above.
8. Improvements related to ADA compliance and/or City standards for ramp and sidewalk ADA
compliant configurations other than those which overlap with utility reconstruction.
9. Operational auditioptimization.
10. Water testing.
11. Funding assistance.
12. Fees associated with any construction permits.
13. Construction observation except as noted above. Does not include geologic assessment/void
observation.
14. Warranty assistance.
15. Redesign for the Owner's convenience or due to changed conditions after previous alternate
direction and/or approval.
16. Attend more than 1 City Council meetings.
17. Development of more than one (1) change order.
Extra Work will be as directed by the City in writing for an additional fee as agreed upon by the City and
Consultant.
ATTACHMENT: Round Rock Additional Improvements
3
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
��ii's
MINI
..��
,..�
������a
naa■�Aio
���BB�BB�B
��B���S
iii�m�i
iiemeoo
����I
I��I�19
�iii■iie
i
�II�II�I
�i�ii
�°�
AI
��
����8
iie�ei■erg
EXHIBIT B
SERVICES TO BE PERFORMED BY THE ENGINEER
General
The scope of services includes surveying, geotechnical services, environmental services, permitting,
subsurface utility investigation, design, bidding services and construction administration services for the
Round Rock West Area 3. The improvements will be located at Area 3 System 7 and Area 3 system 6 as
shown in the attached map. The design will include improvements to the storm drain system, water and
wastewater line replacement including service lines within ROW and pavement reconstruction for the project
limits.
1.0 60% Design Phase Services
Consultant will provide preliminary design phase services for a 60% design deliverable. The preliminary
design phase services will include:
• Revise general, civil, water and wastewater, sidewalk and pedestrian access, and drainage plans.
The scope of work has been developed assuming the following lengths:
;} An additional 600 linear feet of drainage improvements
o No additional linear feet of wastewater improvements
:7 No additional linear feet of water improvements
• Revise paving plans for:
a Asphalt concrete pavement replacement limits
r. Mill and overlay, and full depth repairs including flexible base and joint trench embankment
where two or more utilities are adjacent within the street and for closely spaced storm sewer
improvements such as trunk lines, laterals, and curb inlets;
c Sidewalk, pedestrian ramp and driveway reconstruction where required due to utility line
service improvements, and;
r. Intersection striping notes for one (1) intersection.
• Revise traffic control plans and standard details, including pavement repair and joint trench details.
• Revise Erosion and Sedimentation Control Plans.
• Running a 1 D hydraulic model to confirm that the proposed drainage improvements comply with the
goals of the project.
• Inserting and running the approved drainage features into the 2D hydraulic model to confirm
conformance with the project goals.
• Providing an update to the Opinion of Probable Construction Cost (OPCC) to include full depth
pavement repair zones, flexible base and storm sewer, joint trench repairs, and backfill.
• Meeting/coordination with City to review 60% design.
Key Understanding:
Design Files will be completed using MicroStation and will be converted to AutoCAD at
completion of design
2.0 Final Design Phase Services
Consultant will provide final design phase services. The final design phase services will include:
• Prepare 90% complete general, civil, water and wastewater, sidewalk and pedestrian access, and
drainage plans. The scope of work has been developed assuming the following lengths:
o An additional 600 linear feet of drainage improvements
o No additional linear feet of wastewater improvements
o No additional linear feet of water improvements
• Updates to paving plans for:
o Asphalt concrete pavement replacement limits
o Mill and overlay, and full depth repair limits;
o Sidewalk and pedestrian ramp reconstruction where required due to utility line service
improvements, and;
o Intersection striping notes for up to one (1) intersection.
• Providing an update to the Opinion of Probable Construction Cost (OPCC).
• Meetinglcoordination with City to review 90% design.
• Insert final features to confirm the approved drainage features into the 2D hydraulic model to confirm
conformance with the final project goals. This model will be submitted to the City as a final product.
• Finalize the Erosion and Sedimentation Control Plans for the Water Pollution Abatement Plan
(WPAP) submission.
Prepare 100% complete (bid set documents) for additional general, civil, water and wastewater and drainage
plans.
• Prepare bid set documents including contract documents, plans, and specifications for additional
storm and roadway improvements.
Key Understanding:
• The City will be responsible for obtaining any temporary or permanent easement for the sites.
• Design Files will be completed using MicroStation and delivered to the City in AutoCAD format.
• General construction notes will be included to require the contractor to prepare, implement, and
maintain a Stormwater Pollution Prevention Plan (SWPPP), as required.
• Any required permit fees will be paid for by the City.
3.o Project Deliverables
The following will be submitted to the City, or others as indicated, by the Consultant. No additional
deliverable is noted in this amendment.:
• PDF of the Kick-off Meeting notes.
• PDF of draft and final wetland delineation report.
• PDF of pre -construction notification (PCN) package for a Nationwide Permit (NWP).
• PDF of the letter documenting the cultural resources findings.
• PDFs of the 30%, 60% and 90% plans and specifications with opinion of probable construction
cost.
• PDF and three (3) half-size (11"x17") copies of the final (bid set) plans and specifications with
opinion of probable construction cost.
• PDF and three (3) half-size (11"x17") copies of the conformed set of plans and specifications.
• PDF and one (1) half-size (11" x 17") copy of Record Drawings.
• Record drawings will be provided in dwg format. Shape files will be provided for proposed
utilities.
• Consultant Acceptance Letter.
4.0 Extra Work
The following items are not included under this agreement but will be considered as Extra Work. Extra Work
will be as directed by the City in writing for an additional fee as agreed upon by the City and the Consultant.
1. SCADA Programming or Integration.
2. TxDOT coordination.
3. Materials testing.
4. Preparation of easement descriptions or land acquisition assistance.
5. Subsurface Utility Exploration (SUE), except as noted above
6. Design of utilities and roadway outside the project limits identified on the attached exhibit.
7. Design of pavement profiles, curb and gutter, curb, valley gutter, and/or sidewalk, except as
noted above.
8. Improvements related to ADA compliance and/or City standards for ramp and sidewalk ADA
compliant configurations other than those which overlap with utility reconstruction.
9. Operational audit/optimization.
10. Water testing.
11. Funding assistance.
12. Fees associated with any construction permits.
13. Construction observation except as noted above. Does not include geologic assessment/void
observation.
14. Warranty assistance.
15. Redesign for the Owner's convenience or due to changed conditions after previous alternate
direction and/or approval.
16. Attend more than 1 City Council meetings.
17. Development of more than one (1) change order.
Extra Work will be as directed by the City in writing for an additional fee as agreed upon by the City and
Consultant.
ATTACHMENT: Round Rock Additional Improvements
pYq
4
a
� a
��
i�n��iii■ii�i��
i�oa��i�a■ooaao�
none
iu■iiu��
��
II�lII�I��
�IIIII
i��i�0�6
�,��0�
�il�����lfe
i.im�i�
La
CD AV
a 41?
AW CD
A it
k •F * , y
Jk
00
y {
°°
a fix'
wo -
'Daa'�'� pa9t
been - .;
I� �
City of Round Rock
Agenda Item Summary
Agenda Number:
Title: Consider executing Supplemental No. 1 with Garver, LLC for the Round Rock
West Area 3-Water, Wastewater, & Storm Drain Improvements Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 10/6/2023
Dept Director: Michael Thane, Director Utilities and Environmental Services
Cost: $72,415.00
Indexes: Self -Financed Stormwater Construction
Attachments: Supplemental Contract No. 1, Supplemental No. 1-Exhibit B-D, Info for Prof Svcs,
LAF -, Supplemental No. 1_Map
Department: Utilities & Environmental Services
Text of Legislative File CM-2023-233
On June 23, 2022, the City entered into an Engineering Services Contract with Garver, LLC. to design
water, wastewater, and storm drain improvements in the Round Rock West neighborhood. The
improvements are needed to help alleviate drainage issues and to replace an aging infrastructure.
During the design process, an existing outfall stormwater system, outside of the project limits, was
surveyed and determined to be too damaged to carry the capacity from the proposed systems. The
outfall system will need to be replaced, or at the very least repaired, in order for the proposed
improvements to properly function, which will require extending the project limits. The hydraulic model
was also reviewed and showed that the proposed storm water system would need to be further extended
down Wildwood Drive to capture the bulk of street runoff.
Supplemental No. 1 would provide funding to extend the proposed storm water system in order to
capture additional runoff and increase capacity. The current contracted amount is $350,065.
Supplemental No. 1 would increase the contracted amount to $422,480.
Cost: $72,415
Source of Funds: Self -Financed Stormwater Construction
City of Round Rock Page 1 of 1