Loading...
CM-2023-246 - 10/13/2023 Customer Confidential City of Round Rock Statement of Work for Professional Services CoRR-SOW-IN_MDM-WiFiCerts-20230719 Version Release: 1.0 CM-2023-246 Page 2 of 8 CORR-SOW-IN_MDM-WIFICERTS-20230719 Addresses and Contact Information Customer Address Engagement Address Contact Name Tayon Kendrick Address: 221 East Main Street ROUND ROCK, Texas, UNITED STATES Remote Engagement: Yes Delivery Language: English Contact Telephone Contact Email Address tkendrick@roundrocktexas.gov Document Revision History Date Author Revision Change Reference 2023-07-19 Area Services Manager Darin Hew 1.0 Document Creation Document Reviewer Name Title Revision Date Page 3 of 8 CORR-SOW-IN_MDM-WIFICERTS-20230719 Document Purpose The purpose of this document is to describe the tasks for a Ivanti Professional Services engagement. Note To execute this Statement of Work, both parties must sign as indicated in the Authorization and Acceptance Section of this document. Overview City of Round Rock (“Customer”) has requested the Consultant (as defined below) to provide hours of Ivanti Professional Services consultancy on a time and materials basis as defined in the following Statement of Work (“SOW”). The Ivanti resources assigned to this project will be under the direction of both Ivanti Project Management and the Customer Project Manager. All references to “Consultant” shall mean the entity identified below in the same geographic region as the Customer:  Ivanti, Inc., a Delaware corporation, performs Services in the Americas, except Brazil.  Ivanti Comércio de Software Brasil Ltda, a Brazilian company, performs Services in Brazil.  Ivanti Software K.K., a Japanese company, performs Services in Japan.  Ivanti Software (Beijing) Co., Ltd., a Chinese company, performs Services in China.  Ivanti International Limited, an Irish company, performs Services related to the Wavelink and Naurtech branded products in Europe, the Middle East, Africa, and the Asia Pacific region.  Ivanti U.K. Ltd, an English company, performs Services in all other locations. Page 4 of 8 CORR-SOW-IN_MDM-WIFICERTS-20230719 Tasks This section describes the expected tasks planned for the consultancy engagement. Description Hours Ivanti Professional Services (PS) Consultancy General Consulting Hours 16.00 Project Administration Included Ivanti PS Total 16.00 In Scope This section describes the activities in scope for the consultancy engagement Description Ivanti Professional Services (PS) Consultancy The PS Consulting section provides the Customer with a reserved block of time that can be applied to any professional services as they apply to the Ivanti product set(s) specified below. The primary purpose of this activity is to provide the Customer with a competent and experienced Certified PS Consultant who can assist with any PS related tasks necessary as they apply to the specified Ivanti product set(s). These activities are limited only by product set and time, and may include discussion, demonstration, training, configuration, PS product administration and Q & A on any PS related topics, unless expressly excluded in this SOW. Product Set 1. Ivanti Neurons for Modern Device Management (MDM), formerly MobileIron Planning Meeting: Meet with Customer key stakeholders to determine prioritized objectives for the allotted amount of time Create Agenda: Determine and agree upon a suitable agenda Perform Activities: Engage with Customer to perform mutually agreed upon agenda items. 1. Assistance with Cert Based Authentication for WiFi (General Consulting Hours) a. Review customer environment to determine optimal way of distributing and managing WiFi on managed Devices reviw i. Certificate Distribution ii. PKI Integration b. Additional General Consulting activites may include, i. Planning and Discovery: MobileIron will work with Customer to complete a general project assessment, discovery, and gather Customer requirements. ii. Strategic Services: Strategic guidance on the development of an overall mobili ty plan iii. Advisory Services: Consultation on MobileIron and industry best practices (eg. BYOD, Mobile Policy) iv. Installation Assistance: Advanced assistance with installation activities v. Product Configuration: Assistance with additional product and policy configuration vi. Training: Training for both HelpDesk and Administrative resources Page 5 of 8 CORR-SOW-IN_MDM-WIFICERTS-20230719 vii. Rollout Assistance: Assistance with initial rollout planning and support viii. Post-Deployment System Review: A system review to adjust and optimize the system once customer use cases have Note: Completion of any planned activities is subject to the time constraints set forth in this SOW and completion of specific activities cannot be guaranteed unless agreed to in advance. Project Administration Following the introduction of the consulting resources to the customer, the Ivanti Project administrator will monitor the activities of those resources throughout the project to make sure that the delivery of services matches the Statement of Work. The Project Administrator does not actively participate in project activities, provides no customer reporting other than timecard information, and does not serve as an escalation point for project delivery issues. Customer is responsible for all other project management responsibilities and project outcomes Please note: The Ivanti resource(s) assigned to this project will be under the sole direction of the Customer Project Manager. If additional Project Management resources or functionality is required to complete the work, a Project Change Request will be produced and signed by both parties. Out of Scope By definition any item not deemed in scope is considered out of scope, but for clarity the following specific items are not included: Ref Description OS1 Consultancy relating to any products not specified in the “In Scope” section of this document Assumptions The project will proceed with the following identified assumptions. Any further assumptions that are identified as the project progresses will be subject to a change control and an impact analysis, which may affect the cost and timescales of the project. Where these changes were not reasonably identifiable by Ivanti then the Customer will bear any costs. Ref Assumptions A1 If onsite engagement, the Consultant will be provided with a desk and chair within an office environment preferably with internet access. A2 If onsite engagement, Customer will provide advance notification of any site-specific requirements such as security clearance, identification and safety training. A3 Customer representatives are available to answer requirements and design questions supply logon credentials, IP addresses, and server names to the Ivanti Certified Consultant as reasonably requested. A4 Customer representatives are available in order that the Ivanti Consultant can transfer knowledge regarding the configuration and usage of the software. Page 6 of 8 CORR-SOW-IN_MDM-WIFICERTS-20230719 Ref Assumptions A5 Network connectivity and all relevant cabling will be in place, so as not to impede the progress of work. A6 The agreed physical and logical infrastructure will be provided and access will be provided to the Ivanti consultant as necessary in order to enable the completion of required tasks A7 Ivanti will supply licenses under a separate commercial agreement outside of the scope of this Statement of Work. Any additional non-Ivanti software license requirements (e.g. Microsoft licenses) will be sourced by Customer. A8 For engagements requiring product installation, the latest release of Ivanti software or the required components will be installed unless otherwise agreed. A9 If onsite engagement, delivery of Services assumes inclusion of travel and expense (T&E) rate in the Purchase Order (PO); if no T&E is included in PO, all Services hours will be fulfilled remotely. Constraints The project will proceed with the following identified constraints. Any further constraints that are identified as the project progresses will be subject to a change control and an impact analysis, which may affect the cost and timescales of the project. W here these changes were not reasonably identifiable by Ivanti then the Customer will bear any costs. Ref Constraints C1 Unless otherwise stated all work will be performed during normal business hours, Monday to Friday excluding public holidays C2 Consulting Hours are valid for a period of 1 year from time of purchase and shall be planned in advance with a minimum four (4) week notice period to allow resourcing of Ivanti Consultants Customer Project Management Responsibilities Customer will designate a person to whom all Ivanti communications will be addressed and who has the authority to act for Customer in all aspects of this Statement of Work (the “Customer Project Manager”). The Customer Project Manager will:  Create and maintain an estimated schedule for the overall project.  Provide sufficient notice for rescheduling. Rescheduling requires minimum of ten (10) business days’ notice. Failure to notify Ivanti of need to reschedule can result in additional charges as stated in services Terms and Conditions.  Work with the Ivanti Project Manager to identify resource requirements and desired skill sets. Ivanti recommends a four (4) week lead time to schedule consultants and make travel arrangements when adding resources.  Schedule resources in segments of no less than five (5) business days unless agreed to by both Ivanti and Customer.  Schedule and facilitate completion of this engagement within the respective number of months from date of signing the PO  With Ivanti, administer Change Control and authorize Project Change requests.  Provide access to Customer facilities consistent with the estimated schedule for all Page 7 of 8 CORR-SOW-IN_MDM-WIFICERTS-20230719 resources. Consultants may require access to Customer facilities and systems outside normal business hours. Project Progress Reporting A regular meeting or a teleconference will be scheduled to discuss the Project status; the format will be jointly agreed between the Ivanti Project Manager and Customer Project Manager. Depending on project complexity the weekly status reports may include:  General progress to plan and causes for any Project delays.  Project Plan updates for all tasks due or started ahead of schedule (actual hours worked, percentage of completion for each major task, estimated completion dates, and actu al completion dates).  Issues and action items to resolve change order control items reviewed or for review, including any tasks to be worked on that are not included in the Detailed Project Plan and any tasks that will negatively impact the allotted budget. Delivery Schedule This SOW will deliver hours of time and material consulting over a maximum period of twelve (12) months from the date when the Customer places the order. Page 8 of 8 CORR-SOW-IN_MDM-WIFICERTS-20230719 Authorization In addition to any terms contained in this Statement of Work, the provision of the services described in this SOW (“Services”) shall be subject to terms of the license agreement agreed to by you and Ivanti and are hereby incorporated by reference or, if applicable, the terms and conditions of a separate written agreement agreed to and signed between you and Ivanti on or before the date on which you sign this SOW. Neither the execution nor fulfillment of the Services will relieve or alter Ivanti or Customer’s rights or obligations with respect to standard Ivanti software and other products under the license agreements applicable to such software or products. Nothing in this document is intended to or shall have effect of vesting in or transferring to Customer’s rights in Ivanti’s, its affiliates’ or its suppliers’ software, methods, know-how or other intellectual property, regardless of whether such intellectual property was created, used or first reduced to practice or tangible form by Ivanti in the course of performance of the Services hereunder. By purchasing the Services set forth in this SOW, the parties each indicate their acceptance of the above. Please sign below and return this document in its entirety by email to your account manager. City of Round Rock ("Customer") 221 East Main Street ROUND ROCK, Texas, UNITED STATES 78664 On Behalf of Customer Signature Email Title Date On Behalf of Consultant (Ivanti) Signature Email Title Date bbennett@roundrocktexas.gov Assistant City Manager 10/17/2023 10/17/2023 matthew.elza@carahsoft.com Account Manager - SLED Ivanti CARAHSOFT TECHNOLOGY CORP 11493 SUNSET HILLS ROAD |SUITE 100 |RESTON,VIRGINIA 20190 PHONE (703)871-8500 |FAX (703)871-8505 |TOLL FREE (888)686-9273 WWW.CARAHSOFT.COM |IVANTI@CARAHSOFT.COM PRICE QUOTATION PAGE 1 of 1 QUOTE DATE: QUOTE NO: 07/27/2023 40164005CONFIDENTIAL TO:Tayon Kendrick City of Round Rock 221 East Main St Round Rock,TX 78664 USA tkendrick@roundrocktexas.gov (512)218-5453 EMAIL: PHONE: FROM:Matthew Elza Carahsoft Technology Corp. 11493 Sunset Hills Road Suite 100 Reston,Virginia 20190 EMAIL:Matthew.Elza@carahsoft.com PHONE:(571)662-4525 FAX: TERMS:FTIN:52-2189693 Shipping Point:FOB Destination Remit To:Same as Above Payment Terms:Net 30 (On Approved Credit) Cage Code:1P3C5 DUNS No:088365767 UEI:DT8KJHZXVJH5 Credit Cards:VISA/MasterCard/AMEX Sales Tax May Apply QUOTE NO:40164005 $4,584.64TOTALQUOTE: QUOTE DATE:07/27/2023 QUOTE EXPIRES: RFQ NO: SHIPPING: TOTAL PRICE: ESD $4,584.64 08/18/2023 LINE NO.PART NO.DESCRIPTION LIST PRICE QUOTE PRICE QTY EXTENDED PRICE 1 SVCS-CONSPM-HRLY Hourly Professional Services Consultant /Project Manager -All products Ivanti,Inc -SVCS-CONSPM-HRLY Start Date:07/31/2023 $330.00 $286.54 16 $4,584.64OM $4,584.64SUBTOTAL: TOTAL PRICE: TOTAL QUOTE:$4,584.64 $4,584.64