Loading...
CM-2023-270 - 11/10/2023Page I of 3 Contract Quantity Adjustment/Change Order ROIINO RO[N nv, 01116 Department: Utilities and Environmental Services Project Name: Chandler Branch and Dry Branch Channel Maintenance Improvements Date: 10/31/23 City Project Change Order/Quantity ID Number CBDBM Adjustment No. 1 Vendor Patin Construction, I.LC _ _ 3800 W. 2nd St. Taylor TX 76574 _ 512-212-7214 Company Name Address Phone No. Justification This quantity adjustment is to adjust for the materials and labor that weren't used in the project. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approimj Amount Change 0% $0,00 0% $0.00 0% $603,155.00 -$41,084.00 120 0 0 120 Prepared By: NB2h2G ,cQ Noemi Avila, Engineering Associate, City of Round Rock 10/31/2023 Signature Printed Name, Title, Company Date . Apjprovals Contractor: Q�n�t D A % i — Pio M/, Tu It,�n ,r{ • - r - natu Printed ame, Title, Company Date City Project Manager: � lJ �I /J /lJBdMe, ,cIrW,9z, Noemi Avila, Engineering Associate 10/31/2023 Sig re Printed Name, Title Date Manager Aut,�lp'2d Signature U Printed Name, Title Ii Date Contract Quantity Adjustment/Change Order ROUNPROCKiL1Ul5 MV, 01115 Project Name: Chandler Branch and Dry Branch Channel Maintenance Improvements Quan. Adj./Change Order No.: Chanee Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Davs) $0.00 r7 0.00 0,00 0.00 0.00 $0.00 0.00 0.00 0.00 $0.00 $0.00 0.06 0.00 $0,00 0.00 $0.00 0.00 0.00 $0.00 0.00 0.00 $0.00 $0.05 $0.00 0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order t RUCK Tex" rev, 01116 Project Name; Chandler Branch and Dry Branch Channel Maintenance Improvements Quan. Adj./Change Order No. quantav w ustment data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 3 Cutting and Restoring Asphalt Pavement (Parking Lot) SY -3--6 $30.00 $100.00 -$9,480.00 -$1,000.00 5 Rock Filter Dams (Install an Remove) Type 3 LF -10 12 Stabllized Canstructlon Entrance EA -1 $1,800.00 41,800.00 13 Retror ecto id Pavement Markings (Parking Lot) LF -325 $20.00 -$6,500.00 27 Soil Retention Bla et 11, -ype C SY -100 _ 10.00 - 1,000.00 29 Stabl ized Constructlan Entrance EA -1 00 -$1,800.00 30 Erosion Control Log 18" LF -580 $8.00 -$4,640.00 31 Removing and Relocating Ex. 4' Chain n Fence LF -25 $80.00 -$2,000.00 33 Safety enc ng LF 5,00 - ,400. 0 37 Barricades, Signs, Traffic Handling MO -1 -247 $7,500.00 12.00 -$7,500'.00 -$2,964.00 AA1-7 Sodding for Erosion Control TSY $0.00 0.00 $0.00 s0.00 --� $0.00, $0.00 - -- $0.00 - $0.00 .. $0.00 - -- 50.00 $0.00 $0.00, 50.00 — - $0.00 - 41 os4 no 0 O d a C- Y � �S R y a .� �oas'tl J �eS Nest ✓J as asnoyA SP.�--Ik¢C a � L a 4 m o yy�a1 c ro 1J A IS ejaaZ M 0 7 G d O '- m h Qi U D O 5���1se Rd 3 Y Pb asijuns a ro .N 41- a Engaa��a pass Teravls" pk�� NoK� �A S�oq� Su�tise RdPiz Gypses s glva -o h r # •a c r C L 7 p Y d m,BY`'L V «+ ._cc7 a O 2 V � ` " O LL Z r5 N Mays St � 4i w Ur'Je�s�[y OakZ Cl) 4 m Phoel�`* o cc a C m y apt � dil7 moo the TO 0 c a ppa sight Dr O dd MVP G 7 od 7 J s d �f y Pi AalleA � 0 0 W yf Id doapuns VI N �O +, H N V` to Q Irish Moss TO v m ep 7 # C � O � N � J V Fort Thomas Pl Double Creek Or LL J u rysa a,�s cANJP6 o Ate. Rai �e O Joyce Ln ul uJoylnneH 4110 �O 0,6 0 y1P O, d' — sling Dr EL v o m 3 r so ��r n 50 m x o p w °' r c 0 � o ^ ' o o y L V Elder Way LA LD d = ai a p m Mon ,dale k m v� o m� �+ m U King Cotton 1n East Rock Cv °C 0 Springs Trl Heritage Sp C) C o � � � V Ln 0 � o • m v 30 cd6riel Mills or C y C V1 O L �6yc � �