Loading...
R-2023-427 - 12/21/2023 RESOLUTION NO. R-2023-427 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract"') with TanksCo, Inc. for the Barton Hill Composite Elevated Tank and McNeil Ground Storage Tank Recoating Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with TanksCo, Inc. for the Barton Hill Composite EIevated Tank and McNeil Ground Storage Tank Recoating Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 21st day of December, 2023. CRAIGOR - N, Mayor City of Roun ock, Texas ATTEST: Qq" - MEAGAN S I KS, C ty Clerk 01 12.20232',4893-7212-4054 or Pagc 1 of 4 EXHIBIT Contract Quantity Adjustment/Change Order riAu rev,Q1:L6 Department: Utilities&Environmental Services Project Name: Barton Hill EST and McNeil EST Recoating Date: 11/30/23 City Project Change Order/Quantity ID Number BHMST Adjustment No. 1. Vendor Tanksco Inc. 1516 Royster Rd, Fort Worth,TX 76431 940-210.8914 Company Name Address Phone No. Justification This contract involves pressure wash cleaning, spot preparation/prime, overcoating and Logo installation of the exterior surfaces on the 2,700,000-gallon Composite Elevated Tank(Barton Hill CET)owned by the City of Round Rock, The Contractor shall be responsible for all labor, materials and equipment necessary for the repairs, painting of the exterior tank surfaces. No additional days are awarded to the contract time of 60 days. SUMMARY Amount %Change Original Contract Price: $761 100.00 r Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $761,100.00 Previous Change Order(s): 0% This Change Order: $168,500.00 22% Total Change Order(s)To Date: $168,500.00 22% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)j: $929,600.00 Difference between Original and Adjusted Contract Prices: $168,500.00 Original Contract rime: 160 Time Adjustment by previous Quan,Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 160 Prepared By: .-� Cog 0 z S. nature/ Printed Name,Title, Company I Date Contractor: Saul Saul Bocanegra, President, Tanksco Inc 12/1/2023 Signature Printed Name, Title, Company Date City Project r: ` � C13�) 2,3 - Sign er: Sign ture Printedme,Title Date Mayor/Cit/ F Manager Signature Printed Name,Title Date Page 2 of 4 cK Contract Quantity Adjustment/Change Order 1 rev,01(16 Project Name: Barton Hill EST and McNeil EST Recoating Quan. Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) Furnish all materials, equipment, labor, superintendence and incidental work to clean, spot prime and over-coat the 1 Exterior of the existing 2,700,000-gallon CET, all appendages,etc., as indicated on the drawings and specifications Part 1.02.A above except where specifically covered by other bid items. LS 1 $ 162,500.00 $162,500.00 0 Furnish all materials, equipment, labor, superintendence and incidental work to install the City Logo in color on the exterior at location to be determined by the city, including paint,template, graphic design, etc.,as indicated on the drawings and specifications Part 1.02.A above, except where specifically covered 2 by other bid items. LS 1 $6,000.00 $6,000.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 Page 3 of 4 rContract Quantity Adjustment/Change Order RUCKRUUNU rev,01116 $0.00 $0.00 TOTALS: $168,500-00 0 Page 4 of 4 CH Contract Quantity Adjustment/Change Order r rev,01/16 Project Name: Barton Hill EST and McNeil EST Recoating Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.001 0