CM-2023-253 - 10/27/2023 FILED AND RECORDED
OFFICIAL PUBLIC RECORDS
Dyana Limon-Mercado,County Clerk
Travis County,Texas
Nov 13, 2023 01:28 PIVI Fee: $38.00
ASSIGNMENT OF EASEMENTS2023128398
'Elect
BCRUA Raw Water Delivery System Ph. 2 (Subsurface Tunnel +ronically Recorded*
Temporary Monitoring Well +Temporary Construction Easements)
DATE: Wnlwi&a�,2023
AssIGNOR: CITY OF ROUND ROCK, TEXAS
AssIGNOR'S MAILING ADDRESS: Attn: City Clerk
221 East Main Street
Round Rock,Texas 78664
Williamson County
ASSIGNEE: BRUSHY CREEK REGIONAL UTILITY AUTHORITY, INC., a
domestic government corporation of the State of Texas
ASSIGNEE'S MAILING ADDRESS: 221 East Main Street
Round Rock,Texas 78664
Williamson County
CONSIDERATION' Ten dollars and other good and valuable consideration, the receipt
and sufficiency of which are hereby acknowledged
PROPERTY: All of those certain tracts or parcels of land, situated in the County of Travis,
State of Texas, more particularly described in Exhibit "A" attached hereto and
incorporated herein for any and all purposes.
PROJECT: Raw Water Delivery System Phase 2
RESERVATIONS FROM AND EXCEPTIONS TO CONVEYANCE:
All the rights of the underlying fee owners; casements and rights-of-way of record
not otherwise the subject of this Assignment; all presently recorded restrictions,
reservations, covenants, conditions, oil and gas leases, mineral severances, and other
instruments; any other easements, liens, and encumbrances of record that affect the
Property; discrepancies, conflicts, or shortages in area or boundary lines; and any
encroachments or overlapping of improvements.
CONVEYANCE:
Assignor, for the consideration recited herein and other good and valuable
consideration, receipt of which is acknowledged, and subject to the reservations from and
exceptions to conveyance and warranty, grants, assigns and conveys to Grantee the
subsurface raw waterline, temporary monitoring well, and/or temporary construction
2023128398 Page 2 of 4
access and workspace easement property interests described herein and otherwise
identified in Exhibit "A" attached hereto without express or implied warranty, and all
warranties that might arise by common law and the warranties in Section 5.023 of the
Texas Property Code are excluded.
When the context requires,singular mins and pronouns include the Plural.
By execution of this Assignment document Assignee acknowledges, consents to
and accepts the Assignment as set out herein.
ASSIGNOR:
CITY OF ROUND ROCK, TEXAS
A
By:
Laurie Hadley, City Manager U
ACKNOWLEDGMENT
STATE OF TEXAS §
COUNTY OF WILLIAMSON §
This instrument was acknowledged before me on ow. 2-2-, 2023
by Laurie Hadley, City of Round Rock City Manager, in the capacity and for the
purposes and consideration recited herein.
W
MONIQUEADAMS
My Nota} 19 9 126257913
Of
Expims Ma mh 22,2D26 Notary Publi tate of Texas
2
2023128398 Page 3 of 4
1
BRUSHYACCEPTED AND ACKNOWLEDGED:
CREEK REGIONALUTILITY AUTINC.,
domestic government corporation of the State of Texas
Y
e. �iP G®t
Its: ` ^�
qOWLEDGMENT
STATE OF TEXAS §
COUNTY OF
his instru nt was cknowledged before me on , 2023
y _ _, in the capacity an for the ® and
cofiidti®n ci he i
,•••gip..,,, -
�.eDAVMTAEDWARDS
® ., ? Y ID#12676&M otary Public,State of Texas
OFFICEDO=FeWbhyrvu q 25.WaMfy X.
PREPARED IN THE
Sheets& Crossfield, PLLC
309 East Main
Round Rock,Texas
AFTER RECORDING
3
2023128398 Page 4 of 4
EXHIBIT "A"
CRUA Raw Water Delivery System(Phase 2)
rcelrante o Ease ent Tras ain cial
Records en
Number
001,002,016,106MW City of Round Rock Subsurface raw water line 2020064738
+temp monitor well 202 064739
022,22TCE City of Round Rock Subsurface raw water line 2019021216
+temp construction 2022071395
026 City of Round Rock Subsurface raw water line 2019162807
033 City of Round Rock Subsurface raw water line 2019099511
034 City of Round Rock Subsurface raw water line 2018191709
035 City of Round Rock Subsurface raw water line 2018163625
036 City of Round Rock Subsurface raw water line 20190 1007
037 City of Round Rock Subsurface raw water line 2021071973
038 City of Round Rock Subsurface raw water line 2018121527
039 Ci of Round Rock Subsurface raw water line 2018158728
041 City of Round Rock Subsurface raw water line 20201 815
045,45MW,046,049 City of Round Rock Subsurface raw water line 2023091421
+temp monitor well+
temp access
048 City of Round Rock Subsurface raw water line 2021110357
058 City of Round Rock Subsurface raw water line 2018166219
059 City of Round Rock Subsurface raw waterline 201 163627
062,063,067 City of Round Rock Subsurface raw water line 2021253416
riser facility+temp 2021253415
construction
068 City of Round Rock Temporary construction 2022078220